版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、光伏逆变器、风电变流器功率MOSFET、IGBT、IPM电力电子产品/设备APF、SVG大容量变换技术大功率电磁兼容设计Photovoltaic inverter, wind power convertersPower MOSFET, IGBT, IPMPower electronic products / equipmentAPF, SVGLarge capacity transformEMC Design Power5 kW DC/DC converter for hydrogen generation from photovoltaic sourcesInternational
2、 Journal of Hydrogen EnergyThis paper covers the design of a DCDC power converter aimed for hydrogen production from photovoltaic sources. Power conditioning for such application is usually driven by different constraints: high step-down conversion ratio is required if the input voltage of such equi
3、pment has to be compatible with photovoltaic sources that are connected to grid-connected inverters; galvanic isolation; high efficiency and low mass. Taking into account those factors, this work proposes a pushpull DC/DC converter for power levels up to 5 kW. The operation and features of the
4、converter are presented and analyzed. Design guidelines are suggested and experimental validation is also given.Article OutlineNomenclature1. Introduction2. DC/DC converter: operation principle and features 2.1. PV and electrolyser electrical models2.2. DC/DC converter design3. Application of a spec
5、ific development 3.1. Initial specifications: photovoltaic array and electrolyser3.2. Device selection3.3. Input and output filters: calculations and realisation3.4. Magnetic design: transformer and inductors3.5. Driving and PWM control circuits4. DC/DC converter simulations and experimental results
6、5. ConclusionsReferencesGrid-connected photovoltaic power systems: Technical and potential problemsA review 传统区域性光伏发电电力系统的革新Renewable and Sustainable Energy Reviews可再生与可持续利用能源评论Traditional electric power systems are designed in large part to utilize large baseload power plants, with limited ab
7、ility to rapidly ramp output or reduce output below a certain level. The increase in demand variability created by intermittent sources such as photovoltaic (PV) presents new challenges to increase system flexibility. This paper aims to investigate and emphasize the importance of the grid-connected
8、PV system regarding the intermittent nature of renewable generation, and the characterization of PV generation with regard to grid code compliance. The investigation was conducted to critically review the literature on expected potential problems associated with high penetration levels and islanding
9、 prevention methods of grid tied PV. According to the survey, PV grid connection inverters have fairly good performance. They have high conversion efficiency and power factor exceeding 90% for wide operating range, while maintaining current harmonics THD less than 5%. Numerous large-scale projects a
10、re currently being commissioned, with more planned for the near future. Prices of both PV and balance of system components (BOS) are decreasing which will lead to further increase in use. The technical requirements from the utility power system side need to be satisfied to ensure the safety of the P
11、V installer and the reliability of the utility grid. Identifying the technical requirements for grid interconnection and solving the interconnect problems such as islanding detection, harmonic distortion requirements and electromagnetic interference are therefore very important issues for widespread
12、 application of PV systems. The control circuit also provides sufficient control and protection functions like maximum power tracking, inverter current control and power factor control. Reliability, life span and maintenance needs should be certified through the long-term operation of PV system. Fur
13、ther reduction of cost, size and weight is required for more utilization of PV systems. Using PV inverters with a variable power factor at high penetration levels may increase the number of balanced conditions and subsequently increase the probability of islanding. It is strongly recommended that PV
14、 inverters should be operated at unity power factor.Article OutlineNomenclature1. Introduction2. Glossary of terms and acronyms3. Global PV module and its electrical performance4. Grid-connected PV systems 4.1. Power value4.2. Ratio between load and PV power5. Potential problems associated with high
15、 penetration levels of grid-tied PV6. Grid-connected inverterscontrol types and harmonic performance 6.1. Harmonics6.2. Inverters operational analysis7. Islanding detection methods8. Performance and reliability of inverter hardware9. The overall conclusion and recommendationAcknowledgementsReference
