广东某厂区地下管网安装作业指导书_第1页
广东某厂区地下管网安装作业指导书_第2页
广东某厂区地下管网安装作业指导书_第3页
广东某厂区地下管网安装作业指导书_第4页
广东某厂区地下管网安装作业指导书_第5页
已阅读5页,还剩55页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

目录1、工程概况········································································331.1工程概况况······································································331.2工程范围围及工程量·····························································31.3施工工期期······································································332、编制依据·······································································33、作业前的条条件和准备····························································43.1技术准备备······································································443.2作业人员员······································································553.3作业工机机具····································································73.4材料和设设备····································································83.5工序交接接·····································································1334、作业程序和和方法······························································134.1厂区室外外消防、工业业、生活给水水管道安装施施工工序··························134.2厂区室外外生活污水管管道安装施工工工序········································1194.3管沟施工工·····································································2004.4质量控制制计划································································2214.5施工过程程控制规范····························································245、质量控制点点的设置和质质量通病预防防···········································245.1质量目标标·····································································2445.2质量控制制及质量通病病预防····················································245.3室外管管网安装的控控制点的设置置··············································2245.4质量标标准及要求······························································256、作业的安全全和作业的安安全危害因素素辨识和控制制································256.1作业的安安全要求······························································256.2施工危险险因素和环境境因素辨识及及对策表······································277、《二十五项项反措》和《强强条》要求及及保证措施································307.1《施工现现场临时用电电安全技术规规范》··········································307.2《建筑机机械使用安全全技术规程》··············································3317.3《二十五五项反措》要要求及保证措措施···········································32厂区地下管网安安装作业指导导书1、工程概况1.1工程概况况广东某惠州大亚亚湾热电一期期为2×300MW级燃煤机组工程程,我公司承承建输煤系统统工程的施工工,本作业指指导书用于输输煤系统地下下管网的管道道及设备的安安装工程。我公司承担的广广东某惠州大大亚湾热电一一期2×300MW级燃煤机组工程程输煤系统地地下管网安装装主要包括消消防、工业、生生活给水、生生活污水管道道及附属设备备的安装。1.2工程范围围及工程量本项目的作业范范围包括:消消防、工业、生生活给水、生生活污水管道道布置及安装装,及其附属属设备阀门的的安装。工程量见施工材材料统计表。1.3施工工期期:管沟开挖,厂区区室外消防、工工业、生活给给水及生活污污水管道布置置、安装及组组合。共计40天。2、编制依据参考资料表序号资料名称编号备注1《输煤系统施工工组织设计》2《电力建设安全全工作规程》3《火电施工质量量检验及评定定标准》4《电力建设施工工及验收技术术规范》5厂区室外消防给给水管道平面面布置图6厂区室外消火栓栓管道系统图图7厂区室外生活污污水管道平面面布置图8厂区室外生活污污水管道系统统图9厂区室外工业水水、生活水管管道平面布置置图10厂区室外工业水水管系统图序号资料名称编号备注11厂区室外生活水水管系统图12甲方委托、设计计变更等技术术图纸、资料料13电力建设工程施施工质量监督督(安装工程程)14设备安装工程禁禁忌手册15以往类似工程的的施工技术资资料16《室外给水管道道附属构筑物物》17《室外消火栓安安装》18《埋地钢管的防防腐》19《沟槽开挖及回回填、管道垫垫层》20《涂装前钢材表表面锈蚀等级级和除锈等级级》21《石油化工给排排水管道工程程施工及验收收规范》22《给水钢丝网骨骨架塑料(聚聚乙烯)复合合管管道工程程技术规程》23《给水排水管道道工程施工及及验收规范》24《砖砌化粪池》25《排水检查井》26《埋地高密度聚聚乙烯中空壁壁缠绕结构排排水管道工程程技术规程》27《埋地硬聚氯乙乙烯排水管道道工程技术规规程》3、作业前的条条件和准备3.1技术准备备施工图纸齐全,由由安装技术负负责人组织技技术员进行与与室外消防、工工业水、生活活水及生活污污水管道安装装施工相关的的图纸审核,并并由项目部工工程管理部门门组织与室外外消防、工业业水、生活水水及生活污水水管道安装相相关专业进行行图纸会审,图图纸经审核无无误。