文档简介

望春工业园区经一路工程监理细则第79页共37页春晓规化三、四、五路桥梁工程监理细则编制:审核:宁波高专建设监监监理有限限公司司2006年9月月月10日目录第一章:总则则则·······································································022第二章:工程概概概况···································································022第三章:监理范范范围···································································022第四章:监理依依依据及本本工程程适用标标准及及规范····································022第五章:施工质质质量控制·····························································0035.1.监理质质质量目标··························································0035.2.质量控控控制··································································0335.2.1原原原材料监监理细细则··············································0035.2.2排排排水施工工监理理细则············································0665.2.3沉沉沉井、顶顶管施施工监理理细则则···································095.2.4沉沉沉管灌注注桩监监理细则·······································111路基塘渣填筑监监监理细则则····································113水泥稳定碎石层层层监理细细则··································166水泥砼路面面层层层监理细细则··································177钻孔灌注桩监理理理细则········································19墩、台帽及盖梁梁梁施工监监理细细则····························255预应力空心板梁梁梁监理细细则··································277桥面铺装监理细细细则··········································3005.2.12沥青混混凝土土面层监监理细细则································3325.2.13侧石、缘缘石石安装监监理细细则································334第六章;进度控控控制···································································344第七章:投资控控控制···································································355第八章;信息管管管理···································································355第九章:安全控控控制···································································366第十章:监理工工工作管理理制度度························································36第一章:总则则则1.适用范围::望望春工业园园园区经一一路工工程1.2.编制目目目的:为为了确确保工程程质量量,提高高监理理服务水平,促促进监理理工作作科学化化、公公正化、标标准准化、规规范化化、程序序化,特特编制本本细则则。1.3.编制依依依据:1、国家现行法法法律、法令令、法法规、政政府批批准的工工程建建设文件件及与与本工程程有关关的文件件;2、《监理合同同同》、《监监理理大纲》、《监监理规划》等等;3、本工程施工工工图设计文文件件与资料料;4、已批准的本本本工程《施施工工组织设设计或或施工方方案》;;5、招投标文件件件及施工合合同同;6、其他相关的的的规范、规规程程、标准准等文文件及资资料。第二章:工程概概概况1.1工程名名名称:春晓晓规规划三、四四、五五路工程程1.2工程地地地点:北仑仑区区春晓镇镇1.3业主方方方:宁波市市北北仑区建建筑工工务局1.4设计单单单位:长春春市市市政工工程设设计研究究院1.5承包方方方:东阳阳利越越市政工工程有有限公司司、嘉嘉兴万盛盛市政政开发公公司、宁宁波汇绿绿园林林建设有有限公公司1.6监理方方方:宁波波高专专建设监监理有有限公司司1.7工程概况况况(主要要工程程量及技技术指指标)2.1道路工工工程:(1)道路工工程程1)规划三路工工程程南起规划划划二路,向向北北延伸至至沿海海中路,全全长长15266..4422m,实际施施工工长度为14599..6188m,道路全全宽24m。规划三路工程规规规划等级级为城城市次干干道,设设计行车车速度度为40kmm//h;交叉口口设设计行车车速度度为20kmm//h;本工程程路路面均采采用混混凝土路路面,路路面结构构设计计使用年年限30年,全路路段段以规划划中心心线为道道路实实施的中中心线线,本工工程道道路标准准横断断面形式式为::5m(绿化带)+144m(车行道道)+5m(绿化带)=244m,水泥混混凝凝土路面面结构构为:22cm厚水泥混混凝凝土面层+25ccm厚水泥稳稳定定碎石基基层+40ccm厚塘渣垫垫层+大于或等等于于塘渣换换填土土20cm,水泥混混凝凝土路面面检测测标准(测测定定车为黄黄河JN-11550型):水水泥泥混凝土土抗折折强度为4.5MMPPa;水泥稳稳定定层顶面面计算算弯沉值Ls=11..2mm;水泥稳稳定定碎石基基层应应分两层层施工工,其中中上基基层厚10cm,水泥稳稳定定碎石层7天无侧限限抗抗压强度3MPa,压实度97%(重型标标准准),底底基层层厚15cm,水泥稳稳定定碎石层7天无侧限限抗抗压强度2.5MMPPa,压实度95%(重型标标准准);塘塘渣顶顶面计算算弯沉沉值2.6mmm,压实度93%(重型标标准准)。2)规划四路道道路路工程西起起起规划三三路,向向东延伸伸至笠笠帽礁河河西侧侧,全长15500m,实际施施工工长度为15088m,道路全全宽24m,全线包包括括两座桥桥梁。规划四路工程规规规划等级级为城城市次干干道,设设计行车车速度度为40kmm//h;交叉口口设设计行车车速度度为20kmm//h;本工程程除除在桥梁梁两端端接坡处处采用用沥青混混凝土土路面外外,其其他路面面均采采用水泥泥混凝凝土路面面,水水泥混凝凝土路路面结构构设计计年限30年,沥青青路路面结构构设计计年限15年,全路路段段以规划划中心心线为道道路实实施的中中心线线,本工工程道道路标准准横断断面形式式为::5m(绿化带)+144m(车行道道)+5m(绿化带带)=24m,水泥混混凝凝土路面面结构构为:22cm厚水泥混混凝凝土面层+25ccm厚水泥稳稳定定碎石基基层+40ccm厚塘渣垫垫层+大于或等等于于塘渣换换填土土20cm,水泥混混凝凝土路面面检测测标准(测测定定车为黄黄河JN-11550型):水水泥泥混凝土土抗折折强度为4.5MMPPa;水泥稳稳定定层顶面面计算算弯沉值Ls=11..2mm;水泥稳稳定定碎石基基层应应分两层层施工工,其中中上基基层厚10cm,水泥稳稳定定碎石层7天无侧限限抗抗压强度3MPa,压实度97%(重型标标准准),底底基层层厚15cm,水泥稳稳定定碎石层7天无侧限限抗抗压强度2.5MMPPa,压实度95%(重型标标准准);塘塘渣顶顶面计算算弯沉沉值2.6mmm,压实度93%(重型标标准准)。