版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Drafted Checked Reviewed Approved Modification-AFANGCHENGGANGNUCLEARPOWER PHASE (21000MW) PROJECT文件编DOC. LNCPRODUCTIONANDDISTRIBUTION 220VAC VITAL SYSTEM MANUALCHAPTER 5 OPERATING工程Project文件类Document子项Sub-Item设计阶EngineeringCBDocument A:B:C:深圳中广核工程设计有限公司 NationalAgradeengineeringCertificationNO:Natio
2、nalAgradeengineeringCertificationNO:内部编码Internal This document is the property of CNPDC It must not be used、reproduced、transmitted or disclosed without the prior written permission of CNPDC 本文件之产权属于中广核工程设文文件种类LNCPRODUCTIONLNCPRODUCTIONANDDISTRIBUTION220VACVITALSYSTEM5OPERATINGRev版本记REVISION版日状编Draft
3、ed校Checked审Reviewed批Approved修改说Modification-文件修改记版日章页修改范围及依A2010-3-FIRSTLNCPRODUCTIONLNCPRODUCTIONANDDISTRIBUTION220VACVITALSYSTEM5OPERATINGRevTOC o 1-2 h z u HYPERLINK l _TOC_250006 OPERATING HYPERLINK l _TOC_250005 HYPERLINK l _TOC_250004 HYPERLINK l _TOC_250003 HYPERLINK l _TOC_250002 STARTUPANDN
4、ORMAL HYPERLINK l _TOC_250001 OTHER HYPERLINK l _TOC_250000 CONTROLLNCPRODUCTIONLNCPRODUCTIONANDDISTRIBUTION220VACVITALSYSTEM5OPERATINGRevOPERATINGNormalUnder normal operation, the charger fed from the emergency-supplied 380V AC switchboard,providestheinverterandfloatsthebatteryorrechargesitasnecess
5、ary. The battery is only required to handle transient load peaks. The charger selector switch (001CC) is set to automatic. The charger is operated in the float mode and voltage is maintained constant at float voltage setting.Followingtheinverterpowersthedistributionunit,whiletheinverterswitch(101CC)
6、 is on position on and the bypass switch (102 CC) is on position inverter.TheinverterisoperatedParticularsteadyChargerfloat Theselectorswitch(001CC)issettofloat.Voltageatchargerterminalsis maintained constant at the float voltage setting.Charger recharge/equalize Theselectorswitch(001CC)issettorecha
7、rge/equalize.Voltageatcharger terminals is maintained constant at recharge/equalize voltage setting.Chargermanualmode(withloadVoltageisadjustedmanuallybyusingapotentiometer(locatedonthecharger regulation printed circuit board). This mode overrides the other three modes (automatic, float, recharge/eq
8、ualize). Voltage adjustment range is 0 to 156 V.Theoperatormonitorschargingcurrentbyusinganotherpotentiometer(alsolocated on the charger regulation printed circuit board) and maintains it at a value not exceeding 0.03 C10(Ah).Inverter In case of loss the 110VDC voltage or an internal defect of the i
9、nverter, the power supplyisautomaticallyprovidedthroughatransformerregulatorpoweredfromthe 380V AC switchboard.Inverter In case of the inverter not available or during maintenance, the power supply is manuallyswitchedovertothe380VACswitchboardthoughamanualbypassswitch ParticulartransientLossofACchar
10、gerinputIntheautomaticmode,chargeroperationisasAfterlossofACpowerforaperiodoftimelessthanaswitchsetting(3-6-12min.), the charger is automatically restored to the pre-transient operating mode i.e. float or recharge/equalize. The switch is mounted in the charger enclosure (switch set to 6 After loss o
11、f AC power for a period of lime greater than the switch setting, the chargerresumesoperationintherecharge/equalizemodeforadurationdeterminedby atimer(alsomountedinchargerenclosure) adjustablefrom0to60hours(timersetto 15 hours). The charger then switches to float service.ChargerShortcircuit Charger p
12、erformance and characteristics are not affected by a short circuit. Selectivetrippingisprovidedbytime-delayedmagneticreleaseinthebattery incoming breaker.Chargerovercurrentprotectioncircuitryactuatesafterabout10ms. Short-circuit downstream of an outgoing breakerThebreakeristrippedafter8msbyitsmagnet
13、icrelease(thistimeincludesrelay inertia and breaker opening time).Short-circuitontheDCAfter90ms,thebatteryincomingbreakertrips; Short -circuit downstream of chargerThechargerisabletosupplyconstantlynominalcurrentalsoincaseofshortcircuit, iftheshortcircuitexitforalongtime(thetimewillbedecidedbytheman
14、ufactory), the charger will switch off the incoming breaker with help the charger over current and under voltage protection. The battery incoming breaker does not trip because of its time-delayed magnetic release.Short-circuitonACsideofThechargerAC(380V)busbreakerisCharger ThechargerincomingandACbus
15、breakers(101JA)areautomaticallyInverter TheinverterDCbreaker(102JA)isautomaticallySuddenvariationsorlossof110Vvoltagefor inverterDuring sodden variations in the inverter power supply voltage (from 96.3V to 121V), the instantaneous variation in the switchboard voltage does not exceed 15% of 220V. Sho
16、uldthevoltagedropbelow96.3VDCorriseabove121VDCtheinverterwilltrip and a transfer to the standby supply will be initiated.Load variations ontheinverterFor instantaneous load variations of 50% when initial power is between nominal powerand30%ofnominalpoweraslongastheinstantaneouspowerdoesnotexceed the nominal power and since the power supply voltage of the inverter is from 85% to 110% Un, the output voltage comes
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 多肽功能食品科技行业经营分析报告
- 在线虚拟实验室行业经营分析报告
- 废物填埋处理行业发展前景及投资风险预测分析报告
- 废物环境监测行业市场调研分析报告
- 云社交媒体行业风险投资态势及投融资策略指引报告
- 中低端酒店品牌推广行业商业机会挖掘与战略布局策略研究报告
- 碳捕获和储存行业营销策略方案
- 电视节目剪辑行业发展全景调研与投资趋势预测研究报告
- 化工废水处理行业市场突围建议及需求分析报告
- 多元文化舞蹈行业五年发展预测分析报告
- 2025届高考数学一轮复习建议《立体几何》
- GB/T 4706.114-2024家用和类似用途电器的安全第114部分:饮用水处理装置的特殊要求
- 5 我爱我们班 (教学设计)2024-2025学年统编版道德与法治二年级上册
- 3.2 学习成就梦想 课件-2024-2025学年统编版道德与法治七年级上册
- 2024年新北师大版七年级上册数学教学课件 2.3有理数的乘除运算课时1
- 2024年全国职业院校技能大赛高职组(化工生产技术赛项)考试题库-中(多选题)
- 2024义务教育数学新课标课程标准2022版考试真题及答案
- JTG D70-2-2014 公路隧道设计规范 第二册 交通工程与附属设施
- 封条模板A4直接打印版
- 大队委竞选课件
- 松木桩地基处理计算表格(自动版)
评论
0/150
提交评论