版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、5.1热硫化硬橡胶衬里工作内容:运料、配浆、下料削边、表面清洗、刷浆贴衬、火花检查、硫化、硬度检查。计量单位:10m2定额编号11-73511-73611-73711-738项目单位单价塔、槽类设备1.5m以下1.5m以上一层两层一层两层数量合计数量合计数量合计数量合计综合单价元1371.972120.951285.911962.45其中人工费元673.401047.10617.16943.50材料费元233.95387.20233.95387.20机械费元107.71131.69107.71131.69管理费元262.63408.37240.69367.97利润元94.28146.5986.
2、40132.09二类工工日74.009.10673.4014.151047.108.34617.1612.75943.50材料02010121硬橡胶板m2(11.24)(22.48)(11.20)(22.40)12413556胶料S1002kg(1.99)(3.58)(1.99)(3.58)12030113橡胶溶解剂油kg9.9019.10189.0934.36340.1619.10189.0934.36340.1602270106白布m4.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.501
3、2.500.5012.5031150301电kW·h0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.002.0728.982.0728.982.0728.982.0728.98机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.991.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.102.030.1462.970.1
4、02.030.1462.97工作内容:同前。计量单位:10m2定额编号11-73911-74011-74111-742项目单位单价锥形设备1.5m以下1.5m以上一层两层一层两层数量合计数量合计数量合计数量合计综合单价元1425.182263.611326.672072.27其中人工费元708.181140.34643.801015.28材料费元233.95387.20233.95387.20机械费元107.71131.69107.71131.69管理费元276.19444.73251.08395.96利润元99.15159.6590.13142.14二类工工日74.009.57708.181
5、5.411140.348.70643.8013.721015.28材料02010121硬橡胶板m2(11.26)(22.52)(11.22)(22.44)12413556胶料S1002kg(1.99)(3.58)(1.99)(3.58)12030113橡胶溶解剂油kg9.9019.10189.0934.36340.1619.10189.0934.36340.1602270106白布m4.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.5012.500.5012.5031150301电kW
6、3;h0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.002.0728.982.0728.982.0728.982.0728.98机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.991.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.102.030.1462.970.102.030.1462.97工作内容:同前。计量单位:1
7、0m2定额编号11-74311-744项目单位单价多孔板一层两层数量合计数量合计综合单价元5312.378834.99其中人工费元3229.365404.22材料费元262.66433.14机械费元108.79133.39管理费元1259.452107.65利润元452.11756.59二类工工日74.0043.643229.3673.035404.22材料02010121硬橡胶板m2(11.78)(23.56)12413556胶料S1002kg(2.00)(3.60)12030113橡胶溶解剂油kg9.9022.00217.8039.00386.1002270106白布m4.000.301.