施工方案已确定定,并经项目目部专业技术术负责人审核核批准。组合平台、起吊吊工具等施工工措施、方案案设计完毕,施施工图、材料料预算等经审审核批准。作业指导书编制制完毕。技术人员按照施施工作业指导导书,已对施施工人员进行行技术、质量量、安全交底底,并进行交交底双签字。3.2作业人员员施工前应建立健健全的质量管管理体系和工工程质量检测测制度。施工组织应设立立技术组、质质安组、管道道班、电气焊焊班、开挖班班、测量班等等。施工人员数量根根据工程规模模和工程量的的大小确定,一一般应配备的的人员有:给给排水专业技技术人员,测测量工、管道道工、电焊工工、气焊工、起起重工、油漆漆工等。作业人员配置、资资格序号作业人员工种数量资格要求资质1技术员1能够审清本项目目施工图纸,领领会设计思想想,掌握施工工工艺,熟悉悉施工质量和和安环要求。助工以上2班组长2熟悉本项目施工工的工艺流程程,能有效组组织好施工人人员按照作业业指导书的要要求施工,熟熟悉施工质量量和安环要求求。中级工3安装工12熟练掌握本项目目的技术、工工艺要求,知知道施工质量量、安环要求求。中、初级工4测量工2熟练掌握测量的的基本知识和和技能、施工工工艺精度要要求。中级工5焊工4熟悉焊接工艺及及相关要求,具具有与焊接项项目相符合的的焊工合格证证书。持证6起重工4熟悉所操作吊车车的机械性能能,技术熟练练。持证7油漆工4熟练掌握本项目目的技术、工工艺要求,知知道施工质量量、安环要求求。中、初级工作业人员职责分分工和权限序号岗位名称职责分工和权限限1技术员全面负责输煤系系统室外消防防、工业水、生生活水及生活活污水管道安安装的技术工工作,参加相相关图纸会审审,处理设计计变更,编制制施工作业指指导书、施工工预算、技术术、安全措施施,并主持技技术交底工作作。深入现场指导施施工,及时发发现和解决施施工中的技术术、质量隐患患,按照指导导书的要求指指导施工。配合班组长进行行施工验收的的自检工作。记录、整理施工工记录和验收收记录。对违章操作,有有权制止,严严重者可令其其停工,并及及时向有关领领导汇报。2班组长负责组织安排施施工人力,物物力。严格按按照作业指导导书的施工工工艺要求,质质量要求和安安全环境要求求进行施工。全全面负责质量量、安全工作作。做好输煤系统室室外消防、工工业水、生活活水及生活污污水管道安装装的质量自检检和工序交接接工作。施工过程中,图图纸不清不施施工,材料不不合格不施工工,技术、安安全不交底不不施工,上一一级工序验收收不合格不施施工。发生质量、安全全事故立即上上报,同时组组织本班级组组职工按照“三不放过”的原则认真真分析。3作业人员严格按照作业指指导书的施工工工艺要求、质质量要求和安安全环境要求求进行施工。爱护施工所用工工器具,严格格按照操作规规程作业。发生质量、安全全事故应保护护好现场,并并迅速告知有有关领导,做做好处理工作作。有疑难问题有权权向技术人员员、班组长请请示解决办法法,对自己的的施工质量全全面负责,对对不正确、不不明确的指挥挥有权不执行行。序号岗位名称职责分工和权限限4质检人员熟悉相关图纸内内容和有关质质量标准,参参加图纸会审审,技术交底底。深入施工现场,掌掌握工程进度度及质量情况况,按照质量量标准进行二二级质量验收收工作,配合合项目部质检检师,监理完完成三级,四四级质量验收收。对工作要要一丝不苟,不不殉私情。对不能保证施工工质量的方案案提出否决建建议,请有关关领导部门处处理。整理、汇总质量量验收记录。5安监人员全面负责输煤系系统水消防、喷喷雾、冲洗装装置安装安装装工作的安全全。参加对指导书的的审核工作,参参加安全交底底双签字工作作,在工作中中认真检查指指导书的执行行情况。深入现场施工一一线,及时发发现事故隐患患和不安全因因素,督促采采取防患措施施,有权责令令先停止工作作,并立即研研究处理。做好事故的调查查,分析和处处理工作。3.3作业工机机具(包括配配置、等级、精精度等)施工作业工机具具统计表序号机具名称称规格用途1电动套丝机DN100套丝连接2砂轮机1.1KW切割管材3砂轮锯φ300mm磨光4试压泵0~4MPa电动、手动试压压5电焊机BX型焊接6手锤1.0kg、11.5kg打口7弯管器φ80mm弯管8捻凿1#、2#、33#打口、自制序号机具名称称规格用途9液压铸管切割器器YZGJ-A天津塘沽机床附附件厂10空压机6M3吹扫11套丝扳DN80mm套丝连接12管子割刀1~4#切割管材13倒链1t、2t、55t、提升14管钳150~6000mm夹持管材15麻绳φ20捆绑16虎钳15~115夹持管子直径17铁锹2~4#挖沟18铁镐2.5~4Kgg挖沟19大锤5~8Kg挖沟20挖掘机50型挖沟21手动葫芦拉力器器>φ100mmm胶圈连接22热熔式连接器与管子配套热熔连接23活扳手100~6000mm紧固24角向磨光机φ150内磨光25直向电动砂轮机机φ100内坡口其它小工具有::画线笔、毛毛刷、板锉、钢钢锯、板斧、撬撬杠等施工测量仪器表表序号测量装置名称规格型型号备注1水准仪DSZ100、DS10测量标高2经纬仪J2测量角度3水平尺150~6000mm测量水平度4压力表0~2.5Mppa、φ150水压试验5钢卷尺3m、5m、330m测量长度6游标卡尺0~300mmm、0.02mmm测量管材直径7塞尺150A14测量胶圈接口3.4材料和设设备施工材料施工材料统计表表表1、室外消防防管道主要材材料汇总表序号名称规格及型号单位数量材料备注1可曲挠橡胶接头头DN300,PPN1.6MMpa,GJQQ(X)-DDF(Ⅱ)型个5成品2可曲挠橡胶接头头DN250,PPN1.6MMpa,GJQQ(X)-DDF(Ⅱ)型个2成品3钢丝网骨架塑料料复合管dn315,PPN=1.66Mpa米248PE100配套电熔直接4钢丝网骨架塑料料复合管dn250,PPN=1.66Mpa米186PE100配套电熔直接5钢丝网骨架塑料料复合管dn160,PPN=1.66Mpa米33PE100配套电熔直接6钢丝网骨架塑料料复合管dn110,PPN=1.66Mpa米228PE100配套电熔直接7电熔法兰连接件件D315套10PE100配套PN1.66Mpa法兰盘片配配套螺栓、螺螺母、垫片8电熔法兰连接件件D250套4PE100配套PN1.66Mpa法兰盘片配配套螺栓、螺螺母、垫片9电熔法兰连接件件D160套2PE100配套PN1.66Mpa法兰盘片配配套螺栓、螺螺母、垫片10电熔