城市热力管道施工_第1页
城市热力管道施工_第2页
城市热力管道施工_第3页
城市热力管道施工_第4页
城市热力管道施工_第5页
已阅读5页,还剩17页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

城市热力管道施工

Inthehighschool

Constructionof2K315020urbanthermalpipeline

Constructionof2k315020urbanthermalpipeline

2k315021masterurbanthermalpipelineconstruction

requirements

Engineeringsurvey

Pipelinesurveyshouldbeconsistentwith:

Itshouldbecarriedoutaccordingtothemainline,branch1ine

andbranchline.

Inthepipeline,fixedbracket,buildingontheground,

examinationroom,compensator,valvesinthepipelinelocation,

measurewithrulerpositionmethod.

Two.Civilengineering

Theexcavationoftheearthmustbebasedontheprovisionsof

therelevantprovisionsofthegrooveedgeguardrail,night

lightsandredlightsandotherfacilities,andtheneedtoset

temporaryroadsandbridges.

Three,welding

2.buttjointswithunequalwal1thicknessshallcomplywith

thefollowingprovisions:

(1)whentheouterdiameterisequalortheinnerdiameteris

equal,thethicknessofthethinpieceislessthanorequal

to4mm,thethicknessdifferenceisgreaterthan3mm,andthe

thicknessofthethinpartisgreaterthan4mm,andthe

thicknessdifferenceisgreaterthan30%ormorethanthe

thicknessofthethinpart,thethickpartshouldbethinned.

(2)theinnerdiameterandouterdiameterareunequal,andthe

thicknessdifferenceofonesideexceedsthevaluelistedin

the1paragraphofthisarticle,thethicknessofoneendof

thepipewallshouldbethinned,andthethicknessofthe

interfaceafterthethinningshouldbeuniform.

4.whenweldingbelowzero,preheatingofweldmentshouldbe

carriedoutintherangeof50mmonbothsidesoftheweld.

6.unqualifiedweldingparts,measuresshouldbetakento

repair,thesamesiteweldingrepairfrequencyshallnotexceed

2times.

Four.Pipinginstallationandinspection

3.buttjointshouldcomplywiththeprovisions

1.whenthebuttjointisopened,thestraightnessofthepipe

shallbecheckedandmeasuredat200mmfromthecenterofthe

interface.TheallowabledeviationisLMM,andthemaximum

deviationshallnotexceed10mminthefulllengthrangeofthe

buttweldedsteelpipe;

4.flangeconnectionshouldcomplywiththeprovisions

(4)whenlargediametergasketsneedtobespliced,thebutt

jointorlabyrinthjointshouldbeused,andthebuttjoint

shouldnotbeweldedlongitudinally.Thegasketsizeshouldbe

equaltotheflangesealingsurface.

(9)whentheflangeandaccessoriesareassembled,the

allowabledeviationofverticalityis2〜3mm

(five)valveinstallationshouldcomplywiththeprovisions

4,whenthevalveandpipewithflangeorthreadconnection,

thevalveshouldbeinstalledintheclosedstate;whenthe

valveandthepipelineweldedconnection,thevalvemustnot

beclosed.

7,valvetransportHoistingisnottousethevalvehandwheel

ashoistingloadpoints.

9.weldingbutterflyvalve

(1)theaxisofthevalveplateshouldbeinstalledinthe

horizontaldirection,themaximumanglebetweentheshaftand

thehorizontalplaneshouldnotbegreaterthan60degrees,it

isstrictlyprohibitedtoinstallvertically.

(2)wheninstallingtheriser,thewaterabove100mmshouldbe

injectedintotheclosedvalveplatebeforewelding.

(3)afterwelding,2or3timesofcompleteopeningtoprove

whetherthevalvecanworkproperly.

Seven.Thermalinsulationproject

1.whenthethicknessofinsulationlayerismorethan100mm,

itshouldbedividedintotwolayersorlayersbylayer

construction

2,tiletypeinsulationproductgapwidthnotgreaterthan5mm.