规划四路工程桥桥桥梁两侧侧均设设20~3300m的沥青混混凝凝土路面面接坡坡,沥青青路面面与混凝凝土路路面间设设刚柔柔相接缝缝,沥沥青路面面面层层采用三三层结结构,上上层为为3cm厚细粒式式改改性沥青青混凝凝土(AC-1133C),中层层为6cm厚的中粒粒式式改性沥沥青混混凝土(AC-2200C),下层层为8cm厚的粗粒粒式式改性沥沥青混混凝土(AC-2255C),基层层为为水泥稳稳定碎碎石层和和塘渣渣垫层;;沥青青混凝土土底面面弯拉强强度fcm==22.0MMP,,顶面回弹弹弯弯沉值为0.4mmm;粗粒式式改改性沥青青混凝凝土层压压实度度为95%(重型标标准准);水水泥稳稳定碎石石基层层应分两两层施施工,其其中上上基层厚15cm,水泥稳稳定定碎石层7天无侧限限抗抗压强度3MPa,压实度97%(重型标标准准),底底基层层厚20cm,水泥稳稳定定碎石层7天无侧限限抗抗压强度2.5MMPPa,压实度95%(重型标标准准);塘塘渣顶顶面计算算弯沉沉值2.6mmm,压实度93%(重型标标准准)。侧平石采用预制制制水泥混混凝土土,一般般情况况下绿化化带侧侧石高出出车行行道15cm,绿化带带与与桥梁人人行道道间均设20m侧石标高高渐渐变段。规划四路工程地地地基为盐盐田,设设计地基基回弹弹模量为8MP,如达不不到到要求,应应另另作地基基处理理。3)规划五路道道路路工程南起起起规划四四路,向向北延伸伸至已已建沿海海中线线,全长958..4458m,实际施施工工长度为898..1131m,道路全全宽36m,全线包包括括一座桥桥梁。规划五路工程规规规划等级级为Ⅲ级城市主主干干道,设设计行行车速度度为40kmm//h;交叉口口设设计行车车速度度为20kmm//h;本工程程除除在桥梁梁两端端接坡处处采用用沥青混混凝土土路面外外,其其他路面面均采采用水泥泥混凝凝土路面面,水水泥混凝凝土路路面结构构设计计年限30年,沥青青路路面结构构设计计年限15年,全路路段段以规划划中心心线为道道路实实施的中中心线线,本工工程道道路标准准横断断面形式式为::5m(绿化带)+111m(车行道道)+4m(中央隔隔离离带)+11m(车行道道)+5m(绿化带)=366m,水泥混混凝凝土路面面结构构为:22cm厚水泥混混凝凝土面层+25ccm厚水泥稳稳定定碎石基基层+40ccm厚塘渣垫垫层+大于或等等于于塘渣换换填土土40cm,水泥混混凝凝土路面面检测测标准(测测定定车为黄黄河JN-11550型):水水泥泥混凝土土抗折折强度为4.5MMPPa;水泥稳稳定定层顶面面计算算弯沉值Ls=00..8mm;水泥稳稳定定碎石基基层7天无侧限限抗抗压强度3MPa,压实度97%(重型标标准准);塘塘渣顶顶面计算算弯沉沉值2.4mmm,压实度95%(重型标标准准)。规划五路工程桥桥桥梁两侧侧均设设20~3300m的沥青混混凝凝土路面面接坡坡,沥青青路面面与混凝凝土路路面间设设刚柔柔相接缝缝,沥沥青路面面面层层采用三三层结结构,上上层为为3cm厚细粒式式改改性沥青青混凝凝土(AC-1133C),中层层为6cm厚的中粒粒式式改性沥沥青混混凝土(AC-2200C),下层层为8cm厚的粗粒粒式式改性沥沥青混混凝土(AC-2255C),基层层为为水泥稳稳定碎碎石层和和塘渣渣垫层;;沥青青混凝土土底面面弯拉强强度fcm==22.0MMP,,顶面回弹弹弯弯沉值为0.355mmm;粗粒式式改改性沥青青混凝凝土层压压实度度为97%(重型标标准准);水水泥稳稳定碎石石基层层应分两两层施施工,其其中上上基层厚15cm,水泥稳稳定定碎石层7天无侧限限抗抗压强度3MPa,压实度97%(重型标标准准),底底基层层厚20cm,水泥稳稳定定碎石层7天无侧限限抗抗压强度2.5MMPPa,压实度95%(重型标标准准);塘塘渣顶顶面计算算弯沉沉值2.4mmm,压实度95%(重型标标准准)。侧平石采用预制制制水泥混混凝土土,一般般情况况下绿化化带侧侧石高出出车行行道15cm,绿化带带与与桥梁人人行道道间均设20m侧石标高高渐渐变段。规划五路工程地地地基为盐盐田,设设计地基基回弹弹模量为15MP,如达不不到到要求,应应另另作地基基处理理。(222)排水工工程程1)规划三路工工程程按雨污水水水分流设设计,雨雨水管道道布置置在道路路东侧侧机动车车道内内,距道道路中中心线5m,,管径Φ500~Φ12000mmm,每隔100m左右设雨雨水水预留井井,以以便附近近雨水水接入,经经预预留井收收集后后就近排排入河河道中;;污水水管道布布置在在道路西西侧机机动车道道内,距距道路中中心线线5m,,管径Φ400~Φ900mmm,每隔150m左右设污污水水预留井井,以以便附近近污水水接入,经经预预留井收收集后后,由北北向南南排入春春晓规规划二路路污水水干管内内。Φ300钢筋混混混凝土管(雨雨水连管),国国标Ⅱ级承插管,水水泥砂浆接口口,i≥1%,碎石基础,管管顶覆土大于于70cm;Φ500钢筋混凝土土管(雨水预预留支管),国国标Ⅱ级承插管,135º混凝土管道道基础,水泥泥砂浆接口;;Φ600~Φ1200mmm的雨水主管管采用钢筋混混凝土管,国国标Ⅱ级平口管,180º混凝土管道道基础,钢丝丝网水泥砂浆浆接口;Φ300~Φ700mm(污水预留留管及污水支支管)采用钢钢筋混凝土管管,国标Ⅱ级承插管,180º混凝土管道道基础,“O”型橡胶圈接接口;Φ800~Φ900mmm(顶管)采用“F”型钢承口式式钢筋混凝土土管,纲套环环接口,楔型型橡胶圈止水水;雨水口采采用边沟式雨雨水口(360×4480mm)窨井井盖盖采用复合材材料(重型),允允许变形(1/5000D)荷载≥250KN,破坏荷载载≥300KN。2)规划四路工工程程按雨污水水水分流设设计,雨雨水管道道布置置在道路路南侧侧机动车车道内内,距道道路中中心线5m,,管径Φ500~Φ10000mmm,每隔100m左右设雨雨水水预留井井,以以便附近近雨水水接入,经经预预留井收收集后后就近排排入河河道中;;污水水管道布布置在在道路北北侧机机动车道道内,距距道路中中心线线5m,,管径Φ400~Φ700mmm,每隔100m左右设污污水水预留井井,以以便附近近污水水接入,经经预预留井收收集后后,由东东向西西排入春春晓规规划三路路污水水管内,污污水水管穿越越桥梁梁下河道道时采采用倒虹虹管,倒倒虹管采采用HDPE管水平定定向向钻施工工。Φ300钢筋混混混凝土管(雨雨水连管),国国标Ⅱ级承插管,水水泥砂浆接口口,i≥1%,碎石基础,管管顶覆土大于于70cm;Φ500钢筋混凝土土管(雨水预预留支管),国国标Ⅱ级承插管,135º混凝土管道道基础,水泥泥砂浆接口;;Φ600~Φ1000mmm的雨水主管管采用钢筋混混凝土管,国国标Ⅱ级平口管,180º混凝土管道道基础,钢丝丝网水泥砂浆浆接口;Φ400~Φ700mm(污水预留留管及污水支支管)采用钢钢筋混凝土管管,国标Ⅱ级承插管,180º混凝土管道道基础,“O”型橡胶圈接接口;雨水口口采用边沟式式雨水口(360×4480mm)窨井井盖盖采用复合材材料(重型),允允许变形(1/5000D)荷载≥250KN,破坏荷载载≥300KN。3)规划五路工工程程按雨污水水水分流设设计,雨雨水管道道布置置在道路路东侧侧机动车车道内内,距道道路中中心线11m,,管径Φ500~Φ13500mmm,每隔100m左右设雨雨水水预留井井,以以便附近近雨水水接入,经经预预留井收收集后后就近排排入河河道中;;污水水管道布布置在在道路西西侧机机动车道道内,距距道路中中心线线11m,,管径Φ400~Φ600mmm,每隔100m左右设污污水水预留井井,以以便附近近污水水接入,经经预预留井收收集后后,由北北向南南排入春春晓规规划四路路污水水管内,污污水水管下穿穿河道道时采用用倒虹虹管,倒倒虹管管采用HDPE管水平定定向向钻施工工。