钻孔灌注桩后压浆施工记录表_第1页
钻孔灌注桩后压浆施工记录表_第2页
钻孔灌注桩后压浆施工记录表_第3页
钻孔灌注桩后压浆施工记录表_第4页
钻孔灌注桩后压浆施工记录表_第5页
已阅读5页,还剩4页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

钻孔灌注桩后压浆施工记录表序号桩号桩长(m)日期部位时间(分)注浆速率(升/分)注浆压力(Mpa)水灰比水泥用量(Kg)水泥品种设备型号备注1MZ127.52011.10.05桩底07:40-08:00502.20.61100P.O42.5BW-250型桩侧09:50-10:15502.40.65002MZ227.52011.10.05桩底08:10-08:30502.20.61100P.O42.5BW-250型桩侧10:20-10:45502.40.65003SZ319.42011.10.05桩底08:40-09:00502.20.61100P.O42.5BW-250型桩侧10:50-11:10502.40.65004MZ427.52011.10.05桩底09:05-09:20502.40.61100P.O42.5BW-250型桩侧11:25-11:40502.20.65005MZ527.62011.10.05桩底09:25-09:40502.40.61100P.O42.5BW-250型桩侧11:45-12:00502.20.65006MZ1127.72011.10.05桩底09:50-10:10502.20.61100P.O42.5BW-250型桩侧12:10-12:25502.00.65007MZ1327.62011.10.05桩底10:15-10:30502.40.61100P.O42.5BW-250型桩侧12:30-12:50502.20.65008SZ1219.52011.10.05桩底09:50-10:10502.60.61100P.O42.5BW-250型桩侧12:10-12:25502.40.65009MZ1427.52011.10.06桩底10:15-10:30502.40.61100P.O42.5BW-250型桩侧12:30-12:50502.20.650010MZ1527.52011.10.06桩底10:45-11:00502.20.61100P.O42.5BW-250型桩侧13:00-13:15502.40.650011MZ627.62011.10.06桩底11:15-11:30502.20.61100P.O42.5BW-250型桩侧13:20-13:35502.40.650012MZ727.62011.10.06桩底11:40-12:00502.20.61100P.O42.5BW-250型桩侧13:40-14:00502.40.650013SZ2819.52011.10.06桩底12:05-12:25502.40.61100P.O42.5BW-250型桩侧14:10-14:25502.20.6500工程名称:千禧•御东画卷住宅小区4#楼编号:001施工员:质检员:监理工程师:钻孔灌注桩后压浆施工记录表序号桩号桩长(m)日期部位时间(分)注浆速率(升/分)注浆压力(Mpa)水灰比水泥用量(Kg)水泥品种设备型号备注14MZ927.52011.10.06桩底12:30-12:40502.20.61100P.O42.5BW-250型桩侧14:40-15:00502.40.650015MZ1027.62011.10.06桩底12:50-13:00502.20.61100P.O42.5BW-250型桩侧15:10-15:25502.20.6500工程名称:千禧•御东画卷住宅小区4#楼编号:002施工员:质检员:监理工程师:钻孔灌注桩后压浆施工记录表序号桩号桩长(m)日期部位时间(分)注浆速率(升/分)注浆压力(Mpa)水灰比水泥用量(Kg)水泥品种设备型号备注1GZ10417.52011.12.09桩底06:00-06:10502.20.61100P.O42.5BW-250型桩侧08:15-08:30502.40.65002GZ10317.52011.12.09桩底06:15-06:30502.20.61100P.O42.5BW-250型桩侧08:45-09:00502.20.65003GZ10217.52011.12.09桩底06:40-07:00502.00.61100P.O42.5BW-250型桩侧09:05-09:25502.40.65004GZ10117.52011.12.09桩底07:10-07:35502.20.61100P.O42.5BW-250型桩侧09:35-09:55502.40.65005GZ9917.52011.12.09桩底07:45-08:00502.20.61100P.O42.5BW-250型桩侧10:00-10:20502.20.65006GZ9717.52011.12.09桩底08:05-08:30502.20.61100P.O42.5BW-250型桩侧10:35-10:55502.40.65007GZ9817.52011.12.09桩底07:10-07:25502.40.61100P.