ThegapwithasbestoscementandAshFilledmasonrytightpad

internalwipeasbestosdustclaylayerwiththethicknessof

3〜5nim,andtheconstructionshouldbestaggered.Whenmorethan

2layersofthermalinsulationproducts,thesamelayershould

bewrongseam,insideandoutsidethelayershouldbepressure

seam,itslaplengthshouldnotbelessthan50mm.Eachtile

shouldbetwogalvanizedsteelwireorbandtiedwithspiral

bindingmethodsshallbe.

5.theendofthepipelineortherightblindplateshouldbe

laidinsulationlayer.

Eight.Pressuretest,cleaningandtestrun

1.strengthtestandtightnesstestshouldbecarriedoutfor

twoprimarypipenetworkandtwogradepipenetwork.The

strengthtestpressureshouldbe1.5timesthedesignpressure,

thetightnesstestpressureshouldbe1.25timesthedesign

pressure,andshallnotbelessthan0.6mpa.

Thetestofpipingandequipmentinthe2.thermalpowerstation

andtherelaypumpstationshallcomplywiththefollowing

provisions:

(1)allthesystemsinthestationshouldbetestedstrictly,

thetestpressureshouldbe1.25timesthedesignpressure,and

shal1notbelessthan0.6mpa.

(3)theopentypeequipmentisonlyusedforfullwatertest,

withnoleakageasqualified.

3.heatingnetworkcleaningshouldbecarriedoutbeforethe

trialoperation.

4.cleaningmethodscanbedividedintomanualcleaning,

hydraulicflushingandgasblowing.

8.commissioningshouldmeetthefollowingrequirements:

(4)thetrialruntimeshouldstartfromthenormaltestrun

timeof72h.

(5)theheatingprojectshouldbetestedundertheparameters

approvedbytheconstructionunitandthedesignunit,andthe

testruntimeshouldbecontinuousoperation72h.Thetestrun

shouldbeslowlyheatingup,andtheheatingrateshouldnot

begreaterthan10C/h.

Eight,completionacceptance

1.engineeringqualityacceptanceisdividedinto"qualified”

and“unqualified"”.Unqualified,notacceptance,untilrework,

reworkqualified.

2.thequalityacceptanceoftheprojectshallbedividedinto

subitems,subdivisionsandunits.

3.acceptanceassessmentshallmeetthefollowing

requirements:

(1)thesubprojectconformstothefollowingtworequirements,

whichisqualified:

Themaincontrolprogram(1)listedinthediscussionitem)

qualifiedrateshouldreach100%.

2)thequalifiedrateofgeneralitemsshouldnotbelessthan

80%,andthepointsthatdonotmeettherequirementsofthe

code,themaximumdeviationshouldbewithin1.5timesthe

allowabledeviation.

(2)subprojectqualificationmustbequalifiedforallsub

projects

(3)qualifiedunitsmustbequalifiedforallsubprojects

2K315022isfamiliarwiththeclassificationandmain

accessoriesofurbanheatpipenetwork

2k315022isfamiliarwiththeclassificationandmain

accessoriesofurbanheatpipenetwork

First,thetypesofheatpipenetwork

(1)accordingtoheatmediumtype

Lsteamheatingnetwork

2.hotwaterheatingnetwork

Lowtemperaturehotwaterheatingsystem(2):T=95C.

(two)accordingtotheposition

1.levelonepipenetwork:fromtheheatsourcetotheheat

stationofthewatersupplyandreturnnetwork;

2.twolevelpipenetwork:fromheatstationtouser'swater

supplyandreturnpipenetwork.

(three)accordingtolayingway

1.trenchlayingcanbedividedinto:trench,semipass,non

passtrench;

2.overheadlayingcanbedividedinto:highbracket,middle

bracket,lowbracket;

3.directlyburiedlaying:thepipelineisdirectlyburiedin

theunderground,nopipeditch.

(four)accordingtothesystemform

1.closedsystem:theprimaryheatsupplynetworkandthetwo

heatsupplynetworkareconnectedbytheheatexchanger.The

heatmediumlossoftheprimaryheatsupplynetworkisvery

smal1,buttheintermediateequipmentismore,andthe

practicaluseismoreextensive;

2.opensystem:directconsumptionofheatmedium,few

intermediateequipment,butalargeamountofheatmedia

supplement.

