版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、湖北汽车工业学院科技学院毕业设计(外文翻译)湖北汽车工业学院科技学院毕 业 设 计(论 文) 英 文 翻 译课题名称基于UG的高顶盖后板修边模参数化设计系 部材 料 工 程 系专 业材料成型及控制工程班 级KT633-01学 号2006K330130姓 名何杏指导教师李芳华2 0 10年 3 月 10日4 Sheet metal forming and blanking4.1 Principles of die manufacture4.1.1 Classification of diesIn metalforming,the geometry of the workpiece is esta
2、blished entirely or partially by the geometry of the die.In contrast to machining processes,ignificantly greater forces are necessary in forming.Due to the complexity of the parts,forming is often not carried out in a single operation.Depending on the geometry of the part,production is carried out i
3、n several operational steps via one or several production processes such as forming or blanking.One operation can also include several processes simultaneously(cf.Sect.2.1.4).During the design phase,the necessary manufacturing methods as well as the sequence and number of production steps are establ
4、ished in a processing plan(Fig.4.1.1).In this plan,the availability of machines,the planned production volumes of the part and other boundary conditions are taken into account.The aim is to minimize the number of dies to be used while keeping up a high level of operational reliability.The parts are
5、greatly simplified right from their design stage by close collaboration between the Part Design and Production Departments in order to enable several forming and related blanking processes to be carried out in one forming station.Obviously,the more operations which are integrated into a single die,t
6、he more complex the structure of the die becomes.The consequences are higher costs,a decrease in output and a lower reliability.Fig.4.1.1 Production steps for the manufacture of an oil sumpTypes of diesThe type of die and the closely related transportation of the part between dies is determined in a
7、ccordance with the forming procedure,the size of the part in question and the production volume of parts to be produced.The production of large sheet metal parts is carried out almost exclusively using single sets of dies.Typical parts can be found in automotive manufacture,the domestic appliance in
8、dustry and radiator production.Suitable transfer systems,for example vacuum suction systems,allow the installation of double-action dies in a sufficiently large mounting area.In this way,for example,the right and left doors of a car can be formed jointly in one working stroke(cf.Fig.4.4.34).Large si
9、ze single dies are installed in large presses.The transportation of the parts from one forming station to another is carried out mechanically.In a press line with single presses installed one behind the other,feeders or robots can be used(cf.Fig.4.4.20 to 4.4.22),whilst in large-panel transfer press
10、es,systems equipped with gripper rails(cf.Fig.4.4.29)or crossbar suction systems(cf.Fig.4.4.34)are used to transfer the parts. Transfer dies are used for the production of high volumes of smaller and medium size parts(Fig.4.1.2).They consist of several single dies,which are mounted on a common base
11、plate.The sheet metal is fed through mostly in blank form and also transported individually from die to die.If this part transportation is automated,the press is called a transfer press.The largest transfer dies are used together with single dies in large-panel transfer presses(cf.Fig.4.4.32). In pr
12、ogressive dies,also known as progressive blanking dies,sheet metal parts are blanked in several stages;generally speaking no actual forming operation takes place.The sheet metal is fed from a coil or in the form of metal strips.Using an appropriate arrangement of the blanks within the available widt
