版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
ICS××.×××
J×××
备案号:JXXX-XXXXDL
中华人民共和国电力行业标准
DL/T5190.2—XXXX
P替代DL5190.2-2012
电力建设施工技术规范
第2部分:锅炉机组
Technicalspecificationforthermal
powererectionandconstruction
Part2:Boilerunit
(征求意见稿)
****-**-**发布****-**-**实施
国家能源局发布
DL/T5190.2—××××
I
DL/T5190.2—××××
目次
1总则.........................................................................1
2术语.........................................................................2
3基本规定.....................................................................4
3.1一般规定....................................................................................................................................4
3.2安装与建筑的衔接....................................................................................................................5
3.3绿色施工与成品保护................................................................................................................5
4锅炉构架及有关金属结构.......................................................6
4.1一般规定....................................................................................................................................6
4.2锅炉基础检查、划线和垫铁安装...........................................................................................6
4.3锅炉构架安装和二次灌浆.......................................................................................................7
4.4工程验收..................................................................................................................................11
5受热面......................................................................12
5.1一般规定..................................................................................................................................12
5.2汽包、汽水分离器、联箱.....................................................................................................13
5.3水冷壁......................................................................................................................................14
5.4过热器、再热器、省煤器和减温器.....................................................................................15
5.5锅炉连通管道..........................................................................................................................16
5.6炉顶吊挂装置..........................................................................................................................16
5.7锅炉门孔安装..........................................................................................................................16
5.8锅炉密封部件..........................................................................................................................16
5.9循环流化床锅炉受热面设备.................................................................................................17
5.10水压试验................................................................................................................................19
5.11工程验收................................................................................................................................19
6锅炉附属设备................................................................21
6.1一般规定..................................................................................................................................21
6.2空气预热器..............................................................................................................................21
6.3燃烧装置..................................................................................................................................23
6.4炉水循环泵及启动循环泵.....................................................................................................24
6.5吹灰系统..................................................................................................................................24
6.6工程验收..................................................................................................................................25
7锅炉附属管道及附件..........................................................26
7.1一般规定..................................................................................................................................26
7.2锅炉附属管道..........................................................................................................................26
7.3启动系统..................................................................................................................................26
7.4汽包水位计..............................................................................................................................26
7.5安全阀......................................................................................................................................27
7.6工程验收..................................................................................................................................27
II
DL/T5190.2—××××
8烟、风、燃(物)料管道及附属设备.............................................28
8.1一般规定..................................................................................................................................28
8.2烟、风、燃(物)料管道的组合及安装.............................................................................28
8.3烟、风、燃(物)料管道附件及装置.................................................................................28
8.4烟气余热回收装置安装.........................................................................................................30
8.5炉膛及烟风系统密封性试验.................................................................................................30
8.6工程验收..................................................................................................................................31
9燃油系统设备................................................................32
9.1一般规定.................................................................................................................................32
9.2卸油装置安装.........................................................................................................................32
9.3油罐及其附件安装.................................................................................................................32
9.4燃油泵房设备.........................................................................................................................32
9.5燃油系统受油前应具备的条件............................................................................................33
9.6工程验收.................................................................................................................................33
10锅炉辅助机械...............................................................34
10.1一般规定...............................................................................................................................34
10.2辅机安装通则.......................................................................................................................34
10.3辅机油系统...........................................................................................................................38
10.4磨煤机...................................................................................................................................38
10.5风机.......................................................................................................................................40
10.6给煤机...................................................................................................................................41
10.7空气压缩机...........................................................................................................................42
10.8除灰设备...............................................................................................................................42
10.9捞渣机...................................................................................................................................42
10.10冷渣器设备.........................................................................................................................43
10.11工程验收.............................................................................................................................43
