城市热力管道施工
Inthehighschool
Constructionof2K315020urbanthermalpipeline
Constructionof2k315020urbanthermalpipeline
2k315021masterurbanthermalpipelineconstruction
requirements
Engineeringsurvey
Pipelinesurveyshouldbeconsistentwith:
Itshouldbecarriedoutaccordingtothemainline,branch1ine
andbranchline.
Inthepipeline,fixedbracket,buildingontheground,
examinationroom,compensator,valvesinthepipelinelocation,
measurewithrulerpositionmethod.
Two.Civilengineering
Theexcavationoftheearthmustbebasedontheprovisionsof
therelevantprovisionsofthegrooveedgeguardrail,night
lightsandredlightsandotherfacilities,andtheneedtoset
temporaryroadsandbridges.
Three,welding
2.buttjointswithunequalwal1thicknessshallcomplywith
thefollowingprovisions:
(1)whentheouterdiameterisequalortheinnerdiameteris
equal,thethicknessofthethinpieceislessthanorequal
to4mm,thethicknessdifferenceisgreaterthan3mm,andthe
thicknessofthethinpartisgreaterthan4mm,andthe
thicknessdifferenceisgreaterthan30%ormorethanthe
thicknessofthethinpart,thethickpartshouldbethinned.
(2)theinnerdiameterandouterdiameterareunequal,andthe
thicknessdifferenceofonesideexceedsthevaluelistedin
the1paragraphofthisarticle,thethicknessofoneendof
thepipewallshouldbethinned,andthethicknessofthe
interfaceafterthethinningshouldbeuniform.
4.whenweldingbelowzero,preheatingofweldmentshouldbe
carriedoutintherangeof50mmonbothsidesoftheweld.
6.unqualifiedweldingparts,measuresshouldbetakento
repair,thesamesiteweldingrepairfrequencyshallnotexceed
2times.
Four.Pipinginstallationandinspection
3.buttjointshouldcomplywiththeprovisions
1.whenthebuttjointisopened,thestraightnessofthepipe
shallbecheckedandmeasuredat200mmfromthecenterofthe
interface.TheallowabledeviationisLMM,andthemaximum
deviationshallnotexceed10mminthefulllengthrangeofthe
buttweldedsteelpipe;
4.flangeconnectionshouldcomplywiththeprovisions
(4)whenlargediametergasketsneedtobespliced,thebutt
jointorlabyrinthjointshouldbeused,andthebuttjoint
shouldnotbeweldedlongitudinally.Thegasketsizeshouldbe
equaltotheflangesealingsurface.
(9)whentheflangeandaccessoriesareassembled,the
allowabledeviationofverticalityis2〜3mm
(five)valveinstallationshouldcomplywiththeprovisions
4,whenthevalveandpipewithflangeorthreadconnection,
thevalveshouldbeinstalledintheclosedstate;whenthe
valveandthepipelineweldedconnection,thevalvemustnot
beclosed.
7,valvetransportHoistingisnottousethevalvehandwheel
ashoistingloadpoints.
9.weldingbutterflyvalve
(1)theaxisofthevalveplateshouldbeinstalledinthe
horizontaldirection,themaximumanglebetweentheshaftand
thehorizontalplaneshouldnotbegreaterthan60degrees,it
isstrictlyprohibitedtoinstallvertically.
(2)wheninstallingtheriser,thewaterabove100mmshouldbe
injectedintotheclosedvalveplatebeforewelding.
(3)afterwelding,2or3timesofcompleteopeningtoprove
whetherthevalvecanworkproperly.
Seven.Thermalinsulationproject
1.whenthethicknessofinsulationlayerismorethan100mm,
itshouldbedividedintotwolayersorlayersbylayer
construction
2,tiletypeinsulationproductgapwidthnotgreaterthan5mm.
ThegapwithasbestoscementandAshFilledmasonrytightpad
internalwipeasbestosdustclaylayerwiththethicknessof
3〜5nim,andtheconstructionshouldbestaggered.Whenmorethan
2layersofthermalinsulationproducts,thesamelayershould
bewrongseam,insideandoutsidethelayershouldbepressure
seam,itslaplengthshouldnotbelessthan50mm.Eachtile
shouldbetwogalvanizedsteelwireorbandtiedwithspiral
bindingmethodsshallbe.