13、h of the sheet metal,an optimal material usage is ensured(cf.Fig.4.5.2 to 4.5.5). The workpiece remains fixed to the strip skeleton up until the laFig.4.1.2 Transfer die set for the production of an automatic transmission for an automotive application-st operation.The parts are transferred when the
14、entire strip is shifted further in the work flow direction after the blanking operation.The length of the shift is equal to the center line spacing of the dies and it is also called the step width.Side shears,very precise feeding devices or pilot pins ensure feed-related part accuracy.In the final p
15、roduction operation,the finished part,i.e.the last part in the sequence,is disconnected from the skeleton.A field of application for progressive blanking tools is,for example,in the production of metal rotors or stator blanks for electric motors(cf.Fig.4.6.11 and 4.6.20). In progressive compound die
16、s smaller formed parts are produced in several sequential operations.In contrast to progressive dies,not only blanking but also forming operations are performed.However, the workpiece also remains in the skeleton up to the last operation(Fig.4.1.3 and cf.Fig.4.7.2).Due to the height of the parts,the
17、 metal strip must be raised up,generally using lifting edges or similar lifting devices in order to allow the strip metal to be transported mechanically.Pressed metal parts which cannot be produced within a metal strip because of their geometrical dimensions are alternatively produced on transfer se
18、ts. Fig.4.1.3 Reinforcing part of a car produced in a strip by a compound die set Next to the dies already mentioned,a series of special dies are available for special individual applications.These dies are,as a rule,used separately.Special operations make it possible,however,for special dies to be
19、integrated into an operational Sequence.Thus,for example,in flanging dies several metal parts can be joined together positively through the bending of certain metal sections(Fig.4.1.4and cf.Fig.2.1.34).During this operation reinforcing parts,glue or other components can be introduced. Other special
20、dies locate special connecting elements directly into the press.Sorting and positioning elements,for example,bring stamping nuts synchronised with the press cycles into the correct position so that the punch heads can join them with the sheet metal part(Fig.4.1.5).If there is sufficient space availa
21、ble,forming and blanking operations can be carried out on the same die. Further examples include bending,collar-forming,stamping,fine blanking,wobble blanking and welding operations(cf.Fig.4.7.14 and4.7.15).Fig.4.1.4 A hemming die Fig.4.1.5 A pressed part with an integrated punched nut4.1.2 Die deve
22、lopmentTraditionally the business of die engineering has been influenced by the automotive industry.The following observations about the die development are mostly related to body panel die construction.Essential statements are,however,made in a fundamental context,so that they are applicable to all
23、 areas involved with the production of sheet-metal forming and blanking dies.Timing cycle for a mass produced car body panel Until the end of the 1980s some car models were still being produced for six to eight years more or less unchanged or in slightly modified form.Today,however,production time c
24、ycles are set for only five years or less(Fig.4.1.6).Following the new different model policy,the demands ondie makers have also changed fundamentally.Comprehensive contracts of much greater scope such as Simultaneous Engineering(SE)contracts are becoming increasingly common.As a result,the die make