8、200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.5031150301电kW·h0.892.452.184.904.3631150503蒸汽t14.002.0728.982.0728.98机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.7398410104火花检测仪台班20.310.1533.110.234.67工作内容:同前。计量单位:10m2定额编号11-74511-74611-7471
9、1-748项目单位单价管道108以下426以下一层两层一层两层数量合计数量合计数量合计数量合计综合单价元1772.363058.351344.372129.95其中人工费元911.681610.98631.961004.18材料费元267.90460.16267.90460.16机械费元109.58133.39109.58133.39管理费元355.56628.28246.46391.63利润元127.64225.5488.47140.59二类工工日74.0012.32911.6821.771610.988.54631.9613.571004.18材料02010121硬橡胶板m2(11.64)
10、(22.96)(11.28)(22.56)12413556胶料S1002kg(2.00)(3.60)(2.00)(3.60)12030113橡胶溶解剂油kg9.9024.00237.6043.20427.6824.00237.6043.20427.6802270106白布m4.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.5012.500.5012.5031150301电kW·h0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.001
11、.0314.421.0314.421.0314.421.0314.42机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.991.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.1923.900.234.670.1923.900.234.67工作内容:同前。计量单位:10m2定额编号11-74911-75011-75111-752项目单位单价阀门76以下133以下一层两层一层两层
12、数量合计数量合计数量合计数量合计综合单价元1813.872709.711732.962447.95其中人工费元938.321381.58887.261239.50材料费元267.90460.16265.10415.78机械费元110.35135.73110.35135.73管理费元365.94538.82346.03483.41利润元131.36193.42124.22173.53二类工工日74.0012.68938.3218.671381.5811.99887.2616.751239.50材料02010121硬橡胶板m2(10.83)(21.64)(11.22)(22.44)12413556
13、胶料S1002kg(2.00)(3.60)(2.00)(3.60)12030113橡胶溶解剂油kg9.9024.00237.6043.20427.6824.00237.6039.00386.1002270106白布m4.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.5012.500.5012.5031150301电kW·h0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.001.0314.421.0314.420.8311.620.8
14、311.62机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.991.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.234.670.3457.010.234.670.3457.01工作内容:同前。计量单位:10m2定额编号11-75311-75411-75511-756项目单位单价弯头133以下426以下一层两层一层两层数量合计数量合计数量合计数量合计综合单价元1753.34
15、2492.921371.792088.73其中人工费元900.581241.72651.20977.54材料费元265.10457.36265.10457.36机械费元110.35135.73110.35135.73管理费元351.23484.27253.97381.24利润元126.08173.8491.17136.86二类工工日74.0012.17900.5816.781241.728.80651.2013.21977.54材料02010121硬橡胶板m2(13.27)(26.54)(12.43)(24.86)12413556胶料S1002kg(2.20)(3.96)(2.00)(3.96
16、)12030113橡胶溶解剂油kg9.9024.00237.6043.20427.6824.00237.6043.20427.6802270106白布m4.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.5012.500.5012.5031150301电kW·h0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.000.8311.620.8311.620.8311.620.8311.62机械99450303轴流通风机 功率7.5kW台班4
17、2.981.23252.951.76875.991.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.234.670.3457.010.234.670.3457.01工作内容:同前。计量单位:10m2定额编号11-75711-75811-75911-760项目单位单价管件108以下426以下一层两层一层两层数量合计数量合计数量合计数量合计综合单价元1549.542239.301318.571967.58其中人工费元767.3
18、81075.96616.42898.36材料费元265.10457.36265.10457.36机械费元110.35135.73110.35135.73管理费元299.28419.62240.40350.36利润元107.43150.6386.30125.77二类工工日74.0010.37767.3814.541075.968.33616.4212.14898.36材料02010121硬橡胶板m2(12.09)(24.18)(11.27)(22.54)12413556胶料S1002kg(2.00)(3.60)(2.00)(3.60)12030113橡胶溶解剂油kg9.9024.00237.60
19、43.20427.6824.00237.6043.20427.6802270106白布m4.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.5012.500.5012.5031150301电kW·h0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.000.8311.620.8311.620.8311.620.8311.62机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.991.23252.
