下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Ibri循环电站线路保护、接口屏、计量屏、故障系统订货合同第二卷:技术协议Annex 3Technical Document and Delivery Progress Schedule附件 3技术文件及交付进度1.1.1.1General requirements一般要求Documents to be supplied by the Supplier shall use the national legal unit system i.e.ISU (text in English). All documents, drawings and communications shall be in
2、 English. Inthe me, AUTOCAD and PDF electronic files shall be provided.1.1 投标方提供的资料使用法定制即国际制(文字为英文)。所有文件、图纸及通讯,均应使用英文。同时提供 AUTOCAD 和 PDF 电子文本1.2Technical documents to be provided by the Supplier shall be divided into drawings forcooperating design stage, drawings for manufacture and drawings for con
3、struction, and also shall be divided into four aspects such as equipment manufacture supervision inspection, construction commissioning and trial run, performance test acceptance and operation and maintenance etc. The Suppliers drawing materials shall satisfy concrete requirements on the above four
4、aspects.1.2 投标方提供的技术资料分为配合设计阶段图纸、供生产制造图纸以及供施工用图纸, 又分为设备监造检验、施工调试试运、性能试验验收和运行维护等四个方面。投标方图纸资料须满足以上四个方面的具体要求。1.3The Purchaser shall provide documents concerning contract equipment design andmanufacture in a timely manner.1.3 招标方要及时提供与合同设备设计制造有关的资料。1.4Drawings to be supplied by the Supplier shall be in
5、AutoCAD(2004) format and PDFformat, text files shall be in Word/Excel (2003) format and PDF format. All documents supplied shall be in print font in English. The formal documents supplied shall have use stage clearly marked.1.4 投标方所供图纸应为 AutoCAD(2004)格式和 PDF 格式,文本文件应为 Word/Excel(2003)格式和 PDF 格式。所供资料
6、,均应采用英文对照印刷字体。提供的正式文件应注明使用阶段。1.5The organizing structure of documents shall be clear, with strong logic, attached withdocuments submission list. The contents of documents shall be correct, accurate, consistent, clear and complete, satisfying project requirements. The technical documents (including d
7、rawings) provided by the Supplier shall use KKS identification system, KKS coding allocated to components level. During design cooperation stage, The Purchaser and Design Unit shall provide KKS codes to equipment level and coding principle, The Supplier shall be responsible for following the coding
8、principle, prepare KKS codes for components level upon completion of design cooperation stage, and submit them to Design Unit and The Purchaser for review. The Supplier shall have all KKS codes up to components level marked on drawings for design cooperation and final version.附件 6-1Ibri循环电站线路保护、接口屏、
9、计量屏、故障系统订货合同第二卷:技术协议1.5 资料的组织结构清晰、逻辑性强,附带资料递交。资料内容要正确、准确、一致、清晰完整,满足工程要求。要求投标方提供的技术文件(包括图纸)采用 KKS 标识系统,KKS 编码编到部件级。在设计配合阶段,招标方和设计提供至设备级的 KKS编码及编码原则,投标方负责按编码原则,在设计配合阶段完成编制部件级的 KKS 编码,提交设计及投标方审核。投标方在设计配合以及最终版图纸的图纸中标注全部直至部件级的 KKS 编码。1.6 The Supplier shall be responsible for providing necessary design do
10、cuments to Design Unit in time. The Suppliers technical documents and their electronic files provided to the tendering party shall be electronic files can be edited and revised. The Supplier shall revise drawings and resubmit them after receipt the revision comments of the design party, minor revisi
11、on shall be completed in 1-3 days, major revision shall be completed in 3-5 days; the total revision time of the Suppliers drawings for cooperation design stage shall not exceed 7days. Upon confirmation by signature of Design Unit, The Supplier shall issue drawings for production as per the confirme
12、d drawings, and send them and drawing list to Design Unit and the Purchaser for review within the time specified in this technical agreement. The Purchasers review on the technical documents and drawings shall not relieve the Supplier from its performance obligation.1.6 投标方负责按时向设计提供必需的设计资料。投标方向招标方提供
