中铁港航局公路工程项目劳务分包指导价,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
编号,项目名称,单位,基准价,各地区指导价,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,费用组成,计量规则,工作内容,备注
,,,,京,津,沪,渝,翼,晋,蒙,辽,吉,黑,苏,浙,皖,闽,赣,鲁,豫,鄂,湘,粤,桂,琼,川(不含甘孜、凉山),贵,云,藏,陕,甘,青,宁,新,,,,
GZZ01,总则,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
GLJ02,路基工程,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
GLJ0201,清理与拆除,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
GLJ0201001,清除表土,m2,0.64,0.66,0.65,0.65,0.70,0.72,0.67,0.74,0.71,0.72,0.74,0.63,0.63,0.64,0.64,0.62,0.64,0.63,0.63,0.67,0.64,0.63,0.68,0.70,0.73,0.72,0.87,0.65,0.70,0.76,0.76,0.82,单价包含全部费用,在设计范围内,按照实际完成平方数计量,场地清理,放边界线,推土机(挖掘机)推/挖表土,将表土移出路基范围以外或汇集,原地面平整、压路机压实原地面至设计要求。,
GLJ0201002,砍伐及挖树根,棵,9.63,9.71,9.29,10.05,8.18,9.03,8.52,9.20,8.78,8.95,9.03,9.20,9.12,8.26,8.61,8.09,8.52,8.09,8.35,8.26,9.63,8.01,8.78,8.01,7.92,8.09,10.22,8.18,8.86,10.22,8.86,10.39,单价包含全部费用,按照实际挖除树根的棵数计算,挖除、砍伐、截锯、移运、堆放胸径大于15cm的树木,填平、夯实坑穴。,
GLJ0201003,人工清淤,m3,38.05,38.38,36.70,39.73,32.32,35.69,33.67,36.36,34.68,35.35,35.69,36.36,36.03,32.66,34.01,31.99,33.67,31.99,33.00,32.66,38.05,31.65,34.68,31.65,31.31,31.99,40.40,32.32,35.02,40.40,35.02,41.08,单价包含全部费用,按照实际清淤方量计算,清、装淤泥,修理边底(不含运输)。,
GLJ0201004,拆除碎石路面,m3,15.26,15.39,14.72,15.93,12.96,14.31,13.50,14.58,13.91,14.18,14.31,14.58,14.45,13.10,13.64,12.83,13.50,12.83,13.23,13.10,15.26,12.69,13.91,12.69,12.56,12.83,16.20,12.96,14.04,16.20,14.04,16.47,单价包含全部费用,按实际完成量计算,揭板、凿除旧路面,弃碴装车,清除到路基以外,场地清理、整平等全部工序的工作。,
GLJ0201005,拆除沥青混凝土路面(8cm),m2,2.83,2.85,2.73,2.95,2.40,2.65,2.50,2.70,2.58,2.63,2.65,2.70,2.68,2.43,2.53,2.38,2.50,2.38,2.45,2.43,2.83,2.35,2.58,2.35,2.33,2.38,3.00,2.40,2.60,3.00,2.60,3.05,单价包含全部费用,按实际挖除路面平面面积计算,揭板、凿除旧路面,弃碴装车,清除到路基以外,场地清理、整平等全部工序的工作。,不同厚度需折算
GLJ0201006,拆除混凝土路面(20cm),m2,10.17,10.26,9.81,10.62,8.64,9.54,9.00,9.72,9.27,9.45,9.54,9.72,9.63,8.73,9.09,8.55,9.00,8.55,8.82,8.73,10.17,8.46,9.27,8.46,8.37,8.55,10.80,8.64,9.36,10.80,9.36,10.98,单价包含全部费用,按实际挖除路面平面面积计算,揭板、凿除旧路面,弃碴装车,清除到路基以外,场地清理、整平等全部工序的工作。,不同厚度需折算
GLJ0201007,拆除钢筋混凝土结构,m3,146.90,148.20,141.70,153.40,124.80,137.80,130.00,140.40,133.90,136.50,137.80,140.40,139.10,126.10,131.30,123.50,130.00,123.50,127.40,126.10,146.90,122.20,133.90,122.20,120.90,123.50,156.00,124.80,135.20,156.00,135.20,158.60,单价包含全部费用,按拆除构筑物实际尺寸体积计算,撬除或凿除圬工,弃碴装车,清除到路基以外,场地清理、整平等全部工序的工作。,
GLJ0201008,拆除混凝土结构,m3,92.66,93.48,89.38,96.76,78.72,86.92,82.00,88.56,84.46,86.10,86.92,88.56,87.74,79.54,82.82,77.90,82.00,77.90,80.36,79.54,92.66,77.08,84.46,77.08,76.26,77.90,98.40,78.72,85.28,98.40,85.28,100.04,单价包含全部费用,按拆除构筑物实际尺寸体积计算,撬除或凿除圬工,弃碴装车,清除到路基以外,场地清理、整平等全部工序的工作。,
GLJ0201009,拆除砖、石及其他砌体结构,m3,35.00,35.31,33.76,36.55,29.73,32.83,30.97,33.45,31.90,32.52,32.83,33.45,33.14,30.04,31.28,29.42,30.97,29.42,30.35,30.04,35.00,29.12,31.90,29.12,28.81,29.42,37.17,29.73,32.21,37.17,32.21,37.79,单价包含全部费用,按拆除构筑物实际尺寸体积计算,撬除或凿除圬工,弃碴装车,清除到路基以外,场地清理、整平等全部工序的工作。,
GLJ0202,路基土、石方,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
GLJ0202001,人工挖土方,m3,16.66,16.80,16.07,17.39,14.15,15.62,14.74,15.92,15.18,15.48,15.62,15.92,15.77,14.30,14.89,14.00,14.74,14.00,14.45,14.30,16.66,13.86,15.18,13.86,13.71,14.00,17.69,14.15,15.33,17.69,15.33,17.98,单价包含全部费用,按设计图示开挖断面尺寸体积计算,挖土、将土方弃运至工作面20米外、工作面清理等全部工作内容。,