16、s光伏系统设计选型的优化 联网系统中各模块的技术革新与效能整合提高Optimal sizing of a grid-connected PV system for various PV module technologies and inclinations, inverter efficiency characteristics and locations Renewable EnergyAn optimal sizing methodology based on an energy approach is described and applied to grid-c
17、onnected photovoltaic systems taking into account the photovoltaic module technology and inclination, the inverter type and the location. A model describing the efficiency for m-Si, p-Si, a-Si and CIS is used. The method has been applied on various meteorological stations in Bulgaria and Corsica (Fr
18、ance). The main parameter affecting the sizing is the inverter efficiency curve. The influence of the PV module technology seems less important except for amorphous photovoltaic modules for which special remarks have been made. The inclination on the PV system influences the performances particularl
19、y when the inverter is undersized compared to the PV peak power.Article Outline1. Introduction2. PV module efficiency 2.1. Some models of PV efficiency and maximum power2.2. Experimental verification3. Grid-connected inverters4. Solar radiation estimation on tilted PV modules 4.1. The diffuse compon
20、ent4.2. The diffuse component on tilted surface4.3. The tilted beam radiation4.4. The ground reflected radiation5. Sizing optimization methodology6. Optimization results 6.1. Influence of the inverter type and PV module inclination6.2. Influence of the PV technology6.3. Site influence7. Monthly perf
21、ormances 7.1. Monthly variation of the PV efficiency7.2. Monthly variation of PV system efficiency8. ConclusionsEfficient design and simulation of an expandable hybrid (windphotovoltaic) power system with MPPT and inverter input voltage regulation features in compliance with electric grid requiremen
22、ts 低压智能电力电子变换技术Electric Power Systems ResearchIn this paper an efficient design along with modeling and simulation of a transformer-less small-scale centralized DCbus Grid Connected Hybrid (WindPV) power system for supplying electric power to a single phase of a three phase low voltage (LV) str
23、ong distribution grid are proposed and presented. The main components of the hybrid system are: a PV generator (PVG); and an array of horizontal-axis, fixed-pitch, small-size, variable-speed wind turbines (WTs) with direct-driven permanent magnet synchronous generator (PMSG) having an embedded uncon
24、trolled bridge rectifier. An overview of the basic theory of such systems along with their modeling and simulation via Simulink/MATLAB software package are presented. An intelligent control method is applied to the proposed configuration to simultaneously achieve three desired goals: to extract maxi
25、mum power from each hybrid power system component (PVG and WTs); to guarantee DC voltage regulation/stabilization at the input of the inverter; to transfer the total produced electric power to the electric grid, while fulfilling all necessary interconnection requirements. Finally, a practical case s
26、tudy is conducted for the purpose of fully evaluating a possible installation in a city site of Xanthi/Greece, and the practical results of the simulations are presented.Article Outline1. Introduction2. Configuration and modeling of a small-scale centralized DCbus GCHWPPS via Simulink/MATLAB 2.1. So
27、lar and wind potential analysis of a selected (candidate) installation site2.2. Photovoltaic Subsystem . Photovoltaic generator (PVG) model. Buck-Boost DCDC Converter (BBC1 and BBC2) models. Control unit (DSP1) of the PVS2.3. Wind Energy Conversion Subsystem . Wind turbine model. Permanent magnet sy
28、nchronous generator (PMSG) model. Embedded uncontrolled diode bridge rectifier model. Buck-Boost DCDC Converter (BBC3 and BBC4) models. Control unit (DSP2) of the WECS2.4. Power decoupling capacitor (CPD)2.5. Necessary requirements (rules) for connecting a HWPPS to the Greek LV distribution grid . E
29、lectric grid model. Inverter model. Control unit (DSP3) of the inverter3. Case study 3.1. Solar and wind potential analysis of the selected site in Xanthi, Greece3.2. Simulation results4. ConclusionsAppendix A. List of symbolsAppendix B. Fuzzy rulesReferencesVitaeDesign of a non-inverting synchronou
30、s buck-boost DC/DC power converter with moderate power level Robotics and Computer-Integrated ManufacturingThis paper presents the design of a non-inverting synchronous buck-boost DC/DC power converter with moderate power level for a solar power management system. The buck-boost requirement ari