13、的技术文件及资料的电子文件应是可编辑、修改的电子文件。投标方应在收到设计方的修改意见后及时修改图纸并提交,小型修改应在 13 日内完成,大型修改应在 35 日内完成,投标方配合设计阶段图纸修改时间累积不得超过 7 日。设计签字确认无问题后,投标方应按确认图纸供生产图纸并按本技术协议规定的时间和图纸目录发设计及招标方审核。招标方对技术文件和图纸的审核不减免投标方履约责任。1.7To those documents and information not having been listed into the contract technicaldocuments list, but necess
14、ary for the project, once they are found, the Supplier shall provide them free of charge in a timely manner.1.7 对于其它未列入合同技术资料标方应及时提供。,却是工程所必需的文件和资料,一经发现,投1.8Drawings provided by the Supplier shall be clear, and shall not provide microfilmduplicated drawings.1.8 投标方提供的图纸应清晰,不得提供缩微复印的图纸。1.9Drawings pr
15、ovided by the Supplier shall have drawing purpose and usage stage marked,stating “ Drawings for “Oman IBRI IPPbasic design cooperation” or “OmanIBRI IPPconstruction drawing cooperation”. all drawings and documents to beprovided with the equipment shall be in english, stating “IBRI IPP PROJECT”1.9 投标
16、方提供的图纸必须注明图纸用途及使用阶段,注明“Oman IBRI IPP XXbasic design cooperation”或“Oman IBRI IPPXX construction drawing cooperation”;所有随机图纸资料上均为英文”IBRI IPP PROJECT”.1.10 Electronic version of drawings and documents (provided with the equipment) for construction shall subject to the Purchasers review, which can not b
17、e published until their附件 6-2Ibri循环电站线路保护、接口屏、计量屏、故障系统订货合同第二卷:技术协议quality and format are found satisfying requirements. Equipment Operation Manual, Installation and Commissioning Manual, Operation and Maintenance Manual etc shall have detailed description on equipment structures, principles and stan
18、dards adopted, and have detailed descriptions on operating steps and particulars, the description shall be accurate without mistakes; steps shall be definite and clear, with particular details, illustrations, with strong instructiveness and practicability.1.10 制造生产用图纸必须经过设计和招标方审核,经招标方签字确认后方可用于生产。供施工
19、用图纸资料(随机资料)必须经招标方审核,质量和格式满足要求后方可。设备说明书、安装调试手册、运行维护手册等应对设备结构、原理及采用标准进行详细的描述,并对操作步骤及细节进行详尽的描述,应做到叙述准确无误、步骤明确清晰、细节详实、图文并茂,具有较强的指导性和实用性。1.11 Drawing numbers of the drawings provided shall be clear, in order, without phenomenon of different drawings with the same number. After drawing revision, design en
20、gineering unit shall be informed in time, revision serial numbers shall be marked clearly on the drawings.1.11 所供图纸编号必须清晰、有序,不得有不同图纸相同编号的现象出现。图纸后,必须及时通知工程设计,图纸应注明序号。1.12 Drawings, documents and instruction manuals etc provided for project construction and engineering shall use white drawings.1.12 所供
21、工程施工设计用图和资料、说明书等采用白图。1.13 For drawings of various stages, the Supplier shall provide master list. Each batch of documents provided by the Supplier shall also be attached drawing list, each document shall have revision number marked, the revision sequence for review is A, B, C, D., the revision seque
22、nce of documents having been approved is 0, 1, 2, 3., when updating drawings, revision upgrading description shall be added on the first sheet of the drawing, marking entries, contents, time and drawing sheets revised on the upgraded drawings. Cloud lines shall be used to mark the revised portion on
23、 the drawings, and marked with revision number.1.13 各阶段图纸投标方均应提供总。投标方提交的每一批资料也均应附有图纸清单,每张资料都注明版次,用于审核的版次序列为 A、B、C、D,资料批准后的版次序列为 0,1,2,3,升版图纸时应在图纸第一页增加升版说明,标明升版图修改的条目、内容、时间及修改所在图纸页码。在图纸中修改的部分,应用云线标注,并注明修次。1.14 Documents format and packing requirements1.14 资料格式及包装要求:1.14.1 All installation documents (