GLJ0202002,挖掘机挖土,m3,2.86,2.95,2.92,2.89,3.10,3.19,2.98,3.28,3.16,3.22,3.32,2.82,2.79,2.86,2.86,2.76,2.82,2.79,2.79,3.01,2.86,2.79,3.04,3.10,3.28,3.19,3.93,2.89,3.13,3.41,3.38,3.65,单价包含全部费用,按设计图示开挖断面尺寸体积计算,施工准备、就位、开挖工作面、挖、卸,土方堆放、整修,修整、清理工作面等全部工作内容。,不含运费
GLJ0202003,挖掘机挖装淤泥,m3,10.90,11.25,11.13,10.90,11.95,12.19,11.37,12.54,12.19,12.42,12.66,10.78,10.67,10.90,10.90,10.55,10.78,10.67,10.67,11.49,10.90,10.67,11.60,11.84,12.54,12.19,15.00,11.02,11.95,13.13,12.89,13.95,单价包含全部费用,按设计图示开挖断面尺寸体积计算,施工准备,挖、装、自卸汽车运距1Km内、卸、排水,空回,弃方堆放、整修,清理工作面等全部工序的工作。,
GLJ0202004,利用土填方,m3,4.33,4.37,4.17,4.52,3.68,4.06,3.83,4.14,3.94,4.02,4.06,4.14,4.10,3.72,3.87,3.64,3.83,3.64,3.75,3.72,4.33,3.60,3.94,3.60,3.56,3.64,4.60,3.68,3.98,4.60,3.98,4.67,单价包含全部费用,按照设计图示压实后断面尺寸体积计算,施工准备,原地面清表、填前压实、分层填筑、整平、翻晒、洒水、压实,排水;路面及边坡修整、清理余土等全部工作内容。,
GLJ0202005,利用土改良路拌填方,m3,11.16,11.26,10.77,11.66,9.48,10.47,9.88,10.67,10.18,10.37,10.47,10.67,10.57,9.58,9.98,9.39,9.88,9.39,9.68,9.58,11.16,9.29,10.18,9.29,9.19,9.39,11.86,9.48,10.28,11.86,10.28,12.05,单价包含除改良添加材料费用以外的全部费用,按填方设计断面压实后体积计算,分层摊铺、散布掺合料、拌合、平整、压实、修整路堤边坡及路面、取水洒水或翻晒、清理余土等全部工序的工作。,
GLJ0202006,利用土改良场拌填方,m3,12.75,13.15,12.88,13.01,13.28,13.81,12.75,14.21,13.55,13.81,14.08,12.62,12.48,12.35,12.48,11.95,12.48,12.08,12.22,12.88,12.75,11.95,13.28,13.15,13.68,13.55,16.73,12.48,13.55,14.61,14.48,15.94,单价包含除改良添加材料费用以外的全部费用,按填方设计断面压实后体积计算,改良土的集中拌合、出料、装运1km,分层摊铺、整平、碾压,修整边坡,清理余土等。,
GLJ0202007,借土填方,m3,9.63,9.95,9.84,9.63,10.46,10.77,10.05,11.09,10.77,10.88,11.19,9.53,9.43,9.63,9.63,9.32,9.53,9.43,9.43,10.15,9.63,9.43,10.26,10.46,11.09,10.77,13.26,9.74,10.57,11.60,11.40,12.33,单价包含除超过1km的运输费、土资源费外的全部费用。,按填方设计断面压实后体积计算,挖土、装车、运输、卸土、铺筑、整平、分层碾压、修整边坡、清理余土、1km内土方运输等全部工序。,
GLJ0202008,自卸汽车运土方运距≤1km,m3,3.52,3.64,3.60,3.52,3.91,3.98,3.72,4.10,3.98,4.06,4.17,3.49,3.45,3.56,3.56,3.45,3.52,3.49,3.49,3.75,3.52,3.49,3.79,3.91,4.14,4.02,4.90,3.60,3.91,4.29,4.21,4.56,单价包含全部费用。,按照天然密实体积计算,施工准备、等待装车、运、卸、空回等全部工作内容,
GLJ0202009,自卸汽车运土方每增运1km运距≤5km,m³.km,0.94,0.97,0.96,0.94,1.04,1.06,0.99,1.09,1.06,1.08,1.11,0.93,0.92,0.95,0.95,0.92,0.94,0.93,0.93,1.00,0.94,0.93,1.01,1.04,1.10,1.07,1.31,0.96,1.04,1.14,1.12,1.21,单价包含全部费用。,按照天然密实体积和超运距计算,运输、空回等全部作。,
GLJ0202010,自卸汽车运土方每增运1km运距>5km,m³.km,0.85,0.87,0.86,0.85,0.94,0.96,0.89,0.98,0.96,0.98,1.00,0.84,0.83,0.86,0.86,0.83,0.85,0.84,0.84,0.90,0.85,0.84,0.91,0.94,0.99,0.97,1.18,0.86,0.94,1.03,1.01,1.09,单价包含全部费用。,按照天然密实体积和超运距计算,运输、空回等全部工作。,
GLJ0202011,人工挖软石,m3,23.13,23.34,22.31,24.15,19.65,21.70,20.47,22.11,21.08,21.49,21.70,22.11,21.90,19.86,20.67,19.45,20.47,19.45,20.06,19.86,23.13,19.24,21.08,19.24,19.04,19.45,24.56,19.65,21.29,24.56,21.29,24.97,单价包含全部费用,指无法采用机械施工的特殊地段。,按设计图示石方开挖断面尺寸计算开挖体积,开挖、解小,装、运50m、卸,排水;弃方或利用方堆放、整理;修整边坡、清理工作面等全部工作内容。,
GLJ0202012,挖掘机挖软石,m3,4.66,4.81,4.76,4.66,5.16,5.26,4.91,5.41,5.26,5.36,5.52,4.60,4.55,4.71,4.71,4.55,4.66,4.60,4.60,4.96,4.66,4.60,5.01,5.16,5.46,5.31,6.48,4.76,5.16,5.67,5.57,6.02,单价包含全部费用。,按设计图示石方开挖断面尺寸计算开挖体积,施工准备;挖掘机就位、炮筒配合开挖,修整边坡、清理工作面等全部工作内容。,