Φ300钢筋混混混凝土管(雨雨水连管),国国标Ⅱ级承插管,水水泥砂浆接口口,i≥1%,碎石基础,管管顶覆土大于于70cm;Φ500钢筋混凝土土管(雨水预预留支管),国国标Ⅱ级承插管,135º混凝土管道道基础,水泥泥砂浆接口;;Φ600~Φ1350mmm的雨水主管管采用钢筋混混凝土管,国国标Ⅱ级平口管,180º混凝土管道道基础,钢丝丝网水泥砂浆浆接口;Φ400~Φ600mm(污水预留留管及污水支支管)采用钢钢筋混凝土管管,国标Ⅱ级承插管,180º混凝土管道道基础,“O”型橡胶圈接接口;雨水口口采用边沟式式雨水口(360×4480mm)窨井井盖盖采用复合材材料(重型),允允许变形(1/5000D)荷载≥250KN,破坏荷载载≥300KN。(3)路灯工程程1)规划三路工工程程南起规划划划二路,北北至至沿海中中线,全全长15277m,实际施施工工长度为14600m,道路全全宽24m,路灯间间距距约为40m,车行道道路路灯采用用单叉叉路灯,两两侧侧交叉对对称布布置,灯灯头离离地10m,共约78盏。规划三路工程路路路灯均布布置在在道路两两侧的的人行道道上,均均为全夜夜灯,路路灯外型型由甲甲方确定定,车车行道路路灯光光源单盏250W高压钠灯灯,在在接线盒盒内设设RL1—3A保护,路路口口处照度度适当当增加,路路灯灯基础应应采用用现浇方方法施施工。整条路的路灯均均均采用光光控,时时控为主主人工工为辅,路路灯灯电源接接入点点由甲方方确定定,路灯灯电源源为三相相电,路路灯接入入方式式为间隔隔接三三相电源源,施施工时应应注意意预留电电源接接线头,以以便便电源接接入。规划三路工程照照照明电缆缆采用用VV-44XX50++1XX25(PE线)铜芯芯电电缆,其其截面面按电压压降计计算确定定,以以满足最最远路路灯启辉辉,并并考虑一一定余余粮,以以备以以后其它它路灯灯接入,电电源源采用直直埋敷敷设,在在灯杆杆下部小小室内内接线,电电缆缆埋深0.7mmm,照明电电缆缆过路采采用DN1000的镀锌钢钢管管保护,横横穿穿管应在在道路路施工时时预埋埋,路灯灯电缆缆敷设应应铺砂砂盖砖保保护。电器保安采用TTTN-CC-SS制,所有有配配电箱、接接线线箱、支支架、管管子等电电器设设备不带带电的的金属外外壳均均需与PE线及接地地体体连接,5芯电缆中中其其中一芯芯为PE线,PE线必须在在每每根灯杆杆处作作重复接接地,,该该PE线必须与与配电回路路所经的每每根灯杆内内的接地螺螺栓牢固连连接,接地地电阻≤4欧姆。2)规划四路工工程程西起规划划划三路,向向东东延伸至至笠帽帽礁河西西侧,全全长15500m,实际施施工工长度为15088m,道路全全宽24m,路灯间间距距约为40m,车行道道路路灯采用用单叉叉路灯,两两侧侧交叉对对称布布置,灯灯头离离地10m,共约79盏。规划四路工程路路路灯均布布置在在道路两两侧的的人行道道上,均均为全夜夜灯,路路灯外型型由甲甲方确定定,车车行道路路灯光光源单盏250W高压钠灯灯,在在接线盒盒内设设RL1—3A保护,路路口口处照度度适当当增加,路路灯灯基础应应采用用现浇方方法施施工。整条路的路灯均均均采用光光控,时时控为主主人工工为辅,路路灯灯电源接接入点点由甲方方确定定,路灯灯电源源为三相相电,路路灯接入入方式式为间隔隔接三三相电源源,施施工时应应注意意预留电电源接接线头,以以便便电源接接入。规划四路工程照照照明电缆缆采用用VV-44XX50++1XX25(PE线)铜芯芯电电缆,其其截面面按电压压降计计算确定定,以以满足最最远路路灯启辉辉,并并考虑一一定余余粮,以以备以以后其它它路灯灯接入,电电源源采用直直埋敷敷设,在在灯杆杆下部小小室内内接线,电电缆缆埋深0.7mmm,照明电电缆缆过路采采用DN1000的镀锌钢钢管管保护,横横穿穿管应在在道路路施工时时预埋埋,路灯灯电缆缆敷设应应铺砂砂盖砖保保护。电器保安采用TTTN-CC-SS制,所有有配配电箱、接接线线箱、支支架、管管子等电电器设设备不带带电的的金属外外壳均均需与PE线及接地地体体连接,5芯电缆中中其其中一芯芯为PE线,PE线必须在在每每根灯杆杆处作作重复接接地,,该该PE线必须与与配电回路路所经的每每根灯杆内内的接地螺螺栓牢固连连接,接地地电阻≤4欧姆。3)规划五路工工程程南起规划划划四路,向向北北延伸至至已建建沿海中中线,全全长958..4458m,实际施施工工长度为898..1131m,道路全全宽36m,路灯间间距距约为40m,车行道道路路灯采用用单叉叉路灯,两两侧侧对称布布置,灯灯头离地10m,共约100盏。规划五路工程路路路灯均布布置在在道路两两侧的的人行道道上,均均为全夜夜灯,路路灯外型型由甲甲方确定定,车车行道路路灯光光源单盏250W高压钠灯灯,在在接线盒盒内设设RL1—3A保护,路路口口处照度度适当当增加,路路灯灯基础应应采用用现浇方方法施施工。整条路的路灯均均均采用光光控,时时控为主主人工工为辅,路路灯灯电源接接入点点由甲方方确定定,路灯灯电源源为三相相电,路路灯接入入方式式为间隔隔接三三相电源源,施施工时应应注意意预留电电源接接线头,以以便便电源接接入。规划五路工程照照照明电缆缆采用用VV-44XX50++1XX25(PE线)铜芯芯电电缆,其其截面面按电压压降计计算确定定,以以满足最最远路路灯启辉辉,并并考虑一一定余余粮,以以备以以后其它它路灯灯接入,电电源源采用直直埋敷敷设,在在灯杆杆下部小小室内内接线,电电缆缆埋深0.7mmm,照明电电缆缆过路采采用DN1000的镀锌钢钢管管保护,横横穿穿管应在在道路路施工时时预埋埋,路灯灯电缆缆敷设应应铺砂砂盖砖保保护。电器保安采用TTTN-CC-SS制,所有有配配电箱、接接线线箱、支支架、管管子等电电器设设备不带带电的的金属外外壳均均需与PE线及接地地体体连接,5芯电缆中中其其中一芯芯为PE线,PE线必须在在每每根灯杆杆处作作重复接接地,,该该PE线必须与与配电回路路所经的每每根灯杆内内的接地螺螺栓牢固连连接,接地地电阻≤4欧姆。2.4.预计工工工程投资资:1200万2.5.计划工工工期:240日历天。2.6工程的质质质量目标:一次性验验收收合格第三章:监理范范范围3.1.工程范范范围:包包括设设计文件件内道道路、桥桥梁、雨雨污水管管线、综综合管线线、绿绿化及路路灯等等工程;;3.2.工作范范范围:施施工全全过程的的监理理,包括括质量量、进度度、投投资控制制,信信息、合合同管管理和组组织协协调。第四章:监理依依依据及本本工程程适用标标准规规范4.1.本工程程程监理依依据主主要:工工程建建设监理理合同同、施工工合同同、监理理规划划;建设设单位位提供的的施工工图纸、地地质质资料、工工程程变更联联系单单等相关关设计计文件;;公司司的质量量体系系文件及及其他他相关法法律、法法规、规规范、标标准。4.2.本工工工程适用用规范范、规范范、通通用图如如表1:本工程适用规范范范、规范范、通通用图表1序号名称编号01城市道路路基工工工程施工工及验验收规范范CJJ44-999102沥青路面施工及及及验收规规范GB5009222-96604市政道路工程质质质量检验验评定定标准CJJ1-900005市政桥梁工程质质质量检验验评定定标准CJJ2-900006公路路面基层施施施工技术术规范范JTJ0342000007城市绿化工程施施施工及验验收规规范CJJ/T8222-99908水泥砼路面面施施施工及验验收规规范GBJ97-888709市政排水管渠工工工程质量量检验验评定标标准CJJ3-9000第五章:施工质质质量控制制5.1.监理质质质量目标标:确确保单位位、部部位工程程质量量一次验验收合合格。工工序质质量监理理控制制目标如如表2:工序质量控制目目目标表2单位工程工序控制目标备注道路工程清表合格路基合格路床合格水泥碎石稳定层层层优良水泥砼路面优良沥青混凝土面层层层合格侧石、缘石优良人行道铺装优良收水井、支管合格桥梁工程桩基础合格下部结构合格上部结构优良桥面及附属优良排水工程沟槽合格平基管座合格安管合格接口合格检查井合格闭水合格回填合格5.2.