11输煤设备...................................................................44
11.1一般规定...............................................................................................................................44
11.2胶带输送机...................................................................................................................44
11.3胶带输送机的卸煤设备.......................................................................................................47
11.4磁铁分离器...................................................................................................................48
11.5碎煤机...........................................................................................................................48
11.6筛煤机...........................................................................................................................49
11.7卸车设备...............................................................................................................................50
11.8煤场设备...............................................................................................................................51
11.9工程验收...............................................................................................................................52
12炉墙砌筑...................................................................54
12.1一般规定...............................................................................................................................54
12.2不定形耐火耐磨料施工.......................................................................................................56
12.3定型耐火耐磨料施工...........................................................................................................58
12.4循环流化床锅炉烘炉...........................................................................................................59
12.5工程验收...............................................................................................................................60
III
DL/T5190.2—××××
13锅炉机组启动试运及验收.....................................................61
13.1一般规定...............................................................................................................................61
13.2锅炉化学清洗前及清洗后检查..........................................................................................61
13.3锅炉机组蒸汽吹管前及吹管后检查..................................................................................62
13.4蒸汽严密性试验及安全阀调整..........................................................................................63
13.5整套启动试运中的检查.......................................................................................................63
13.6工程验收...............................................................................................................................64
附录A生活垃圾焚烧锅炉安装.....................................................65
附录B燃气—蒸汽联合循环电站余热锅炉安装.......................................68
附录C锅炉钢结构的制造和装配公差...............................................70
附录D高强度螺栓连接工程检验项目...............................................77
附录E锅炉基础轴线与外形尺寸允许偏差...........................................81
附录F火电安装中常用钢材的临界温度.............................................82
附录G受热面管的外径和壁厚的允许偏差...........................................86
附录H管式空气预热器的制造和装配公差...........................................87
附录J水压试验临时管路与堵头的强度计算要求....................................89
附录K烟风道、燃(物)料管道制造尺寸的允许偏差................................90
附录M大型动力设备基础的允许偏差...............................................91
附录N轨道铺设要求.............................................................92
附录P垫铁面积计算要求.........................................................93
标准用词说明...................................................................94
引用标准名录...................................................................94
条文说明.......................................................................96
IV
DL/T5190.2—××××
Contents
1Generalprovisions······························································································1
2Terms··············································································································2
3Basicrequirement································································································4
3.1Generalprovisions··············································································································4
3.2Therelationshipbetweeninstallationandcivilinplantconstruction···················································5
3.3Greenconstructionandproductprotection·················································································5
4BoilerFrameworksandMetalStructures···································································6
4.1Generalprovisions··············································································································6
4.2Boilerfoundationcheck,mark,parallelserection···········································································6
4.3Boilerframeworkerectionandgrouting····················································································7
4.4Acceptanceandcheck··························································································11
5Boilerpressureparts··························································································12
5.1Generalprovisions·····························································································12
5.2Steamdrum,steam-waterseparator,header····································································13
5.3Waterwalls·································································································14
5.4Superheater,reheater,economizer,desuperheater·····························································15
5.5Boilerconnectedline···························································································16
5.6Tophangingdevice···························································································16
5.7Furedoor,peepdoorandfurnacewallaccessory·······························································16
5.8Boilersealing··················································································································16
5.9Circulationfluidizedbedboilerpressureparts·································································17
5.10Boilerhydraulictest···························································································19
5.11Acceptanceandcheck·························································································19
6Boilerauxiliaries································································································21
6.1Generalprovisions·····························································································21
6.2Airpreheater····································································································21
6.3Combustionapparatus··························································································23
6.4Boilercirculationpump,startupcirculationpump·····························································24
6.5Sootblowersystem·····························································································24
6.6Acceptanceandcheck·······················································································25
7BoilerAccessorialPipelineandAccessories····························································26
7.1Generalprovisions·····························································································26
7.2BoilerAccessorialPipeline····················································································26
7.3Start-upsystem································································································26
7.4Steamdrumwaterstagegauge·················································································26
7.5Safetyvalve····································································································27