25、r is often involved at the initial development phase of the metal part as well as in the planning phase for the production process.Therefore,a much broader involvement is established well before the actual die development is initiated.Fig.4.1.6 Time schedule for a mass produced car body panelThe tim
26、etable of an SE project Within the context of the production process for car body panels,only a minimal amount of time is allocated to allow for the manufacture of the dies.With large scale dies there is a run-up period of about 10 months in which design and die try-out are included.In complex SE pr
27、ojects,which have to be completed in 1.5 to 2 years,parallel tasks must be carried out.Furthermore,additional resources must be provided before and after delivery of the dies.These short periods call for pre-cise planning,specific know-how,available capacity and the use of the latest technological a
28、nd communications systems.The timetable shows the individual activities during the manufacturing of the dies for the production of the sheet metal parts(Fig.4.1.7).The time phases for large scale dies are more or less similar so that this timetable can be considered to be valid in general.Data recor
29、d and part drawingThe data record and the part drawing serve as the basis for all subsequent processing steps.They describe all the details of the parts to be produced. The information given in the Fig.4.1.7 Timetable for an SE projectpart drawing includes: part identification,part numbering,sheet m
30、etal thickness,sheet metal quality,tolerances of the finished part etc.(cf.Fig.4.7.17). To avoid the production of physical models(master patterns),the CAD data should describe the geometry of the part completely by means of line,surface or volume models.As a general rule,high quality surface data w
31、ith a completely filleted and closed surface geometry must be made available to all the participants in a project as early as possible.Process plan and draw developmentThe process plan,which means the operational sequence to be followed in the production of the sheet metal component,is developed fro
32、m the data record of the finished part(cf.Fig.4.1.1).Already at this point in time,various boundary conditions must be taken into account:the sheet metal material,the press to be used,transfer of the parts into the press,the transportation of scrap materials,the undercuts as well as thesliding pin i
33、nstallations and their adjustment. The draw development,i.e.the computer aided design and layout of the blank holder area of the part in the first forming stageif need bealso the second stage,requires a process planner with considerable experience(Fig.4.1.8).In order to recognize and avoid problems
34、in areas which are difficult to draw,it is necessary to manufacture a physical analysis model of the draw development.With this model,theforming conditions of the drawn part can be reviewed and final modifications introduced,which are eventually incorporated into the data record(Fig.4.1.9). This pro
35、cess is being replaced to some extent by intelligent simulation methods,through which the potential defects of the formed component can be predicted and analysed interactively on the computer display.Die designAfter release of the process plan and draw development and the press,the design of the die
36、 can be started.As a rule,at this stage,the standards and manufacturing specifications required by the client must be considered.Thus,it is possible to obtain a unified die design and to consider the particular requests of the customer related to warehousing of standard,replacement and wear parts.Ma