24、instruction manuals and installation drawings) shall be packed with hard file folders. Documents have nothing to do with installation such asequipments of compliance, equipment inspection reports, equipment qualitys, raw materials reports etc shall be packed separately. (for detailed templets, refer
25、 to relevant pictures attached to the Annex 3)附件 6-3Ibri循环电站线路保护、接口屏、计量屏、故障系统订货合同第二卷:技术协议1.14.1 所有安装资料(说明书和安装图纸)全部采用硬质文件夹包装。设备证、设备检验报告、设备质量证明、原材料报告单等与安装无关的资料另外单独包装。(详细的样板请见附件 3 所附的相关图片)1.14.2Equipment and components descriptions &KKS codes in all documents shall beconsistent with the equipment d
26、escriptions in the Ordering Agreement, such as, circulating pump, condensate pump etc, instead of using common names of this kind of equipment such as mixed flow pump, centrifugal pump etc.1.14.2 所有资料中的设备及部件名称&KKS 编码应与订货协议中设备名称相同,如:循环水泵、凝结水泵等,而不采用混流泵、离心泵等这种设备的通用名称。1.14.3The name of this project
27、shall be marked in all documents (project description shallhave English expression).1.14.3 所有资料中必须注明本工程项目的名称(项目名称必需有英文表示)。1.14.4Drawing sizes shall meet ISO A series size requirement, use A4 or A3 papers aspossible, the max. size shall not exceed A0 (can be lengthened as per standard), however, whic
28、h shall be folded into A4 size for being bind into hard file holders;1.14.4 图纸符合ISO A 系列图幅要求,尽量采用A4 或A3 纸,最大图幅不超过A0(可以按照标准加长),但需折成 A4 版幅装订在硬质文件夹中;1.14.5High quality white papers over 80g/m2 will be used for drawing printing;1.14.5 图纸采用 80g/m2 以上的高质量白纸打印;1.14.6The title column at the lower right corn
29、er of the drawing shall be drawn as per thestandard drawing format; signatures of preparer, reviewer and approver shall be complete. If for the reason of drawing level, no signature at certain level is required, corresponding description shall be made or the signature column shall be crossed out, no
30、 blank shall be allowed in the signature columns.1.14.6 图纸右下标题栏应按照招标方提供的标准图框格式绘制;编审批签名应齐全,如因图纸级别问题,某级不需签字时应作出相应说明或把签字栏划掉,签字栏不得出现空白。1.14.7All drawings shall be drawn as per scale, which shall be detail and accurate, withcomplete marking;1.14.7 所有的图纸均按比例绘制,应详细准确、标注完整;1.14.8Requirementsonwrittendocumen
31、ts(reports,otherfilesandInstallation,Commissioning, Operation, Maintenance Manuals etc):1.14.8 文字性资料(报告,其它文档和安装、调试、运行、维护手册等)的要求:1)Written documents shall be prepared in MS Word and Excel, and electronic version shall be provided;a) 文字性资料采用MS Word和Excel编制,并提供;2)Instruction Manuals etc using the paper
32、 size provided in the unified templet shall be A4附件 6-4Ibri循环电站线路保护、接口屏、计量屏、故障系统订货合同第二卷:技术协议(except for attached drawings) and high quality white paper over 80g/m2 shall be used for printing and duplication.b) 说明书等采用统一模板中提供的纸版幅面必须为A4(附图除外)并采用80g/m2以上的高质量白纸打(复)印。3) Contents of written documents shall
33、 at least include cover sheet, which is similar to drawing title column; documents table of contents; general description, purpose; each subject of file shall be divided into several chapters and sections properly; reference list; attachments etc.c) 文字性资料的内容应至少包括:封面,与图纸标题栏类似;资料目录表;简介,目的;文档的各个主题,应适当分
34、成若干章节;列表;附件等。4)For templets, refer to Appendix 5d) 模板参见附录(Appendix)51.15 The Suppliers installation documents equipment produced by the Supplier itself andinclude installation documents of main installations documents of all the Supplieroutsourcing equipment (such as purchased motors, purchased valv
35、es etc), the requirements on installation documents of its outsourcing equipment are the same with the installation requirements on main equipment, and the Supplier is required to have installation documents of outsourcing equipment arranged in the file holders in a complete manner. Relevant documen
