1、Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Failure Mode & Effect AnalysisExplanation and Use of FMEAQuality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载What is FMEA?FMEA is a problem solving process adopted by Snap-on as a key component of the Quality Forward System.Generally, FMEA is done by an

2、on-site multifunctional team facilitated locally or by an SEQ Group Advanced Quality Engineer.Objective is to identify all of the reasons why quality of a process or product does not meet expectations.Uses severity, occurrence and detection ratings to determine corrective action priority for each po

3、ssible failure reason.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载When should a FMEA study be conducted?As part of a Design/Development phase.When corrective action is needed due to unfavorable performance data (performance based on QFS metrics does not meet goals).When a need to make incremental

4、 improvement is identified by facility management or the SEQ Group.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载FMEA Team Start-UpTeam Selection done by local quality coordinator, business unit manager or, on request, SEQ Group Advanced Quality Engineer.Problem Statement A concise and focused desc

5、ription of the quality problem or opportunity for improvement, “what went wrong” or “what needs fixing”.Goal Statement a description of what is to be accomplished by the team, in quantifiable terms “reduce by”, “increase by”, “eliminate”, etc. Good metrics to use include scrap cost, rework cost, or

6、Defects Per Million Opportunities (DPMO), etc. For example, a goal statement could be “To reduce DPMO on product family X from 3000 to 2000 by year end”.Complete FMEA Team Start-Up Worksheet (example located in procedure SEQ 80.10, Figure 1).Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Problem Sta

7、tement & Goal StatementProblem Statement and Goal Statement should consider:What went wrong?What is the gap between the desired quality level and the actual quality level?Which process or processes are involved?Which department or cell is the deficiency occurring in?Is the problem cyclic, can it

8、 be attributed to specific events?What are the appropriate metrics to measure?What is the impact on operational fitness and profitability?What is the impact on the bottom line (reduced, increased, eliminated)?Are there constraints recognized early in the process? If so, have they been explored and c

9、larified with the appropriate management levelQuality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载FMEA Process FMEAs uncover process problems related to the manufacture of product. Examples: a piece of automated assembly equipment may misfeed parts resulting in products not being assembled correctly, or,

10、 in a chemical manufacturing process, temperature or mixing time could be sources of potential failures resulting in unusable product. Think in terms of the five elements of a process: people, materials, equipment, methods and environment. With these five elements in mind, ask “How can process failu

11、re affect the product, processing efficiency or safety?” Nine steps in FMEA process.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #1 - Review the ProcessEnsure that everyone on the FMEA team has the same understanding of the process being worked on.Review blueprint/engineering drawing of produ

12、ct (if conducting FMEA on product) and/or a detailed flowchart of the process. If these are not available, the team will need to create one.Using the blueprint and/or flowchart, team members should familiarize themselves with the product or process. They should physically see the product or a protot

13、ype of the product, and physically walk through the process exactly as the process flows.It is helpful to have an “expert” on the product or process available to answer any questions the team might have.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #2 Brainstorm Potential Failure ModesMethod o

14、f generating and documenting ideas of potential failure modes.If product or process is complex, a series of brainstorming sessions, each focused on a different element (i.e. people, methods, equipment, materials, environment), may be needed to generate a more thorough list of potential failure modes

15、.Facilitator should write down all ideas generated in brainstorming sessions.Once brainstorming is complete, ideas should be grouped into like categories (as determined by the team). Groups can be type of failure, where on the product failure occurred, estimated seriousness of the failure, etc. Fail

16、ure modes may also be combined if they are the same or very similar.Once failure modes have been grouped/combined, they should be transferred to the Potential Failure Mode and Effect Analysis Sheet (example in SEQ 80.10, Figure 2).Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #2 (continued) Br

17、ainstorming Guidelines Do not make any judgment on ideas. Team members should not comment on whether an idea is good or bad. Thinking should be unconventional, imaginative, or even outrageous. Aim for a large number of ideas in the shortest possible time. Team members should “hitchhike” on other ide

18、as, by expanding them, modifying them, or producing new ones by association. All team members should participate in brainstorming process. Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #3 List Potential Effects of Each Failure Mode After the failure modes are listed on the FMEA worksheet form,

19、 the FMEA team needs to review each failure mode and identify the potential effects of the failure should it occur. For some failure modes, there may be only one effect, while other failure modes may have several effects. This step must be thorough this information will determine assignment of risk

20、ratings for each of the failures. It is helpful to think of this step as an if-then process: If the failure occurs, then what are the consequences.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #4 Assign Severity Rating The severity rating is an estimate of how serious the effects would be if a

21、 given failure did occur. May be based on past experience, or an estimate based on the knowledge and expertise of the team members. Because each failure may have several different effects, and each effect may have a different level of severity, the effect, not the failure, must be rated. Each effect