O42.5BW-250型桩侧09:25-09:40502.20.65008GZ10017.52011.12.09桩底07:35-07:55502.00.61100P.O42.5BW-250型桩侧09:45-09:55502.20.65009GZ9017.52011.12.09桩底08:00-08:20502.40.61100P.O42.5BW-250型桩侧10:05-10:25502.60.650010GZ9117.52011.12.09桩底08:30-08:45502.40.61100P.O42.5BW-250型桩侧10:35-10:55502.00.650011GZ9217.52011.12.09桩底09:00-09:20502.20.61100P.O42.5BW-250型桩侧11:00-11:20502.20.650012GZ9317.52011.12.09桩底09:30-09:45502.20.61100P.O42.5BW-250型桩侧11:30-11:55502.40.650013GZ9417.52011.12.09桩底09:55-10:10502.40.61100P.O42.5BW-250型桩侧12:00-12:25502.20.6500工程名称:千禧•御东画卷住宅小区4#楼编号:003施工员:质检员:监理工程师:钻孔灌注桩后压浆施工记录表序号桩号桩长(m)日期部位时间(分)注浆速率(升/分)注浆压力(Mpa)水灰比水泥用量(Kg)水泥品种设备型号备注14GZ9617.52011.12.10桩底06:55-07:20502.40.61100P.O42.5BW-250型桩侧09:10-09:25502.20.650015GZ8617.52011.12.10桩底07:30-07:50502.00.61100P.O42.5BW-250型桩侧09:30-09:50502.20.650016GZ8517.52011.12.10桩底07:55-08:15502.20.61100P.O42.5BW-250型桩侧10:00-10:20502.20.650017GZ8417.52011.12.10桩底08:20-08:45502.00.61100P.O42.5BW-250型桩侧10:25-10:40502.40.650018GZ7617.52011.12.10桩底08:50-09:05502.00.61100P.O42.5BW-250型桩侧10:45-11:00502.40.650019GZ7717.52011.12.10桩底09:10-09:25502.20.61100P.O42.5BW-250型桩侧11:10-11:35502.40.650020GZ7817.52011.12.10桩底09:35-09:55502.40.61100P.O42.5BW-250型桩侧11:40-12:00502.20.650021GZ8017.52011.12.10桩底10:00-10:20502.00.61100P.O42.5BW-250型桩侧12:10-12:25502.20.650022GZ7917.52011.12.10桩底09:50-10:10502.40.61100P.O42.5BW-250型桩侧12:10-12:25502.60.650023GZ8117.52011.12.10桩底10:15-10:30502.40.61100P.O42.5BW-250型桩侧12:30-12:50502.00.650024GZ8217.52011.12.10桩底10:45-11:00502.20.61100P.O42.5BW-250型桩侧13:00-13:15502.20.650025GZ6917.52011.12.10桩底11:15-11:30502.40.61100P.O42.5BW-250型桩侧13:20-13:35502.20.650026GZ7017.52011.12.10桩底11:40-12:00502.20.61100P.O42.5BW-250型桩侧13:40-14:00502.40.6500工程名称:千禧•御东画卷住宅小区4#楼编号:004施工员:质检员:监理工程师:钻孔灌注桩后压浆施工记录表序号桩号桩长(m)日期部位时间(分)注浆速率(升/分)注浆压力(Mpa)水灰比水泥用量(Kg)水泥品种设备型号备注27GZ7217.52011.12.11桩底06:30-06:50502.40.61100P.O42.5BW-250型桩侧08:50-09:05502.20.650028GZ6417.52011.12.11桩底06:55-07:20502.40.61100P.O42.5BW-250型桩侧09:10-09:25502.20.650029GZ7117.52011.12.11桩底07:30-07:50502.40.61100P.O42.5BW-250型桩侧09:30-09:50502.20.650030GZ817.52011.12.11桩底07:55-08:15502.40.61100P.O42.5BW-250型桩侧10:00-10:20502.20.650031GZ717.52011.12.11桩底08:20-08:45502.40.61100P.O42.5BW-250型桩侧10:25-10:40502.40.650032GZ617.52011.12.11桩底08:50-09:05502.20.61100P.O42.5BW-250型桩侧10:45-11:00502.40.650033GZ417.52011.12.11桩底09:15-09:30502.20.61100P.O42.5BW-250型桩侧11:10-11:25502.20.650034GZ217.52011.12.11桩底09:40-09:55502.00.61100P.O42.5BW-250型桩侧11:40-12:00502.40.650035GZ517.52011.12.11桩底10:05-10:20502.20.61100P.O42.5BW-250型桩侧12:10-12:30502.60.650036GZ117.52011.12.11桩底10:25-10:45502.40.61100P.O42.5BW-250型桩侧12:45-13:00502.40.650037GZ317.52011.12.11桩底10:50-11:10502.20.61100P.O42.5BW-250型桩侧13:10-13:35502.60.650038GZ1517.52011.12.11桩底11:40-12:00502.40.61100P.O42.5BW-250型桩侧13:40-14:00502.30.650039GZ1417.52011.12.11桩底12:10-12:25502.40.61100P.O42.5BW-250型桩侧14:10-14:35502.20.6500工程名称:千禧•御东画卷住宅小区4#楼编号:005施工员:质检员:监理工程师:钻孔灌注桩后压浆施工记录表序号桩号桩长(m)日期部位时间(分)注浆速率(升/分)注浆压力(Mpa)水灰比水泥用量(Kg)水泥品种设备型号备注40GZ1317.52011.12.11桩底12:30-12:40502.40.61100P.O42.5BW-250型桩侧14:40-15:00502.20.650041GZ1217.52011.12.12桩底07:40-08:00502.00.61100P.O42.5BW-250型桩侧09:50-10:15501.80.650042GZ1117.52011.12.12桩底08:10-08:30502.40.61100P.O42.5BW-250型桩侧10:20-10:45502.00.650043GZ1017.52011.12.12桩底08:40-09:00502.20.61100P.O42.5BW-250型桩侧10:50-11:10501.80.650044GZ1717.52011.12.12桩底09:05-09:20502.00.61100P.O42.5BW-250型桩侧11:25-11:40502.20.650045GZ1917.52011.12.12桩底09:25-09:40502.00.61100P.O42.5BW-250型桩侧11:45-12:00501.80.650046GZ3417.52011.12.12桩底09:50-10:10502.20.61100P.O42.5BW-250型桩侧12:10-12:25502.00.650047GZ1817.52011.12.12桩底10:15-10:30502.40.61100P.O42.5BW-250型桩侧12:30-12:50502.20.650048GZ2617.52011.12.12桩底10:45-11:00502.00.61100P.O42.5BW-250型桩侧13:00-13:15501.80.650049GZ2517.52011.12.12桩底11:15-11:30502.60.61100P.O42.5BW-250型桩侧13:20-13:35502.20.650050GZ2417.52011.12.12桩底11:40-12:00502.40.61100P.O42.5BW-250型桩侧13:40-14:00502.20.650051GZ3317.52011.12.12桩底12:10-12:25502.40.61100P.O42.5BW-250型桩侧14:10-14:35502.00.650052GZ2317.52011.12.12桩底12:30-12:40502.20.61100P.O42.5BW-250型桩侧14:40-15:00502.30.6500工程名称:千禧•御东画卷住宅小区4#楼编号:006施工员:质检员:监理工程师:钻孔灌注桩后压浆施工记录表序号桩号桩长(m)日期部位时间(分)注浆速率(升/分)注浆压力(Mpa)水灰比水泥用量(Kg)水泥品种设备型号备注53GZ2817.52011.12.13桩底07:40-08:00502.40.61100P.O42.5BW-250型桩侧09:50-10:15502.20.650054GZ3117.52011.12.13桩底08:10-08:30501.80.61100P.O42.5BW-250型桩侧10:20-10:45502.00.650055GZ3217.52011.12.13桩底08:40-09:00502.60.61100P.O42.5BW-250型桩侧10