版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、S Drafted Checked ReviewedApproved Modification-BCHENGGANG NUCLEARPLANT PHASE I (21000MW)文件编DOC. BLXS Drafted Checked ReviewedApproved Modification-BCHENGGANG NUCLEARPLANT PHASE I (21000MW)文件编DOC. BLX17RIC046DIYK45堆芯测量系统手册SystemManual-6.6,6.7Chapter6.6,6.7Operatingprincipleand supply failureProject文
2、件类Sub-ItemEngineeringSAA:B:C:国家甲级工咨甲中广核工程设NationalAgradeengineeringCertificationNO:NationalAgradeengineeringCertificationNO:编ernal isthepropertyofCNPDCItmustnotbeused、reproduced、transmittedordisclosedwithout the prior written permisof CNPDC 本文件之SystemManual-RICChapter6.6,6.7Operatingprinciplesupply版
3、版日状编Drafted 校Checked 审Reviewed 批Approved 修改Modification-ASystemManual-RICChapter6.6,6.7Operatingprinciplesupply版版日状编Drafted 校Checked 审Reviewed 批Approved 修改Modification-ASystemManual-RICChapter6.6,6.7OperatingprinciplesupplyCHENGGANG NUCLEAR PLANTPHASEI(21000MW)堆芯测量系统手册RIC-In-Core System 员可用的控制和信息Sys
4、temManual-RICChapter6.6,6.7OperatingprinciplesupplyCHENGGANG NUCLEAR PLANTPHASEI(21000MW)堆芯测量系统手册RIC-In-Core System 员可用的控制和信息第6.4,6.5 CHAPTER 6.4,6.5 Controls CHINA ER DESIGN JANUARY,SystemManual-RICChapter6.6,6.7OperatingprinciplesupplySystemManual-RICChapter6.6,6.7Operatingprinciplesupply文件修 版日章页修
5、改范围及ABSystemManual-RICChapter6.6,6.7OperatingprincipleSystemManual-RICChapter6.6,6.7OperatingprinciplesupplyOPERATING ER SUPPLY SystemManual-RICChapter6.6,6.7Operatingprinciplesupply6.6 OPERATING In addition to the explanations on the various operating modes given in chapter 5 of the System Design M
6、anual, all operations to be carried out by the operator normal and spe actionSystemManual-RICChapter6.6,6.7Operatingprinciplesupply6.6 OPERATING In addition to the explanations on the various operating modes given in chapter 5 of the System Design Manual, all operations to be carried out by the oper
7、ator normal and spe action to be Operationandloperating conditions, start-up and shutdown, and the course he event enancet system failure, are he Theoperatingprinciplesoftheneutronfluxmeasurements arethe 6.6.1.1Fluxmap-singThese operating modes allow complete, partial or specific exploration of the
8、fifty measurement paths. The operator chooses the mode by performing actions on human-erface of theapplication ion Foreachchannel,thedetectorspeedchanges(pre-selection)areTotal ionoperationcanbeusedinseveral. ionWhen the start-up order is given, the measurement chambers perform their explorations an
9、d return automatically to their initialAt the beginning of operation, the sensitivity of four chambers must adjusted in relation to the fifth. This can be performed roducing the co the same path, called the reference path, which called reference calibration or by sending the probes in back-up o path
10、 ted n adjacent channel, which is called circular The five chambers are raised at low speed ly driven to the bottom of the core, then they the top; they simultaneously carry out measurements and then return to the ition. The path change plished according to the program and the cycle starts again. Al
11、l this dithout ervention. This operating method is the SystemManual-RICChapter6.6,6.7Operatingprinciplesupplymeasuringoperation2) Individualtotalinstrumen ionEach channel operates individually and path selection is manual. This operating method is used, in particular, in the event of temporary unava
12、ilability of a main component of one of the channels causing this particular channel to be unavailable.he case ilure of one channel,SystemManual-RICChapter6.6,6.7Operatingprinciplesupplymeasuringoperation2) Individualtotalinstrumen ionEach channel operates individually and path selection is manual.