20、951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.234.670.3457.010.234.670.3457.015.2热硫化软橡胶衬里工作内容:同前。计量单位:10m2定额编号11-76111-76211-76311-764项目单位单价塔、槽类设备1.5m以下1.5m以上一层两层一层两层数量合计数量合计数量合计数量合计综合单价元1496.512343.901410.452185.40其中人工费元673.401047.10617.169
21、43.50材料费元358.49610.15358.49610.15机械费元107.71131.69107.71131.69管理费元262.63408.37240.69367.97利润元94.28146.5986.40132.09二类工工日74.009.10673.4014.151047.108.34617.1612.75943.50材料02010131软橡胶板m2(11.20)(22.54)(11.10)(22.20)12413555胶料4508#kg(1.32)(2.37)(1.32)(2.37)12030113橡胶溶解剂油kg9.9031.68313.6356.88563.1131.683
22、13.6356.88563.1102270106白布m4.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.5012.500.5012.5031150301电kW·h0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.002.0728.982.0728.982.0728.982.0728.98机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.991.23252.951.76875.9999433
23、310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.102.030.1462.970.102.030.1462.97工作内容:同前。计量单位:10m2定额编号11-76511-76611-76711-768项目单位单价锥形设备1.5m以下1.5m以上一层两层一层两层数量合计数量合计数量合计数量合计综合单价元1549.722486.561451.212295.22其中人工费元708.181140.34643.801015.28材料费元358.49610.15358.4961
24、0.15机械费元107.71131.69107.71131.69管理费元276.19444.73251.08395.96利润元99.15159.6590.13142.14二类工工日74.009.57708.1815.411140.348.70643.8013.721015.28材料02010131软橡胶板m2(11.25)(22.42)(11.21)(22.54)12413555胶料4508#kg(1.32)(2.37)(1.32)(2.37)12030113橡胶溶解剂油kg9.9031.68313.6356.88563.1131.68313.6356.88563.1102270106白布m4
25、.000.301.200.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.5012.500.5012.5031150301电kW·h0.892.452.184.904.362.452.184.904.3631150503蒸汽t14.002.0728.982.0728.982.0728.982.0728.98机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.991.23252.951.76875.9999433310电动空气压缩机 排气量10m3/min台班527.
26、340.1052.730.1052.730.1052.730.1052.7398410104火花检测仪台班20.310.102.030.1462.970.102.030.1462.97工作内容:同前。计量单位:10m2定额编号11-76911-770项目单位单价多孔板一层两层数量合计数量合计综合单价元5408.209012.00其中人工费元3229.365404.22材料费元358.49610.15机械费元108.79133.39管理费元1259.452107.65利润元452.11756.59二类工工日74.0043.643229.3673.035404.22材料02010131软橡胶板m2
27、(11.21)(22.42)12413555胶料4508#kg(1.32)(2.37)12030113橡胶溶解剂油kg9.9031.68313.6356.88563.1102270106白布m4.000.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.5031150301电kW·h0.892.452.184.904.3631150503蒸汽t14.002.0728.982.0728.98机械99450303轴流通风机 功率7.5kW台班42.981.23252.951.76875.9999433310电动空气压缩机 排气量10m3/
28、min台班527.340.1052.730.1052.7398410104火花检测仪台班20.310.1533.110.234.675.3热硫化软、硬胶板复合衬里工作内容:同前。计量单位:10m2定额编号11-77111-772项目单位单价塔、槽类设备1.5m以下1.5m以上两层数量合计数量合计综合单价元2219.362060.86其中人工费元1047.10943.50材料费元485.61485.61机械费元131.69131.69管理费元408.37367.97利润元146.59132.09二类工工日74.0014.151047.1012.75943.50材料02010121硬橡胶板m2(1