法兰连接件件D110套12PE100配套PN1.66Mpa法兰盘片配配套螺栓、螺螺母、垫片11电熔正三通D315个3PE10012电熔异径三通D315×D1160个3PE10013电熔异径三通D315×D1110个7PE10014电熔异径三通D250×D1160个1PE10015电熔异径三通D250×D1110个4PE100序号名称规格及型号单位数量材料备注16电熔90°弯头头D315个8PE10017电熔90°弯头头D250个2PE10018电熔90°弯头头D160个2PE10019电熔90°弯头头D110个10PE10020电熔45°弯头头D110个2PE10021电熔异径直接D315×D2250个1PE10022砖砌圆形阀门井井Φ1500座7砖砌参见05S5002/16~25,配套重型型球墨铸铁支支座及铸铁井井盖表2、室外消防防管道设备阀阀门汇总表序号名称规格及型号单位数量材料备注1管网双法兰蝶阀阀DN300,PPN1.6MMPa,GD3341X-116Q型个62可曲挠橡胶接头头DN250,PPN1.6MMpa,GD3341X-116Q型个23室外地上式消火火栓DN100,PPN1.6MMPa,SS1100/655-1.6型套6详见本册-044图,带座90°双法兰弯头头,DN100(与消火栓栓配套供应)表3、室外生活活污水管道主主要材料汇总总表序号名称规格及型号单位数量材料备注1高密度聚乙烯双双壁波纹管DN200米4HDPE双壁波纹管环刚度≥8kNN/m22钢丝网骨架塑料料复合管dn75,PNN=1.6MMpa米259PE100配套电熔直接3电熔45°弯头头D75个16PE1004圆形砖砌污水检检查井Φ700座1砖砌参见02S5115/195重型井盖及盖座座Φ700套1球墨铸铁参见97S5001-1/441、436化粪池Z1-2S型座1砖砌参见02S7001/13、20表4、室外工业业、生活给水水管道主要材材料汇总表序号名称规格及型号单位数量材料重量备注单重总重1钢丝网骨架塑料料复合管dn160,PPN=1.66Mpa米65PE100配套电熔直接2钢丝网骨架塑料料复合管dn140,PPN=1.66Mpa米79PE100配套电熔直接3钢丝网骨架塑料料复合管dn50,PNN=1.6MMpa米51.5PE100配套电熔直接4内筋嵌入式衬塑塑钢管DN32米12.5钢塑5内筋嵌入式衬塑塑钢管DN25米7钢塑6无缝焊接钢管D426×9..0米6420#90.555923.27无缝焊接钢管D159×6..0米7920#22.641788.68无缝焊接钢管D89×4.55米12620#9.381181.99无缝焊接钢管D76×4.55米17020#7.931348.110无缝焊接钢管D57×3.55米11620#4.62535.911无缝焊接钢管D45×3.55米320#3.5810.712电熔法兰连接件件D160套1PE100配套PN1.00Mpa法兰兰盘片配套螺螺栓、螺母、垫垫片13电熔法兰连接件件D140套1PE100配套PN1.00Mpa法兰兰盘片配套螺螺栓、螺母、垫垫片14电熔法兰连接件件D50套2PE100配套PN1.00Mpa法兰兰盘片配套螺螺栓、螺母、垫垫片15钢制法兰DN150,PPN=1.00MPa片120#6.126.1202S403配配套螺栓、螺螺母、垫片序号名称规格及型号单位数量材料重量备注单重总重16钢制法兰DN40,PNN=1.0MMPa片220#1.713.4202S403配配套螺栓、螺螺母、垫片17电熔异径三通D140×D550个1PE10018异径三通DN400×DDN80个120#GB/T124459-2000519大小头DN80×DNN65个120#GB/T124459-2000520大小头DN65×DNN40个120#GB/T124459-2000521大小头DN50×DNN40个220#GB/T124459-2000522大小头DN32×DNN25个120#GB/T124459-2000523大小头DN25×DNN20个120#GB/T124459-2000524电熔90°弯头头D160个4PE10025电熔90°弯头头D140个4PE1002690°无缝弯头头DN400个220#52.510502S403//872790°无缝弯头头DN150个520#5.0625.302S403//872890°无缝弯头头DN80个620#1.126.7202S403//872990°无缝弯头头DN50个1020#0.343.402S403//8730钢塑过渡接头D50个1PE10031快速接头Dg40个1成品表5、室外工业业、生活给水水管道设备阀阀门汇总表序号名称规格及型号单位数量材料备注1手动对夹式蝶阀阀DN40,PNN=1.0MMPaWBLX-00040-110型个12流量调节阀DN150,PPN=1.00MpaLT3341X-110型个1手动调节材料要求1)工程所使用用的主要材料料、成品、半半成品、配件件和设备必须须具有中文质质量合格证明明文件。2)工程所使用用的材料、设设备的规格型型号和性能检检测报告应符符合国家技术术标准和设计计要求。3)所有材料进进入施工现场场时应进行品品种、规格、外外观验收。包包装应完好,表表面无划痕及及外力冲击破破损。4)主要器具和和设备必须有有完整的安装装使用说明书书。5)管道使用的的配件的压力力等级、尺寸寸规格等应和和管道配套。塑塑料复合管材材、管件、粘粘接剂、橡胶胶圈及其它附附件等应是同同一厂家的配配套产品。6)手拉葫芦使使用前的检测测①检查转动部部分是否灵活活,有无卡链链现象,链条条是否有裂纹纹和断节;制制动器是否安安全可靠,销销子是否牢固固。②发现下述情况况时需要更换换零件:齿轮轮裂纹、断齿齿、齿面磨损损搭齿厚的330%;吊钩钩损坏达报废废标准。③检查吊挂倒倒链之受力构构件的强度、刚刚度是否满足足安全要求;;牵引、吊挂挂钢丝绳及手手扳葫芦自身身之钢丝绳是是否满足要求求,有无严重重断丝、断股股及其他外观观压扁、扭曲曲、严重腐蚀蚀等物理化学学变形。④所吊物件是是否超载。只有确确认以上几条条均符合安全全要求后,方方可投入使用用。3.4.3安全全器具施工安全用具统统计表序号名称规格单位数量备注1安全带条152安全帽顶213工具袋个203.5工序交接接管道施工区域内内的地面要进进行清理,杂杂物、垃圾弃弃出场地。管管道走向上的的障碍物要清清除。在施工前应摸清清地下高、低低压电缆、煤煤气等管道的的分布情况,并并作出标记。管道敷设前,所所有组合工作作完成,临时时吊装措施准准备并制作完完毕。管道敷设前,管管沟、垫层验验收完毕。管道安装后及时时验收,为下下道工序作准准备。4、作业程序和和方法4.1厂区室外外消防、工业业、生活给水水管道安装施施工工序给水管材质量要要求1)主材的技术术标准主要材料的技术术标准表序号材料名称质量验收标准备注1钢丝网骨架塑料料复合管企业标准厂家提供2HDPE双壁波波纹管企业标准厂家提供3镀锌钢管GB/T81663-198874无缝钢管GB/T81663-198875衬塑钢管企业标准厂家提供2)材料的验收收给水管材及管件件的规格品种种应符合设计计要求,管壁壁薄厚均匀,内内外光滑整洁洁,不得有砂砂眼、裂纹、飞飞刺和疙瘩。