22、 should be given its own severity rating. Ratings based on 10-point scale, with 1 being the lowest rating and 10 being the highest. General example on next page may be customized by team for their specific FMEA project.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #4 continued Severity Rating

23、Scale ExampleRatingDescriptionDefinition10Dangerously HighFailure could injure the customer or an employee9Extremely HighFailure would create noncompliance with federal regulations8Very HighFailure renders the unit inoperable or unfit for use7HighFailure causes a high degree of customer dissatisfact

24、ion6ModerateFailure results in a subsystem or partial malfunction of the product5LowFailure creates enough of a performance loss to cause the customer to complain4Very LowFailure can be overcome with modifications to the customers process or product, but there is minor performance loss3MinorFailure

25、would create a minor nuisance to the customer, but the customer can overcome it in the process or product without performance loss.2Very MinorFailure would not be readily apparent to the customer, but would have minor effects on the customers process or product1NoneFailure would not be noticeable to

26、 the customer and would not affect the customers process or product.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #5 Assign Occurrence RatingThe occurrence rating is a measure of how often an failure mode may occur.Best method for determine occurrence rating is to use actual data from the proc

27、ess (for example, failure logs or process capability data).If actual data is not available, the team needs to estimate how often a failure mode could occur.Team can make a better estimate of how likely a failure mode is to occur and at what frequency by knowing the potential causes of failure.Rating

28、s based on 10-point scale, with 1 being the lowest rating and 10 being the highest.General example on next page may be customized by team for their specific FMEA project.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #5 continued Occurrence Rating Scale ExampleRatingDescriptionPotential Failure

29、 Rate10Very High Failure is almost inevitableMore than one occurrence per day or a probability of more than three occurrences in 10 events (Cpk 0.33).9One occurrence every three to four days or a probability of three occurrences in 10 events (Cpk approximately equal to 0.33).8High Repeated failuresO

30、ne occurrence per week or a probability of 5 occurrences in 100 events (Cpk approximately equal to 0.67).7One occurrence every month or one occurrence in 100 events (Cpk approximately equal to 0.83)6Moderate Occasional failuresOne occurrence every three months or three occurrences in 1,000 events (C

31、pk approximately equal to 1.00)5One occurrence every six months to one year or one occurrence in 10,000 events (Cpk approximately equal to 1.17)4One occurrence per year or six occurrences in 100,000 events (Cpk approximately equal to 1.33)3Low Relatively few failuresOne occurrence every one to three

32、 years or six occurrences in 10 million events (Cpk approximately equal to 1.67)2One occurrence every three to five years or two occurrences in one billion events (Cpk approximately equal to 2.00)1Remote Failure is unlikelyOne occurrence in greater than five years or less than two occurrences in one

33、 billion events (Cpk greater than 2.00)Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #6 Assign Detection Rating The detection rating looks at how likely it is that a failure or the effect of a failure will be detected. Start by identifying current controls that may detect a failure or effect o

34、f a failure (example SPC or in-process checks). More controls in place generates a low number (better) rating; no current controls means the likelihood of detection is low and therefore the item would receive a high number (worse) rating. Ratings based on 10-point scale, with 1 being the lowest rati

35、ng and 10 being the highest. General example on next page may be customized by team for their specific FMEA project.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #6 continued Detection Rating Scale ExampleRatingDescriptionDefinition10Absolute UncertaintyThe product is not inspected or the defe

36、ct caused by failure is not detectable.9Very RemoteProduct is sampled, inspected and released based on Acceptable Quality Level (AQL) sampling plans.8RemoteProduct is accepted based on new defectives in a sample.7Very LowProduct is 100% manually inspected in the process.6LowProduct is 100% manually

37、inspected using go/no go or other mistake-proofing gages5ModerateSome Statistical Process Control (SPC) is used in process and product is final inspected off-line4Moderately HighSPC is used and there is immediate reaction to out-of-control conditions3HighAn effective SPC program is in place with pro

38、cess capabilities (Cpk) greater than 1.332Very HighAll product is 100% automatically inspected.1Almost CertainThe defect is obvious or there is 100% automatic inspection with regular calibration and preventive maintenance of the inspection equipment.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Ste

39、p #7 Calculate Risk Priority NumberThe risk priority number (RPN) is calculated by multiplying the severity rating times the occurrence rating times the detection rating for all of the items. RPN = Severity X Occurrence X DetectionTotal RPN is calculated by adding all of the RPN numbers. This number

40、 serves as a ranking tool to prioritize which Failure Modes are to be considered a concern and therefore should be addressed first.Quality Forward System来自来自 中国最大的资料库下载中国最大的资料库下载Step #8 Prioritize the Failure Modes for Action Once the RPN is calculated, the failure modes can be prioritized by ranking them in order from the highest RPN to the smallest. A Pareto diagram is helpful to visualize the differences between the various ratings. When the failure modes are ranked, the team must decide which items to work on.

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论