36、ts of outsourcing equipment shall be in printing font in English. And paper documents and electronic version of documents shall be provided as per requirements in Annex 2.3.1.15 投标方的安装资料包括投标方生产的主设备安装资料和所有投标方外购设备(如外购电机、外购阀门等)的安装资料,其外购设备的安装资料的要求和主设备的安装资料要求相同,且投标方在提交安装资料时需要将外购设备的安装资料也全部整理在文件夹内。外购设备的相关资
37、料,均应采用英文对照印刷字体。并按照本附件 2.3 的要求提供正式纸版及2. 技术文件和图纸资料。2.1Design cooperation documents 设计配合资料After signing Technical Agreement, the Supplier shall provide design cooperation documents as per “Design Cooperation Technical Documents Requirements” and “Coordiantion documents submisition suchedule” in Annex 3
38、. The supplier shall submit the documents as per requirement if related documents be omitted or unqualified and unsuitable by free.技术协议签订后,投标方应按照附件 3 中“设计配合技术文件要求”和“配合资料文件提交时间表”提供设计配合资料。The submission of the Suppliers documents shall be timely, sufficient, and satisfy the requirements of project sch
39、edule.投标方资料的提交应及时、充分,满足工程进度要求。附件 6-5Ibri循环电站线路保护、接口屏、计量屏、故障系统订货合同第二卷:技术协议Manufacturers cooperation documents submission schedule for Design institute (Fill in designing institute, supplement by supplier)设计院设计需要的厂家配合资料文件提交时间表(设计院填写,设备厂补充)Equipment design input data documents required (Fill in manufac
40、turer)设备设计需要的输入资料统计表(设备厂家填写)Equipment site installation, operation and maintenance documents list (Fill in supplyer)设备供现场安装及运行维护的设备资料文件统计表(设备厂家填写)2.2料)Formal documents (documents to be provided with the equipment) 正式资料(随机资Within one month after signing ordering contract, the Supplier shall provide t
41、he Purchaser with final installation drawing list and submission plan and confirmed version with seals on it for review and finalization.订货合同签订后一 内,投标方应向招标方提供最终安装供图 及提交计划盖章确认版供 、确定。Before printing installation documents to be supplied together with the equipment, the Supplier shall provide electroni
42、c version preliminary draft to the Purchaser, so that the Purchaser can organize experts concerned to review. Without obtaining The Purchasers review comments, the drawings, documents printed at the Suppliers own discretion, will not附件 6-6NO.序号Document资料名称Submisition Date提供时间Remark备注NO.序号Document资料名
43、称Required schedule 需求时间Design depth深度要求Remark备注1NoNoNo序号详细设计阶段初步设计阶段需求资料名称需求时间深度要求备注Ibri循环电站线路保护、接口屏、计量屏、故障系统订货合同第二卷:技术协议be approved by the Purchaser. The installation documents to be supplied with the equipment shall include drawing table of contents, to facilitate the Purchasers check. For documen
44、ts with the equipment to be reviewed and confirmed, the Purchaser shall give the Supplier written reply within 10 working days after receipt of drawings.在随机安装资料正式交付印刷前,投标方需提供给招标方初稿,以便招标方组织相关审核。未取得招标方的审核意见,而自行印刷的图纸、资料将不被招标方认可。随机安装资料必须包括图纸目录,以便招标方核对。供、确认的随机资料,招标方收到图纸后 10 个工作日内回复投标方。2.3Spare parts manu
45、al to be supplied in the Suppliers documents with the equipment (shallattach with equipment explode diagram and CPN codes)2.3投标方在随机资料文件中提供备品备件零件手册(须带有设备图及 CPN 编码)Parts manual provided by the Supplier shall include a series of drawings, indicating equipment parts can be purchased as spares. The follo
46、wing is the brief description of how to use this manual. Each sheet of drawing will have index number on the bottom of the sheet. The index number has four columns:投标方提供零件手册包含一系列图纸,指出可以作为备件采购的设备零件。以下是如何使用本手册的简要说明。每张图纸在本页的底部都有索引编号。索引编号有 4 列:(ITEM)-Item number will link the numbered part in the drawin