管管件应造型规规矩,尺寸合合格,并有出出厂合格证。阀门、法兰及其其它设备应具具有质量合格格证,且无裂裂纹、开关灵灵活严密、铸铸造规矩,手手轮良好。电焊条、螺栓、螺螺母等应具有有质量合格证证。给水管道安装装作业条件管沟平直,管沟沟深度、宽度度符合要求,阀阀门井、表井井垫层,消火火栓底座施工工完毕。管沟沟底夯实,沟沟内无障碍物物。且应有防防塌方措施。管沟两侧不得堆堆放施工材料料和其它物品品。4.1.3给水水管道安装工工艺流程1)管道安装铺铺设规定厂区室外工业水水管采用无缝缝钢管,电焊焊连接,与阀阀门法兰连接接;室外生活活水管采用钢钢丝网骨架塑塑料复合管,电电熔连接,与与阀门法兰连连接;规格小小于DN50的室外生活活水管采用内内筋嵌入式衬衬塑钢管,卡卡环连接。钢钢丝网骨架塑塑料复合管与与衬塑钢管之之间采用钢塑塑转换接头,电电熔连接。钢钢丝网骨架塑塑料复合管与与无缝钢管之之间采用电熔熔法兰连接。厂区室外工业、生生活水管上的的阀门井做法法参照《室外外给水管道附附属构筑物》(05S502)阀门井的做法施工,阀门井应设集水坑。根据设计坐标和和设计布置,施施放管道埋放放沟槽线,厂厂区室外消防防给水管道采采用钢丝网骨骨架塑料复合合管,电熔连连接,室内消消防管道采用用热浸镀锌管管,室外与室室内管道接口口处通过PN1.66Mpa的法兰与室室内管道法兰兰连接。管道穿越公路等等有荷载应设设套管,在套套管内不得有有接口,套管管宜比管道外外径大两号。管道安装和铺设设工程中断时时,应用木塞塞或其它盖堵堵将管口封闭闭,防止杂物物进入。给水管道上所采采用的阀门、管管件等其压力力等级不应低低于管道设计计工作压力,且且满足管道的的水压试验压压力要求。在管道施工前,要要掌握管线沿沿途的地下其其它管线的布布置情况。与与相邻管线管管线之间的水水平净距不宜宜小于施工及及维护要求的的开槽宽度及及设置阀门井井等附属构筑筑物要求的宽宽度,饮用水水管道不得敷敷设在排水管管道和污水管管道下面。2)管道敷设前前的准备工作作管道铺设应在沟沟底标高和管管道基础检查查合格后进行行,在铺设管管道前要对管管材、管件、阀阀门等作一次次外观检查,发发现有问题的的不得使用。准备好下管的机机具及绳索,并并进行安全检检查。对于管管径在1500mm以下的的金属管道可可用撬压绳法法下管,直径径大的要启用用起重设备。管道安装前应用用压缩空气或或其它气体吹吹扫管道内腔腔,使管道内内部清洁。支敦设置支敦设置管道定位管沟验收管道清理管道连接(电熔连接、焊接、法兰连接、卡环连接)试压、冲洗、消毒管道防腐管道及阀门铺设就位安装准备4.1.4管道道的敷设1)管道应敷设设在原状土地地基上或开挖挖后经过回填填处理达到设设计要求的回回填层上。对对高于原状地地面的填埋试试管道,管底底的回填处理理层必须落在在达到支撑能能力的原状土土层上。2)敷设管道时时,可将管材材沿管线方向向排放在沟槽槽边上,依次次放入沟底。为为减少地沟内内的操作量,对对焊接连接的的管材可在地地面上连接到到适宜下管的的长度;电熔熔连接连接一一定长度后用用弹性敷管法法下管。3)管道下管时时,下管方法法可分为人工工下管和机械械下管、单节节下管和组合合下管等方式式。下管方法法的选择可根根据管径、管管长和重量、管管材和接口强强度、沟槽和和现场情况及及拥有的机械械设备量等条条件确定。下下管时应精心心操作,搬运运过程中应慢慢起轻落,尽尽量不要使管管口处受力。4)管道施工中中须切割时,切切割面要平直直。完成后应应将残屑清除除干净,不留留毛刺。5)管道安装完完毕后应按设设计要求防腐腐,如设计无无要求参照本本工艺质量标标准部分防腐腐。工业给水管道安安装无缝钢管运至现现场后,首先先根据设备及及管件位置进进行排管,并并在现场将每每根钢管的具具体长度丈量量好,标注具具体尺寸和排排列位置,以以便于接口时时对号入座,采采用吊车下管管,下管过程程中采用尼龙龙吊带进行吊吊装,以管道道保温层的保保护。1)修口、对口口修口集中在管道道出厂前加工工完成,为保保证焊接质量量,焊接前均均进行全面检检查、修正,使使管子端面、坡坡口角度、钝钝边、圆度等等,均符合对对口接头尺寸寸的要求,个个别钢管需在在现场做坡口口处理时,采采用气焊切割割,清除熔渣渣后再用砂轮轮打磨平整。对口操作程序为为:检查接口接头尺尺寸→清膛→确定并调整整钢管纵向焊焊缝错开位置置→第一次管道道找直→调整对口间间隙尺寸→对口找平→管道拉线找找直→点焊2)焊接接口焊接采用电电弧焊,一遍遍打底,二遍遍成活,每道道焊缝均一次次焊完,每层层施焊的引熄熄弧点须错开开。管节焊接前应先先修口、清渣渣、管端端面面的坡口角度度、钝边、间间隙,应符合合规范规定;;不得在对口口间隙夹焊帮帮条或用加热热法缩小间隙隙施焊。对口时应使内壁壁齐平,采用用长300mm的直尺在接接口内壁周围围顺序贴靠,错错口的允许偏偏查差应为0.2倍壁厚,且且不得大于2mm。对口纵、环向焊焊缝的位置应应符合下列规规定:①纵向焊缝应在在管道中心垂垂线上半圆的的45°左右处;②有加固的钢管管,加固环的的对焊焊缝应应与管节纵向向焊缝错开,其其间距不应小小于100mm;加固环距距管节的环向向焊缝不应小小于50mm;③管道任何位置置不得有十字字形焊缝。定位焊时,定位位焊缝所有焊焊条号(或牌号)应与正式焊焊接相同,但但焊条直径可可选细一些。定定位焊缝的焊焊接电流要选选得比正式焊焊接时大一些些,通常大10%-15%,以保证焊焊透。管道的焊接:焊焊缝质量必须须符合GB502268-977中4.2的有关规定定,焊缝应平平滑,宽窄一一致,根部焊焊透,无明显显的凹凸缺陷陷及咬边现象象,焊缝加强强面应高出管管面约2毫米,焊出出坡口边缘2-3毫米。管道与法兰焊接接时,管道应应插入法兰三三分之二,法法兰与管道应应垂直,两者者的轴线重合合。①水平管道坡度度不小于0.3%。②焊接前应检查查施焊环境,焊焊接安装设备备、焊接材料料的干燥及清清理,必须符符合规范及焊焊接操作规定定。③焊接双面焊件件时,应清理理并检查焊缝缝根部背面,清清理缺陷后,方方可施焊背面面焊缝。规定定清根的焊缝缝应在清根后后进行外观检检查后方可施施焊。④管壁大于4mmm的管道焊接接前必须打坡坡口,坡口表表面不得有夹夹层、裂缝、加加工损伤、毛毛刺及焰切割割熔渣等缺陷陷。焊接后药药皮应敲干净净,焊口应呈呈现均匀的鱼鱼鳞状,不得得有气孔、夹夹渣、裂纹、焊焊瘤等现象,咬咬肉长度应在在规范要求内内。大于20mm的的放气阀门采采用法兰连接接,小于或等等于20mm的放气阀门门采用螺纹连连接。管道转弯、穿墙墙及支吊架处处,不应有接接口和焊缝,管管道穿越墙壁壁应预埋套管管,套管直径径应比管道保保温外径大50mm。管道最高高点设放气阀阀,最低点设设放水阀。4.1.6阀阀门的安装1)阀门安装前前应核对阀门门的规格型号号和检查阀门门的外观质量量。2)阀门安装前前应作强度和和严密性试验验。试验应在在每批(同牌牌号、同型号号、同规格)数数量中抽查110%,且不不应少于一个个。