(five)accordingtotheclassificationofsupplyandreturn

1.watersupplypipe(steamsupplypipenetwork:):fromtheheat

sourcetoheattheuser(orheatstation)pipeline;

2.returnpipe(steamnetwork:condensatepipe):heatfromthe

user(orheatstation)backtotheheatpipe.

Two.Mainaccessoriesofheatpipenetwork

Themainaccessoriesofheatpipenetworkarecompensator,

hanger,valveandsoon.

2k315031mastertheinstallationrequirementsofcitygas

pipeline

First,materialselectionofgaspipeline

Highpressureandmediumpressureagaspipelineshouldadopt

steelpipe;mediumpressureBandlowpressuregaspipeline;

steelpipeormechanicalinterfacecastironpipeshouldbe

adopted.Polyethylenepipesareusedinmediumandlowpressure

pipes.

Two.Installationofindoorgaspipeline

1.intheplacewherepeoplewalk,thelayingheightshouldnot

belessthan2.2m

2.theheightshal1notbelessthan4.5mintheplacewhere

thevehicleisavailable

Gasapplianceandgaspipelineshouldadoptthepipeconnection,

connectedbyahose,thehoselengthshouldnotexceed2m,have

nointerface,usedintheproductionofmobilegasequipment

shal1betheconnectinghoseshouldnotexceed30m,the

interfaceisnotmorethan2.

Three.Installationofoutdoorgaspipeline

(1)basicrequirementsforpipelineinstallation

One

Undergroundgaspipelinesshallnotpassthroughbuildingsand

largestructures.

2.theminimumcoverthicknessofburiedgaspipeline(pavement

topipetop)shallmeetthefollowingrequirements:

Buriedintheunderground,notlessthan0.9m;buriedinnon

roadwayisnotlessthan0.6m;buriedinthecourtyard,notless

than0.3m;buriedinthepaddyfieldisnotlessthan0.8m

3.theundergroundgaspipelineshallnotbecrossedunderthe

siteofaccumulationofflammableandexplosivematerialsand

corrosiveliquid,andshallnotbelaidinthesameditchas

otherpipelinesorcables.

4.whentheundergroundgaspipelinepassesthroughthedrain

pipe,theheatpipeditch,thecombinedtrench,thetunneland

othervarioususegrooves,thegaspipelineshouldbelaidin

thecasing.

The5.gaspipelineshouldmeetthefollowingrequirementswhen

crossingtheraiIway,expressway,tramtrackandmainurban

roads:

(1)thegaspipelinepassingthroughtherailwayandthe

expresswayshouldbeconnectedwiththecasing.Thecasingof

thegaspipelinecrossingtherailwayshouldmeetthefollowing

requirements:

1)thedepthofcasingEmbedment:therailtracktothetopof

thecasingshouldnotbelessthan1.20m,andshouldcomplywith

therequirementsoftherailwayadministrationdepartment;

2)thecasingshallbemadeofsteelpipeorreinforcedconcrete

pipe;

3)theinnerdiameterofthecasingshouldbemorethan100mm

largerthantheouterdiameterofthegaspipeline;

4)thegapbetweenthetwoendsofthecasingandthegaspipe

shouldbemadeofflexibleanti-corrosionandwaterproof

material,andoneoftheendsshouldbeequippedwithaleak

detector;

5)theendofthecasingdistancefromtheembankmentangle

shouldnotbelessthan2.om.

(3)gaspipelinecrossingtramrailandurbanmainroadsshould

belaidinthecasingortrench;gaspipelinecasing,Gas

PipelineCrossingExpresswayacrossthemainroadofthetown

carandthecasingortrench,shouldmeetthefollowing

requirements:

1)theinnerdiameterofthecasingshouldbegreaterthan100mm

oftheouterdiameterofthegaspipeline,andtheendsofthe

casingortrenchshouldbesealed,andtheleakdetectorpipe

shouldbeinstalledattheendofthecasingortheendofthe

trenchintheimportantarea.