5.theendofthepipelineortherightblindplateshouldbe
laidinsulationlayer.
Eight.Pressuretest,cleaningandtestrun
1.strengthtestandtightnesstestshouldbecarriedoutfor
twoprimarypipenetworkandtwogradepipenetwork.The
strengthtestpressureshouldbe1.5timesthedesignpressure,
thetightnesstestpressureshouldbe1.25timesthedesign
pressure,andshallnotbelessthan0.6mpa.
Thetestofpipingandequipmentinthe2.thermalpowerstation
andtherelaypumpstationshallcomplywiththefollowing
provisions:
(1)allthesystemsinthestationshouldbetestedstrictly,
thetestpressureshouldbe1.25timesthedesignpressure,and
shal1notbelessthan0.6mpa.
(3)theopentypeequipmentisonlyusedforfullwatertest,
withnoleakageasqualified.
3.heatingnetworkcleaningshouldbecarriedoutbeforethe
trialoperation.
4.cleaningmethodscanbedividedintomanualcleaning,
hydraulicflushingandgasblowing.
8.commissioningshouldmeetthefollowingrequirements:
(4)thetrialruntimeshouldstartfromthenormaltestrun
timeof72h.
(5)theheatingprojectshouldbetestedundertheparameters
approvedbytheconstructionunitandthedesignunit,andthe
testruntimeshouldbecontinuousoperation72h.Thetestrun
shouldbeslowlyheatingup,andtheheatingrateshouldnot
begreaterthan10C/h.
Eight,completionacceptance
1.engineeringqualityacceptanceisdividedinto"qualified”
and“unqualified"”.Unqualified,notacceptance,untilrework,
reworkqualified.
2.thequalityacceptanceoftheprojectshallbedividedinto
subitems,subdivisionsandunits.
3.acceptanceassessmentshallmeetthefollowing
requirements:
(1)thesubprojectconformstothefollowingtworequirements,
whichisqualified:
Themaincontrolprogram(1)listedinthediscussionitem)
qualifiedrateshouldreach100%.
2)thequalifiedrateofgeneralitemsshouldnotbelessthan
80%,andthepointsthatdonotmeettherequirementsofthe
code,themaximumdeviationshouldbewithin1.5timesthe
allowabledeviation.
(2)subprojectqualificationmustbequalifiedforallsub
projects
(3)qualifiedunitsmustbequalifiedforallsubprojects
2K315022isfamiliarwiththeclassificationandmain
accessoriesofurbanheatpipenetwork
2k315022isfamiliarwiththeclassificationandmain
accessoriesofurbanheatpipenetwork
First,thetypesofheatpipenetwork
(1)accordingtoheatmediumtype
Lsteamheatingnetwork
2.hotwaterheatingnetwork
Lowtemperaturehotwaterheatingsystem(2):T=95C.
(two)accordingtotheposition
1.levelonepipenetwork:fromtheheatsourcetotheheat
stationofthewatersupplyandreturnnetwork;
2.twolevelpipenetwork:fromheatstationtouser'swater
supplyandreturnpipenetwork.
(three)accordingtolayingway
1.trenchlayingcanbedividedinto:trench,semipass,non
passtrench;
2.overheadlayingcanbedividedinto:highbracket,middle
bracket,lowbracket;
3.directlyburiedlaying:thepipelineisdirectlyburiedin
theunderground,nopipeditch.
(four)accordingtothesystemform
1.closedsystem:theprimaryheatsupplynetworkandthetwo
heatsupplynetworkareconnectedbytheheatexchanger.The
heatmediumlossoftheprimaryheatsupplynetworkisvery
smal1,buttheintermediateequipmentismore,andthe
practicaluseismoreextensive;
2.opensystem:directconsumptionofheatmedium,few
intermediateequipment,butalargeamountofheatmedia
supplement.
(five)accordingtotheclassificationofsupplyandreturn
1.watersupplypipe(steamsupplypipenetwork:):fromtheheat
sourcetoheattheuser(orheatstation)pipeline;
2.returnpipe(steamnetwork:condensatepipe):heatfromthe
user(orheatstation)backtotheheatpipe.
Two.Mainaccessoriesofheatpipenetwork
Themainaccessoriesofheatpipenetworkarecompensator,
hanger,valveandsoon.