GLJ0202013,常规爆破开挖软石,m3,6.41,6.62,6.55,6.41,7.11,7.25,6.76,7.46,7.25,7.39,7.60,6.34,6.27,6.48,6.48,6.27,6.41,6.34,6.34,6.83,6.41,6.34,6.90,7.11,7.53,7.32,8.92,6.55,7.11,7.81,7.67,8.29,单价包含全部费用。,按实测爆破的路基石方断面尺寸计算,打眼、爆破、清理(包括解小),挖掘机就位、开挖工作面、挖、修整边坡、清理工作面等全部工序的工作。,
GLJ0202014,常规爆破开挖次坚石,m3,8.63,8.91,8.82,8.63,9.57,9.76,9.10,10.04,9.76,9.94,10.22,8.54,8.44,8.72,8.72,8.44,8.63,8.54,8.54,9.19,8.63,8.54,9.29,9.57,10.13,9.85,12.01,8.82,9.57,10.51,10.32,11.16,单价包含全部费用。,按实测爆破的路基石方断面尺寸计算,打眼、爆破、清理(包括解小),挖掘机就位、开挖工作面、挖、修整边坡、清理工作面等全部工序的工作。,
GLJ0202015,常规爆破开挖坚石,m3,9.51,9.82,9.72,9.51,10.55,10.75,10.03,11.06,10.75,10.96,11.27,9.41,9.31,9.62,9.62,9.31,9.51,9.41,9.41,10.13,9.51,9.41,10.24,10.55,11.17,10.86,13.24,9.72,10.55,11.58,11.37,12.30,单价包含全部费用。,按实测爆破的路基石方断面尺寸计算,打眼、爆破、清理(包括解小),挖掘机就位、开挖工作面、挖、修整边坡、清理工作面等全部工序的工作。,
GLJ0202016,控制(预裂)爆破软石,m3,12.49,12.90,12.77,12.49,13.85,14.12,13.17,14.53,14.12,14.39,14.80,12.36,12.22,12.63,12.63,12.22,12.49,12.36,12.36,13.31,12.49,12.36,13.44,13.85,14.67,14.26,17.38,12.77,13.85,15.21,14.94,16.16,单价包含全部费用。,按挖方天然体积断面计算,要点封锁线路、警戒检查、消点开通线路、改装药包,处理盲炮,钻孔、装药、爆破、解小、清理,修整边坡及底面等全部工作内容。,
GLJ0202017,控制(预裂)爆破次坚石,m3,13.86,14.32,14.17,13.86,15.37,15.67,14.62,16.12,15.67,15.97,16.43,13.71,13.56,14.02,14.02,13.56,13.86,13.71,13.71,14.77,13.86,13.71,14.92,15.37,16.28,15.82,19.29,14.17,15.37,16.88,16.58,17.93,单价包含全部费用。,按照挖方天然密实体积计算,要点封锁线路、警戒检查、消点开通线路、改装药包,处理盲炮,钻孔、装药、爆破、解小、清理,修整边坡及底面等全部工作内容,
GLJ0202018,控制(预裂)爆破坚石,m3,15.23,15.72,15.56,15.23,16.88,17.21,16.05,17.71,17.21,17.54,18.04,15.06,14.90,15.39,15.39,14.90,15.23,15.06,15.06,16.22,15.23,15.06,16.38,16.88,17.87,17.38,21.18,15.56,16.88,18.54,18.21,19.69,单价包含全部费用。,按照挖方天然密实体积计算,要点封锁线路、警戒检查、消点开通线路、改装药包,处理盲炮,钻孔、装药、爆破、解小、清理,修整边坡及底面等全部工作内容。,
GLJ0202019,利用石方填筑,m3,4.21,4.35,4.30,4.26,4.52,4.66,4.35,4.79,4.66,4.75,4.88,4.17,4.12,4.17,4.21,4.08,4.17,4.08,4.12,4.39,4.21,4.08,4.44,4.52,4.75,4.66,5.69,4.21,4.57,5.06,4.88,5.33,单价包含全部费用。,按照设计断面压实后体积计算,原地面清表、解小并分层摊平、羊足碾碾压、压路机压实、修整路堤边坡及路面,洒水等。,
GLJ0202020,路基级配碎石拌合路拌,m3,5.12,5.28,5.23,5.12,5.61,5.72,5.34,5.89,5.72,5.83,6.00,5.06,5.01,5.12,5.12,4.95,5.06,5.01,5.01,5.39,5.12,5.01,5.45,5.61,5.89,5.78,7.04,5.17,5.61,6.16,6.05,6.55,除碎石、水泥外的全部费用,按路基设计图示压实断面方计算,施工准备,配料、上料、拌制、装车,设备及场地清理等全部工作内容.,
GLJ0202021,路基级配碎石拌合厂拌,m3,7.92,8.17,8.00,8.09,8.33,8.58,8.09,8.83,8.58,8.75,8.91,7.84,7.76,7.76,7.84,7.51,7.76,7.59,7.59,8.09,7.92,7.59,8.25,8.25,8.66,8.50,10.40,7.76,8.42,9.41,8.99,9.90,除碎石、水泥外的全部费用,按路基设计图示压实断面方计算,施工准备,配料、上料、拌制、装车,设备及场地清理等全部工作内容,
GLJ0202022,路基级配碎石填筑、碾压,m3,4.57,4.71,4.67,4.62,4.91,5.05,4.71,5.20,5.05,5.15,5.30,4.52,4.47,4.52,4.57,4.42,4.52,4.42,4.47,4.76,4.57,4.42,4.81,4.91,5.15,5.05,6.17,4.57,4.96,5.49,5.30,5.78,单价包含全部费用,按设计路基断面尺寸计算压实方方量,施工准备,分层摊铺、推平、碾压、整平,养护,路面及边坡修整等全部工作内容,
GLJ0202023,自卸汽车运石方运距≤1km,m3,5.00,5.16,5.11,5.00,5.54,5.65,5.27,5.82,5.65,5.76,5.92,4.95,4.89,5.05,5.05,4.89,5.00,4.95,4.95,5.33,5.00,4.95,5.38,5.54,5.87,5.71,6.96,5.11,5.54,6.09,5.98,6.47,单价包含全部费用,按照天然密实体积计算,装、运、卸、空回,运距1km内全部工作。,
GLJ0202024,自卸汽车运石方每增运1km,m³.km,1.13,1.17,1.16,1.13,1.25,1.28,1.19,1.32,1.28,1.30,1.34,1.12,1.11,1.14,1.14,1.11,1.13,1.12,1.12,1.21,1.13,1.12,1.22,1.25,1.33,1.29,1.57,1.16,1.25,1.38,1.35,1.46,单价包含全部费用,按照天然密实体积和超运距计算,运输、空回全部工序。,
GLJ0203,软土地基处理,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
