1、Retro-Commissioning: A Tool for Improving HVAC Systems and Energy Cost Reduction Speaker: William McGuire, P.E.,Retro-Commissioning of Existing Buildings Why Retro-Cx What is Retro-Cx ? How do you do it / what to look for Case Studies Take-Away,AGENDA,Why Retro-Cx,Older bldgs. (Pre 1990) on average

2、consume more energy Antiquated control systems that dont work Energy saving control strategies missed in design Neglected maintenance wasting energy and/or causing IAQ problems System upgrades that miss the mark Building usage / floor plans changed,Why Retro-Cx,Energy cost are only expected to rise

3、Economic outlook may prevent new construction Employee / Community goodwill “Its the right thing to do” Owners learn more about their own facilities Benefits intended to be long lasting Simple payback typically less than two years,Why Retro-Cx,Leased Buildings LEED EB / ENERGY STAR buildings may bec

4、ome a differentiator High energy costs translate into increased rent cost,Why Retro-Cx,Source: US Government Energy Information Administration,Consumption in Gross Energy by Year Constructed - 2003,45% less energy consumed,New buildings 35% to 57% more efficient,Energy intensity 10% less,Why Retro-C

5、x,A study by Lawrence Berkeley National Laboratory (LBNL) - 2004 Retro-Cx results Whole-building electricity savings range from 5% to 15% Gas savings range from 1% to 23% Payback ranged from 0.2 to 2.1 years The bigger the building typically the better the payback period Small buildings have opportu

6、nity as well Source: A RetroCommissioning Guide for Building Owners - PECI,Why Retro-Cx,Lawrence Berkeley National Laboratory (LBNL) 2004 Value of Energy Savings$0.11 - $0.72/ft2 Value of Non Energy Savings$0.10 - $0.45/ft2 Non Energy: Equip Life, thermal comfort, IAQ, productivity, liability, etc.,

7、1996 PECI/EPA/DOE Study of 60 Commercial Buildings:,40%,33%,15%,HVAC Problems,Sensors not operating properly,Missing Equipment,Why Retro-Cx,Why Retro-CxRetro-Commissioning X-nth Examples,Retro-commissioning is “GREENER”,If Retro-commissioning our existing buildings can save just 10% energy consumpti

8、on,Reduce oil imports by 50%. Almost meets Kyoto Protocol.,Exploit our existing buildings, not the environment !,Green Moment,What is Retro-Commissioning?,DISCOM,What is Retro-Cx,Design Installation Set-up / TAB Controls / Optimization Operation Maintenance,RETRO-Commissioning is evaluating and perf

9、ormance testing an Existing buildings HVAC.,Reveals hidden deficiencies that could have been avoided by commissioning. Highlights O design oversight? Can save pump energy by going variable primary (add drives). $20,000 VAV with Reheat many are reheating. Min cfm setting could be lowered to avoid reh

10、eating. And SATR logic can be implemented. Save +/- $big,PROBLEMSAVINGS DISCO&M Cooling Tower Operation:$24,000 O Hot Water Boiler Sequence:$20,000 IS Chilled Water: Low Delta-T Syndrome$80,000 D or I AHU Static Pressure Setpoint Optimization:$50,000 S Constant pump CHW system with 2-way valves :$20

11、,000 D VAV re-heating setpoints:$ big S Total:$200,000 per year.,Baseline Savings: $200,000 /yr ($0.50 / sf),Retro-Commissioning Results,Retro-Commissioning DISCO&M Case Study #3,Not-For-Profit Hospital,“O&M” Looking for HIDDEN CAPACITY resulting from possible improper operation.,Hospital BAS Interr

12、ogation - Typical Air Handling Unit,1. Chilled Water Valve failed open, making 49.6F air. 5.4F colder than set point 2. Supply Fan VFD is at 100%, no spare capacity for filter loading 3. Outdoor air damper Software Override (SWO), changed from design setpoint,Hospital BAS Interrogation - Chiller Pla

13、nt,Return Chilled water temperature is too low. The return temperature should be 58F. Too many chilled water coils are over-flowing, and producing low return water temperatures. Another LOW DELTA-T PROBLEM. The flow of 1149 gpm and the calculated tons of 359, calculate a flow rate of 3.2 gpm/ton. Th

14、e secondary CHW is pumping over 50% more chilled water than it should be due to failed open AHU chilled water valves.,6 of 30 Air Handling Units had hidden cooling coil valve problems. Heating boilers are re-heating the overcooled air. The spare central plant capacity that was discovered: Cooling:14

15、2 Tons (new spare capacity) Heating: 1.7 million btuh(25% of one big boiler),Baseline Savings: $200,000 /yr ($0.90 / sf) Retro-Cx Investment: 1 day ( Incidental) Value: Defer new 1000 ton chiller ($1000/ton),Retro-Commissioning Case Study #3: Summary Not-for-profit Hospital,Retro-Commissioning DISCO

16、&M Case Study #4,For-Profit Hospital,“DISCO&M” Administration wanted energy savings. Facilities Staff did not want anyone (us) to look at their system and find potential problems it might make them look bad.,Hospital BAS Interrogation - Chiller Plant Logic Problems,Improper Chiller OFF Logic Operati

17、ng more pumps & towers than necessary,Building Load 1000 tons. (2 chillers needed),Three 550 ton chillers ON. (1650 tons),For-Profit Hospital: Improper Constant Volume Pump Set-up,Circuit Setter 80% Closed. Should have trimmed impeller,For-Profit Hospital: AHU Investigation Improper Design,Original

18、Design / Construction Problems: Low first cost solutions = high long term operating costs,PROBLEMSAVINGSDISCO&M AHU Supply Air Temp Reset Logic$72,000D Condenser Water Reset Temp Reset Logic$33,000D Chiller ON/OFF Logic$10,000D Pump Valve Adjustment$26,000S AHU Device Tune-up$58,000O&M Modify AHU Re-he

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论