XGN2-10箱型固定式开关柜英文说明书_第1页
XGN2-10箱型固定式开关柜英文说明书_第2页
XGN2-10箱型固定式开关柜英文说明书_第3页
XGN2-10箱型固定式开关柜英文说明书_第4页
XGN2-10箱型固定式开关柜英文说明书_第5页
已阅读5页,还剩7页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、XGN2-10 box stationary metal sealing switchgear1. Overview1.1 XGN2-10 box stationary metal sealing switch equipment (referred to as the switchgear) is suitable for 12KV and below three-phase AC 50HZ system as acceptance and distribution of electric energy use, particularly suitable for frequent oper

2、ation places, the bus system is a single bus , and derive a single bus bar with bypass and double-bus structure.1.2 XGN2-10 box stationary AC metal sealing switch equipment, on the basis of ordinary type of switchgear has been derived use for high-altitude plateau-type products.1.3 This switchgear m

3、eet the national standard GB3906 "3 35KV AC Metal Sealing Switchgear" and international requirements of standard IEC298, and has "Five Anti" lockout feature. 1.4 Main switch of this switchgear is using ZN28A-10 series vacuum circuit breaker and SN10-10 type small oil circuit brea

4、ker with series with CD10 and CD17 series of electromagnetic and CT8 series and CT17/CT19 series spring mechanism. According to user needs can also be used ZN28-10, ZN73 etc integral circuit breakers, disconnector using GN30-10 rotary isolation switch, GN22-10 high-current disconnectors and GN30-10

5、rotary-high current isolation switch products.2. Use environmental conditions:2.1Environmental temperature: upper limit + 40; lower limit -5 2.2 Altitude does not exceed 1000m, which of plateau-type switchgear does not exceed 3000m2.3 Relative humidity: daily average is no greater than 95%, monthly

6、average is not more than 90%2.4 Vapor pressure: daily average is more than 2.2 × 10-3Mpa, monthly average less than 1.8 × 10-3Mpa;2.5 Seismic intensity: no more than 8 degrees2.6 No fire and explosion danger, serious pollution, chemical corrosion and violent vibration places.3. Product ser

7、ies and main specification, technical data3.1 Main wiring scheme specifications refer to Table 1, main wiring scheme assembly example refer to Table 2.3.2 When used at plateau-type scheme, the components shown at Table 1 are corresponded to the chosen plateau-type component. Like ZN28A-10G etc.3.3 S

8、witchgear technical data please refer to Table 3.3.4 Circuit breaker and operation mechanism technical data please refer to Table 4.Switchgear technical data Table 3No.ItemUnitTechnical parameter1Rated voltageKV102Rated working voltageKV123Rated current *A6301000100012502000250031504Rated short circ

9、uit breaking circuitKA2031.5405Rated short time withstand current (4S)KA2031.5406Rated peak value withstand currentKA50801007Rated short circuit close current (peak value)KA50801008Protection levelIP2X9Operation modeElectromagnetic mode, spring energy storage mode10Overall dimension (width*depth*hei

10、ght) *mm1100×1200×2650 (below 1250A)*Plateau-type switchgear rated current is 630/1000/1250A*Plateau-type switchgear overall dimension is 1200×1350×2900mmZN28A-12 circuit breaker and operation mechanism technical data Table 4ItemUnitZN28A-10/1000-20ZN28A-10/1250-31.5、2000-31.5ZN2

11、8A-10/2500-40、3150-40Rated voltageKV10Maximum working voltageKV12Rated frequencyHz50Rated currentA10001250、20002500、3150Rated short circuit breaking currentKA2031.540Rated short circuit close current peak valueKA5080100Rated short circuit withstand currentKA2031.540Rated peak value withstand current

12、KA5080100Rated short time withstand current duration timeS4Mechanical lifetime10000Rated short circuit breaking current breaking timestime30(50)Vacuum degree of vacuum arc free chamberPa6.6×10-2Arc timems20Used together mechanismDC electromagnetismTypeCD17CD17CD17Working voltage VSwitch-on coil