31、ses from the rapid changes in the atmospheric condition or the sunlight incident angle. The system mainly consists of the non-inverting synchronous buck-boost DC/DC power converter, MOSFET drivers, anti-cross conduction logic circuitry, feedback compensator, and PWM regulator. The system is capable
32、of converting the supply voltage source to higher and lower voltages to the load terminal with voltage polarity unchanged. The voltage at the load terminal is controlled by continuously adjusting the duty cycle of the PWM regulator. Application of the buck-boost converter in battery management syste
33、m design is also addressed.Article Outline1. Introduction2. Synchronous buck-boost converter3. System design4. Dynamic characteristic5. Feedback compensator design6. Application in Li-ion battery management7. ConclusionsAcknowledgementsReferences锂电池阵列的应用项目与管理方案Mathematical modelling of a wind power
34、system with an integrated active filter Integrated power characteristic study of DFIG and its frequency converter in wind power generation Development of an FPGA-based system for real-time simulation of photovoltaic modules 光伏和风电系统仿真建模与数字化的模拟运和行计算DFIG wind generation systems ope
35、rating with limited converter rating considered under unbalanced network conditions Analysis and control design 风电逆变器的系统运行、非平衡状态联网和各种条件下的控制设计TLM method for thermal investigation of IGBT modules in PWM mode Design and control of a direct drive wind turbine equipped with multilevel converter
36、s Design optimization and site matching of direct-drive permanent magnet wind power generator systems Wave powerSustainable energy or environmentally costly? A review with special emphasis on linear wave energy converters Conventional and novel control designs for direct driven
37、PMSG wind turbines Optimal design of a reliable hydrogen-based stand-alone wind/PV generating system, considering component outages 氢发电和氢储能系统的可靠性优化设计方法 风力/光伏发电平台 元器件性能及其输出约束A hybrid wind/photovoltaic/fuel cell generation system is designed to supply power demand. The aim of this desi
38、gn is minimization of annualized cost of the hybrid system over its 20 years of operation. Optimization problem is subject to reliable supply of the demand. Three major components of the system, i.e. wind turbine generators, photovoltaic arrays, and DC/AC converter, may be subject to failure. Also,
39、solar radiation, wind speed, and load data are assumed entirely deterministic. System costs involve investments, replacement, and operation and maintenance as well as loss of load costs. Prices are all empirical and components are commercially available. An advanced variation of Particle Swarm Optim
40、ization algorithm is used to solve the optimization problem. Results reveal the impact of component outages on the reliability and cost of the system, so they are directly dependent on components' reliabilities, i.e. outages result in need for a larger generating system for supplying the load wi
41、th the acceptable reliability. Additionally, it is observed that the inverter's reliability is an upper limit for the system's reliability. Moreover, an approximate method for reliability evaluation of the hybrid system is proposed which considerably reduces the time and computations.Article
42、 Outline1. Introduction2. PV/WG/FC system modeling 2.1. Photovoltaic array2.2. Wind turbine generator2.3. Generated power by renewable units2.4. Electrolyzer2.5. Hydrogen tank2.6. Fuel cell2.7. DC/AC converter (inverter)2.8. Operation strategy3. Reliability/cost assessments 3.1. Reliability indices
43、. Loss of load expected. Loss of energy expected (expected energy not supplied). Loss of power supply probability. Equivalent loss factor3.2. System's reliability model3.3. Cost of loss of load3.4. Approximate method4. Problem statement5. Particle swarm optimization (PSO)6. Results 6.1. Base cas
44、e6.2. 100% available components6.3. Impact of DC/AC converter on the system's reliability7. ConclusionAcknowledgementsReferencesA new simple analytical method for calculating the optimum inverter size in grid-connected PV plants 智能电力系统的新分析方法 联网光伏电站的逆变器容量选择 参数计算 设备选型 匹配和整体组建A new simpl
45、e analytical method for the calculation of the optimum inverter size in grid-connected PV plants in any location is presented. The derived analytical expressions contain only four unknown parameters, three of which are related to the inverter and one is related to the location and to the nominal pow