GLJ0203001,抛填石(片石),m3,7.90,8.15,7.98,8.07,8.31,8.56,8.07,8.81,8.56,8.72,8.89,7.82,7.74,7.74,7.82,7.49,7.74,7.57,7.57,8.07,7.90,7.57,8.23,8.23,8.64,8.48,10.37,7.74,8.39,9.38,8.97,9.88,单价包含除片石、石碴外的全部费用,按实际抛填压实断面尺寸计算,人工配合机械抛填片石、填隙石屑或小石块、整平、碾压等全部工序。,
GLJ0203002,砂垫层、砂砾垫层,m3,5.53,5.70,5.59,5.64,5.70,5.99,5.59,6.10,5.93,6.04,6.16,5.42,5.36,5.36,5.42,5.19,5.36,5.24,5.30,5.59,5.53,5.24,5.70,5.70,5.93,5.81,7.18,5.42,5.87,6.50,6.16,6.84,单价包含除砂、砂砾外的全部费用,按设计图示压实断面尺寸计算,装、运、铺筑、整平、分层碾压等全部工序。,
GLJ0203003,碎(砾)石垫层,m3,5.63,5.81,5.69,5.69,5.99,6.17,5.75,6.35,6.17,6.29,6.46,5.57,5.51,5.57,5.57,5.40,5.51,5.46,5.46,5.81,5.63,5.40,5.93,5.99,6.29,6.11,7.53,5.57,6.05,6.70,6.46,7.06,单价包含除碎石外的全部费用,按设计图示压实断面尺寸计算,装、运、铺筑、整平、分层碾压等全部工序。,
GLJ0203004,塑料排水板,m,0.80,0.81,0.77,0.84,0.68,0.75,0.71,0.76,0.73,0.74,0.75,0.76,0.76,0.69,0.72,0.67,0.71,0.67,0.69,0.69,0.80,0.67,0.73,0.67,0.66,0.67,0.85,0.68,0.74,0.85,0.74,0.86,单价包含除塑料排水板外的全部费用,按实际施作塑料排水板的长度计算,桩机就位、穿剪塑料排水板、安桩靴、打拔钢管,起重机、桩机移位等全部工序。,
GLJ0203005,水泥搅拌桩,m,10.02,10.34,10.13,10.23,10.54,10.86,10.23,11.17,10.86,11.07,11.28,9.92,9.81,9.81,9.92,9.50,9.81,9.60,9.60,10.23,10.02,9.60,10.44,10.44,10.96,10.75,13.15,9.81,10.65,11.90,11.38,12.53,单价包含除水泥外的全部费用,按现场实际施工的有效桩长计算,不计空桩,桩机就位、喷浆、钻进、搅拌、提升、成桩、重复喷浆钻进搅拌、重复搅拌提升、复喷、桩机移位、清理场地及配合检测等全部工序。,
GLJ0203006,旋喷桩(桩径≤φ60cm),m,39.24,40.06,39.65,39.65,41.28,42.51,40.06,43.74,42.51,43.33,44.15,38.42,38.01,38.42,38.42,37.20,38.01,37.61,37.61,40.06,39.24,37.61,40.88,41.28,42.92,42.10,51.91,38.42,41.69,46.19,44.55,49.05,单价包含除水泥外的全部费用,按现场实际施工的有效桩长计算,施工准备、桩机进出场、就位;钻孔,水泥浆拌制、喷射、提升、复喷、成桩完毕,桩机移位;泥浆清理、场地清整;配合检测等全部工作内容,
GLJ0203007,粉喷桩(桩径≤φ50cm),m,8.50,8.76,8.59,8.68,8.76,9.20,8.59,9.38,9.11,9.29,9.46,8.32,8.24,8.24,8.32,7.97,8.24,8.06,8.15,8.59,8.50,8.06,8.76,8.76,9.11,8.94,11.04,8.32,9.03,9.99,9.46,10.52,单价包含除水泥以外的全部费用,按现场实际施工的有效桩长计算,施工准备、桩机进出场、移位、对位、井架调直;钻进,提升喷灰、不喷灰提钻、复喷、成桩完毕、场地清整;灰罐上料、配合检测等全部工作内容。,
GLJ0203008,挤密碎石桩,m,10.57,10.80,10.68,10.57,11.24,11.58,10.80,11.91,11.58,11.80,12.13,10.35,10.24,10.46,10.46,10.13,10.35,10.24,10.24,10.91,10.57,10.13,11.13,11.24,11.80,11.58,14.14,10.46,11.35,12.58,12.13,13.24,单价包含除砂(碎石)以外的全部费用,按现场实际施工的有效桩长计算,桩机就位、打拔钢管、灌砂(碎石)、桩机移位、清理工作面等全部工序。,
GLJ0203009,挤密砂桩(φ≤80cm),m,12.92,13.19,13.06,12.92,13.74,14.14,13.19,14.55,14.14,14.42,14.82,12.65,12.51,12.78,12.78,12.38,12.65,12.51,12.51,13.33,12.92,12.38,13.60,13.74,14.42,14.14,17.27,12.78,13.87,15.37,14.82,16.18,单价包含除砂以外的全部费用,按现场实际施工的有效桩长计算,桩机就位、打拔钢管、灌砂(碎石)、桩机移位、清理工作面等全部工序,
GLJ0203010,PHC预应力管桩(Φ≤30cm),m,13.81,14.25,13.96,13.81,14.84,15.28,14.25,15.72,15.28,15.57,16.01,13.51,13.37,13.66,13.81,13.22,13.66,13.37,13.51,14.40,13.81,13.37,14.54,14.84,15.72,15.28,18.66,13.81,14.98,16.60,16.01,17.48,单价包含除管桩以外全部费用,按设计图示尺寸以桩长计量,施工准备、机具就位,安卸桩帽、吊桩定位、压(打)桩、送桩、截桩、接桩,桩机移位、场地清理等全部工作内容。,
GLJ0203011,PHC预应力管桩(φ≤50cm),m,15.70,16.20,32.90,49.60,66.30,83.00,99.70,116.40,133.10,149.80,166.50,183.20,199.90,216.60,233.30,250.00,266.70,283.40,300.10,316.80,333.50,350.20,366.90,383.60,400.30,417.00,433.70,450.40,467.10,483.80,500.50,517.20,单价包含除管桩以外全部费用,按设计图示尺寸以桩长计量,施工准备、机具就位,安卸桩帽、吊桩定位、压(打)桩、送桩、截桩、接桩,桩机移位、场地清理等全部工作内容。,