2k315031mastertheinstallationrequirementsofcitygas
pipeline
First,materialselectionofgaspipeline
Highpressureandmediumpressureagaspipelineshouldadopt
steelpipe;mediumpressureBandlowpressuregaspipeline;
steelpipeormechanicalinterfacecastironpipeshouldbe
adopted.Polyethylenepipesareusedinmediumandlowpressure
pipes.
Two.Installationofindoorgaspipeline
1.intheplacewherepeoplewalk,thelayingheightshouldnot
belessthan2.2m
2.theheightshal1notbelessthan4.5mintheplacewhere
thevehicleisavailable
Gasapplianceandgaspipelineshouldadoptthepipeconnection,
connectedbyahose,thehoselengthshouldnotexceed2m,have
nointerface,usedintheproductionofmobilegasequipment
shal1betheconnectinghoseshouldnotexceed30m,the
interfaceisnotmorethan2.
Three.Installationofoutdoorgaspipeline
(1)basicrequirementsforpipelineinstallation
One
Undergroundgaspipelinesshallnotpassthroughbuildingsand
largestructures.
2.theminimumcoverthicknessofburiedgaspipeline(pavement
topipetop)shallmeetthefollowingrequirements:
Buriedintheunderground,notlessthan0.9m;buriedinnon
roadwayisnotlessthan0.6m;buriedinthecourtyard,notless
than0.3m;buriedinthepaddyfieldisnotlessthan0.8m
3.theundergroundgaspipelineshallnotbecrossedunderthe
siteofaccumulationofflammableandexplosivematerialsand
corrosiveliquid,andshallnotbelaidinthesameditchas
otherpipelinesorcables.
4.whentheundergroundgaspipelinepassesthroughthedrain
pipe,theheatpipeditch,thecombinedtrench,thetunneland
othervarioususegrooves,thegaspipelineshouldbelaidin
thecasing.
The5.gaspipelineshouldmeetthefollowingrequirementswhen
crossingtheraiIway,expressway,tramtrackandmainurban
roads:
(1)thegaspipelinepassingthroughtherailwayandthe
expresswayshouldbeconnectedwiththecasing.Thecasingof
thegaspipelinecrossingtherailwayshouldmeetthefollowing
requirements:
1)thedepthofcasingEmbedment:therailtracktothetopof
thecasingshouldnotbelessthan1.20m,andshouldcomplywith
therequirementsoftherailwayadministrationdepartment;
2)thecasingshallbemadeofsteelpipeorreinforcedconcrete
pipe;
3)theinnerdiameterofthecasingshouldbemorethan100mm
largerthantheouterdiameterofthegaspipeline;
4)thegapbetweenthetwoendsofthecasingandthegaspipe
shouldbemadeofflexibleanti-corrosionandwaterproof
material,andoneoftheendsshouldbeequippedwithaleak
detector;
5)theendofthecasingdistancefromtheembankmentangle
shouldnotbelessthan2.om.
(3)gaspipelinecrossingtramrailandurbanmainroadsshould
belaidinthecasingortrench;gaspipelinecasing,Gas
PipelineCrossingExpresswayacrossthemainroadofthetown
carandthecasingortrench,shouldmeetthefollowing
requirements:
1)theinnerdiameterofthecasingshouldbegreaterthan100mm
oftheouterdiameterofthegaspipeline,andtheendsofthe
casingortrenchshouldbesealed,andtheleakdetectorpipe
shouldbeinstalledattheendofthecasingortheendofthe
trenchintheimportantarea.
2)thedistancebetweentheendsofthecasingandtheelectric
laneshouldnotbelessthan2.om,andthedistancefromthe
edgeoftheroadshouldnotbelessthan1.om.
3)gaspipelineshouldbeperpendiculartorailway,expressway,
tramtrackandmaintrunkroadsofcitiesandtowns.
(two)basicrequirementsforpipelineembedment
1.whentheartificialexcavationandnogroundwaterareused
inthetrenchexcavation,thereservedvalueofthebottomof
thetrenchshouldbe0.05~0.Im.Whenthemechanicalexcavation
andgroundwaterareused,thereservedvalueofthebottomof
thetrenchisnotlessthan0.15m.
Backfill.Whentheditchwithoutgroundwater,overbreaking
within0.15mwithoriginalsoilbackfill,overbreakin0.15m
andabovebylimesoi1treatment,whenditchalargeamountof
waterorgroundwater,thegradedgravelbackfilltothe
elevation.
