无尘车间物料管理(Dust-free workshop material management )_第1页
无尘车间物料管理(Dust-free workshop material management )_第2页
无尘车间物料管理(Dust-free workshop material management )_第3页
无尘车间物料管理(Dust-free workshop material management )_第4页
无尘车间物料管理(Dust-free workshop material management )_第5页
已阅读5页,还剩5页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、无尘车间物料管理63701(Dust-free workshop material management 63701)The dust-free workshop material management of.Txt every girl was once an angel without tears, when you love the boy, he will cry one by one, then falls into the earth into a girl, so, the boy must not abandon the girl, because the girl is yo

2、u give up the whole heaven. Friends, dont cry, tonight I like Epiphyllum blooming in the most beautiful moments fade, dust-free workshop production management your tears can not restore my withered 1. standard1.1, the deployment of work by more than elongated cadres in accordance with the needs of t

3、he job to determine the location of personnel, any person affected by the post can not be picky about the behavior of the work(except in exceptional cases, but confirmed by the officer at the competent level)1.2. The operator must complete the work in accordance with the operation instruction or the

4、 instruction manual of the machine. The operation method change or special technical operation must be done by the competent personThe clerk will confirm the execution.1.3, operators must be self check (including raw materials inspection and component inspection) assembly line operation station, oth

5、er operators need to carry out the last station inspection,And requires all operators must be familiar with their previous station and next station job content1.4, operators must be completed according to the provisions of production, in order to ensure efficiency.1.5, when the operation is found ab

6、normal, must promptly report to elongated above cadres request processing.1.6, when the workers found their homework is not enough materials 1 hours in advance to report material or material handler or elongated issue, not allowed to materialPick up the material on the rack.2. clean room material ma

7、nagement regulations2.1, all materials must be clearly marked (including raw materials, combinations, finished products)2.2. All materials must be put in order according to regulations.2.3, material handler must periodically repaying the bad material (1 times, each batch according to the order confi

8、rmation)2.4, every time when the material material handler when Queliao must report to the main person in charge of production or elongated.2.5, or elongated material handler must be responsible for material import and make the account details.3. clean workshop production discipline3.1, all personne

9、l must be 5 minutes ahead of time to work3.2, all personnel must be required to wear clean clothes, hats, shoes, you can enter the dust-free workshop, and not in the dust-free workshop finishing dust-free clothing.3.3, the relevant personnel must be required to wear gloves, before entering dust-free

10、 workshop operation.3.4, the work time can not have chat phenomenon, still more dont allow quarrel phenomenon.3.5, dust-free workshop is not allowed to bring personal things unrelated to work.3.6, all personnel, half an hour before work and half an hours work is not allowed to go to the bathroom.3.7

11、, to Restroom personnel must use to change the label off card to leave, to Restroom time shall not exceed 10 minutes.3.8, all personnel to and from work must be placed in accordance with the provisions of their clothes and static clothing.3.9. All personnel must clean their jobs according to the reg

12、ulations before and after work.3.10, all personnel to and from work must be lined up according to the provisions of the dust-free workshop.4. dust-free workshop operating environment regulations4.1, dust test, every three months outside the commission test, and attached to test results to the manage

13、ment of the Department archives.4.2, dust-free workshop standard temperature: 21 degrees -25 degrees, humidity: 50%-70%, every day to have thermometer records.Four3, the operator will be 10 minutes before and after the work of their own station environment for cleaning (including overtime), by the c

14、ompetent staff review and confirm irregularly.1. purposeThis procedure aims to provide a standardized procedure for the protection of aseptic operations and asepsis room.2. scope of applicationBioassay Laboratory3. responsible personQC supervisor, student tester4. definitionsnothing5. safety precaut

15、ionsStrict aseptic operation to prevent microbial contamination; operators should turn off the UV light when they enter asepsis room.6. rules6.1. asepsis room should be equipped with aseptic operation room and buffer room. The cleanliness of aseptic operation should reach 10000 levels, the indoor te