GLJ0203012,PHC预应力管桩(φ≤55cm),m,17.68,18.24,37.04,55.84,74.64,93.44,112.24,131.04,149.84,168.64,187.44,206.24,225.04,243.84,262.64,281.44,300.24,319.04,337.84,356.64,375.44,394.24,413.04,431.84,450.64,469.44,488.24,507.04,525.84,544.64,563.44,582.24,单价包含除管桩以外全部费用,按设计图示尺寸以桩长计量,施工准备、机具就位,安卸桩帽、吊桩定位、压(打)桩、送桩、截桩、接桩,桩机移位、场地清理等全部工作内容。,
GLJ0203013,CFG桩长螺旋法(Φ≤50cm),m,18.66,19.25,18.86,18.66,20.05,20.64,19.25,21.24,20.64,21.04,21.64,18.46,18.26,18.46,18.66,17.87,18.46,18.06,18.26,19.45,18.66,18.06,19.65,20.05,21.24,20.64,25.21,18.66,20.25,22.43,21.64,23.62,单价包含除主材费外的全部费用,实际桩底标高至设计桩顶标高之间的长度,准备机具、移动桩机、桩机校测、钻孔,搅拌和泵送砼,清理钻孔余土,并运至现场50m以外指定地点,切割桩头。,
GLJ0203014,CFG桩振动沉管法(Φ≤50cm),m,15.57,16.06,15.73,15.57,16.73,17.22,16.06,17.72,17.22,17.55,18.05,15.40,15.24,15.40,15.57,14.90,15.40,15.07,15.24,16.23,15.57,15.07,16.39,16.73,17.72,17.22,21.03,15.57,16.89,18.71,18.05,19.71,单价包含除主材费外的全部费用,实际桩底标高至设计桩顶标高之间的长度,准备机具、移动桩机、桩机校测、钻孔,搅拌和泵送砼,清理钻孔余土,并运至现场50m以外指定地点,切割桩头。,
GLJ0203015,CFG桩桩帽施工,根,38.14,38.48,36.79,39.83,32.40,35.78,33.75,36.45,34.76,35.44,35.78,36.45,36.11,32.74,34.09,32.06,33.75,32.06,33.08,32.74,38.14,31.73,34.76,31.73,31.39,32.06,40.50,32.40,35.10,40.50,35.10,41.18,单价包含除砼材料费外的全部费用,按照设计数量计算。,桩头打磨、土方开挖、回填、夯实、桩头割除、立桩帽模板、砼灌注、养护、配合检测等全部工序。,
GLJ0203016,CFG桩桩头割除,根·次,10.93,11.02,10.54,11.41,9.28,10.25,9.67,10.44,9.96,10.15,10.25,10.44,10.35,9.38,9.77,9.19,9.67,9.19,9.48,9.38,10.93,9.09,9.96,9.09,8.99,9.19,11.60,9.28,10.06,11.60,10.06,11.80,单价包含人工、材料、机械等全部费用。,按现场实际完成桩头的个数进行计量,使用专用电锯完成,桩头破除的切面需平滑,破除桩头的施工中不得扰动CFG桩桩间土,桩头破除完毕后,将废料及杂物集中堆放等全部工序的工作。,
GLJ0203017,土工布,m2,0.54,0.55,0.52,0.57,0.46,0.51,0.48,0.52,0.49,0.50,0.51,0.52,0.51,0.47,0.48,0.46,0.48,0.46,0.47,0.47,0.54,0.45,0.49,0.45,0.45,0.46,0.58,0.46,0.50,0.58,0.50,0.59,单价包含除土工材料费以外的全部费用,按设计平面面积计算,不考虑拼接/搭接,整平路基、挖填锚固沟、铺设、缝合、锚固土工布等全部工序。,
GLJ0203018,土工格栅,m2,0.62,0.63,0.60,0.65,0.53,0.58,0.55,0.59,0.57,0.58,0.58,0.59,0.59,0.53,0.56,0.52,0.55,0.52,0.54,0.53,0.62,0.52,0.57,0.52,0.51,0.52,0.66,0.53,0.57,0.66,0.57,0.67,单价包含除土工格栅材料费以外的全部费用,按设计平面面积计算,不考虑拼接/搭接,整平路基、挖填锚固沟、铺设、缝合、锚固土工布等全部工序。,
GLJ0203019,土工膜(两布一膜),m2,0.73,0.74,0.71,0.77,0.62,0.69,0.65,0.70,0.67,0.68,0.69,0.70,0.70,0.63,0.66,0.62,0.65,0.62,0.64,0.63,0.73,0.61,0.67,0.61,0.60,0.62,0.78,0.62,0.68,0.78,0.68,0.79,单价包含除土工膜材料费以外的全部费用,按设计平面面积计算,不考虑拼接/搭接,整平路基、挖填锚固沟、铺设、缝合、锚固土工布等全部工序。,
GL0401005,反滤层碎石,m3,10.00,10.09,9.65,10.44,8.50,9.38,8.85,9.56,9.12,9.29,9.38,9.56,9.47,8.58,8.94,8.41,8.85,8.41,8.67,8.58,10.00,8.32,9.12,8.32,8.23,8.41,10.62,8.50,9.20,10.62,9.20,10.80,单价包含除碎石外的全部费用,按设计断面尺寸及实际量测长度计算的体积计量,沟槽开挖、清底,碎石填筑、平整等工作。,
GLJ0204,排水与防护,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
GL0204001,浆砌片(块)石边沟、排水沟、截水沟,m3,110.69,111.67,106.77,115.59,94.04,103.83,97.96,105.79,100.89,102.85,103.83,105.79,104.81,95.02,98.94,93.06,97.96,93.06,96.00,95.02,110.69,92.08,100.89,92.08,91.10,93.06,117.55,94.04,101.87,117.55,101.87,119.51,单价包含除石料、砂浆外的全部费用,按设计图示尺寸计算圬工体积,沟槽开挖,垫层铺筑、压实,石料选择、整修、清洗,砂浆拌和、运输,砌筑、勾缝、安泄水孔、设置变形缝、养生,回填、夯实等全部工序。,
GL0204002,浆砌片(块)石急流槽,m3,110.69,111.67,106.78,115.59,94.04,103.84,97.96,105.80,100.90,102.86,103.84,105.80,104.82,95.02,98.94,93.06,97.96,93.06,96.00,95.02,110.69,92.08,100.90,92.08,91.10,93.06,117.55,94.04,101.88,117.55,101.88,119.51,单价包含除石料、砂浆外的全部费用,按设计图示尺寸计算圬工体积,沟槽开挖,垫层铺筑、压实,石料选择、整修、清洗,砂浆拌和、运输,砌筑、勾缝、安泄水孔、设置变形缝、养生,回填、夯实等全部工序。,
