版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、VersionENGINEERING REPORT P / L DatePlace ModelChassisContentsTitle Sample Qty EventW/OrderProblem StatusCause MeasuresCause Division1.0 PV40E2000Skyworth ME Lab.16.09.13korea1/2Explanation for failure of ESDhuangyang lixia How to improveSolution:1. Pay attention to the operation of the conductive c
2、loth, make sure it attached right from the metal bar to the rear metal plate, strictly following the SOP.2. Strengthen the management of production process, and underline the assembly of conductive cloth . There is one machine failed in the ESD test. While tested at the condition of 8kv ESD discharg
3、e between plastic frame and open cell,1 of the 2 tested samples failed to continue lighting.Why 1It is a problem that lead to no image of open cell ;Why 2In the ESD test, the interference signal causes the latch-up of the opencells Power IC;Why 3There is a high resistance value between the conductiv
4、e cloth and the rear metal plate;Why 4Assembly operation of the conductive cloth does not conform to SOP strictly ;Root causeAbnormal assembly results in the high resistance value between the conductive cloth and the rear metal plate, finally causes the ESD failure.Step 1: measure the resistance val
5、ue between the conductive cloth and the rear metal plate. The left picture is the result of which we have tested before on the qualified machine . We has tested the resistance value between the conductive cloth and the rear metal plate on the failed one, and the measured value is too high ,as the pi
6、cture on the right side.Normal Resistance ValueAbnormal Resistance ValueStep 2: check the assembly of the conductive cloth to plastic frame.The conductive cloth attached to plastic frame: We open the front frame of the machine, but find no mistake of the conductive cloth attached to plastic frame.St
7、ep 3: check the assembly of the conductive cloth to rear metal plate.The conductive cloth attached to rear metal plate: We find wrong assembly of the conductive cloths attaching to rear metal plate. The left picture shows the right operation. The right picture is the wrong operation: (1) the conduct
8、ive cloth does not completely get in touch with the metal bar ; (2) the conductive cloth is partly posted on the non-conductive oil paint. RightWrongConclusion & SolutionConclusion: Abnormal assembly results in the high resistance value between the conductive cloth and the rear metal plate, finally causes the ESD failure.Solution: 1. Pay attention to the operation of the conductive cloth, make sure it attached right from the metal bar to the rear metal plate, stri
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 辅警培训课件教学模板
- 失能老人护理专业培训课程
- 《GAT 797.2-2008公安基本装备业务信息代码 第2部分:公安基本装备流向方式代码》专题研究报告深度
- 2026年深圳中考物理磁场的基本性质试卷(附答案可下载)
- 2026年深圳中考生物生物体的结构层次试卷(附答案可下载)
- 2026年深圳中考生物高分冲刺综合试卷(附答案可下载)
- 健身证书题库及答案大全
- 2026年人教版物理八年级上册期末质量检测卷(附答案解析)
- 大数据分析技术平台搭建要点
- 2025云南昆华医院投资管理有限公司(云南新昆华医院)招聘3人备考题库参考答案详解
- 收购商场协议书范本
- 2025年榆林神木市信息产业发展集团招聘备考题库(35人)及答案详解(新)
- 2025年公务员时事政治热点试题解析+答案
- 免疫联合治疗的生物样本库建设
- 项目管理沟通矩阵及问题跟进器
- 交通运输企业人力资源管理中存在的问题及对策
- 蒂森电梯安全质量培训
- 设备供货进度计划及保证措施
- 干热复合事件对北半球植被的影响及响应机制研究
- 纯化水取样课件
- 2025年四川单招护理试题及答案
评论
0/150
提交评论