质量控控控制5.2.1原材材材料监理理细则则一)原材料的进进进场★承包人按监理批准的材材材料规格格组织织进场。材料进场后应按按按《合同同技术术规范》的的规规定妥善善贮存存保管。进场后应书面向向向现场监监理报报告:1)材料产地、生生生产厂家家资料料,包括括生产产工艺流流程、生生产方式式与主要机械、生生生产许可可证副副本等(首首次次进场)。2)产产品出厂厂合格格证,包包括出出厂试验验报告告,质量量担保保书等。材料进场后应按按按规定频频率与与规范进进行抽抽样试验验。抽样试验取样必必必须由现现场监监理旁站站。抽样试验报告应应应送交总总监办办审查。进场材料能否使使使用,或或退出出现场应应服从从现场监监理的的指令。建立材料进场档档档案,见见附表表。★监理材料进场后立即即即指令承承包人人进行抽抽样试试验,并并旁站站取样。抽样试验如由承承承包人工工地试试验室进进行,则则应进行行旁站站,或按按规定频率组织织织复核试验验。3...审批承包包人人材料抽抽样试试验报告告,决决定是否否用于于工程。对对不不合格材材料应应指令退退场,或或降级使使用。4...对同意使使用用的材料料的贮贮存与保保管进进行检查查。三)原原原材料的的要求求I.砼原材料料料:水泥1)除除非设计计另有有规定,水水泥泥一般应应用硅硅酸盐水水泥或或普通水水泥,其其质量应应符合合GB1775—1999的规定。2)不得使用高高高炉矿渣水水泥泥。3)水泥的生产产产方式应为为旋旋窑生产产,生生产厂家家的生生产能力力应在在30万吨以上上。4)实际使用水水水泥的生产产厂厂家、品品种、标标号,必必须与与配合比比设计计的水泥泥相同同。5)从生产到使使使用应有必必要要的时段段间隔隔。6)同一类结构构构与构件的的水水泥必须须相同同。细集料1)细集料应采采采用天然河河砂砂或山砂砂。2)砂的细度模模模数宜≥2.3。3)砂的级配宜宜宜处于《技技术术规范》之之1区或2区。4)其他质量指指指标详见《技技术规范》的的规定。粗集料1)应应应采用坚坚硬的的卵石或或碎石石。不得得采用用经酸水水浸泡泡或经煅煅烧的的石灰石石碎石石。2)级配宜采用用用连续级配配。3)其他质量指指指标详见《技技术规范》之之规定。4.水1)用自来水,其其其他水首首次使使用必须须进行行试验。2)水的质量指指指标详见《技技术规范》的的规定。5.外加剂1)任何外加剂剂剂的使用必必须须事先获获得监监理的同同意。在在使用之之前,要要将生产产厂家家、生产产许可可证、产产品鉴鉴定书、比比对试验验结果果报总监监办审审查。2)不得使用含含含氯盐的外外加加剂。3)在予应力砼砼砼中不能使使用用引气剂剂。6.施工中中中商品混混凝土土的使用用1)使使用前要要对商商品混凝凝土制制品厂家家的资资质、产产品质质量、规规模、生生产能力力及使使用原材材料的的质量进进行考考察,并并做混混凝土配配合比比验证试试验,经经验证合合格后后可用于于本工工程。2)商品混凝土土土进场要附附有有混凝土土配合合比,配配合比比R28的强度及及所所用原材材料的的试验检检测报报告。3)混凝土浇筑筑筑前要取混混凝凝土拌和和物测测试坍落落度,允允许偏差差范围围为设计计坍落落度的±20mmm。4)浇筑前每一一一构造物混混凝凝土均按按要求求制取一一定数数量的混混凝土土试件,以以标标养R28的强度作作为为评定其其混凝凝土强度度的依依据。5)为保证商品品品混凝土质质量量的稳定定性,要要对混凝凝土制制品厂所所用的的原材料料水泥泥、砂、石石不不定期进进行抽抽检,对对混凝凝土拌和和楼配配料所用用的计计量装置置随时时抽查校校验。II.钢筋:::1...钢筋1)进进场的钢钢筋必必须有出出厂合合格证、涂涂色色、标牌牌清楚楚。2)合格证书中中中包括试验验报报告、金金相分分析、生生产程程序、每每批鉴鉴定及法法律担担保人。3)钢筋的种类类类、钢号、直直径应与设计计图相同,一一般不进行替替换。4)钢筋砼结构构构中一般不不采采用冷拉拉钢筋筋(冷拉拉调直直除外)。5)钢筋的质量量量指标应符符合合GB144999—98、GB1330013—91的规定。2.焊条1)II级钢筋筋搭接焊焊、帮帮条焊须须采用用T500以上的焊焊条条。2)焊条的质量量量应符合有有关关标准。IIIII.予应力力钢钢材111.予应力钢钢绞绞线的质质量指指标应符符合GB/TT55224的规定。2.锚具的钢钢钢材应符符合GB6999—65中45号钢的要要求求。3.锚具的硬硬硬度为GB2003—65中洛氏HRC555—58。4.锚具要逐逐逐一进行行探伤伤检测。Ⅳ)原材料的试试试验与质量量标标准原材材材料进场场后的的抽样试试验要要求具体体如下下表:材料名称预控内容进场验收控制内容存放控制内容复核控制内容平行检测计划水泥厂家资质出厂合格证、试试试验报告告,按按品种、强强度度、证明明文件件、出厂厂时间间、批次次查看看包装与与提供供资料是是否一一致,有有无结结块失效效水泥泥,补报28天强度报报告告防受潮,不得露露露天存放放,地地面应有有隔潮潮层,不不同等等级品种种和出出厂日期期、批批次的水水泥分分别堆放放,堆堆垛不超超过10袋胶砂强度、凝结结结时间、安安定定性、细细度,存存放三个个月复复检(袋袋装同同批次200吨、散装500吨)对质量怀疑时进进进行钢筋厂家资质、样品品品出厂试验报告、质质保书,按证证明文件核对对数量、品种种,外观检查查:有无锈蚀蚀、鳞片、污污染宜堆放仓库,露露露天堆置置时应应垫高并并加盖盖,按不不同钢钢种、等等级、牌牌号、规规格、厂厂家分别别标识识存放力学性能:抗拉拉拉、抗弯弯强度度以及可可焊性性(同批批次60吨)对质量怀疑时进进进行钢铰线厂家资质、样品品品出厂试验报告、质质保书,按证证明文件核对对数量、品种种,外观检查查:有无锈蚀蚀、污染堆放仓库,按不不不同等级级、牌牌号、规规格、厂厂家分别别标识识存放钢绞线分批检验验验(每批≤60T)、如每每批批少于3盘,则逐逐盘盘取样对质量怀疑时进进进行石子样品目测最大粒径、针针片状、白皮皮量泥块含量量,查合格证证、出厂证明明地面平整,无泥泥泥土,不不同规规格堆放放整齐齐压碎值、筛分析析析、表观观密度度、堆密密度、含含泥量、针针片片状含量量(同同批次400吨)对质量怀疑时砂子样品查合格证、出厂厂厂证明、目目测测含泥量量、洁洁净度地面平整,无泥泥泥土,不不同规规格堆放放整齐齐筛分析、表观密密密度、堆堆密度度、含泥泥量、氯氯离子含含量(同同批次400吨)对质量怀疑时塘渣产地、样品最大粒径、级配配配、含泥泥量按规范要求土工格栅厂家资质样品质保书、合格证证证、外观观检查查堆放整齐、覆盖盖盖,防老老化按规范要求人行道花岗岩样品外观质量检查防碎裂按规范要求沥青混合料厂家资质温度、外观保温稳定性、流值、沥沥青饱和度、马马歇尔高温稳稳定性检测一次5.2.2排排排水施工工监理理细则雨水管道工程质质质量监控控总程程序测量放样测量放样沟槽、工作坑开挖放样复核管道安装、接口、抹带、顶管平基、管座、预制砼顶管巡视检查、地基验槽、后背、导轨检查验收检查井、顶管、工作井、接收井施工巡视接口、平行检测安装和顶管砼旁站、砌体巡视、抽做试块砼、砂浆回填验收签认巡视检查、回填土含水量、分层厚度、抽检压实度钢筋检查,砼、顶管、沉井施工旁站、砌体巡视,抽做砼、砂浆试块检查验收1.沟槽开挖::(1)槽开挖允允许许偏差控制制制目标(2)沟槽开挖挖监监理要点:::审核施工单位提提提交的沟沟槽土土方施工工方案案,审核核其沟沟槽开挖挖断面面型式是是否适适用,安安全;;沟槽支支撑措措施是否否合理理,排水水措施施是否得得当,提提出合理理的监监理建议议并督督促其落落实。要要求施工工单位位在土方方开挖挖前进行行一次次全面性性的轴轴线复测测,并并进行自自然地地坪标高高测定定。涉及及采用用钢板桩桩防护护的需要要现场场监理人人员和和业主单单位同同意才可可实施施。