对于安装装在主干管上上起切断作用用的闭路阀门门,应逐个作作强度和严密密性试验。阀阀门试压宜在在专用的试压压台上进行。3)阀门的强度度和严密性试试验,应符合合下列规定::阀门的强度度试验压力为为工称压力的的1.5倍;;严密性试验验压力为公称称压力的1..1倍;试试验压力在试试验持续时间间内应保持不不变,且壳体体填料及阀瓣瓣密封面无渗渗漏。阀门试试压的试验持持续时间不应应少于下表的的规定。阀门试验持续时时间公称直径DN(mm)最短试验持续时时间(s)严密性试验强度试验金属密封非金属密封≤5015151565~200301560250~450060301804)阀门法兰的的衬垫不得凸凸入管内,其其外边缘接近近螺栓孔为宜宜,不得安装装双垫或偏垫垫。5)连接法兰的的螺栓,直径径和长度应符符合标准,拧拧紧后,突出出螺母的长度度不应大于螺螺杆直径的11/2。4.1.7管道道水压试验及及消毒1)一般规定(1)水压试验验应在回填土土前进行。(2)水压试验验前,对试压压管段应采取取有效的固定定和保护措施施,但接头部部位必须明露露。(3)水压试验验管段长度一一般不要超过过1000mm,超过长度度宜分段试压压,并应在管管件支敦达到到强度后方可可进行。(4)试压管段段不得采用闸闸阀做堵板,不不得与消火栓栓等附件相连连,已设置这这类附件的要要设置堵板,各各类阀门在试试压过程中要要全部处于开开启状态。(5)管道水压压试验前后要要做好水源引引进及排水疏疏导路线的设设计。(6)管道灌水水应从下游缓缓慢灌入。灌灌入时,在试试验管段的上上游管顶及管管段中的凸起起点应设排气气阀将管道内内的气体排除除。(7)水压试验验的压力表应应校正,弹簧簧压力计的精精度不应低于于1.5级,最最大量程宜为为试验压力的的1.3~1.5倍,表表壳的公称直直径不应小于于150mmm,压力表至至少要有两块块。2)试压及消毒毒程序如下(1)按本标准准有关工艺铺铺设连接试验验管道,进水水管段,安装装阀门、试压压泵、压力表表等。(2)缓慢充水水,冲水后应应把管内空气气全部排尽。(3)空气排尽尽后,将检查查阀门关闭好好,进行加缓缓慢加压,先先升至工作压压力检查,再再升至试压压压力观察,然然后降至工作作压力读表,符符合本标准质质量标准为合合格。(4)升压过程程中,若发现现弹簧压力计计表针摆动、不不稳、且升压压缓慢则气体体没排尽,应应重新排气后后再升压。(5)试压过程程中,全部检检查若发现接接口渗漏,应应作出明显标标记,待压力力降至零后,制制定修补措施施全面修补,再再重新试验,直直至合格。(6)试验合格格后,进行冲冲洗,冲洗合合格后,应立立即办理验收收手续,组织织回填。(7)新建室外外给水管道于于室内管道连连接前,应经经室内外全部部冲洗合格后后方可连接。(8)冲洗标准准当设计无规规定时,以出出口的水色和和透明度与入入口处的进水水目测一致为为合格。(9)饮用水管管道在使用前前的消毒用每每升水含200~30mg的游游离氯的清水水灌满后消毒毒。含氯水在在管道中应静静置24h以上,消毒毒后再用水冲冲洗。常用的的消毒剂为漂漂白粉,进行行消毒处理时时,把漂白粉粉放入水桶内内,加水搅拌拌溶解,随同同管道充水一一起加入管段段,浸泡244小时后,放放水冲洗。新新安装的饮用用水管道可采采用下表选用用剂量。每100m管道道消毒用水量量及漂白粉用用量表管径DN(mmm)15~5075100150200250300350400用水量(m3)0.8~568142232425675漂白粉用量(kkg)0.090.110.140.140.380.550.930.971.34.1.8室外外消火栓安装装1)室外消火栓栓质量要求室外消火栓、阀阀门等产品型型号的选用应应遵守设计要要求。严格检查消火栓栓各处开关是是否灵活、严严密、吻合,所所配带的附属属设备配件是是否齐全。产品要具有生产产合格证和消消防主管部门门的认可证书书2)室外消火栓栓安装工艺流流程水压试验水压试验安装支管砌筑支敦连接管道防腐安装消火栓管道穿井壁空隙的处理检查消火栓等设备3)室外消火栓栓安装操作工工艺室外消防火栓所所有外露消防防设施,均应应按规定油漆漆红色。其消消防火栓的安安装栓体支墩墩不要放在回回填土上,室室外消火栓距距路边不应大大于2m,如大于2m,则消火栓与管管之间加弯头头连接,以保保证消防栓与与路边的距离离满足要求,且且消防栓底部部应设支墩。室外消火栓的安装应参照标准图01S201、99S203。厂区室外消防给给水管道上的的阀门井做法法可参照(05S5002)阀门井的的做法施工,阀阀门井应设集集水坑。埋入土中的管道道防腐按图纸纸设计要求,法法兰接口涂沥沥青冷底子油油及沥青漆各各两道,并用用沥青麻布或或0.2mmm厚底塑料薄薄膜包严。消火栓的水压试试验和冲洗参参照与管网水水压试验和冲冲洗。4.1.9埋埋地钢管的防防腐1)防护层施工工环境应在胶粘带制造造商提供的说说明书推荐的的环境条件下下进行,施工工时的温度应应高于露点温温度3℃以上,在风风沙较大、雨雨雪天气时,没没有可靠的防防护措施,不不应进行现场场施工。2)钢管表面预预处理钢管表面除锈前前,应清除钢钢管表面的焊焊渣、毛刺,并并用适当的方方法将附着在在钢管外表面面的油、油脂脂及任何其它它杂质清除干干净。钢管表面除锈宜宜采用喷(抛抛)射除锈方方式。受现场场施工条件限限制时,经设设计选定,可可采用动力工工具除锈方法法。采用喷(抛抛)射除锈时时,其质量应应达到《涂装装前钢材表面面锈蚀等级和和除锈等级》GB/T88923规定的Sa2.5级;采用电电动工具除锈锈方法时,除除锈等级达到到St3级。除锈后,对可能能刺伤防腐层层的尖锐部分分应进行打磨磨。并将附着着在金属表面面的磨料和灰灰尘清除干净净。钢管表面预处理理后至涂底漆漆前的时间间间隔宜控制在在4h内,期间应应防止钢管表表面受潮和污污染。涂底漆漆前,如出现现返锈或表面面污染时,必必须重新进行行表面预处理理。3)底漆涂敷使用前,底漆应应充分搅拌均均匀。按照制造商提供供的底漆说明明书的要求涂涂刷底漆。底底漆应涂刷均均匀,不得有有漏涂、凝块块和流挂等缺缺陷。待底漆表干后再再缠绕胶粘带带,期间应防防止表面污染染。4)胶粘带缠绕绕胶粘带的解卷温温度应满足胶胶粘带制造商商规定的温度度。宜使用专专用缠绕机或或手动缠绕机机进行缠绕施施工。在缠绕绕时,如焊缝缝两侧可能产产生空隙,应应采用胶粘带带制造商配套套供应的填料料填充焊缝两两侧。螺旋焊焊缝管缠绕胶胶粘带时,缠缠绕方向应与与焊缝方向一一致。按预先选定的工工艺,在涂好好底漆的钢管管上按照搭接接要求缠绕,胶胶粘带始末搭搭接长度应不不小于1/4管子周长,且且不少于100mm。两次缠绕绕搭接缝应相相互错开。搭搭接宽度遵照照设计规定,但但不应低于25mm。缠绕时搭搭接缝应平行行,不得扭曲曲皱褶,带端端应压贴,使使其不翘起。工厂预制聚乙烯烯胶粘带防腐腐层,管端应应有150mmm±10mmm的焊接预留留段。防腐管管应按照SY/T00414-22007第7章的要求进进行质量检验验,检验合格格后方可出厂厂。5)预制防腐管管的标志、堆堆放和运输合格的防腐管在在距管端约1m处作出标志志,标明钢管管规格、材质质、防腐层类类型、等级、涂涂敷商名称、生生产日期和执执行标准等。