13、110,220Switch-off coil24,48,110,220Working current ASwitch-on110V196240294220V98120147Switch-off24V3748V18.5110V5220V2.5Used together mechanismSpring energy storageTypeCT19- CT19-Working voltage VEnergy storage motor110,220,-380Shunt trip-48,110,220,-380Lose voltage trip-110(100),-220,-380Storage ti

14、meS5Over-current tripA5Switch-on timeSDC electromagnetism0.20, spring energy storage0.15Switch-off time0.063.5 Disconnector technical parameters please refer to Table 5, Table 6 (spiraling type disconnector).3.6 Earth switch technical data.Earth switch technical data shall be coordinated with corres

15、ponding disconnector parameters, therefore earth switch dynamic, thermo stability current, contact pressure is corresponded with corresponding disconnector, but the distance between earth switch fracture is no less than 125mm (Plateau-type fracture distance is no less than 190mm).3.7 LZZJ-10 current

16、 transformer technical parameters refer to Table 7.3.8 Vacuum circuit breaker adjustment parameters refer to Table 8.GN30-10 disconnector technical parameters Table 5ItemUnitGN30-10/630-12.5GN30-10/1000-20GN30-10/1250-31.5GN30-10D/630-12.5GN30-10D/1000-20GN30-10D/1250-31.5Rated voltageKV10Maximum wo

17、rking voltageKV12Rated currentA63010001250Rated short time withstand currentKA2031.540Rated peak value withstand currentKA5080100Rated insulation level1.2/50s lightning impact withstandKV75*1 min working frequency withstandKV42*For plateau-type product, it means at altitude 3000m rated insulation le

18、vel.GN-10 disconnector technical parameters Table 6ItemUnitGN-10/2000-40GN-10/3150-50Rated voltageKV10Maximum working voltageKV12Rated currentA20003150Rated short time withstand currentKA4040Rated peak value withstand currentKA100100Rated insulation levelLightning impact withstandPhase to earth, int

19、er phase, inter fractureKV75851 min working frequency withstandPhase to earth, inter phaseKV42Inter fracture48Current transformer technical data Table 7Rated primary current ASecondary current AAccuracy classRated output capacity VARated short time withstand current KADuration time SRated peak value

20、 withstand current KA550.5100.3210P151050.510122.510P151550.5101.523.7510P152050.51022510P153050.51032710P154050.510421010P155050.5105212.510P157550.510822010P1510050.5101022510P1515050.5101624010P1520050.5102045010P1530050.5102045010P1540050.5102045010P1550050.5102045010P1560050.5102045010P1580050.

21、51031.548010P15100050.51031.548010P15Vacuum circuit breaker adjustment data Table 8No.ItemUnitData1Contact open distancemm12±12Contact tripmm4±13Oil impact damper buffering tripmm10-304Inter phase center distancemm250(275)5Three phase switch-off synchronizationms26Switch-on contact bouncin

22、g timems57Switch-on contact touch pressureN2000±2008Average switch-off speed(before contacting oil buffer)m/s1±0.39Average switch-on speedm/s0.55±0.1510Each phase conduct circuit resistor4011Dynamic, static contact accumulated allowable abrasive thicknessmm33.9 Disconnector adjustment

23、 parameter refer to Table 9, Table 103.9.1 Spiraling type disconnector adjustment parameter refer to Table 93.9.2 High-current disconnector adjustment parameter refer to Table 10Spiraling type disconnector adjustment parameter Table 9ItemunitGN30-10(D)/630GN30-10(D)/1000GN30-10(D)/2500Spring positiv

24、e pressureN400±40600±60600±60Three-phase close position synchronizationmm3Three-phase close position inclinationmm2Main circuit conduct(high potential grounding distancemm125 (plateau type150)Inter polar insulation distancemm125 (plateau type150)Grounding knife open distancemm125 (pla