GL0204003,浆砌片石盲沟,m3,113.00,114.00,109.00,118.00,96.00,106.00,100.00,108.00,103.00,105.00,106.00,108.00,107.00,97.00,101.00,95.00,100.00,95.00,98.00,97.00,113.00,94.00,103.00,94.00,93.00,95.00,120.00,96.00,104.00,120.00,104.00,122.00,单价包含除石料、砂浆外的全部费用,按设计图示尺寸计算圬工体积,沟槽开挖,垫层铺筑、压实,石料选择、整修、清洗,砂浆拌和、运输,砌筑、勾缝、安泄水孔、设置变形缝、养生,回填、夯实等全部工序。,
GL0204004,现浇混凝土排水沟,m3,214.70,216.60,207.10,224.20,182.40,201.40,190.00,205.20,195.70,199.50,201.40,205.20,203.30,184.30,191.90,180.50,190.00,180.50,186.20,184.30,214.70,178.60,195.70,178.60,176.70,180.50,228.00,182.40,197.60,228.00,197.60,231.80,单价包含除砼外的全部费用,按设计断面尺寸及实际量测长度计算的体积计量,沟槽开挖、清底,模板制安拆、砼浇筑、养护安装泄水孔等工作。,
GL0204005,干砌片石护坡,m3,50.00,50.44,48.23,52.21,42.48,46.90,44.25,47.79,45.58,46.46,46.90,47.79,47.35,42.92,44.69,42.04,44.25,42.04,43.36,42.92,50.00,41.59,45.58,41.59,41.15,42.04,53.10,42.48,46.02,53.10,46.02,53.98,单价包含除片石、预埋泄水孔、伸缩缝以外的全部费用,按实际施工砌体尺寸计算体积,施工准备,搭、拆跳板,挂线、找平,选修片石,制作各种笼,装片石,安砌;排水孔、变形缝设置;场内材料运输、清理等全部工作内容。,
GL0204006,浆砌片(块)石护坡,m3,80.00,80.71,77.17,83.54,67.96,75.04,70.80,76.46,72.92,74.34,75.04,76.46,75.75,68.67,71.50,67.26,70.80,67.26,69.38,68.67,80.00,66.55,72.92,66.55,65.84,67.26,84.96,67.96,73.63,84.96,73.63,86.37,单价包含除片石、块石、砌筑砂浆外的全部费用,按实际施工圬工尺寸计算体积,坡面清理,垫层铺筑,搭拆跳板、挂线、找平、选修片石、砂浆拌和、运输,砌筑、勾缝、养生等全部工序。,
GL0204007,预制块护坡砼块预制,m3,180.80,182.40,174.40,188.80,153.60,169.60,160.00,172.80,164.80,168.00,169.60,172.80,171.20,155.20,161.60,152.00,160.00,152.00,156.80,155.20,180.80,150.40,164.80,150.40,148.80,152.00,192.00,153.60,166.40,192.00,166.40,195.20,单价包含除砼外的全部费用,按设计预制砼构件圬工体积计算,模板制作、安装、拆除、修理、涂刷脱模剂,混凝土配运料,拌和、运输、浇筑振捣、抹平、养生,块件堆放等。,
GL0204008,预制块护坡砼块铺砌,m3,80.00,80.71,77.17,83.54,67.96,75.04,70.80,76.46,72.92,74.34,75.04,76.46,75.75,68.67,71.50,67.26,70.80,67.26,69.38,68.67,80.00,66.55,72.92,66.55,65.84,67.26,84.96,67.96,73.63,84.96,73.63,86.37,单价包含除预制构件及砂浆以外的全部费用,按设计图示混凝土预制件圬工体积计算,坡面清理,垫层铺筑,搭拆脚手架、挂线、找平、砂浆拌和、运输,砌筑、勾缝、安泄水孔、设变形缝,养护、场地清理等全部工序。,
GL0204009,现浇混凝土护坡,m3,180.00,181.59,173.63,187.96,152.92,168.85,159.29,172.04,164.07,167.26,168.85,172.04,170.44,154.51,160.88,151.33,159.29,151.33,156.11,154.51,180.00,149.73,164.07,149.73,148.14,151.33,191.15,152.92,165.66,191.15,165.66,194.34,单价包含除砼外的全部费用,按照实际施工的设计体积计算,坡面基槽开挖及回填,脚手架搭拆,模板制安拆,混凝土浇筑及养护,收面及修面,反滤层或垫层铺设,变形缝、泄水管(孔)设置等全部工序的工作。,
GL0204010,浆砌片(块)石挡土墙,m3,75.00,75.66,72.35,78.32,63.72,70.35,66.37,71.68,68.36,69.69,70.35,71.68,71.02,64.38,67.04,63.05,66.37,63.05,65.04,64.38,75.00,62.39,68.36,62.39,61.73,63.05,79.65,63.72,69.03,79.65,69.03,80.97,单价包含除石料、砂浆外的全部费用,按照实际施工的设计体积计算,基坑开挖,选修石料,垫层铺筑,砂浆拌和、运输,搭拆脚手架,砌筑、勾缝、养生,沉降缝制作与填抹,排水孔安装等全部工序。,
GL0204011,浆砌条石挡土墙,m3,106.01,106.95,102.26,110.70,90.06,99.44,93.81,101.32,96.63,98.50,99.44,101.32,100.38,91.00,94.75,89.12,93.81,89.12,91.94,91.00,106.01,88.19,96.63,88.19,87.25,89.12,112.58,90.06,97.57,112.58,97.57,114.45,单价包含除石料、砂浆外的全部费用,按照实际施工的设计体积计算,基坑开挖,选修石料,垫层铺筑,砂浆拌和、运输,搭拆脚手架,砌筑、勾缝、养生,沉降缝制作与填抹,排水孔安装等全部工序。,
GL0204012,现浇混凝土挡土墙,m3,80.00,80.71,77.17,83.54,67.96,75.04,70.80,76.46,72.92,74.34,75.04,76.46,75.75,68.67,71.50,67.26,70.80,67.26,69.38,68.67,80.00,66.55,72.92,66.55,65.84,67.26,84.96,67.96,73.63,84.96,73.63,86.37,单价包含除砼、定型钢模板、预埋泄水孔、伸缩缝以外的所费用,按照实际施工的设计体积计算,基坑开挖、夯实、整形,垫层铺筑,安拆、维修模板,搭拆脚手架,混凝土灌注、震捣、养生,场地清理等全部工序,不含钢筋制作、安装。,