防腐层吊架应采采用宽尼龙带带或专用吊具具,不能用损损伤防腐层的的吊具。采用用合理的吊装装方法,轻吊吊轻放,严禁禁损伤防腐层层。运输时应采取相相应的防护措措施防止损伤伤防腐层。6)补伤及补口口修补时先修整损损伤部位,并并清理干净,涂涂上底漆。使用与管体相同同的胶粘带修修补时,宜采采用缠绕法;;也可使用专专用胶粘带采采用贴补法修修补。缠绕和和贴补宽度应应超出损伤边边缘至少50mm。使用与管体相同同的胶粘带修修补时,防腐腐层结构、等等级应与管体体相同;采用用专用补伤带带时,其防腐腐层性能应不不低于管体防防腐层。补口带与原防腐腐层搭接宽度度应不小于100mm。补口处防防腐等级应不不低于管体防防腐层。4.2厂区室外外生活污水管管道安装施工工工序生活污水管材质质量要求1)颜色应均匀匀一致,无色色泽不均及分分解变色线;;2)内壁光滑、平平整、无气泡泡、裂口、脱脱皮、严重的的冷斑及明显显的裂纹、凹凹陷;3)管材轴向不不得有异向弯弯曲,其直线线度偏差应小小于1%,端口必必须平直其垂垂直于轴线;;4)管件应完整整无损,无变变形、合模缝缝、浇口应平平整无开裂;;5)管材、管件件的承插口工工作面应平整整、尺寸准确确,以保证接接口的密封性性能。生活污水管道道安装作业条条件管沟平直,管沟沟深度、宽度度符合要求,阀阀门井、表井井垫层,消火火栓底座施工工完毕。管沟沟底夯实,沟沟内无障碍物物。且应有防防塌方措施。管沟两侧不得堆堆放施工材料料和其它物品品。4.2.3生生活污水管道道安装工艺流流程下管检验下管机具和绳索检查沟底标高和管基强度接口闭水实验下管前管材检验下管检验下管机具和绳索检查沟底标高和管基强度接口闭水实验下管前管材检验1)管道安装铺铺设规定厂区室外生活污污水管道系统统采用重力流流与压力流管管道相结合的的管道系统,重重力流管道采采用HDPE双壁波纹管管(接室内排排水支管为PVC-U管),承插插弹性密封连连接(PVC-U管溶剂粘接接),压力流流污水管采用用钢丝网骨架架塑料复合管管,电熔连接接。化粪池的做法及及安装参见标标准图集《砖砖砌化粪池》(02S701)。厂区室外重力流流污水管道检检查井均采用用砖砌圆形检检查井,施工工参照标准图图集《排水检检查井》(02S5115)。厂区室外重力流流污水管道检检查井的井顶顶面标高与所所在位置的场场地标高一致致,井中采用用流槽连接,其其衔接方式原原则上采用管管顶平接,当当检查井的进进出管管径相相等时,所注注标高为检查查井中心流槽槽底面标高;;当进出管管管径不同时,则则所注标高分分别为进出水水管口的内底底面标高。对于钢丝网骨架架塑料复合管管的管道连接接,由生产厂厂家提供技术术条件。2)闭水试验管道应于充满水水24h后进进行严密性检检查,水位应应高于检查管管段上游端部部的管顶。如如地下水位高高出管顶时,则则应高出地下下水位。一般般采用外观检检查,检查中中应补水,水水位保持规定定值不变,无无漏水现象则则认为合格。4.3管沟施施工4.3.1管道道开挖与回填填施工要求沟槽开挖:开挖挖沟槽设管道道的沟底标高高,必须符合合设计要求,清清除堆积在沟沟槽的回填土土,准确的将将地基整平至至规定标准;;凹凸度必须须小于+50、-100mmm;个别地方方的超挖,应应用碎石和砂砂填补夯实。管管道施放须与与沟槽底开挖挖线间净距及及并排敷设管管壁间净距必必须符合图纸纸要求。管道的回填:为为了保证管道道外壁与周围围土壤良好接接触,提高管管道承载能力力和安全运行行,管道敷设设完并检查后后,对沟槽内内回填土要严严格要求。回回填土料以轻轻亚粘土,不不得用粉砂、细细沙、淤泥、石石块、砖块冻冻土等,当填填土时,不允允许用坚硬的的纯粘土回填填夯实,回填填必须在管道道两侧同时分分层进行,并并逐层夯实,每每层回填土厚厚度为20~30厘米。管沟开挖工艺流流程测量放线定位钉中心桩管沟回填测量放线定位钉中心桩管沟回填确定线路管沟开挖(1)测量、定定位测量之前先找固固定好水准点点,并沿管道道线路设置临临时水准点。测量管线中心线线和转弯处的的角度,并与与当地固定建建筑物相连。给水管道坐标和和标高偏差要要符合本标准准的规定,从从测量定位起起就应控制偏偏差值符合偏偏差要求。(2)沟槽开挖挖按设计图纸要求求及测量定位位的中心线,依依据沟槽开挖挖计算尺寸,撒撒好灰线。挖掘管沟和检查查井底槽时,沟沟底留出155~20cm暂不不开挖。待下下道工序进行行前抄平开挖挖,如个别地地方不慎破坏坏了天然土层层,要先清除除松动土壤,用用砂等填至标标高,夯实。当遇到有地下水水时,排水或或人工抽水应应保证下道工工序进行前将将水排除。敷设管道前,应应按规定进行行排尺,并将将沟底清理到到设计标高。采用机械挖沟时时,应由专人人指挥。为确确保机械挖沟沟时沟底的土土层不被扰动动和破坏,用用机械挖沟时时,当天不能能下管时,沟沟底应留出00.2m左右右一层不挖,待待铺管前人工工清挖。(3)回填管道安装验收合合格后应立即即回填。回填时沟槽内应应无积水,不不得带水回填填,不得回填填淤泥、有机机物及冻土。回回填土中不得得含有石块、砖砖及其它杂硬硬物体。管道两侧及管顶顶以上0.55m部分的回回填,应同时时从管道两侧侧填土分层夯夯实,不得损损坏管子和防防腐层,沟槽槽其余部分的的回填也应分分层夯实。管管子接口工作作坑的回填必必须仔细夯实实。管道回填宜在管管道充满水的的情况下进行行,管道敷设设后不宜长期期处于空管状状态。4.4质量控控制计划按《机械设备安安装工程标准准及验收规范范》4.4.1给给水管道安装装质量标准1)一般规定室外消防、工业业、生活给水水管道采用钢钢丝网骨架塑塑料复合管、镀镀锌钢管、无无缝钢管、衬衬塑钢管,其其管材、管件件应是同一厂厂家的配套产产品。2)主控项目(1)管道的接接口法兰、卡卡口、卡箍等等应安装在检检查井或地沟沟内,不应埋埋在土壤中。检检验方法:观观察检查(2)管网必须须进行水压试试验,试验压压力为工作压压力的1.55倍。检验方法:管材材为钢管时,试试验压力下110min内内的压力降不不应大于0..05Mpaa,然后降至至工作压力进进行检查,压压力应保持不不变,不渗不不漏;管材为为塑料复合管管时,试验压压力下,稳压压1h压力降降不大于0..05Mpaa,然后降至至工作压力进进行检查,压压力应保持不不变,不渗不不漏。(3)镀锌钢管管、钢管的埋埋地防腐必须须符合设计要要求,如设计计无规定时,可可按表《管道道防腐层种类类》的规定执执行。检验方法:观察察和切开防腐腐层检查。(5)给水管道道在竣工后,必必须对管道进进行冲洗,饮饮用水管道还还要在冲洗后后进行消毒,满满足饮用水卫卫生要求。检验方法:观察察冲洗水的浊浊度,查看有有关部门提供供的检验报告告。3)一般项目(1)管道的坐坐标、标高、坡坡度应符合设设计要求,管管道安装的允允许偏差应符符合表《室外外给水管道安安装的允许偏偏差和检验方方法》的规定定。(2)管道连接接应符合工艺艺要求,阀门门安装的位置置应正确。检验方法:现场场观察检查。