审查挖土单位的的的分包资资质及及人员、设设备备情况和和质保保体系,督督促促施工单单位做做好班组组技术术交底。根据现场实际情情情况和施施工条条件,督督促施施工单位位合理理确定开开挖顺顺序,合合理确确定分段段长度度,确保保工序序衔接,劳劳动动力、机机械均均衡施工工。在整个挖土过程程程中,监监理人人员经常常巡视视,提醒醒施工工单位做做好沟沟槽长度度、宽宽度及放放坡坡坡度控制制。督督促施工工单位位将开挖挖土分分类堆放放、确确保回填填土土土源质量量。严严格控制制机械械挖土深深度,管管槽底土10cm范围内必必需需采用人人工开开挖,严严禁扰扰动槽底底土壤壤,发生生超挖挖,严禁禁用土土回填。提提醒醒施工单单位注注意施工工期天天气情况况,禁禁止雨天天开挖挖,避免免槽底底受水浸浸泡。沟槽开挖后,立立立即组织织有关关单位进进行基基槽验收收,检检验符合合要求求后填写写验收收意见并并签证证,并督督促施施工单位位立即即进行下下道工工序施工工,以以防基底底土扰扰动或水水浸。2.平基管座::平基管座偏差控控控制目标标平基、管座允许许许偏差控控制目目标序号项目允许偏差检验频率检验方法范围点数1垫层中线每侧宽不小于设计10m2点经纬仪/拉线、尺尺量高程0~-15mmm10m1点水准仪量2平基中线每侧宽0~10mm10m2点经纬仪/拉线、尺尺量高程0~-15mmm10m1点水准仪厚度不小于设计10m1点用尺量3管座肩宽-5~10mmm10m2点拉边线用尺量肩高±20mm10m2点用水准仪量4蜂窝面积1%2井间每侧面1点用尺量蜂窝、麻麻麻面面积积(2)基坑开挖挖检检查合格后后后,应尽尽快施施工平基基,避避免基槽槽长时时间暴露露,平平基施工工前要要把积水水抽干干,不得得带水水施工;;管座座混凝土土施工工时进行行旁站站监理,提提醒醒施工单单位注注意使基基础与与管道结结合良良好,以以保证证在受力力条件件下共同同作用用。(3)注意检查查垫垫层、平基基基厚度、高高程程、中线线偏差差、管基基浇注注质量、顺顺直直度,两两井之之间必须须直线线连接,不不得得出现反反坡、弯弯曲。3.管道安装::(1)管材购买买前前施工单位位位应先对对管材材厂家资资质进进行报验验,监监理同意意方可可购买,督督促促施工单单位加加强对进进场管管材的检检查验验收,检检查承承插口及及管身身缺陷,清清退退不合格格产品品,并及及时办办理材料料报验验手续,严严格格按要求求进行行承插口口工作作面、橡橡胶圈圈表面的的处理理;(2)安管过程程中中应检查其其其中线位位置,管管道高程程是否否符合设设计要要求,督督促其其进行班班组技技术交底底,并并随时记记录安安装原始始数据据,及时时填写写安装质质量记记录报表表;(3)安装时严严格格检查管道道道是否平平稳,中中线、高高程核核对正确确后是是否逐根根加固固,缝宽宽应均均匀,管管道内内不得有有泥土土、砖石石、砂砂浆、木木块等等杂物;;(4)管道安装装偏偏差控制目目目标如表表安管允许偏差控控控制目标标序号项目允许偏差(mm)检验频率检验方法范围点数1中线位移15两井之间2经纬仪/拉线、尺尺量2管内底标高D≤1000mmm±10两井之间2用水准仪量D>1000mmmm±15两井之间2倒虹吸管±30每道直管4用水准仪量3邻管内底错口D≤1000mmm3两井之间3用尺量4.抹带接口::接口应平直,环环环间缝隙隙均匀匀,灰口口应整整齐、密密实、饱饱满,不不得有有裂缝、空空鼓鼓现象;;UPVC管需直直直线铺设设,需需利用柔柔性接接口折线线铺设设时,每每个承承接口处处相对对转角不不得大大于2度。接口、抹带允许许许偏差控控制目目标序号项目允许偏差检验频率检验方法范围点数1宽度0~5MM两井之间2点用尺量2厚度0~5MM两井之间2点用尺量5.检查井:巡视检查井砌筑筑筑质量::检查查砌体用用砖及及砂浆是是否合合格,施施工时时灰缝是是否饱饱满、抹抹面是是否压光光、有有无空鼓鼓裂缝缝、井壁壁是否否垂直、是是否否有通缝缝,砌砌筑前红红砖是是否浸湿湿;巡视检查井内流流流槽是否否平顺顺、踏步步按装装是否牢牢固、位位置是否否准确确、井内内是否否干净;;检查井盖、井框框框质量以以及安安装是否否牢固固、平稳稳,井井身尺寸寸、标标高是否否准确确;检查井偏差控制制制目标如如表检查井允许偏差差差控制目目标序号项目允许偏差(mm)检验频率检验方法范围点数1井身尺寸长、宽±20每座2尺量直径±20每座2尺量2井盖高程非路面±20每座1水准仪量路面3每座1水准仪量3井底高程D≤1000±10每座1水准仪量6.雨水井支管管管:根据设计文件和和和图纸,测测定定井位、支支管管的定位位和高高程;检查所用的井框框框、井盖盖等物物质的合合格证证和其他他出厂厂证明材材料;;抽查水泥砂浆强强强度、砌砌筑质质量;督促承包人注意意意井周、支支管管回填质质量,按按照设计计与规规范要求求进行行施工;;检查外观质量,要要求井内抹面面平整,不得得起壳、裂缝缝,井框、井井盖、井蓖完完好无损,合合格后予以签签认;7.回填土:(1)管道回填填前前,施工单单单位应进进行隐隐蔽工程程验收收报验,监监理理单位检检查合合格后方方能进进行回填填;(2)回填工作作应应选择晴天天天进行,督督促促施工单单位不不得带水水回填填,注意意回填填土的含含水量量,并分分层夯夯实平整整;督促检查施工单单单位用土土质量量,胸腔腔及管管顶50cm以内应两两侧侧同时进进行夯夯填,填填料不不得含有有有机机物及大大于5cm的砖石等等硬硬块;填旁站时注意管管管道两侧侧均衡衡回填,两两个个回填段段搭接接处不得得形成成陡坎,窨窨井井周围同同步回回填,同同时确确保回填填密实实度。序号由路槽底算起的的的深度范范围压实度(%)轻轻轻型击实实检查频率检验方法范围点数1≤800mm不小于98两井之间一组3点环刀2600~150000mm不小于95两井之间一组3点环刀3>1500mmmm不小于90两井之间一组环刀5.2.3沉沉沉井、顶顶管施施工监理理细则则:1、顶管机选型型型1)、主机千斤斤斤顶为等推推力力双冲程程千斤斤顶,满满足设设计顶力力的要要求。顶顶进用用的导轨轨上也也装有活活动底底架,除除了用用于调整整轴线线外,还还可在在顶进施施工中中根据需需要调调节砼管管节位位置的高高低,保保证洞口口处的的橡胶止止水圈圈顺利套套在顶顶管机及及管节节上。2、顶进设备安安安装1)、要求把地地地面上建立立的的测量控控制网网络引放放至工工作井内内,并并建立相相应的的地面控控制点点,便于于顶进进施工时时进行行复测。2)、工作井内内内测量放样样,精精确测放放出顶顶进轴线线。3)、安装顶进进进后靠。后后靠靠采用整整块箱箱型结构构钢后后靠,与与井壁壁的接触触面积积大于4M*33M范围,以以扩扩大井壁壁受力力面积,有有利利于工作作井的的稳定。顶顶进进后靠的的平面面应垂直直于顶顶进轴线线,后后靠与井井壁结结构混凝凝土之之间的空空隙要要用砂浆浆或是是砼填塞塞密实实。4)、安装主顶顶顶装置及导导轨轨。先将将它们们大致固固定,然然后在测测量的的监测下下,精精确调整整他们们的位置置,直直至满足足要求求为止,随随即即将它们们固定定牢固。5)、工作井内内内的平面布布置置。搭建建井内内工作平平台,安安装配电电箱,主主顶动力力箱,控控制台等等,敷敷设各种种电缆缆、电线线、油油路等,井井内内平面布布置要要求面局局合理理,保证证安全全,方便便施工工。3、出洞1)、出洞前,先先先在洞口口处应应安装双双层止止水带,其其作作用是防防止顶顶管机出出洞时时正面的的水土土涌入工工作井井内,保保证能能够形成成完整整有效的的泥浆浆套,两两层橡橡胶止水水板间间可以压压注触触变泥浆浆,使使管节一出出洞洞便被泥泥浆包包裹。2)、为了阻止止止钢封门拔拔除除后洞外外土体体涌入顶顶管机机密封舱舱,在在顶管机机顶入入洞圈前前,用用黄粘土土填充充密封舱舱,这这样既能能平衡衡顶管机机的出出洞时的的部分分正面土土压力力,又有有减小小对洞口口处土土体的扰扰动和和地表沉沉降。3)、出洞时可可可以利用工工作作井施工工时的的井点,降降低低洞口处处的地地下水位位,减减小水头头差,防防止洞外外水土土涌入。