GL0204013,片石混凝土挡墙,m3,75.00,75.66,72.35,78.32,63.72,70.35,66.37,71.68,68.36,69.69,70.35,71.68,71.02,64.38,67.04,63.05,66.37,63.05,65.04,64.38,75.00,62.39,68.36,62.39,61.73,63.05,79.65,63.72,69.03,79.65,69.03,80.97,单价包含除片石、混凝土费用以外的全部费用,按照实际施工的设计体积计算,基坑开挖、夯实、整形,垫层铺筑,安拆、维修模板,搭拆脚手架,混凝土灌注、震捣、养生等全部工序,不含钢筋制作、安装。,
GL0204014,喷射砼,m2,22.76,22.96,21.95,23.77,19.34,21.35,20.14,21.75,20.75,21.15,21.35,21.75,21.55,19.54,20.34,19.13,20.14,19.13,19.74,19.54,22.76,18.93,20.75,18.93,18.73,19.13,24.17,19.34,20.95,24.17,20.95,24.57,单价包含除砼以外的全部费用,按实际喷射面积计算,搭、拆脚手架、坡面清理、嵌补、岩面冲洗,砼喷射、养护,收回弹料、场地清理等全部工作内容。,厚10cm,按厚度折算
GL0204015,砂浆锚杆,m,14.21,14.34,13.71,14.84,12.07,13.33,12.58,13.58,12.95,13.20,13.33,13.58,13.46,12.20,12.70,11.95,12.58,11.95,12.32,12.20,14.21,11.82,12.95,11.82,11.69,11.95,15.09,12.07,13.08,15.09,13.08,15.34,单价包含除锚杆以外的全部费用,按实际施工锚杆有效长度计量,原材料卸车,搭、拆脚手架、边坡修整,定位、钻孔、清孔,砂浆拌制、灌注,钢筋半成品装运卸,锚杆制作安装、锚固、封端等全部工作内容。,
GL0204016,预应力锚索综合,m,139.01,140.24,134.09,145.16,118.10,130.40,123.02,132.86,126.71,129.17,130.40,132.86,131.63,119.33,124.25,116.87,123.02,116.87,120.56,119.33,139.01,115.64,126.71,115.64,114.41,116.87,147.62,118.10,127.94,147.62,127.94,150.08,单价包含除锚索、锚具以外的全部费用,按设计图示预应力锚索长度计量,原材料卸车,施工准备、搭、拆脚手架,钻孔、清孔、坡面清理,预应力锚索制、安、张拉,材料倒运,浆液制作、压浆,锚固、封端等全部工作内容。,
GL0204016b1,锚索制作安装(φ110mm以内)土层,m,45.00,45.40,43.41,46.99,38.23,42.21,39.82,43.01,41.02,41.81,42.21,43.01,42.61,38.63,40.22,37.83,39.82,37.83,39.03,38.63,45.00,37.43,41.02,37.43,37.04,37.83,47.79,38.23,41.42,47.79,41.42,48.58,除锚索、锚具、孔内配件、水泥、砂的材料费以外的所有费用;,按实际入土深度计算,制作锚索及附件,清洗岩面,钻孔,制作砂浆,灌浆,锚索安装,锚固,运输材料,场地清理等。,
GL0204016b2,锚索制作安装(φ110mm以内)入岩增加费中风化,m,3,3.03,2.89,3.13,2.55,2.81,2.65,2.87,2.73,2.79,2.81,2.87,2.84,2.58,2.68,2.52,2.65,2.52,2.60,2.58,3.00,2.50,2.73,2.50,2.47,2.52,3.19,2.55,2.76,3.19,2.76,3.24,除锚索、锚具、孔内配件、水泥、砂的材料费以外的所有费用;,按实际入岩深度计算,制作锚索及附件,清洗岩面,钻孔,制作砂浆,灌浆,锚索安装,锚固,运输材料,场地清理等。,
GL0204016b3,锚索制作安装(φ110mm以内)入岩增加费微风化,m,8,8.07,7.72,8.35,6.80,7.50,7.08,7.65,7.29,7.43,7.50,7.65,7.58,6.87,7.15,6.73,7.08,6.73,6.94,6.87,8.00,6.65,7.29,6.65,6.58,6.73,8.50,6.80,7.36,8.50,7.36,8.64,除锚索、锚具、孔内配件、水泥、砂的材料费以外的所有费用;,按实际入岩深度计算,制作锚索及附件,清洗岩面,钻孔,制作砂浆,灌浆,锚索安装,锚固,运输材料,场地清理等。,
GL0204017,框架梁钢筋,t,570.65,575.70,550.45,595.90,484.80,535.30,505.00,545.40,520.15,530.25,535.30,545.40,540.35,489.85,510.05,479.75,505.00,479.75,494.90,489.85,570.65,474.70,520.15,474.70,469.65,479.75,606.00,484.80,525.20,606.00,525.20,616.10,单价包含除主材费用以外的全部费用,按设计图示尺寸计数重量,不计搭接、损耗,钢筋制作、运输、绑扎、焊接、就位安装等全部工序的工作。,
GL0204018,框架梁混凝土,m3,293.80,296.40,283.40,306.80,249.60,275.60,260.00,280.80,267.80,273.00,275.60,280.80,278.20,252.20,262.60,247.00,260.00,247.00,254.80,252.20,293.80,244.40,267.80,244.40,241.80,247.00,312.00,249.60,270.40,312.00,270.40,317.20,单价包含除砼以外的全部费用,按实际施工圬工尺寸计算体积,框架梁钢筋砼施工(自备模板),搭拆支架,制安拆模型、砼拌和、运输、浇筑、养生等。,
GL0204019,预应力锚杆Φ110mm,m,122.61,123.69,118.27,128.03,104.16,115.01,108.50,117.18,111.76,113.93,115.01,117.18,116.10,105.25,109.59,103.08,108.50,103.08,106.33,105.25,122.61,101.99,111.76,101.99,100.91,103.08,130.20,104.16,112.84,130.20,112.84,132.37,单价包含除压浆水泥、钢筋外的全部费用,按实际施工锚杆有效长度计量,边坡开挖,人工修整,刷坡平整,钻孔,锚杆制安、清孔、拌浆、压浆浆,封锚等全部工序。,