16、mperature should be kept at 20-24 degrees, and the humidity should be kept at 45-60%. Ultra clean table should reach 100 level.6.2. asepsis room should be kept clean, no stacking of debris, in case of pollution.6.3. to prevent all sterilization equipment and medium pollution, polluters should stop u

17、sing.6.4. asepsis room should be provided with a concentration of disinfectant, such as 5% cresol solution, 70% alcohol, 0.1% new benzalkonium solution, and so on.6.5. asepsis room should be regularly disinfected with appropriate disinfectant cleaning, so as to ensure the cleanliness of asepsis room

18、 meets the requirements.All instruments, instruments, dishes, etc. used by the 6.6. to be used in the asepsis room should be tightly bandaged and should be sterilized by suitable methods.The 6.7. staff before entering asepsis room, must use soap or disinfectant wash disinfection, and then in the buf

19、fer room for replacing work clothes, shoes, hats, masks and gloves (or with 70% alcohol wipe hands, again) before entering asepsis room operation.6.8. asepsis room must be opened before the asepsis room UV lamp irradiation sterilization for more than 30 minutes, and open the super clean table for bl

20、owing. After the operation, the asepsis room should be cleaned in time, and then sterilized with ultraviolet light for 20 minutes.6.9. samples should be kept intact before inspection and must not be opened to prevent contamination. Before examination, disinfect the outer surface with 70% alcohol cot

21、ton balls.6.10. should be negative control during each operation to check the reliability of aseptic operation.When 6.11. absorbs the liquid, it must be sucked by the ear bulb. Do not touch the straw directly.6.12. inoculation needles must be sterilized by flame before and after each use, and can be

22、 inoculated until they are cooled.6.13. straws, test tubes, culture dishes and other containers containing bacteria liquid should be soaked in sterilized tanks filled with 5% to Suhl solution, and removed after 24 hours.6.14. if the liquid is sprinkled on the table or on the ground, it should be pro

23、mptly treated with 5% stone carbonate solution or 3% to Suhl for more than 30 minutes at the contaminated area. Work, clothing and other contaminated by bacteria, should be immediately removed, high-pressure steam sterilization after washing.6.15. any products containing live bacteria must be steril

24、ized before they can be washed under the tap. No pollution drains are allowed.6.16. asepsis room should examine the number of colonies every month. Open in the clean bench under the condition of asepsis 90mm diameter Petri dish of aseptic operation were injected into nutrient agar, melted and cooled

25、 to about 45 DEG 15ml to the culture basis, after solidification in 30 35 degrees, inverted incubatortraining 48 hours after taking 3 tablet proved sterile, 5 from left to right, etc. are respectively arranged working position, open the cover after 30 min of exposure to 30 to 35 DEG C inverted incub

26、ator for 48 hours, check out. The average number of miscellaneous bacteria in the 100 clean zones should not exceed 1 colonies, and the average number of colonies in the 10000 clean rooms should not exceed 3 colonies. In case of exceeding the limit, the asepsis room should be thoroughly disinfected

27、until repeated inspection is required.7. referencesMethods for examination of drug hygieneChapter of the operation standard of Chinese drug inspection standard (asepsis examination)Peoples Republic of China pharmaceutical industry standard YY/T0188.6-1995 operation rules for drug inspection8. Distri

28、bution DepartmentQuality control departmentClean room management rulesScope of application: all into the clean room personnel (including personnel, the companys vendors and visitors etc.) and goods and materials accepted the rules governing constraint specification.Two objective: to ensure the envir

29、onmental quality of cleanroom and reduce the management cost, ensure the quality of products and improve the efficiency of operation.Three contents: (a) staff and clean room shall comply with the management, 1 items: before entering the clean room of the 1.1 company personnel entering the clean room

30、 in the area will be more shoes outdoor shoes placed in the shoe cabinet, personal items (handbags, books, etc.) shall be retained shall be placed in the outdoor, indoor dust, and then walk to the locker area wearing a mask and in accordance with the personal identification number for clean and clean shoes and clothes to wear latex gloves, wearing clean clothes for personal clothing and hair will not only be exposed to eyes and face exposed surface. 1.2 if the manufa

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论