4、顶进施工1)、出洞阶段段段结束后,即即可进行正常常的顶进施工工。顶进时,一一般情况下主主顶顶速是恒恒定的,随着着土质的变化化可能引起正正面土压力的的变化。2)、在整个施施施工过程中中,要要针对不不同的的覆土和和土质质情况及及调整整设定土土压力力值,有有利顶顶进的顺顺利进进行。3)、一节管节节节顶进结束束后后,缩回回主顶顶千斤顶顶,拆拆除洞口口处的的管线,吊吊放放下一节节管节节,然后后连接接洞口的的管线线,再继继续顶顶进。4)、在顶管机机机和中继间间处处应放置置应急急照明灯灯具,保保证断电电或停停电时管管道内内的工作作人员员能顺利利撤出出。在中中继间间处压浆浆总管管用软管管过渡渡。管道道内的的设备安安装的的管线布布置,可可采用预预埋件件或膨胀胀螺栓栓固定,凡凡采采用预埋埋件固固定的,应应在在砼管节节生产产前,将将预埋埋件图纸纸提交交给砼管管节生生产厂家家。5、管节接口处处处理措施1)、顶进前应应应对砼成品品管管、钢套套环、橡橡胶密封封圈和和衬垫板板从尺尺寸、规规格、性性能、数数量等等均作详详细调调查,必必须符符合标准准设计计图的要要求。顶顶进前还还必须须在现场场作试试安装,对对不不合格的的砼成成品管应应予以以剔除。2)、砼管接头头头口的槽头头尺尺寸必须须正确确,光洁洁平整整无气泡泡。3)、橡胶圈的的的外观和任任何何断面都都必须须质密、均均匀匀、无裂裂缝、无无孔隙或或凹痕痕等缺陷陷,橡橡胶圈应应保持持清洁、无无油油污、不不能在在阳光下下直晒晒。4)、插入安装装装前滑动部部位位应均匀匀涂薄薄层硅油油等润润滑材料料,对对橡胶无无侵蚀蚀性,减减少摩摩阻。严严禁使使用其它它油脂脂及肥皂皂水等等润滑剂剂。5)、承插时外外外力必须均均匀匀,橡胶胶圈不不移位、不不反反转、不不露出出管外,否否则则应拔出出后重重插。6)、顶管结束束后后,应按设设设计要求求在内内间隙嵌嵌以弹弹性密封封膏,要要求与二二管口口抹平。6、顶管机出洞洞洞1)、先在预留留留洞内接长长顶顶进导轨轨,并并做好限限位块块。2)、在洞圈内内内割除外封封门门钢横梁梁,在在洞门内内将钢钢板桩顶顶松。3)、将顶管机机机顶入止水水带带内,至至顶管管机端部部离外外封门约10cm时停止。4)、在测量监监监控下顶管管机机继续顶顶进,至至主顶行行程伸伸足。5)、在顶管顶顶顶尾部烧焊焊限限位块,防防止止主顶千千斤顶顶缩回时时,顶顶管机在在正面面土体作作用下下退回。6)、缩回主顶顶顶千斤顶,吊吊放砼管节。7)、割除限位位位块,吊放放砼砼管节。7、通讯、监控控控顶管施工必须保保保证信息息交换换渠道的的畅通通,同时时对施施工操作作人员员要进行行监护护,防止止发生生安全事事故。8、顶管纠偏(1)、施工过过程程中,要根根根据测量量报表表绘制顶顶进轴轴线的单单值控控制图,直直接接反映顶顶进轴轴线的偏偏差情情况,使使操作作人员及及时了了解纠偏偏的方方向,保保证顶顶管机处处于良良好的工工作状状态。(2)、顶进轴轴线线发生偏差差差时,调调节纠纠偏千斤斤顶的的伸缩量量,使使偏差值值逐渐渐减小并并回至至设计轴轴线位位置。9、顶进测量及及及控制在顶进过程中,要要经常对顶进进轴线进行测测量。在正常常情况下,每每顶进一节砼砼管节测量一一次,要出洞洞、纠偏、进进洞时,适当当增加测量的的次数。施工工时还要经常常对测量控制制点进行复测测,以保证测测量的精度。5.2.4振振振入或压压入式式沉管灌灌注桩桩监理细细则沉管灌注桩适用用用于粘土土、粉粉土、淤淤泥质质土、砂砂土及及填土;;施工工前应制制定质质量保证证措施施,并经经工艺艺试验成成功后后方可实实施。根据土质情况和和和荷载要要求,宜宜采用预预制桩桩尖。砼预制桩尖的加加加工质量量和埋埋设位置置应与与设计相相符,桩桩管和桩桩尖的的接触有有良好好的密封封性。沉管全过程必须须须有专职职记录录员做好好施工工记录,每每根根桩的施施工记记录,应应包括括贯入速速率、电电流、电电压变变化情况况和最最后两分分钟的的贯入速速度;;两者的的最后后贯入度度一般般均按试试成桩桩结果和和地质质经验确确定。沉管至设计标高高高后,应应立即即灌注砼砼,尽尽量减少少间隔隔时间,灌灌注注砼之前前,必必须检查查桩管管内有无无吞桩桩尖或进进泥、进进水。拔管速度要均匀匀匀。先振振动5~100s再开始拔拔管管,边振振边拔拔,每拔0.5~~11.0m停拔振动5~200S,如此反反复复,直至至桩管管全部拔拔出。在在一般土土层中中,拔管管速度度宜为1.2~~11.5mm/mmin,用活瓣瓣桩桩尖时宜宜慢,用用预制桩桩尖时时右适当当加快快,在软软弱土土层中,宜宜控控制在0.6~~00.8mm/mmin。充盈系数:对于于于振动式式和静静压式(振振拔拔),不不得小小于1.10。反插法施工应遵遵遵守下列列规定定:桩管管灌满满砼后,每每次次拔管高高度为为0.588~~1.00m,反插深深度0.3~~00.5m。在拔管管过过程中,应应分分段添加加砼,并并保持管管内砼砼面始终终不低低于地表表面或或高于地地下水水位1.0~~11.5m以上,拔管速度度应应小于0.5mm//min。在桩尖尖处1.5m范围内可可多多次反插插以扩扩大桩的的端部部断面,穿穿过过淤泥夹夹层时时,应当当放慢慢拔管速速度,并并减少拔拔管高高度和反反插深深度,在在流动动性淤泥泥中不不宜采用用反插插法。复打法施工分为为为局部复复打和和全复打打,对对于可能能有断断桩和缩缩颈的的桩,应应采用用局部复复打,局局部复打打应超超过断桩桩或缩缩颈后1m以上。全全复复打尚应应遵守守下列规规定::第一次灌注砼应应应达到自自然地地面;应随拔管随清除除除粘在管管壁上上和散落落在地地上的泥泥土;;前后两次的轴线线线就重合合;复打施工必须在在在第一次次灌注注的砼初初凝之之前完成成。砼的坍落度宜采采采用80cmm~~1000cmm。沉管灌注桩常见见见的质量量问题题:缩颈:成桩后的的的桩身局局部直直径小于于设计计要求,一一般般发生在在地下下水位以以下,上上层滞水水层和和饱和粘粘性土土中。治理办法:在淤淤淤泥质土土层中中出现缩缩颈时时,可采采用复复打法解解决;;在其他他土层层中出现现缩颈颈时,最最好采采用预制制桩尖尖,在缩缩颈部部位采用用反插插法施工工。断桩及桩身砼坍坍坍塌:桩桩身局局部分离离,甚甚至有一一段没没有砼,桩桩身身的某一一部位位坍塌,在在坍坍塌处没没有砼砼,处理理办法法:采用用跳打打法施工工,跳跳找法必必须等等相邻成成形的的桩达到到设计计强度的60%以上方可可进进行;采采用复复打法或或反插插法施工工。套管内砼拒落:::灌完砼砼后拔拔管时,砼砼不不从管底底流出出,拔出出一定定高度后后,砼砼才流出出管外外,产后后桩的的下部没没有砼砼或砼不不密实实。治理理办法法:在砼砼拒落落部位采采用反反插法施施工。套管内进入泥浆浆浆及水::套管管沉入过过程中中,地下下水及及泥进入入套管管内。治治理办办法:在在套管管沉至地地下水水位以上0.5m时,灌0.055~~0.110mm3的封底砼砼,把把套管底底部的的裂缝用用砼填填住,使使水和和泥浆不不能进进入套管管;采采用预制制桩尖尖时,在在预制制桩尖与与套管管接触处处缠绕绕上麻绳绳或垫垫硬纸板板块等等材料,使使桩桩头和套套管接接头处封封严密密。沉桩达不到最终终终控制要要求::桩设计计时以以最终贯贯入度度和最终终标高高作为施施工的的最终控控制。一一般情况况下,以以一种控控制标标准为主主,以以另一种种控制制标准为为辅,但但有时沉沉桩还还是达不不到最最终控制制要求求。治理理办法法:根据据工程程地质条条件,选选用合适适的打打桩机;;对较较厚的硬硬夹层层,可先先把硬硬夹层钻钻透,然然后再把把套管管植入沉沉下,也也可辅以以射水水法一起起沉桩桩。钢筋笼下沉:桩桩桩顶钢筋筋或钢钢筋笼放放入后后,在相相邻桩桩位下沉沉套管管时,该该桩顶顶的钢筋筋或钢钢筋笼下下沉。治治理办法法:钢钢筋或钢钢筋笼笼放入后后,上上部用木木棍将将钢筋或或钢筋筋混凝土土笼架架起固定定,这这样,相相邻桩桩振动时时钢筋筋或钢筋筋笼就就不会下下沉。桩身夹泥:桩身身身砼内有有泥夹夹层。