46、er of the PV plant. All four parameters can be easily estimated from data provided by the inverter manufacturer and from freely available climate data. Additionally, analytical expressions for the calculation of the annual energy injected into the ac grid for a given PV plant with given inverter, ar
47、e also provided. Moreover, an expression for the effective annual efficiency of an inverter is given. The analytical method presented here can be a valuable tool to design engineers for comparing different inverters without having to perform multiple simulations, as is the present situation. The val
48、idity of the proposed analytical model was tested through comparison with results obtained by detailed simulations and with measured data.Article Outline1. Introduction2. Solar irradiance and dc power at the output of PV modules3. The efficiency curve of the solar inverter4. Analytical expressions f
49、or the optimum inverter size and the energy yield5. Validation of the model 5.1. Comparison with analytical simulations5.2. Comparison with measurements6. ConclusionsReferencesReal-time 3D electromagnetic field measurement instrument with direct visualization TCAD assessment of Gate Elect
50、rode Workfunction Engineered Recessed Channel (GEWE-RC) MOSFET and its multi-layered gate architecture, Part II: Analog and large signal performance evaluation Hydrodynamic simulation of a floating wave energy converter by a U-tube rig for power take-off testing 智能电力系统性能的整体离线测试 氢发电和储能设施的复杂
51、环境仿真Ocean Engineering海洋工程学学报Floating oscillating-bodies constitute an important class of offshore wave energy converters. The testing of their power take-off equipment (PTO) (high-pressure hydraulics, linear electrical generator or other) under realistically simulated sea conditions is usually regar
52、ded as a major task. A laboratory rig, consisting of a U-tube enclosing an oscillating column of water driven by a time-varying air-pressure, was devised to simulate the hydrodynamics of an oscillating buoy absorbing energy from sea waves, especially the inertia and the resonant frequency of the osc
53、illating body. The PTO force is applied (by means of a piston) on one of the ends of the U-tube oscillating water column, whereas the other end is subject to a controlled time-varying air pressure. This is found to provide a reasonably realistic way of testing the PTO system (including its control)
54、at an adequate scale (say about 1:5 to 1:4), which would avoid the use of a much more expensive experimental facility (very large wave tank) or testing in real wind-generated sea-waves. The matching conditions that the U-tube geometry and the driving time-varying air pressure must meet to ensure an
55、adequate simulation are derived. These conditions leave some freedom to the U-tube rig designer and operator, allowing practical and engineering issues to be taken into account.Article Outline1. Introduction2. Governing equations 2.1. Heaving body dynamics2.2. Irregular waves2.3. U-tube dynamics2.4.
56、 Dynamic similitude conditions between floating body and U-tube2.5. Air pressure control2.6. U-tube rig versus direct actuator system3. Numerical example4. ConclusionsAcknowledgementsReferencesCondition monitoring and fault detection of wind turbines and related algorithms: A review Condition m
57、onitoring and fault detection of wind turbines and related algorithms: A review 实时运行条件与故障检测系统:其相关算法回顾Distributed DC-UPS for energy smart buildings Energy efficiency (EE) improvement is one of the most important targets to be achieved on every society as a whole and in buildings in particul
58、ar. Energy Smart Building aims to accelerate the uptake of EE, healthy buildings that by integrating smart technology and solutions consume radically little resources while enhancing the quality of life. This paper addresses how uninterruptible power supply (UPS), particularly when configured in distributed DC mode, can become an Energy Efficient (EE) solution in high tech buildings, especially when integrated with complimentary Power Quality (PQ) measures. The paper is based upon PQ audits conducted at different IT-intensive modern building. Some of the ma
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 课件标题模板教学课件
- 南京工业大学浦江学院《食品添加剂》2022-2023学年第一学期期末试卷
- 都江堰某希望小学教学楼及综合楼施工组织设计
- jqx第课时说课稿
- 南京工业大学浦江学院《金庸小说欣赏》2021-2022学年第一学期期末试卷
- 《小小旅行家》说课稿
- 南京工业大学《自动化》2022-2023学年第一学期期末试卷
- 南京工业大学《药物商品学》2023-2024学年第一学期期末试卷
- 南京工业大学《水工程施工》2022-2023学年第一学期期末试卷
- 南京工业大学《企业战略管理》2022-2023学年第一学期期末试卷
- 高边坡脚手架专项施工方案
- 风电场月度运行分析模板(共28页)
- 起搏的基本概念
- 明挖隧道施工方案
- 消防部队水源手册范本
- 政策工具视角下的中国教育扶贫政策文本研究
- 教育部新版本科专业目录(2012年)
- 七年级英语上培优扶差记录表
- 二级减速器箱体盖工艺卡片
- 互联网高速专线电路开通测试报告[宝典]
- 虎牌电饭煲中文使用说明书
评论
0/150
提交评论