25、teau type190)Each phase circuit resistor(main circuit)757045High-current disconnector adjustment parameter Table 10ItemUnitGN-10/2000GN-10/3150Each phase circuit resistor12.58Three-phase close position synchronizationmm3Three-phase close position inclinationmm2Main circuit conduct(high potential gro

26、unding distancemm125 (plateau type150)4. Product overall dimension and structure4.1 Product overall dimension refer to Figure 1.4.2 Switchgear installation dimension refer to Figure 1b, Figure 2.4.3 StructureThis switchgear is of metal sealing box type structure, cabinet framework is welded by angle

27、 steel, inside of the cabinet is divided into circuit breaker chamber, bus bar chamber, and relay chamber. Upper of the relay chamber can design a small bus chamber. Each chamber is separated by steel plates.The circuit breaker is at the lower side of the cabinet, transmission of circuit breaker is

28、connected by pull rod and operation mechanism, circuit breaker lower connection terminal connects current transformer, current transformer connects lower disconnector wiring terminal, circuit breaker upper wiring terminal connects upper disconnector wiring terminal, circuit breaker chamber is equipp

29、ed with pressure release passage, if internal electric arc happens, gas can through air ventilation passage to release the pressure.Bus chamber is at the upper of rear cabinet, to reduce cabinet height, the bus bar is orderly arranged, use 7350N anti-bending strength porcelain insulator to support,

30、bus bar connects upper disconnector wiring terminal.Cable chamber is behind the lower part of the cabinet room, internal support insulator equipped with monitoring devices, the cable fixed to the bracket, when main wiring is contact program, the cable room is the contact chamber.Circuit breaker oper

31、ation mechanism is mounted on the front left position, its upper side is disconnector operation and interlocking mechanism.Switchgear is for two-sided maintenance, the front part is for repairing the secondary components of the relay room, maintaining operation mechanism, mechanical interlock and tr

32、ansmission parts, repairing circuit breakers; the rear part is for maintaining the main bus and cable terminals, the breaker room and cable room are equipped with floodlight.Below the front door is equipped with a ground copper bus bar which parallel to the cabinet width direction, the cross-section

33、 of 4 × 40mm2.Mechanical interlock: in order to prevent load disconnects disconnector; prevent mistakenly open or close circuit breaker; prevent mistakenly enter charged interval; prevent charged connect grounding switch; to prevent the switch-on of grounding knife. Switchgear is adopted with c

34、orresponding mechanical interlock, procedures of mechanical interlock each motion is as follow:4.3.1 No power operation (operationoverhaul) Switchgear is at working position, that is upper and lower disconnectors, circuit breakers are under switch-on state, front and back door close is locked, and u

35、nder charged operation, this time the small handle is at working position. No power operation must strictly accord to the following order to operate: Circuit breaker is breaking; Pull small handle to “breaking locked” position, at this time the circuit breaker can not be switch-on; Insert the handle

36、 into lower disconnector operating hole, from up to down, pull down to lower disconnector switch-off position then take down the operation handle; Insert the handle into upper disconnector operation hole and pull from up to down, pull to upper disconnector switch-off position; then take down the ope

37、rating handle and insert it into grounding switch operation hole, push from down to up, make grounding switch at switch-on position; Pull the small handle to “overhaul” position, open the front door first, take out procedure lock keys to open the backdoor, then the no power operation is completed. T

38、he overhaul staff can conduct maintenance and overhaul to the circuit breaker and the cable room.4.3.2 Transmission operation (Overhauloperation)Close and lock the back door; take out the key and close the front door; Pull the small handle from overhaul position to breaking locked position, at this

39、time the front door is locked; The circuit breaker can not be switch-on, use operation handle to insert into grounding switch operating hole, pull from up to down, make grounding switch at switch-off position; Take down the operating handle and insert it into the disconnector operating hole, push fr

40、om down to up, make the upper disconnector at switch-on position; Take down the operating handle, insert it into the lower disconnector operating hole, push from down to up, make the lower disconnector at switch-on position; Take out the operating handle, pull the small handle to working position, a