(3)给水管道道与污水管道道在不同标高高平行敷设,其其垂直间距在在500mmm以内时,给给水管管径小小于或等于2200mm的的,管壁水平平间距不得小小于1.5mm;管径大于于200mmm的,不得小小于3m。检验方方法:观察和和尺量检查室外给水管道安安装的允许偏偏差和检验方方法项次项目允许偏差(mm)检验方法1坐标铸铁管埋地100拉线和尺量检查敷设在沟槽内50钢管、塑料管、复复合管埋地100敷设在沟槽内或或架空402标高铸铁管埋地±50拉线和尺量检查敷设在沟槽内±30钢管、塑料管、复复合管埋地±50敷设在沟槽内或或架空±303水平管纵横向弯曲铸铁管埋地40拉线和尺量检查敷设在沟槽内钢管、塑料管、复复合管埋地30敷设在沟槽内或或架空4)成品保护给水管道、管件件、阀门及消消火栓运、放放要避免碰撞撞损伤。消火栓并及表井井要及时砌好好,以保证管管件安装后不不受损坏。埋地管要避免受受外荷载破坏坏而产生变形形,试水完毕毕后要及时泄泄水,防止受受冻。管道穿公路基础础要加套管。地下管道回填土土时,为防止止管道中心线线位移或损坏坏管道,应用用人工先在管管子周围填土土夯实,并应应在管道两边边同时进行,直直至管顶0..5m以上时时,在不损坏坏管道的情况况下,方可采采用蛙式打夯夯税夯实。在管道安装过程程中,管道未未捻口前应对对接口处做临临时封堵,以以免污物进入入管道。无缝钢管焊接时时应注意不要要在管道外壁壁面起弧,应应在坡口内起起弧。以免擦擦伤,影响外外观。不在现场组装的的管段在运输输过程中应防防止擦伤,在在现场组装的的管段,组装装后应堆放在在有防护或遮遮盖的场地,以以防锈蚀。焊后应按要求做做防锈及保温温处理。4.4.2室外外消火栓安装装质量标准1)一般规定室外消火栓的安安装位置、形形式必须符合合设计要求。2)主控项目系统必须进行水水压试验,在在试验压力下下,10miin内压力力降不大于00.05Mppa,然后降降至工作压力力进行检查,压压力保持不变变,不渗不漏漏。消防管道在竣工工前,必须对对管道进行冲冲洗。检验方法:观察察冲洗出水的的浊度。消火栓的位置标标志应明显,栓栓口的位置应应方便操作。检验方法:观察察和尺量检查查。3)一般项目室外消火栓的各各项安装尺寸寸应符合设计计要求,栓口口安装高度允允许偏差未±20mm。检验方法:尺量量检查。4)成品保护定位控制桩,挖挖好的沟槽等等均应有保护护措施给水管道敷设完完毕,管沟回回填之前,应应由保护措施施,以免管道道受破坏。冬季施工水压试试验应由保护护措施,试压压完毕后应排排尽水,以免免管道冻裂。消火栓、消防水水泵接合器等等安装完毕交交工之前施工工现场应由保保护措施。4.4.3生活活污水管道安安装质量标准准1)一般规定室外生活污水管管道采用钢丝丝网骨架塑料料复合管和HDPE双壁波纹管管。其规格及及质量必须符符合现行国家家标准及设计计要求。2)主控项目排水管道的坡度度必须符合设设计要求,严严禁无坡和倒倒坡。管道埋设前必须须做灌水实验验和通水试验验,排水应通通畅,无堵塞塞,管接口无无渗漏。3)一般项目管道的坐标和标标高应符合设设计要求,安安装的允许偏偏差应符合下下表的规定。室外排水管道的的安装的允许许偏差和检验验办法项次项目次允许偏差(mmm)项检验方法1坐标埋地100拉线尺量敷设在沟槽内502标高埋地±20用水平仪、拉线和尺量敷设在沟槽内±204)成品保护污水管道、管件件、阀门运、放放要避免碰撞撞损伤。阀门井要及时砌砌好,以保证证管件安装后后不受损坏。埋地管要避免受受外荷载破坏坏而产生变形形。管道穿公路基础础要加套管。地下管道回填土土时,为防止止管道中心线线位移或损坏坏管道,应用用人工先在管管子周围填土土夯实,并应应在管道两边边同时进行,直直至管顶0..5m以上时时,在不损坏坏管道的情况况下,方可采采用蛙式打夯夯税夯实。在管道安装过程程中,管道未未捻口前应对对接口处做临临时封堵,以以免污物进入入管道。4.4.4管沟沟施工质量标标准1)一般规定冬季井室施工应应有防冻措施施,夏季施工工应有防晒措措施。2)主控项目管沟的基层处理理和井室的地地基必须符合合设计要求。检验方法:现场场观察检查。各类井室的井盖盖应符合设计计要求,应有有明显的文字字标识,各种种井盖不得混混用。检验方法:现场场观察检查。重型铸铁或混凝凝土井圈,不不得直接放在在井室的砖墙墙上,砖墙上上应做不少于于80mm厚的的细石混凝土土。检验方法:观察察和尺量检查查。3)一般项目管沟的坐标、位位置、沟底标标高应符合设设计要求。检验方法:观察察、尺量检查查。管沟底沟底层应应是原土层,或或是夯实的回回填土,沟底底应平整,坡坡度应顺畅,不不得有尖硬的的物体、石块块等。检验方法:观察察检查。如沟为岩石、不不易清除的块块石或为硕石石层时,沟底底应下挖1000~200mmm,填铺细纱纱或粒径不大大于5mm的细土土,夯实到沟沟底标高后,方方可进行管道道敷设。检验方法:观察察和尺量检查查管沟回填土,管管顶上部2000mm以内内应用砂子或或无块石及冻冻土块的土,并并不得用机械械回填;管顶顶上部5000mm以内不不得回填直径径大于1000mm的块石石和冻土块;;500mmm以上部分回回填土中的块块石和冻土块块不得集中。上上部用机械回回填时,机械械不得在管沟沟上行驶。检验方法:观察察和尺量检查查。4.5施工过过程控制规范范室外消防给水管管道设计压力力为1.2Mpa,试验压力力为1.6Mpa;室外工业业水管的工作作压力与验收收压力分别为为0.65MMpa,1.2Mpa;室外生活活水管的工作作压力与验收收压力分别为为0.60MMpa,1.2Mpa。管道安装及验收收标准,按::《给水钢丝网骨骨架塑料复合合管道工程技技术规程》(CECS1181.20005)《给排水管道工工程施工及验验收规范》(GB502268-977)《中华人民共和和国国家标准准建筑给水排排水及采暖工工程施工质量量验收规范》GB502442-20002《埋地高密度聚聚乙烯中空壁壁缠绕结构排排水管道工程程技术规程》(DBJ/T15-333-20033)《室外给水管道道附属构筑物物》(05S5002)《室外消火栓安安装》(01S2001)《钢质管道聚乙乙烯粘带防腐腐层技术标准准》(SY/T00414-22007)5、质量控制点点的设置和质质量通病预防防5.1质量目标标根据工程总体质质量目标和专专业分项目标标,本项目的的质量目标为为:分项工程程验收合格率率达100%。