2.backfillsoil
Backfillshouldbestratifiedcompaction,eachlayerthickness
shouldbe0.2〜0.3m,onbothsidesofthepipelineand0.5mabove
thetopofpipeinthebackfillmustadoptartificialbackfill
compaction,thetopofthepipeabove0.5mcanbeusedforsmall
mechanicalcompaction,eachlayerthicknessshouldbe
0.25〜0.4m.
3,warningbeltlaying
Thewarningbeltshouldbecontinuouslylaidalongtheburied
gaspipeline.Beforethelayingofthewarningbelt,thelaying
surfaceshouldbecompactedandlaidonthetopofthepipeline.
Thedistancefromthetopofthepipeshouldbe0.3~0.5m,but
itshouldnotbelaidontheroadbedandroadsurface.
Thewarningtapeisyellowpolyethylenematerial.
Four.Testmethodofgaspipeline
Afterthepipelineisinstalled,thepipelinepurging,strength
testandtightnesstestshouldbecarriedoutinturn.
(1)purgingofpipes
1.gaspurgingshouldbeselectedaccordingtothefollowing
requirements:
(1)ductileironpipe,polyethylenepipe,steelskeleton
polyethylenecompositepipeandsteelpipewithnominal
diameterlessthan100mmorlengthlessthanloom,canbeblown
bygas.
(2)thesteelpipewithnominaldiametergreaterthanorequal
to100mmshouldbecleanedbypiggingball.
2.pipingpurgingshallcomplywiththefollowingrequirements:
Blowingintheorderofthemainpipe,branchpipeandcourtyard
pipe,andthedirtsweepingawayshallnotenterthequalified
pipeline.
Thepressureregulator,valve,orificeplate,filterscreen,
gasmeterandotherequipmentinthepurgingpipesectionshall
notbeinvolvedinpurging,andthenresetafterpurging.
Thepurgepressureshallnotbegreaterthanthedesignpressure
ofthepiping,andshallnotbegreaterthan0.3mpa.
Purgemediashouldbecompressedair,oxygenandflammable
gasesareprohibited.
3.gaspurgingshouldcomplywiththefollowingrequirements:
(3)thelengthofeachpurgingpipeshouldnotexceed500m;when
thepipelengthismorethan500m,itshouldbeswept
separately.
(5)whenthereisnosmokeanddustinthevisualinspection,
thewhiteclothorwhitecoatedwoodtargetplateshouldbeset
attheexhaustport,andthetargetofnorust,dustandother
impuritiesinthe5minisqualified.
4.piggingbal1cleaningshouldmeetthefollowing
requirements:
(1)thediameterofthepipelinemustbeofthesamesize,and
thepipeswithdifferentdiametersshouldbedisconnectedand
cleanedseparately.
(two)strengthtest
Undernormalcircumstances,thetestpressureis1.5times
higherthanthedesignedgaspressure,butthesteelpipeshall
notbelessthan0.4MPa,polyethylenepipe(sdrll)shal1not
belessthan0.4MPa,polyethylenepipe(sdrl7.6)shallnotbe
lessthan0.2mpa.Whenthepressurereachesthespecifiedvalue,
the1Hshouldberegulated,andthenthepipelineinterfacecan
becheckedwithsoapandwater.Alltheinterfacesarefreeof
airleakage,andtheyareconsideredqualified.Ifthereisa
leak,itcanberepairedafterbeingdeflated,andthentested
againaftertherepair,untilqualified.
(three)tightnesstest
Thetightnesstestshouldbecarriedoutafterthestrengthtest
isqualifiedandthepipelineisbackfilledalloverthe
pipeline.Tightnesstestpressuredependsonthedesignofgas
transmissionpipelinedesignpressure,whenthegaspressure
ofPwaslessthan5kpa,thetestpressureis20KPa;whenpis
largerthan5kpa,thetestpressureshallbe1.15timesthe
designpressure,butnotlessthan0.Impa.Beforethetightness
test,thepipelineshouldbeinflatedtothetestpressure,the
tightnesstestdurationofgaspipelineisgenerallynotless
than24h,theactualpressuredropisnotmorethanthe
allowablevalueisqualified.