治治理办办法;采采用反反插深度度不宜宜过大,采采用用复打法法时,在在复打前前应把把套管上上的泥泥清理干干净;;砼要拌拌和均均匀,和和易性性要好,坍坍落落度要符符合规规范要求求,在在饱和软软粘土土中,要要控制制好拔管管速度度;拔管管时经经常观察察桩身身砼灌入入量,发发现灌注注桩径径小于设设计桩桩径时,应应立立即采取取措施施。砼用量过大;灌灌灌注砼时时,砼砼的用量量比正正常情况况大1倍以上。治治治理办法法:施施工前详详细了了解施工工现场场内洞穴穴情况况,预先先开挖挖,进行行清理理,然后后用素素土填死死;对对于饱和和淤泥泥和淤泥泥质软软土中采采用套套管护壁壁灌注注桩时,试试桩桩时如发发现砼砼用量过过大,可可共同研研究,分分析原因因,改改用其它它桩型型。12、沉管桩桩桩成成桩检验。①、要求承包人人人开挖自检检,用用目测法法检查查桩体成成型情情况,如如实做做好记录录。开开挖深度度为0.5mm~~1.00m,如发现现凝凝体不良良等情情况,应应报废废补桩。②、成桩28天天天后,检测测桩桩身的完完整性性。③、实测项目如如如下表:项次项目允许偏差1桩砼符合规范要求2桩长不小于设计3桩距(mm)1504桩径(mm)-205垂直度<1%5.2.5路路路基塘渣渣填筑筑监理细细则::一)、一般要求求求:1)、路基填筑筑筑用材料主主要要是在当当地山山上开采采的土土石混合合料,俗俗称宕渣渣。其其粒径不大于层厚的2/3,第一层层厚厚度不大大于50cm,以上各各层层不应超超过30cm。2)、宕渣填筑筑筑应慢速、均均匀、分层铺铺筑、层摊铺碾压压。3)、路基填筑筑筑施工报验验和和监理工工作流流程:确定料场、承包包包人试验验报告告测量放样施工准备及开工报告测量放样施工准备及开工报告监理平行试验审审审核报监理检查监理工程师审核核核报监理检查监理现场检查认可监理现场检查认可地面清理,填前前前压实,检检查查宕渣路基分层摊摊摊铺碾压压检查查监理巡视抽查监理现场检查认认认可交工验收交工验收进入下下下道分项项工程程施工二)、开工前准准准备:料场的选择与要要要求①料场的选择应应应满足业主主的的要求及及施工工合理性性的需需要。②填料料场离路路路基坡脚不不应应小于500mm,并应有有畅畅通的便便道。③料场范围应有有有良好的排排水水系统,开开挖挖、运输输完成成后均不不能污污染环境境,中中断或破破坏当当地交通通、水水系及电电力、电电力系统统。④填料开挖前应应应清除一切切不不合格材材料。★监理检查并记记记录:1、料场距填筑筑筑场地的距距离离及排水水、运运输便道道等的的情况。2、开采前检查查查不合格土土料料是否已已清除除。三)测量放样1、路基开工前前前必须逐桩桩复复核中桩桩位置置、水准准点的的正确性性。2、及时进行原原原地面的纵纵、横横断面测测量,并并将测量量记录录、横断断面图图报监理理审核核。★监理检查并记记记录:1、控制点复测测测。2、横断面抽查查查。四)、场地清理理理1、按设计文件件件的要求,路路基填筑前,应应将路基范围围内的所有腐腐殖质土、垃垃圾、树根、结结构物及所有有杂质等清理理到路基外或或合同指定的的弃土场地。2、清理表土前前前,在路基基范范围内,根根据据现场实实际情情况,挖挖纵向向或横向向排水水沟,将将地表表积水引引出路路基范围围外,保保持基底底干燥燥。路基基两侧侧的排水水沟应应保持顺顺畅,以以利排水水。★现场监理检查查查并记录::1、新建路段路路路基用地范范围围内清除除耕植植土的厚厚度及及长宽尺尺寸、结结构物的的拆除除尺寸。2、清除所有在在在用地界内内的的结构物物,结结构物的的基础础原则上上也要要挖除。3、路基内的水水水田、池塘塘、泥泥沼应排排干积积水,按按规定定挖除不不适宜宜材料。4、清理的废土土土、建筑垃垃圾圾应清出出用地地范围之之外,在在指定的的地点点堆放,并并按按规定的的方法法处理,不不得得污染环环境。五)、填前碾压压压1、路基宕渣材材材料回填前前应应取基底底层土土样做有有关试试验。非软土段清表后后后应进行行碾压压,拆除除构造造物的空空穴应应用合格格填料料回填并并压实实。按规规定频频率(1点/1000mmPAGE\#"'页:'#'

'"2)进行自自检检,自检检合格格后报PAGE\#"'页:'#'

'"PAGE\#"'页:'#'

'"PAGE\#"'页:'#'

'"由路槽底算起的的的深度范范围最低压实度(%%%)重型击实标准填方0~30≥9330~80≥90挖方0~30≥93★监理检查并记记记录:取基底土做有关关关试验。进行基底密实度度度检测(规规定定频率的的200%以上)。检查台阶开挖情情情况,是是否满满足设计计及规规范要求求。六)、路基填筑筑筑施工1、基底清理整整整平后用压压路路机碾压压,达达到规定定的压压实度后后方可可填筑路路基,特特殊地段段(不不能碾压压)的的处理方方案由由总监办办会同同业主和和设计计部门研研究确确定处理理方案案。2、宕渣材料要要要求为:其其粒粒径不大于层厚的2/3,第一层层厚厚度不大大于50cm,以上各各层层不应超超过30cm。对已用用于于填筑的的不合合规定粒粒径的的石块,应应掘掘起、清清除,费费用由承承包人人自负。3、摊铺宕碴填填填料前,应应在在半幅施施工的的路两侧侧按规规定松铺铺厚度度进行挂挂线控控制。宕宕碴摊摊铺过程程中应应分层填填筑,粗粗细颗粒粒应分分布均匀匀,避避免出现现粗颗颗粒集中中堆积积,松铺铺厚度度一般为为300cm。4、压实方法及及及具体要求求::⑴、宕碴路堤应应应用12tt以上重重型振动动压路路机分层层碾压压。采用用振动动碾压时时,第第一遍应应不振振动静压压,然然后先慢慢后快快,由弱弱振动动到强振振;压压路机的的碾压压行驶速速度开开始时宜宜慢速速,最快快速度度不宜超超过44km//h,碾碾压时直直线段段由两边边向中中间,小小半径径曲线段段由内内侧向外外侧,纵纵向进退退式进进行,横横向接接头处振振动压压路机一一般重重叠0.44~~0.55m,对对三轮压压路机机一般重重叠后后轮宽的的1//2,前后后相相邻区段段宜纵纵向重叠叠1..0~11.55m。应达达到到无漏洞洞压、无无死角,确确保保碾压均均匀。应应先静压压,然然后由慢慢到快快,由弱弱振到到强振,各各种种压路机机碾压压时,均均宜慢慢速(≦4Km//hh)。直线线段段由边到到中,小小半径曲曲线段段由内侧侧向外外侧,纵纵向进进退式进进行,⑵、压实厚度和和和压实遍数数根根据现场场试验验确定,用用施施工工艺艺控制制压实度度,并并报经监监理工工程师检检验批批准。⑶、用推土机和和和自卸汽车车推推运宕渣渣填筑筑时,应应水平平分层、且且自自中线向向两边边设置2%%~~4%的横横坡坡,及时时碾压压,雨季季施工工时更应应注意意。⑷、路堤分几个个个作业段施施工工时,两两个相相邻段交交接处处不在同同一时时间填筑筑,则则先填段段应按按1:1的坡度分分层层留台阶阶;如如两段同同时施施工,则则应分分层相互互交叠叠衔接,搭搭接接长度不不得小小于2m。对新新旧旧路基结结合部部,为保保证路路基施工工质量量,减少少不均均匀沉降降,应应将老路路边或或原路基基挡墙墙拆除挖挖成阶阶状,台台阶水水平宽度≥1m、高度度同同每层填填土高高度,有有向内内倾斜横横坡,再再进行路路基拼拼宽,由由新路路向老路路方向向分层填填筑,分分层碾压压。对对原地面面坡度度陡于1:5时,必须须挖挖上述相相同的的台阶进进行填填筑。5、土石混合填填填料不得采采用用倾填方方法,应应分层填填筑,分分层压实实。6、路基填筑中中中,严禁出出现现弹簧、松松散散等缺陷陷,否否则,一一律返返工。5.2.6水水水泥稳定定碎石石层监理理细则则:工艺及质量监理理理流程图图如图图2;测量放样放样复核粒料拌制原材料、配合比审查、巡检粒料摊铺整平碾压养生稳定成型工序验收旁站监理松铺厚度、见证取样试验旁站检查压实遍数巡检养生情况巡检提醒不得行车合格确认,不合格返工测量放样放样复核粒料拌制原材料、配合比审查、巡检粒料摊铺整平碾压养生稳定成型工序验收旁站监理松铺厚度、见证取样试验旁站检查压实遍数巡检养生情况巡检提醒不得行车合格确认,不合格返工图图2水泥稳定碎石监理流程图本工程稳定层采采采用集中中厂拌拌法施工工,施施工前施施工单单位要把把配合合比以及及原材材料材质质证明明、复验验报告告提供给给监理理,经审审核合合格后方方能使使用;所所有进进场粒料料都必必须经检检测符符合设计计方可可使用。