13、This operating method is used, in particular, in the event of temporary unavailability of a main component of one of the channels causing this particular channel to be unavailable.he case ilure of one channel, after simultaneous operation of the working channels, the ten normal paths of the defectiv
14、e channel are explored by one of the other four chambers on individual total instrumen ion ModificationmodeDrive system controls are he form of basic actions or t,when o more complex programs, enable exploration of all instrumentedheA basic action may be ted with other such actions to constitute for
15、 insertion of a o or withdrawal from a given path in given mode. These actions, defined as usual may likewise be and synchronized over various channels to ensure automatic generation of complete flux map.The modification mode therefore enables creation or modification by the operator of any flux mea
16、surement sequence or drive system control sequence. The is also authorized to display and modify unit specific parameter tables ition) or the lockout us of certain equipment (drive components,detectorsdeclaredto bein orout of Manualhis mode of operation, the path is selected manually as well as the
17、control and direction of movement. Progress of the chamber is followed on the display screen.This procedure is not normal an be he event of breakdown of pre-selection device or in order to bring the chamber to a SystemManual-RICChapter6.6,6.7OperatingprinciplesupplyUsualmodeBasic actions may be defi
18、ned to be executed for defined detectors such as performing a passage in high or low speed insideSystemManual-RICChapter6.6,6.7OperatingprinciplesupplyUsualmodeBasic actions may be defined to be executed for defined detectors such as performing a passage in high or low speed inside chosen thimbles.
19、These areused toconstitute theactionsperformed duringafluxSurveillancemodeIn standby us, the twin line pervise the nozzles and thimbles detectors,ervaleastone If a leak or a leak detector fault is detected, according to the type of the leak armissenttothecontrol-RIC901KA:thimbleleak,RIC902KA:sealass
20、embly-The localization of the leaks can be ed from the control computer of 6.6.1.2Off-linesingThe RIC sing equipment is able to perform calculation of various parametersderived from theresultof anuclearflux n such In-corenuclearfluxdetectorheterogeneityPerin-corethimbleAveragevalueofthestandardizedf
21、lux the overall active area,umvalueofthestandardizedflux Axial peaking factor,Axialoffsethereferencearea,active area,-heactive-Neutronic calculations per in-core ut o account all the -Reference - Overallpeaking SystemManual-RICChapter6.6,6.7Operatingprinciplesupply-Overallaxialoffset-SystemManual-RI
22、CChapter6.6,6.7Operatingprinciplesupply-Overallaxialoffset-erunitThesedataarestoredbythesystem andcanbe storageedout ortransferred to Thefluxcomputer alsogeneratesthe parametersfor oLOCAcomputer nuclearerrange ThisoperationisusedgenerallyafterfluxThe operator can acquire the enough information on th
23、e BUP and KIC. On the BUP indications and records are given on conventional indicators (digital meter and light) , S-VDUandP-VDU.Thedetailedinformationisrepresentedonchapter4”description and definition of equipment ”.If the thermocouple invalidation pro sing is forbidden by reactor trip signal, safe
24、ty injection signal or all pumps out of service signal, the operator can reset the thermocouple invalidation pro sing by RIC101KG and RIC201KG from S-whenthesesignal If sary, the operator can switch to the raw data display by RIC103CC RIC203CCfromS-SystemManual-RICChapter6.6,6.7Operatingprinciplesup