41、t this time the circuit breaker can be switch-on.5. Installation, adjustment and maintenance5.1 Vacuum circuit breaker at switch-off generated dynamic load, up, down about 7840N, this data provides the basis of the design basis for estimating the stress.5.2 FoundationSwitchgear foundation is based o

42、n Figure 2 as reference for design and construction, foundation should be flat. 5.3 Installation procedures and matters need attentiona) Put switchgears on the foundation according to the sequence order, adjust straightness, vertical degree, horizontal degree of group switchgears, and then use M12 b

43、olts or spot welding method to fix switchgears on the foundation groove steel.b) Use M12 ×30 bolts to link between the cabinet.c) Install the main bus, open bus room top cover to install, after installation fixed the top cover plate, when connecting on the bus the contact surface shall be smoot

44、h, free of dirt, if there is dirt shall get rid of it, coated with neutral petrolatum.d) During installation of primary cable, when the cable head is finished, fixed the cable head on the bracket, cable and bus bar contact surface should be smooth and free of dirt, after with the contact surface coa

45、ted with the neutral petroleum jelly it can be connected and fastened, when cable construction is completed shall use plate to separate the cable room and cable groove.e) Connect inter cabinet grounding bus, to arrange along the direction of switchgear, inspect whether there are any omissions for wo

46、rking grounding and protective grounding, whether ground circuit is of continuous conduction, work grounding resistance should not be more than 1000, protective earth resistance shall be less than 4;f) Install secondary circuit cables, cable is penetrated on the left end of the mechanism, along the

47、wall into the relay room, tap received to the corresponding terminal block, during construction, should be noted that the cable number, terminal number will not leak through or wear wrong, after completion of secondary construction, pay attention not to forget to cover cable holes.5.4 Acceptance tes

48、t and preparation before put into operation 5.4.1 Acceptance Test Projecta) According to order information to check whether installed electrical components models, specifications are matched;b) Check whether fixed components have been loosen, if loosen is detected should be reinforced;c) Check bus c

49、onnection, the contact is tight and, if contact is at bad condition, should be repaired;d) Manually operate disconnector, circuit breakers, mechanical interlock procedures for 3-5 times, the operation should be flexible, smooth and non- lock phenomenon, and the action should be accurate, correct pro

50、cedures;e) Check the mechanical properties of circuit breaker, disconnector, whether it is consistent with its own requirements;f) Check whether the secondary wiring matches with the drawings, in case the main power circuit is not supplied with power the secondary circuit action test shall be conduc

51、ted and comply with the requirements of the secondary wiring diagram;g) For main circuit resistance measurement, because this switchgear has many programs, each phase resistance value is to be determined, tentatively scheduled the measurement parts are the circuit breaker and electrical connectors,

52、does not exceed its standard value, the electrical connection terminals should not exceed 1, measurement method is DC step-down method, through 100A DC current, measured its voltage drop value;h)For the main circuit insulation strength test, between the conductor and the shell, put AC 50Hz, voltage

53、200V, lasted 1min, there should be no breakdown discharge phenomena, the secondary circuit have electronics parts, test voltage is agreed by the user and the manufacturer; i) For the main circuit power frequency insulation voltage test, at phase to earth and inter phase add AC 50Hz, according to rat

54、ed voltage of switchgear, according to GB311-1 6 85% of the specified value, lasted 1min, there should be no breakdown flashover. Plateau-type switchgear test shall be conduct at the site of altitude is no higher than 1000m, the test voltage shall accord to GB311.13.4 rated withstand voltage times a

55、ltitude rectified factor Ka.5.4.2 Preparation for putting into operationa) Movable parts need lubricant oiling should supply with oil;b) Connect control, signal, lighting etc power supply;c) When the disconnector, circuit breaker etc places under switch-off state, transmit power to the main bus, which means closing incoming line circuit breaker cabinet;d) Close the disconnector of the switchgear with voltage transformer, check whether the voltage meter is correct, if correct continue to proceed;e) Close lightning arrestor, station transformer switchgear and relevant auxiliary electrical

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论