(3)监理人员员巡巡视检查实实实际配合合比;;粒料拌拌制严严禁使用用挖掘掘机翻拌拌,发发现后全全部返返工,同同时粒粒料拌制制数量量应根据据需要要拌制,及及时时使用,不不得得存放,避避免免水泥失失效;;(4)粒料摊铺铺宽宽度、厚度度度符合设设计要要求,摊摊铺时时要控制制好松松铺厚度度及碾碾压遍数数,注注意消除除粒料料离析现现象,在在粒料处处于最最佳含水水量时时进行碾碾压,在在施工过过程中中监理人人员旁旁站检查查;(5)施工单位位完完成后及时时时覆盖进进行养养生,养养生时时间不得得小于于7天,自检检合合格后填填报浙浙建监A55--3表,监监理理人员主主要检检查表面面是否否平整、有有无无坑洼、离离析析现象,以以及及接茬处处理情情况;各项目偏差控制制制目标如如表66:表6序号项目允许偏差检查频率检验方法范围点数1压实度机不小于97%%%1000m21灌砂法2中线高程±20mm20m1水准仪3平整度15mm20m13m直尺4宽度不小于设计40m1尺量5横坡±20mm且不不不大于±0.33%%20m2水准仪6厚度±15mm1000m21尺量7强度符合设计要求符合设计要求8弯沉机0.476mmmm非0.60088mm5.2.7水水水泥砼路路面面面层监理理细则则:(一)、材材材料要求求:水泥砼路面所所所用原材料料均均应应符符合本本章第一一部分分的原材材料要要求。(二)、砼砼砼配合比比设计计砼配合比设计应应应符合下下列要要求:砼配合比应保证证证砼的设设计抗抗折强度度、耐耐磨、耐耐久和和砼拌和和物的的和易性性要求求。应根据水灰比与与与强度关关系曲曲线进行行了计计算和试试配,按按抗压强强度作作配合比比设计计,以抗抗折强强度作强强度检检验。试配强度宜比设设设计强度度高10~15%。砼的最大不灰比比比不应大大于0.5,坍落度度宜宜为1~2.5ccm。单位水泥用量不不不应小于350KKgg/m3。(三)、施工过过过程监理理施工测量检查:::在砼板板浇筑筑前,应应检查查板块布布置(中中线、边边线、高高程)是是否正正确。砼拌和物的搅拌拌拌和运输输过程程检查。砼采用机械搅拌拌拌,搅拌拌机容容量、运运输工工具、发发电机机组等应应相匹匹配。进场材料是否符符符合要求求。砼拌和应符合下下下列要求求:砂、石散装水泥泥泥必须准准确过过秤,袋袋装水水泥抽查查重量量是否下下确;;每班开工前,实实实测砂、石石料料含水量量,调调整确定定施工工配合比比;加水必须准确,拌拌和机必须配配置进水量自自动控制装置置;原材料按质量计计计的允许许误差差为:1234水泥粗细骨料水外加剂±1%±3%±1%±2%砼每盘的搅拌时时时间应符符合GBJ9977-98表4.3..5的规定。砼拌和物的运输输输应符合合下列列要求::砼宜采用自卸机机机动车运运输,控控制拌和和至浇浇筑完毕毕时间间;运输车不应漏浆浆浆,防止止离析析,卸料料高度度不应超超过1.5m。砼拌和物的浇筑筑筑模板:模板采用用用钢模板板,模模板高度度应与与砼板厚厚度一一致,高高度的的允许误误差±2mm。立模时时仪仪器定位位,使使模板平平面位位置、高高程、横横坡符合合设计计要求,支支撑撑应牢固固,模模板要求求采用用花篮螺螺丝固固定、调调节,模模板接头头和模模板与基基层处处不得漏漏浆。模模板表面面清洁洁,涂刷刷隔离离剂,以以利拆拆模。浇浇筑砼砼前,模模板内内基层表表面应应洒水湿湿润。按设计要求,认认认真安放放舍传传力杆、拉拉杆杆,位置置正确确。砼的摊铺:采用用用一次连连续性性摊铺,摊摊铺铺厚度应应考虑虑振实预预留高高度,摊摊铺过过程中防防止砼砼拌和物物离析析;砼拌和物振捣:::应由插插入式式振捣器(2.2~2.8kkww)振捣,再再用用功率不不小于于2.2kkw平板振捣捣器器纵横交交错全全面振捣捣,纵纵横振捣捣时,应应重叠10cm,然后用用振振动梁振振捣拖拖平,振振捣作作业应符符合规规范要求求,并并在振捣捣作业业过程中中随时时检查模模板松松动或变变形,应应及时纠纠正;;摊铺、振捣砼时时时,应特特别注注意不得得碰撞撞模板、传传力力杆和拉拉杆,以以避免变变位;;振捣结束,要用用用滚桶提提浆,再再用真空空吸水水机吸取取泌水水,要求求吸水水时真空空度达达到0.5—0.6MMppa。砼板做面:当有烈日暴晒或或或干旱风风吹时时,做面面宜在在遮阳棚棚下进进行:做面前应做好清清清边整缝缝、清清除粘浆浆、修修补掉角角、缺缺角。严严禁在在面板砼砼上撒撒水、撒撒水泥泥粉;做面宜分二次进进进行,先先找平平抹平,待待砼砼表面无无泌水水时,再再做地地二次抹抹平,砼砼板面应应平整整、密实实;抹平后采用机具具具压槽,压压槽槽深度为1-2MMM或采用刨刨缝缝机割缝缝;钢筋设置:钢筋筋筋设置应应符合合设计要要求及及施工规规范的的规定;;接缝施工:施工缝位置与胀胀胀缝或缩缩缝吻吻合;B、胀缝必须与与与路面垂直直,缝缝宽必须须一致致;C、采用切缝法法法施工时,必必须在砼强度度达到25%—30%时方能进行行切割,以避避免收缩裂缝缝;D、平面纵缝对对对已浇砼的的缝缝壁应涂涂沥青青,并应应避免免涂在拉拉杆上上;E、所有胀缝、缩缩缩缝、传传力杆杆、拉杆杆的设设置必须须按设设计文件件的规规定进行行,凡凡钢筋和和涵洞洞顶补强强钢筋筋网不得得遗漏漏;F、砼板养护期期期满后,缝缝槽槽应及时时填缝缝,填缝缝料应应符合设设计要要求,填填缝施施工必须须符合合施工规规范要要求;G、对畸形和不不不规范的板板要要补强(如如新新老路拼拼宽段段、行车车到交交叉边缘缘板等等)拼宽宽边板板钢筋或或角偶偶钢筋,应应先先铺钢筋筋下层层砼,用用平板板振动器器振捣捣砼到钢钢筋高高度或预预留一一定沉落落度的的安放位位置,钢钢筋就位位,再再用砼拌拌和物物压住,然然后后按常规规振捣捣。砼板养护板浇筑后应及时时时覆盖洒洒水养养护,也也可以以喷洒养养护剂剂,养护护期间间禁止通通行,养养护时间间依据据砼强度度增长长情况确确定,一一般为14—21天;拆模:拆模时间间间根据施施工时时昼夜平平均气气温差确确定,拆拆模应仔仔细,不不得损坏坏面、边边、角;;砼板施工期间,应应注意天气预预报。如遇阵阵雨,应暂停停施工,气温温过高时,避避免中午施工工。搅拌站应应注意搭设防防雨棚,摊铺铺现场应备有有较轻便易于于移动的工防防雨棚。5.2.8钻孔灌注注桩桩监理细细则桥梁桩基为钻孔孔孔灌注桩桩,桩桩的受力力型式式为摩擦擦桩。桩桩径分别别有1.2m,台桩桩桩长30.5米,共16根。墩桩桩桩桩长34.5米,共16根。钻孔孔灌灌注桩采采用25号混凝土土。施工过程中应严严严格按照照本《监监理细则则》及及《公路路桥涵涵施工技技术规规范》按按程序序规范施施工和和监理。(一)场地准备备备★承包人:对旱地应清除杂杂杂物,整整平填填实。场地为深水或淤淤淤泥层较较厚时时,须搭搭设工工作平台台,施施工方案案须得得到监理理工程程师同意意。★监理:检查场地是否符符符合要求求。检检查工作作平台台的牢固固稳定定性,充充分保保证施工工安全全。(二)测量放样样样★承包人:施工桩位进行放放放样,并并须保保证在另另一测测站进行行复核核,成果果资料料必须得得到测测量监理理工程程师的认认可。有有条件的的应用用钢尺对对前后后、左右右的相相邻桩位位进行行相互校校核。桩位确定后,应应应对该桩桩布置置十字形形护桩桩。3、放样测量应应应报送监理理测测量监理理工程程师审批批。★监理:测量工程师对结结结构物附附设的的控制系系统进进行审批批。审批承包人的桩桩桩位放样样资料料,并对对桩位位进行抽抽查复复测。(三)护筒钻孔灌注桩施工工工监理程程序::开工申请开工申请监理组批准监理组批准埋设护筒埋设护筒现场监理检查现场监理检查现场监理检查批准钻

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论