:50-11:10502.40.650056GZ3017.52011.12.13桩底09:05-09:20502.00.61100P.O42.5BW-250型桩侧11:25-11:40501.80.650057GZ2917.52011.12.13桩底09:25-09:40502.20.61100P.O42.5BW-250型桩侧11:45-12:00501.80.650058GZ6517.52011.12.13桩底09:50-10:10502.20.61100P.O42.5BW-250型桩侧12:10-12:25502.00.650059GZ6617.52011.12.13桩底10:15-10:30501.81.60.61100P.O42.5BW-250型桩侧12:30-12:50502.60.650060GZ7417.52011.12.13桩底10:45-11:00502.00.61100P.O42.5BW-250型桩侧13:00-13:15502.80.650061GZ6717.52011.12.13桩底11:15-11:30502.40.61100P.O42.5BW-250型桩侧13:20-13:35502.60.650062GZ7317.52011.12.13桩底11:40-12:00502.00.61100P.O42.5BW-250型桩侧13:40-14:00502.30.650063GZ6017.52011.12.13桩底12:05-12:25502.00.61100P.O42.5BW-250型桩侧14:10-14:25502.80.650064GZ5917.52011.12.13桩底12:30-12:50503.00.61100P.O42.5BW-250型桩侧14:30-14:505020.650065GZ5817.52011.12.13桩底12:55-13:10502.60.61100P.O42.5BW-250型桩侧15:00-15:15502.20.6500工程名称:千禧•御东画卷住宅小区4#楼编号:007施工员:质检员:监理工程师:钻孔灌注桩后压浆施工记录表序号桩号桩长(m)日期部位时间(分)注浆速率(升/分)注浆压力(Mpa)水灰比水泥用量(Kg)水泥品种设备型号备注66GZ5217.52011.12.13桩底13:15-13:405020.61100P.O42.5BW-250型桩侧15:20-15:45502.30.650067GZ5117.52011.12.18桩底06:30-06:50501.80.61100P.O42.5BW-250型桩侧08:50-09:05502.20.650068GZ4817.52011.12.18桩底06:55-07:20502.60.61100P.O42.5BW-250型桩侧09:10-09:25502.00.650069GZ6117.52011.12.18桩底07:30-07:50502.80.61100P.O42.5BW-250型桩侧09:30-09:50502.40.650070GZ3717.52011.12.18桩底07:55-08:15501.80.61100P.O42.5BW-250型桩侧10:00-10:20502.00.650071GZ3617.52011.12.18桩底08:20-08:45502.60.61100P.O42.5BW-250型桩侧10:25-10:40502.20.650072GZ3817.52011.12.18桩底08:50-09:05502.20.61100P.O42.5BW-250型桩侧10:45-11:00502.00.650073GZ5417.52011.12.18桩底09:25-09:40502.40.61100P.O42.5BW-250型桩侧11:45-12:00502.00.650074GZ5317.52011.12.18桩底09:50-10:10501.80.61100P.O42.5BW-250型桩侧12:10-12:25502.40.650075GZ4117.52011.12.18桩底10:15-10:30502.80.61100P.O42.5BW-250型桩侧12:30-12:50502.20.650076GZ5017.52011.12.18桩底10:45-11:00501.80.61100P.O42.5BW-250型桩侧13:00-13:15502.00.650077GZ4017.52011.12.18桩底11:15-11:30502.40.61100P.O42.5BW-250型桩侧13:20-13:35502.60.650078GZ3917.52011.12.18桩底11:40-12:00502.80.61100P.O42.5BW-250型桩侧13:40-14:00502.20.6500工程名称:千禧•御东画卷住宅小区4#楼编号:008施工员:质检员:监理工程师:钻孔灌注桩后压浆施工记录表序号桩号桩长(m)日期部位时间(分)注浆速率(升/分)注浆压力(Mpa)水灰比水泥用量(Kg)水泥品种设备型号备注79GZ7517.5

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论