25、plyER SUPPLY FAILUREOF380VVOLTAGE NeutronfluxmeasurementThisvoltageisusederthemotorsofthedriveSystemManual-RICChapter6.6,6.7OperatingprinciplesupplyER SUPPLY FAILUREOF380VVOLTAGE NeutronfluxmeasurementThisvoltageisusederthemotorsofthedriveThelossof thisvoltage preventsanyflux measurement,because all
26、fivechainsarethen Ifthelossofthe380VACsupplyhecourse ofperformingflux,thechambersttheyoccupiedatthetimeofthevoltageThisfaultissignaledbytheRICcomputer(seechapter4,paragraph-On the display screen, by er supply us table represented on installationsynopticdiagram,andonthealarmThe detection of the fault
27、 and the appearance of the ted message occur as asthesupplyislost,whatevertheoperatingusof the RIC(see paragraph The off-line sing operation mode and surveillance operation mode Restoration of the 380V AC supply s voltage to the drive and the us indications for this equipment automatically returns t
28、o “available”, thedisappearanceoftheAs sary, the ds a repeat of the flux t was progresswhen the380V ACfault 6.7.1.2Core coolingmonitoring ThereisnoupplyforcorecoolingmonitoringFAILUREOF48VVOLTAGE Neutronfluxmeasurementsystem Thisvoltageisusedtosupplythemotors:-Ofthedriveunittake-upreels, Of the sele
29、ctors,Oftheautomatic-The loss of 48V DC makes the transfer and automatic valves unavailable SystemManual-RICChapter6.6,6.7Operatingprinciplesupplythe five flux measurement chains. This equipment remains before the fault occurred.This fault is detected as soon as it appears by the itions it was compu
30、ter, SystemManual-RICChapter6.6,6.7Operatingprinciplesupplythe five flux measurement chains. This equipment remains before the fault occurred.This fault is detected as soon as it appears by the itions it was computer, whatever operating usofthe RIC(see paragraph6.6.1).Itsignalsitas-Signaling on the
31、display screen by er supply us table represented the installation synoptic diagram, on the alarm table and on the onthe frontpanel of -Signaling on the display screen by the ion of automatic valves on synopticThe off-line sing operation mode and surveillance operation mode As soon as the 48V DC supp
32、ly is restored, the indication of its presence reappears On the other hand, the operator must manually re-engage the controlled 48V circuit to re-supply the transfer , and disappearance of the fault is Atthesametime,theionoftheautomaticvalveschangestonormal6.7.2.2Core coolingmonitoring Thereisnoupplyforcorecoolingmonitoring This fault corresponds to a loss of the er supply for the flux computer. What
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025-2030中国铁路装备行业竞争分析及发展前景预测报告
- 2025-2030中国金融行业市场深度发展趋势与前景展望战略研究报告
- 2025-2030中国适体行业市场发展趋势与前景展望战略研究报告
- 2025-2030中国轻轨市场发展分析及市场趋势与投资方向研究报告
- 2025-2030中国软磁材料元件行业市场深度调研及发展趋势与投资前景研究报告
- 2024年十月调酒师职业技能等级认证聘用附加协议
- 2025-2030中国贸易融资服务行业市场现状供需分析及市场深度研究发展前景及规划可行性分析研究报告
- 2025-2030中国货物运输行业市场深度发展趋势与前景展望战略研究报告
- 2025-2030中国谷物磨制饲料行业市场深度调研及发展前景与投融资战略规划研究报告
- 2025-2030中国蜂王浆行业市场发展趋势与前景展望战略研究报告
- 2025年福建省中考数学模拟试题(原卷版+解析版)
- 小学生卫生知识小常识
- 清理报废渔船合同范本
- 成都设计咨询集团有限公司2025年社会公开招聘(19人)笔试参考题库附带答案详解
- 2025年江苏太仓市文化教育投资集团有限公司招聘笔试参考题库附带答案详解
- 广东省中山市2024-2025学年九年级上学期期末语文试题
- 装饰装修木工施工合同
- “轻松前行压力不再”-高中生压力管理与情绪调节 课件-2024-2025学年高二下学期压力管理与情绪调节班会
- 2025年全球及中国双金属氰化物(DMC)催化剂行业头部企业市场占有率及排名调研报告
- Unit5Amazing nature 说课稿(6课时) -2024-2025学年外研版(2024)英语七年级下册
- GB/T 44927-2024知识管理体系要求
评论
0/150
提交评论