47、g with the information in the index.(ITEM)-项目。项目号将图纸里编号的零件与索引的信息挂钩。(CPN) -CPN part number. Indicates the part number required for ordering spare parts. (If the same part marked with several item numbers, selection shall be made based onequipment m).(CPN)-CPN 零件号。表示订购备件时要用的零件号。(如果同一零件标有多个项目号, 则必需根据设备
48、型号做出选择)(QTY)-quantity. Indicate the quantity of parts with the part number shown in the drawing. (QTY)-数量。表示图纸所示中此部件号的部件的数量。(DESCRIPTION)-name. The brief description of corresponding part. (DESCRIPTION)-名称。相应零件的简要描述。1)Serial number in the Exhibit illustration corresponding to CPN (Catalogue Part Num
49、ber), quantity, part description etc information. Of which part number can use numeric figure, letters etc, concrete form to facilitate equipment the Supplier to express in principle. For part difficult to be expressed in spare parts illustrations , the expressing method of adding a * after the nume
50、ric figure can be used.1) 附表说明图中序号所对应的部件号 CPN (Catalogue Part Number) 、数量、部件描述等信息。其中部件号可采取数字、字母等,具体形式以便于设备供应方表示为原则。对于备件说明图纸中难以表示的部件,可采取数字后加*号的表示方法。附件 6-7Ibri循环电站线路保护、接口屏、计量屏、故障系统订货合同第二卷:技术协议2)for relevant spare parts components drawings, refer to “Spare parts components manual illustrations”2)相关的备品备
51、件零部件图请参见招标方提供的“备品备件零件手册示例图”。附件 6-8Item项目CPNInstalled Qty安装数量Recommended Qty备件数量Description相关描述名称部件KKS编码Page/Drawing NumberAdaptor过渡接头23989463930Screw螺钉33990633410Separator, water水分离器*3A9593481620Bolt螺栓*3B3912854120Nut螺母*3C3915639311Connector接头Ibri循环电站线路保护、接口屏、计量屏、故障系统订货合同第二卷:技术协议3)The recommended sp
52、are parts list, descriptions,quantity, partnumbers provided by theSupplier shall be expressed by using the form in the above table, so as to know exactly which parts are the Supplier recommender within the equipment lifetime, so that purchase can be made before hand, and put forward accurate parts r
53、equired.附件 6-9Ibri循环电站线路保护、接口屏、计量屏、故障系统订货合同第二卷:技术协议3) 投标方应提供推荐的备件,名称、数量、部件号采用如上表格的形式予以表示,便于准确知道在设备期内哪些部件是供应商推荐采购的,从而可以提前采购,并能准确提出需要的部件。2.4 Equipment O&M Manual shall be completed as per the following table of contents:2.4 设备运行维护手册按照以下目录内容完成:Content of O&M Manual for Recommendation 运行维护手册推荐目录
54、1 Instructions说明1.1 General safety instructions 整体安全指南1.2 User instructions 用户说明1.3 Technical Data 技术数据2 Description of system 系统描述3 Operating Instruction. 操作指南Content and sequence by Vendor, including safety instruction. 供货方的内容及操作顺序,包括安全指南4 Error Detection 错误检测4.1 Diagnosis诊断4.2 Restoration of oper
55、ability恢复操作性能5 Maintenance Instructions 维护指南5.1 Troubleshooting故障处理5.2 Maintenance, Clearances维护,故障排除5.3 Test and adjustment instructions (e.g. calibration) 实验和调整指南5.4 ConsumablesSuch as: lubricants/lubricating points, needed chemicals 消耗品如:润滑油/润滑点,所需化学药品6 Purchased Parts 外购件7 Quality Record 质量8 Spa
56、re Part List备品备件9 Drawings, Lists, Diagrams, etc图纸,清册,图表9.1 System diagrams, arrangement diagrams, section views, component drawings 系统图,布置图,剖视图,零件图9.2 Valve-, component-, load-, measuring point lists 阀门,部件,负荷,测点9.3 Circuit diagrams 电路图9.4 Functional diagrams 逻辑图9.5 Allocation drawings 配置图附件 6-10Ibri循环电站线路保护、接口屏、计量屏、故障系统订货合同第二卷:技术协议9.6 Cable terminal diagrams 电缆接线图9.7 Cable dispositions 电缆配置Description 说明:The Operating & Maintenance Manuals comprises Technical Documents and Data required fo
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 城市道路照明节能路灯合同范本
- 劳务分包合同索赔与反索赔实例
- 河北省建筑安装合同模板
- 森林防火工程委托施工合同
- 煤矿加固改造合同
- 瑜伽教练合作协议样本
- 国际平整园精装房施工合同
- 仓储租赁合同法律意见书
- 职工工伤事故协议
- 太原二手房急售合同样本
- 医科大学2024年12月精神科护理学作业考核试题答卷
- 论青少年合理怀疑精神的培育
- 机关干部礼仪培训课件
- 2024-2025学年浙教版八年级上册科学期中模拟卷
- (正式版)HGT 6313-2024 化工园区智慧化评价导则
- 智能制造工程生涯发展报告
- 二级公立医院绩效考核三级手术目录(2020版)
- 品牌授权工厂生产授权书合同
- 6人小品《没有学习的人不伤心》台词完整版
- 销售配合与带动-培训PPT课件
- 暗挖隧道帷幕注浆专项方案[优秀工程方案]
评论
0/150
提交评论