GL0204020,预应力锚杆Φ50mmmm,m,63.28,63.84,61.04,66.08,53.76,59.36,56.00,60.48,57.68,58.80,59.36,60.48,59.92,54.32,56.56,53.20,56.00,53.20,54.88,54.32,63.28,52.64,57.68,52.64,52.08,53.20,67.20,53.76,58.24,67.20,58.24,68.32,单价包含除压浆水泥、钢筋外的全部费用,按实际施工锚杆有效长度计量,边坡开挖,人工修整,刷坡平整,钻孔,锚杆制安、清孔、拌浆、压浆等全部工序。,
GL0204021,抗滑桩成孔(挖土方、排水),m3,112.89,113.89,108.89,117.88,95.90,105.89,99.90,107.89,102.90,104.90,105.89,107.89,106.89,96.90,100.90,94.91,99.90,94.91,97.90,96.90,112.89,93.91,102.90,93.91,92.91,94.91,119.88,95.90,103.90,119.88,103.90,121.88,单价包含全部费用,按实际施工的有效圬工尺寸计算体积,人工挖土、抽水、通风、装土、提升、出料、弃于指定位置等全部工序的工作。,
GL0204022,抗滑桩成孔(挖石方、排水),m3,188.00,189.66,181.34,196.32,159.72,176.35,166.37,179.68,171.36,174.69,176.35,179.68,178.02,161.38,168.03,158.05,166.37,158.05,163.04,161.38,188.00,156.39,171.36,156.39,154.72,158.05,199.64,159.72,173.02,199.64,173.02,202.97,单价包含全部费用,按开挖断面尺寸天然密实的体积计算,人工钻孔、装药、爆破、抽水、通风、挖石、装石、提升、出料、弃于指定位置等全部工序的工作。,
GL0204023,抗滑桩护壁,m3,148.78,150.09,143.51,155.36,126.39,139.56,131.66,142.19,135.61,138.24,139.56,142.19,140.88,127.71,132.98,125.08,131.66,125.08,129.03,127.71,148.78,123.76,135.61,123.76,122.44,125.08,157.99,126.39,136.93,157.99,136.93,160.63,单价包含除砼、钢筋外的全部费用,按实际施工的有效圬工尺寸计算体积,模板制、安、砼拌和、浇筑、养护、清理等全部工序的工作。,
GL0204024,砼抗滑桩身砼,m3,31.39,31.67,30.28,32.78,26.67,29.45,27.78,30.00,28.61,29.17,29.45,30.00,29.72,26.95,28.06,26.39,27.78,26.39,27.22,26.95,31.39,26.11,28.61,26.11,25.84,26.39,33.34,26.67,28.89,33.34,28.89,33.89,单价包含除砼以外的全部费用,按实际施工的有效圬工尺寸计算体积,砼灌注、振捣、养生、、清理等全部工序的工作。,
GL0204025,砼抗滑桩身钢筋,t,524.82,529.46,506.24,548.04,445.86,492.31,464.44,501.60,478.37,487.66,492.31,501.60,496.95,450.51,469.08,441.22,464.44,441.22,455.15,450.51,524.82,436.57,478.37,436.57,431.93,441.22,557.33,445.86,483.02,557.33,483.02,566.62,单价包含除钢筋外的全部费用,按钢筋设计重量计,不计搭接、损耗,下料、制作、绑扎、焊接、安装就位等全部工序的工作。,
GL0204026,桩板式抗滑挡墙,m3,303.21,305.90,292.48,316.63,257.60,284.43,268.33,289.80,276.38,281.75,284.43,289.80,287.11,260.28,271.01,254.91,268.33,254.91,262.96,260.28,303.21,252.23,276.38,252.23,249.55,254.91,322.00,257.60,279.06,322.00,279.06,327.36,单价包含除主材费外的全部费用,按实际施工的有效圬工尺寸计算体积,木模制安、砼灌注、振捣、养护,钢筋制、安,定位,校正、清理等全部工序的工作。,
GL0204027,挂网(主动防护网),m2,56.66,57.16,54.65,59.17,48.13,53.15,50.14,54.15,51.64,52.65,53.15,54.15,53.65,48.64,50.64,47.63,50.14,47.63,49.14,48.64,56.66,47.13,51.64,47.13,46.63,47.63,60.17,48.13,52.15,60.17,52.15,61.17,单价包含除锚杆、钢丝网和格栅网外的全部费用,按现场实际施工防护面积计算,脚手架搭拆、坡面整理,基坑挖填,基础混凝土浇注,钢柱埋设,钻孔清孔,砂浆配、拌、运、灌注,锚杆制安,支撑绳的安装与调试,钢丝绳网铺挂与缝合,减压环安装拉锚绳固定柔性防护网,防腐处理。,
GL0204028,被动柔性网安装,m2,130.00,131.15,125.40,135.75,110.44,121.95,115.04,124
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 商业地下停车位租赁合同协议
- 3食物的消化(教学设计)-2023-2024学年科学六年级上册粤教版
- 版权许可合同 广播电视节目播放权许可合同
- 地下停车场使用合同
- 2023-2024学年陕教版小学信息技术三年级下册 第一单元 第3课 认识键盘大家族(教学设计)
- 机械施工劳务合同范本
- 7《健康看电视》(教学设计)2024-2025学年统编版道德与法治四年级上册
- 5 玲玲的画(教学设计)-2024-2025学年统编版语文二年级上册
- 借款经营合同范本
- 赠与过户合同范本
- 自建房-预算表
- 合约部年终工作总结
- 【人教版】pep六年级英语下全册教案(表格版)
- 森林质量精准提升项目(2024年度)作业设计
- 北师大版小学数学五年级下册同步课时练习试题含答案(全册)
- 战马魂(2023年重庆A中考语文试卷记叙文阅读题及答案)
- 2024年全国职业院校技能大赛中职组(法律实务赛项)考试题库-下(多选、判断题)
- 区块链应用操作员技能大赛考试题库大全-下(多选、判断题)
- 二 《“友邦惊诧”论》(同步练习)解析版
- 施工技术交底(电气安装)
- 污水处理厂TOT项目招标文件模板
评论
0/150
提交评论