37、ny dies need to be designed so that they can be installed in different types of presses.Dies are frequently installed both in a production press as well as in two different separate back-up presses.In this context,the layout of the die clamping elements,pressure pins and scrap disposal channels on d
38、ifferent presses must be taken into account.Furthermore,it must be noted that drawing dies working in a single-action press may be installed in a double-action press(cf.Sect.3.1.3 and Fig.4.1.16).Fig.4.1.8 CAD data record for a draw development In the design and sizing of the die,it is particularly
39、important to consider the freedom of movement of the gripper rail and the crossbar transfer elements(cf.Sect.4.1.6).These describe the relative movements between the components of the press transfer system and the die components during a complete press working stroke.The lifting movement of the pres
40、s slide,the opening and closing movements of the gripper rails and the lengthwise movement of the whole transfer are all superimposed.The dies are designed so that collisions are avoided and a minimum clearance of about 20 mm is set between all the moving parts.4 金属板料的成形及冲裁4. 模具制造原理4.1.1模具的分类在金属成形的过
41、程中,工件的几何形状完全或部分建立在模具几何形状的基础上的。与机械加工相比,在成形时明显更大的压力是必要的。由于零件的复杂性,往往不是只进行一次操作就能成形的。根据零件的几何形状,通过由一个或几个生产过程例如成形或冲裁的几个操作步骤进行生产。一个操作也可以同时完成几个过程。 在设计阶段,合理的生产步骤、生产次序以及生产工序数都由生产计划来决定(如图4.1.1)。在这个计划中,应该对机器的可利用性、零件的计划生产量和其他限制条件予以考虑。其目的是在保证高水平的操作可靠性的同时最大限度地减少需要使用的模具数量。通过部件设计部和生产部之间的紧密合作促使几个成形和有关的冲裁过程能在一个成形操作中完成,
42、如此一来,仅仅在设计阶段就可以大大地简化部件。显然,越是更多的操作集成到一个单独的模具上,模具结构就必然更为复杂。其后果是成本较高、产量下降和可靠性较低。图4.1.1 油底壳的生产步骤模具类型模具的类型和模具之间零部件的密切相关运输是根据成形步骤、预算的部件的尺寸、要生产的部件的生产量来确定的。大型钣金零件的生产几乎完全采用单套模具来实现的。典型零件可在汽车制造、国内家电业以及散热器的生产中找到。适当的转移系统,例如真空抽吸系统,可以使双动模安装在一个足够大的安装面上。例如,用这种方式可以使汽车左右车门在一个工作行程中一起成形。(参考图4.4.34)。尺寸大的单套模具需安装在大型压力机上。部件
43、从一个成形点到另一个成形点的运输是机械化地执行的。工人或机器人可以使用与单工序压力机一前一后安装的冲压线(对比图4.4.20与 4.4.22),同时,在大型多工位压力机上,系统还配备了夹钳轨(如图4.4.29)或交叉抽吸系统(如图4.4.34)来运输部件。多工位转换模是用于小型和中型零件的大批量生产(如图4.1.2)。它们由几个安装在同一个基准平面上的单工序模具组成。金属板料的送进主要以机械手运送的方式,也可以人工地从一个模具运到另一个模具。如果这部分的运输自动化,那么此时的压力就称为转换压力。在大板料转换冲压线上,最大的多工位转换模要与单工序模具配合使用(参考图4.4.32)。级进模,也称为
44、渐进冲裁模,钣金件是分阶段冲裁的; 一般来说,没有实实在在的成形操作。钣金是以金属圈或金属条的形式送进的。通过使用尺寸适宜的金属板料和优化的材料利用率可以达到对板料的合理利用(对比图Fig.4.5.2与图4.5.5)。工件一直固定在载体上,直到最后一次操作。冲裁完成后,整个条料按照工序流动方向移动时,该部件随着转移。移动的长度等于模具间中心线的距离,它也被称为步距。切边,通过使用非常精确的进给装置或试点引脚确保相关进给零件精度。在最后一个工位,即最后一道工序,已成形的部分于载体断开。例如电动机金属转子和定子的生产就是渐进冲裁模的一个应用领域(如图.4.6.11和4.6.20)。图4.1.2转移
45、成套模具在机动装置中的自动变速器上生产应用较小的成形部件使用复合级进模通过几个连续的操作即可完成后生产。与级进模相比,不仅可以完成冲裁,而且能完成成形操作。然而,工件还是与载体相连一直到最后一步操作(如图4.1.3和对比图4.7.2)。由于零件的高度,钢带必须提高时,通常使用起重边缘或类似的起重设备,以便实现条料金属的机械化运输。由于其几何尺寸而不能用一个金属条料生产出来的冲压金属零件选择性地在转移设置上生产。图4.1.3 用一个条料在复合级进模上生产的汽车加强筋接下来时已经提到过的模具,一系列特殊模具适用于个别特殊运用。按规定,这些模具是单独使用的。但是,特殊的操作使得特殊的模具集成到一个工
46、序上成为可能。因此,例如,使用翻边模几个金属部件组合在一起能积极通过某些区域的弯曲(如图4,1,4和对比图2,1,34)。在此期间加强部分,胶水或其他组件的运作可实施。其他的特殊模具使特殊的连接部件直接定位在压力机上。装配和定位部件,例如,引进与压力周期同步的冲头到指定的位置以便冲头与钣金零件(如图4.1.5)。如果有足够的可用空间,成形和冲裁操作可以在同一模具上完成。更一步的例子包括弯曲,滚压成形,冲压,精密冲裁,震动冲裁和焊接操作(对比图4.7.14和图4.7.15)。如图4.1.4卷边模如图4.1.5带有整体冲压螺母的冲压件 4.1.2 模具开发汽车行业的发展已经必然地影响了模具工程的发展。以下对与模具开发的研究主要是关于车身覆盖件模具结构的。然而,用一个基本的环境获得实质的结论
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 《防雷工程资格培训》课件
- 鸟生物课件教学课件
- 《集体生活成就我》课件
- KTV顾客投诉的原因及课件
- 规划设计服务合同完整版
- 《建筑制图及识》课件
- 《建筑法规课程简介》课件
- 英语基础模块1-U5 We Have Only One Earth
- 酒店承包经营合同范本完整版
- 龙门吊噪音治理工程2024年合同
- 第5章 对函数的再探索 综合检测
- 专题05-因式分解(历年真题)-2019-2020学年上海七年级数学上册期末专题复习(学生版)
- 安全生产管理制度-普货运输
- 广西壮族自治区房屋建筑和市政工程监理招标文件范本(2020年版)
- 河北省石家庄市第四十中学2024-2025学年七年级上学期期中语文试题
- 2024-2030年中国地热能市场经济效益及发展前景展望研究报告
- 公务用车车辆安全培训课件
- 人工智能导论-2022年学习通超星期末考试答案章节答案2024年
- 单元教学设计17 大单元背景下的教材内容重构设计思路及具体课时实施-高中数学单元教学设计
- 2024CSCO胃癌诊疗指南解读
- 某大型药品SPD管理建设方案
评论
0/150
提交评论