2)thedistancebetweentheendsofthecasingandtheelectric

laneshouldnotbelessthan2.om,andthedistancefromthe

edgeoftheroadshouldnotbelessthan1.om.

3)gaspipelineshouldbeperpendiculartorailway,expressway,

tramtrackandmaintrunkroadsofcitiesandtowns.

(two)basicrequirementsforpipelineembedment

1.whentheartificialexcavationandnogroundwaterareused

inthetrenchexcavation,thereservedvalueofthebottomof

thetrenchshouldbe0.05~0.Im.Whenthemechanicalexcavation

andgroundwaterareused,thereservedvalueofthebottomof

thetrenchisnotlessthan0.15m.

Backfill.Whentheditchwithoutgroundwater,overbreaking

within0.15mwithoriginalsoilbackfill,overbreakin0.15m

andabovebylimesoi1treatment,whenditchalargeamountof

waterorgroundwater,thegradedgravelbackfilltothe

elevation.

2.backfillsoil

Backfillshouldbestratifiedcompaction,eachlayerthickness

shouldbe0.2〜0.3m,onbothsidesofthepipelineand0.5mabove

thetopofpipeinthebackfillmustadoptartificialbackfill

compaction,thetopofthepipeabove0.5mcanbeusedforsmall

mechanicalcompaction,eachlayerthicknessshouldbe

0.25〜0.4m.

3,warningbeltlaying

Thewarningbeltshouldbecontinuouslylaidalongtheburied

gaspipeline.Beforethelayingofthewarningbelt,thelaying

surfaceshouldbecompactedandlaidonthetopofthepipeline.

Thedistancefromthetopofthepipeshouldbe0.3~0.5m,but

itshouldnotbelaidontheroadbedandroadsurface.

Thewarningtapeisyellowpolyethylenematerial.

Four.Testmethodofgaspipeline

Afterthepipelineisinstalled,thepipelinepurging,strength

testandtightnesstestshouldbecarriedoutinturn.

(1)purgingofpipes

1.gaspurgingshouldbeselectedaccordingtothefollowing

requirements:

(1)ductileironpipe,polyethylenepipe,steelskeleton

polyethylenecompositepipeandsteelpipewithnominal

diameterlessthan100mmorlengthlessthanloom,canbeblown

bygas.

(2)thesteelpipewithnominaldiametergreaterthanorequal

to100mmshouldbecleanedbypiggingball.

2.pipingpurgingshallcomplywiththefollowingrequirements:

Blowingintheorderofthemainpipe,branchpipeandcourtyard

pipe,andthedirtsweepingawayshallnotenterthequalified

pipeline.

Thepressureregulator,valve,orificeplate,filterscreen,

gasmeterandotherequipmentinthepurgingpipesectionshall

notbeinvolvedinpurging,andthenresetafterpurging.

Thepurgepressureshallnotbegreaterthanthedesignpressure

ofthepiping,andshallnotbegreaterthan0.3mpa.

Purgemediashouldbecompressedair,oxygenandflammable

gasesareprohibited.

3.gaspurgingshouldcomplywiththefollowingrequirements:

(3)thelengthofeachpurgingpipeshouldnotexceed500m;when

thepipelengthismorethan500m,itshouldbeswept

separately.

(5)whenthereisnosmokeanddustinthevisualinspection,

thewhiteclothorwhitecoatedwoodtargetplateshouldbeset

attheexhaustport,andthetargetofnorust,dustandother

impuritiesinthe5minisqualified.

4.piggingbal1cleaningshouldmeetthefollowing

requirements:

(1)thediameterofthepipelinemustbeofthesamesize,and

thepipeswithdifferentdiametersshouldbedisconnectedand

cleanedseparately.

(two)strengthtest

Undernormalcircumstances,thetestpressureis1.5times

higherthanthedesignedgaspressure,butthesteelpipeshall

notbelessthan0.4MPa,polyethylenepipe(sdrll)shal1not

belessthan0.4MPa,polyethylenepipe(sdrl7.6)shallnotbe

lessthan0.2mpa.Whenthepressurereachesthespecifiedvalue,

the1Hshouldberegulated,andthenthepipelineinterfacecan

becheckedwithsoapandwater.Alltheinterfacesarefreeof

airleakage,andtheyareconsideredqualified.Ifthereisa

leak,itcanberepairedafterbeingdeflated,andthentested

againaftertherepair,untilqualified.