5.2质量控制制及质量通病病预防序号质量通病预想预防措施1埋地管道断裂做好管基处理,按按设计要求填填土夯实2阀门井深度不够够,地上消火火栓的顶部出出水口距井盖盖底部距离小小于400mmm准确控制埋地管管道坐标及标标高3管道冲洗数遍,水水质仍达不到到设计要求和和施工规范规规定管道连接前,管管膛清扫干净净5.3室外管网网安装的控制制点的设置序号控制点检验单位班组施工队项目部监理控制点1定位放线★★★★W2沟槽开挖★★★W3沟底处理★★★H4管道防腐★★★★H5管道安装★★★★H6给水管道通水、试试压★★★★S7排水管道灌水试试验★★★★S8管沟回填★★★★H9管道冲洗与消毒毒★★★★HR:记录确认点点W:见证点H:停工待检检点S:连续监视视监护5.4质量标标准及要求序号项目名称执行验收标准备注1电力建设施工质质量验收及评评定规程第1部分:土建建工程DL/T52210.1-220052火电施工质量检检验及评定标标准(焊接篇篇)建质[19966]111号3火电施工质量检检验及评定标标准(第十篇篇加工配置)(83)水电基基火字第137号4火电工程调整试试运质量检验验及评定标准准建质[19966]111号5检测方法6火电施工质量检检验及评定标标准6、作业的安全全要求和作业业的安全危害害因素辩识和和控制6.1作业的的安全要求作业的安全要求求.1对参加施工工管理的操作作人员进行施施工前技术、质质量、安全交交底,实行全全员签字,施施工工期超过过1个月的重复复进行技术、质质量、安全交交底,明确分分工和责任。.2现场施工区区均设立专职职安全员,进进行监督检查查,发现问题题及时采取措措施。.3所有参加作作业人员必须须认真遵守《电电力建设安全全工作规程》和和《电力建设设安全健康与与环境管理工工作规定》,杜杜绝“三违”现象(违章章指挥、违章章作业、违反反劳动纪律)。.4进入施工区区必须戴安全全帽,穿工作作服,不准穿穿拖鞋、高跟跟鞋,非施工工人员不准进进入施工现场场。.5严格按照施施工机械操作作规程施工,对对机械设备非非专业人员不不得动用,机机械操作人员员必须持有效效的上岗证件件方可作业。.6各种工具(锹锹、镐、锄等等)必须坚实实,工具把柄柄应用坚硬的的木料制成,表表面必须刨光光。锹、镐、锄锄等应有倒楔楔子使其安装装牢固,操作作人员在使用用这些工具时时一定要注意意前后方同时时作业的人员员的安全距离离,防止碰伤伤。.7所有电源设设备均应设有有漏电保护器器,定期检查查,防止触电电。.8夜间施工应应有足够的照照明,照明线线不得沿地面面敷设,以防防机械压断,造造成事故。.9所有机械设设备必须做到到早晚都检查查,确保机械械工作性能良良好,安全作作业。.14临时用电电线路要绝缘缘良好,并且且施工用工机机具要安装漏漏电保护器,使使用前要对漏漏电保护进行行试验以保证证漏电保护器器的可靠性。.15下雨时时要做好防触触电工作,雨雨后及时清理理积水。.17电源闸箱箱下班后切断断电源并锁上上,用电设备备要有防雨措措施,非电工工人员严禁私私接电源线。.18电焊机按按国华电厂要要求设置在电电焊机集装箱箱内,并有可可靠的保护接接零、接地措措施。.19焊工要持持证上岗,作作业时要穿好好绝缘鞋,戴戴焊工手套,焊焊接时必须使使用专用电焊焊帽和防护罩罩。6.1.1.119凡属一、二二、三级动火火范围的焊、割割作业,未办办理火审批手手续,不准进进行焊、割。6.1.1.220焊工不不了解焊、割割现场周围情情况,不得进进行焊、割。6.1.1.221焊工不不了解焊件内内部是否安全全时,不得进进行焊、割。6.1.1.222各种装装过可燃气体体,元气燃液液体和有毒物物质的容器,未未经彻底清洗洗,排队危险险性之前,不不准进行焊、割割。6.1.1.223用可燃材材料作保温层层、冷却层、隔隔热设备的部部位,或火星星能尽溅到的的地方,在未未采取切实可可靠的安全措措施之前,不不准焊、割。6.1.1.224有压力力或密闭的管管道、容器,不不准焊、割。6.1.1.225焊、割部部位附近有易易燃易爆物品品,在未作清清理或未采取取有效的安全全措施之前,不不准焊、割。6.1.1.226附近有有与明火作业相抵触触的工种在作作业时,不准准焊、割。6.1.1.227与外单单位相连的部部位,在没有有弄清有无险险情,或明知知存在危险而而未采取有效效的措施之前前,不准焊、割割。吊装工作区应有有明显标志,并并设专人警戒戒,与吊装无无关人员严禁禁人内。起重重机工作时,起起重臂杆旋转转半径范围内内,严禁站人人或通过。严禁在被运输、吊吊装的工件上上站人指挥和和放置材料、工工具。构件必须绑扎牢牢固,起吊点点应通过构件件的重心位置置,吊升时应应平稳,避免免振动或摆动动。起吊构件件时,速度不不应太快,不不得在高空停停留过久,严严禁猛升猛降降,以防构件件脱落。构件就位后临时时固定前,不不得松钩、解解开吊装索具具。构件固定定后,应检查查连接牢固和和稳定情况,当当连接确定安安全可靠,才才可拆除临时时固定工具和和进行下步吊吊装。消防管理.1凡有明火的的地方,必须须有用火准用用证,设专人人负责,常检检查,常督促促,特别是夜夜间,确保安安全,防止火火灾事故发生生。.2严格按照照《电力建设设安全工作规规程》(第1部分:火力力发电厂DJ50009.1-22002)中“防火防爆”的要求进行行施工区域消消防器材的配配备及布置。6.2施工危危险因素和环环境因素辨识识及对策表施工条件项目名称:输煤煤系统室外消消防、工业水水、生活水及及生活污水管管道安装序号危险点描述控制对策实施负责人确认签证人场地和环境1在施工现场照明明不足在每个作业点安安装充足的照照明灯具并能能正常投入使使用。序号危险点描述控制对策实施负责人确认签证人2电焊机露天摆放放露天摆放的电焊焊机放在干燥燥场所,有棚棚遮蔽或使用用电焊机专用用箱3临时施工平台搭搭设、使用不不合理专业人员搭设,验验收合格并挂挂牌后,方可可施工,并不不得超载使用用。4施工中废弃物不不集中回收施工中废弃物及及时清理,不不得乱扔乱抛抛,并集中回回收到指导定定存放处。5梯子、栏杆、平平台不完善在梯子、平台、栏栏杆不完善处处加临围栏、盖盖板并挂警示示牌。6施工现场有孔洞洞、沟槽施工现场的孔洞洞、沟槽加盖盖盖板、围栏栏;下方铺设设安全网。作业和人员1在吊装物下接料料或逗留,坠坠物伤人禁止在吊装物下下通过停留,接接料人员必须须按操作规程程施工。2大锤脱手伤人使用大锤时拴保保险绳,且对对面严禁站人人。3作业人员施工态态度不端正施工人员严禁嬉嬉戏、打斗,严严禁酒后作业业。4私拉乱接电源严禁私拉乱接电电源,电源拆拆线、维护由由专业电工负负责。5钢丝绳使用不当当钢丝绳必须有88倍以下保险险系数并在与与吊物尖锐棱棱角接触处垫垫关圆板。序号危险点描述控制对策实施负责人确认签证人6吊挂物脱落钢丝绳与管道接接触处垫防滑滑物,吊挂生生根牢固并进进行二次保护护。7起重区域、起重重臂下吊装通通道有人设警戒区域,设设专门监护人人,拒绝任何何人通过。使用工机具1电焊机无可靠接接地电焊机外壳必须须进行保护接接零和重复接接地。2电动工具漏电使用前进行检查查,确认电动动工具完好并并装有漏电保保护器。4工机具不合格或或损坏使用前进行检查查、维修。5操作非本专业工工机具严禁操作非本专专业的工机具具。6施工触电施工场所要干燥燥、电焊二次次线使用胶皮皮软线。电源源线架空,或或埋入地下。7锁具安全系数低低安全系数达到88倍以上。8手拉葫芦使用不不当使用前检查,修修理合格;使使用中必须受受力均匀,不不超载使用;;手链必须备备牢,防止滑滑脱。6.2.2环境境条件项目名称:输煤煤系统室外消消防、工业水水、生活水及及生活污水管管道安装序号危险点描述控制对策实施负责人确认签证人1在施工现场照明明不足在每个作业点安安装充足的照照明灯具并能能正常投入使使用。2施工中废弃物不不集中回收施工中

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论