29、1.24)(11.20)02010131软橡胶板m2(11.24)(11.20)12413556胶料S1002kg(2.00)(2.00)12413555胶料4508#kg(1.04)(1.04)12030113橡胶溶解剂油kg9.9044.30438.5744.30438.5702270106白布m4.000.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.5031150301电kW·h0.894.904.364.904.3631150503蒸汽t14.002.0728.982.0728.98机械99450303轴流通风机 功率7
30、.5kW台班42.981.76875.991.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.7398410104火花检测仪台班20.310.1462.970.1462.97工作内容:同前。计量单位:10m2定额编号11-77311-77411-775项目单位单价锥型设备多孔板1.5m以下1.5m以上两层两层数量合计数量合计数量合计综合单价元2362.022170.688887.46其中人工费元1140.341015.285404.22材料费元485.61485.61485.61机械费元131.69131.69133.39管
31、理费元444.73395.962107.65利润元159.65142.14756.59二类工工日74.0015.411140.3413.721015.2873.035404.22材料02010121硬橡胶板m2(11.26)(11.22)(11.78)02010131软橡胶板m2(11.26)(11.22)(11.78)12413556胶料S1002kg(2.00)(2.00)(2.00)12413555胶料4508#kg(1.04)(1.04)(1.04)12030113橡胶溶解剂油kg9.9044.30438.5744.30438.5744.30438.5702270106白布m4.000
32、.301.200.301.200.301.2024170101丝绸绝缘布m225.000.5012.500.5012.500.5012.5031150301电kW·h0.894.904.364.904.364.904.3631150503蒸汽t14.002.0728.982.0728.982.0728.98机械99450303轴流通风机 功率7.5kW台班42.981.76875.991.76875.991.76875.9999433310电动空气压缩机 排气量10m3/min台班527.340.1052.730.1052.730.1052.7398410104火花检测仪台班20.3
33、10.1462.970.1462.970.234.675.4预硫化橡胶衬里工作内容:运料、配浆、下料削边、表面清洗、胶板打毛、刷浆贴衬、粘贴盖。计量单位:10m2定额编号11-77611-777项目单位单价设备一层两层数量合计数量合计综合单价元1683.852517.81其中人工费元918.341310.54材料费元199.38386.10机械费元79.41126.58管理费元358.15511.11利润元128.57183.48二类工工日74.0012.41918.3417.711310.54材料02010901预硫化橡胶板m2(11.50)(23.00)02070427盖胶板m2(0.70
34、)(0.70)11010324底涂料kg(4.40)(4.40)11450703固化剂kg(1.40)(2.80)11452103工业酒精 99.5%kg8.000.806.401.6012.8012300382三氯乙烯kg7.362.0014.724.0029.4412413543胶接剂 JHFkg11.5014.00161.0028.00322.0024170101丝绸绝缘布m225.000.5012.500.5012.5012333542溶剂kg2.701.363.672.707.29其它材料费元1.092.07机械99450303轴流通风机 功率7.5kW台班42.981.23252.
35、951.76875.9998410104火花检测仪台班20.310.234.670.3457.0199091904电动卷扬机(单筒快速) 牵引力10kN台班142.430.15321.790.30643.585.5自然硫化橡胶衬里工作内容:同前。计量单位:10m2定额编号11-778项目单位单价设备一层数量合计综合单价元1181.06其中人工费元684.50材料费元54.36机械费元79.41管理费元266.96利润元95.83二类工工日74.009.25684.50材料11010324底涂料kg(3.20)02010905自然硫化橡胶板m2(12.00)12410101粘结剂kg(7.00)12310305甲苯kg9.504.0038.0002270106白布m4.000.301.2024170101丝绸绝缘布m225.000.5012.5031150301电kW·h0.892.452.18其它材料费元0.48机械99450303轴流通风机 功率7.5kW台班42.981.23252.9
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 中考物理复习主题单元4第8课时熟悉而陌生的力课件
- 冀少版八年级生物上册第三单元第二节蒸腾作用课件
- 等高线地形图教案
- 《蚂蚁搬豆》体育游戏
- 人教版一年级数学上册【教案全册】
- 旅游景区酒店建设承揽
- 西师版五年级语文上册教案
- 人教版三年级语文上册教案
- 乐器制品标识制度
- 老年护理中心财务流程
- 市政道路管道吊装施工方案(共7页)
- 人教版八年级物理上册全知识点大全
- 破产管理人报酬计算器
- Q_JLY J7110281D-2016 乘用车内外饰塑料件通用技术要求
- 树木移植工程技术交底
- 南非电力市场投资前景预测报告(目录)
- 国家生态环境建设项目管理办法
- 秦腔传统剧《草坡面理》
- 直流电机设计参数计算
- 核心素养下小学语文教学策略探究
- 室外球墨铸铁管施工方案
评论
0/150
提交评论