(three)tightnesstest

Thetightnesstestshouldbecarriedoutafterthestrengthtest

isqualifiedandthepipelineisbackfilledalloverthe

pipeline.Tightnesstestpressuredependsonthedesignofgas

transmissionpipelinedesignpressure,whenthegaspressure

ofPwaslessthan5kpa,thetestpressureis20KPa;whenpis

largerthan5kpa,thetestpressureshallbe1.15timesthe

designpressure,butnotlessthan0.Impa.Beforethetightness

test,thepipelineshouldbeinflatedtothetestpressure,the

tightnesstestdurationofgaspipelineisgenerallynotless

than24h,theactualpressuredropisnotmorethanthe

allowablevalueisqualified.

2K315032isfamiliarwiththeclassificationandmain

accessoriesofcitygaspipeline

2k315032isfamiliarwiththeclassificationandmain

accessoriesofcitygaspipeline

Thetypesofgaspipeline

(1)gasclassification

Therearemainlyartificialgas(gas),naturalgasand

liquefiedpetroleumgas.

(two)classificationofgaspipelines

1.classificationbyuse

(1)longdistancegaspipeline

(2)citygaspipeline

(3)gaspipelinesinindustrialenterprises

2.classificationaccordingtolayingmethod

(1)undergroundgaspipeline:undergroundlayingisusually

usedincities.

(2)overheadgaspipeline:inthepipelinethroughobstacles,

orinthefactoryareainordertomanageandmaintain

convenience,overheadlaying.

3.classificationaccordingtogastransmissionpressure

Accordingtothegastransmissionpressure,thecitygas

pipelineinourcountryisgenerallydividedintotwoparts:

(1)lowpressuregaspipeline:

(2)mediumpressureBgaspipeline:

(3)mediumpressureagaspipeline:

(4)subhighpressureBgaspipeline:

(5)subhighpressureagaspipeline:

(6)highpressureBgaspipeline:

(7)highpressureagaspipeline:

MVBAandmediumpressurepipingmustbethroughtheregional

subscriberstationtostation,citydistributionnetworkinthe

lowandmediumpressuregaspipeline,ortofactoriesand

enterprises,usersoflargepublicbuildingsandgasboiler

room.

Generally,theurbanhighpressureBgaspipelineconstitutes

theouterringnetworkofthelargecitypipelinesystem.High

pressureBgaspipelinesarealsotheaortathatsuppliesgas

tobigcities.

Highpressureapipelineisalongdistancepipelinethatruns

throughprovinces,regionsorconnectingcities.Itsometimes

constitutestheouterringnetworkoflargeurbanpipeline

network.

Two.Gaspipelineancillaryfacilities

Inordertoensurethesafeoperationofthepipenetwork,

Consideringtheneedofmaintenanceandwiring,thenecessary

accessoryequipmentissetupintheproperplaceofthe

pipeline.Thesedevicesincludevalves,compensators,drains,

drainpipes,etc..

(1)valves

Valveisusedtoopenandclosethepipelineaccessoradjust

thepipelinemediumflowequipment.Thetightnesstestshould

bedonebeforeinstallation,theleakageisnotqualified,and

theunqualifiedpersonshouldnotbeinstalled.

Valveinstallationshouldpayattentiontotheproblem:

1.directivity

2.installationposition

3.otherproblemsshouldbepaidattentionto

(two)compensator

Asadevicetoeliminatethestressofexpansionandcontraction

inthepipesection,thecompensatoriscommonlyusedin

overheadpipelinesandpipelineswhichneedsteampurging.The

compensatorisusuallyinstalledonthelowersideofthevalve

(inthedirectionofairflow),anditstelescopicperformance

isusedtofacilitatethedisassemblyandmaintenanceofthe

valve.Intheburiedgaspipeline,thesteelwavecompensator

isusedmoreoften,

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论