2K315032isfamiliarwiththeclassificationandmain
accessoriesofcitygaspipeline
2k315032isfamiliarwiththeclassificationandmain
accessoriesofcitygaspipeline
Thetypesofgaspipeline
(1)gasclassification
Therearemainlyartificialgas(gas),naturalgasand
liquefiedpetroleumgas.
(two)classificationofgaspipelines
1.classificationbyuse
(1)longdistancegaspipeline
(2)citygaspipeline
(3)gaspipelinesinindustrialenterprises
2.classificationaccordingtolayingmethod
(1)undergroundgaspipeline:undergroundlayingisusually
usedincities.
(2)overheadgaspipeline:inthepipelinethroughobstacles,
orinthefactoryareainordertomanageandmaintain
convenience,overheadlaying.
3.classificationaccordingtogastransmissionpressure
Accordingtothegastransmissionpressure,thecitygas
pipelineinourcountryisgenerallydividedintotwoparts:
(1)lowpressuregaspipeline:
(2)mediumpressureBgaspipeline:
(3)mediumpressureagaspipeline:
(4)subhighpressureBgaspipeline:
(5)subhighpressureagaspipeline:
(6)highpressureBgaspipeline:
(7)highpressureagaspipeline:
MVBAandmediumpressurepipingmustbethroughtheregional
subscriberstationtostation,citydistributionnetworkinthe
lowandmediumpressuregaspipeline,ortofactoriesand
enterprises,usersoflargepublicbuildingsandgasboiler
room.
Generally,theurbanhighpressureBgaspipelineconstitutes
theouterringnetworkofthelargecitypipelinesystem.High
pressureBgaspipelinesarealsotheaortathatsuppliesgas
tobigcities.
Highpressureapipelineisalongdistancepipelinethatruns
throughprovinces,regionsorconnectingcities.Itsometimes
constitutestheouterringnetworkoflargeurbanpipeline
network.
Two.Gaspipelineancillaryfacilities
Inordertoensurethesafeoperationofthepipenetwork,
Consideringtheneedofmaintenanceandwiring,thenecessary
accessoryequipmentissetupintheproperplaceofthe
pipeline.Thesedevicesincludevalves,compensators,drains,
drainpipes,etc..
(1)valves
Valveisusedtoopenandclosethepipelineaccessoradjust
thepipelinemediumflowequipment.Thetightnesstestshould
bedonebeforeinstallation,theleakageisnotqualified,and
theunqualifiedpersonshouldnotbeinstalled.
Valveinstallationshouldpayattentiontotheproblem:
1.directivity
2.installationposition
3.otherproblemsshouldbepaidattentionto
(two)compensator
Asadevicetoeliminatethestressofexpansionandcontraction
inthepipesection,thecompensatoriscommonlyusedin
overheadpipelinesandpipelineswhichneedsteampurging.The
compensatorisusuallyinstalledonthelowersideofthevalve
(inthedirectionofairflow),anditstelescopicperformance
isusedtofacilitatethedisassemblyandmaintenanceofthe
valve.Intheburiedgaspipeline,thesteelwavecompensator
isusedmoreoften,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年度互联网广告行业劳动合同范本及广告内容审核责任协议3篇
- 脱丙烷课程设计
- 船舶原理课程设计散货船
- 美术生创新思维课程设计
- 线上花束插花课程设计
- 茶园生产 课程设计
- 线上课程设计公司
- 《精神分析技巧》课件
- 2024年美术教案设计(7篇)
- 穿销单元课程设计
- DZ/T 0462.4-2023 矿产资源“三率”指标要求 第4部分:铜等12种有色金属矿产(正式版)
- 热带园林树木学智慧树知到期末考试答案章节答案2024年海南大学
- 《无机及分析化学》期末考试试卷附答案
- 2024年药品集中采购合同范本(二篇)
- 微生物学(鲁东大学)智慧树知到期末考试答案章节答案2024年鲁东大学
- 玻璃制造过程绿色节能技术创新
- 广东省深圳市龙华区2023-2024学年中考适应性考试物理试题含解析
- MOOC 国际私法-暨南大学 中国大学慕课答案
- 部队行车安全教育
- 椎管内肿瘤切除术的手术后护理
- 低温共烧陶瓷(LTCC)全球市场、份额、市场规模、趋势、行业分析报告2024-2030年
评论
0/150
提交评论