7.6Acceptanceandcheck·························································································27
8Fluegasduct,AirDuct,CoalDustPipe,FuelChannelandAccessory·································28
V
DL/T5190.2—××××
8.1Generalprovisions·····························································································28
8.2Fluegasduct,airduct,coaldustpipe,fuelchannelassemblyanderection····································28
8.3Fluegasduct,airduct,coaldustpipe,fuelchanneldeviceandaccessory·····································28
8.4Installationoffluegaswasteheatrecoveryunit.······························································30
8.5Leakagetestofthefluegas,airductandfurnacechamber···················································30
8.6Acceptanceandcheck·························································································31
9FuelOilSystemDevices·····················································································32
9.1Generalprovisions·····························································································32
9.2Oilunloadingdevice·······················································································32
9.3Oiltankandaccessories·······················································································32
9.4Fueloilservicingfacilities·····················································································32
9.5FueloilsystemPrerequisitebeforeoil-taking·································································33
9.6Acceptanceandcheck·························································································33
10BoilerAuxiliaryMachinery··················································································34
10.1Generalprovisions····························································································34
10.2Machineryerectionregulation················································································34
10.3Auxiliarymachineoilsystem·················································································38
10.4Coalmill······································································································38
10.5Fan········································································································40
10.6Coalfeeder·································································································41
10.7Aircompressor·····························································································42
10.8Deashingdevice·······························································································42
10.9Slagdraggingmachine························································································42
10.10Ashcoolermachine····························································································43
10.11Acceptanceandcheck·························································································43
11CoalHandlingPlant···························································································44
11.1Generalprovisions····························································································44
11.2Beltcoalconveyer····························································································44
11.3Coalunloadingdeviceforthebeltcoalconveyer·····························································47
11.4Magneticseparator····························································································48
11.5Coalcrusher···································································································48
11.6Coalscreen····································································································49
11.7Unloadingequipment·························································································50
11.8Coalyard······································································································51
11.9Acceptanceandcheck·························································································52
12FurnaceWallMasonry························································································54
12.1Generalprovisions····························································································54
12.2Non-stereotypedrefractoryabrasiveconstruction···························································56
12.3Finalizetheconstructionofrefractoryabrasives·····························································58
12.4Circulatingvulcanizedbedboileroven······································································59
12.5Acceptanceandcheck·······················································································60
13Start-upCommissioningandAcceptanceInspectionofboiler&Unit······························61
13.1Generalprovisions························································································61
VI
DL/T5190.2—××××
13.2Conditionandcheckforchemicalcleaningofboiler···············································61
13.3Conditionandcheckforrinseandblowwashofconduit··········································62
13.4Steamleakandsafetyvalueregulate·································································63
13.5Completesetstart-upforcommissioningoperation···············································63
13.6Acceptanceandcheck·····················································································64
AppendixAInstallationofdomesticwasteincinerationboiler·········································65
AppendixBInstallationofheatrecoveryboilerforgasturbine··············································68
AppendixCFabricatingandassemblingtolerancesofboilersteelstructure····························70
AppendixDInspectionitemsofconnectionofhighstrengthbolts···································77
AppendixEAllowabledeviationsofoveralldimensionsofboilerfoundation··························81
AppendixFReferencedataofcriticaltemperatureoffrequently-usedrolledsteelforerectionof
thermalpowerplantequipment·································································82
AppendixGAllowabledeviationsofouterdiameterandwallthicknessofheatingsurfacetubes··86
AppendixHManufactureandfittoleranceoftubulartypeairpreheater······························88
AppendixJStrengthcalculationrequirementsoftemporarypipelinesandblankplugsforHydraulic
Test····································································································90
AppendixKAllowabledeviationsofmanufacturingdimensionsofair/gas/coalducts···········91
AppendixMAllowabledeviationsoffoundationsforlargescalepowerequipment···················92
AppendixNStandardsfortracklaying········································································93
AppendixPShimareacalculationrequirements················································94
ExplanationofWordinginThisStandard········································································95
ListofQuotedStandards···························································································96
Addition:ExplanationofProvision·············································································97
VII
DL/T5190.2—××××
1总则
1.0.1为了进一步提高电站锅炉安装施工水平,促进技术进步,适应科学发展,确保工程质量
和安全生产,特修订本部分。
1.0.2本部分适用于额定蒸汽压力9.8MPa及以上的电站锅炉机组施工。
1.0.3生活垃圾焚烧锅炉和燃气-蒸汽联合循环电站余热锅炉的施工应分别按本部分附录A、附
录B执行。
1.0.4进口机组的施工应执行合同的规定,如合同无明确规定,则应执行本部分。
1.0.5电站锅炉安装施工除应符合本部分外,尚应执行国家、行业现行有关标准规定。
1
DL/T5190.2—××××
2术语
2.0.1间距偏差distancedeviation
表示锅炉结构、设备部件设计中心线之间相对尺寸安装时允许的偏差(如柱子之间、横梁
之间、水冷壁与钢结构之间等)。
2.0.2对角线差diagonaldeviation
表示锅炉结构、设备部件外形设计方形或
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 妈妈祝4岁儿子生日简单说说
- 志愿军:存亡之战观后感
- 教学反思阶段性总结
- 工资管理制度
- 《风机车间报告》课件
- 态度创造快乐课件
- 幼儿园组成课件
- 【初中数学课件】因式分解-完全平方公式课件
- 中学2024-2025学年度学校工作计划
- 《icu学习体会》课件
- 精彩两分钟-鸡犬升天
- 初中数学人教七年级上册 一元一次方程实际问题与一元一次方程-销售盈亏问题
- 西方经济学导论全套课件
- 树立正确的人生观
- 二年级下册音乐课件 (简谱) 欣赏 调皮的小闹钟(3) 人教版 15张
- 中学生安全教育优质实用课件(共54张PPT)
- (完整版)霍兰德职业兴趣测试量表及答案.docx
- 《糖尿病足的治疗》PPT课件
- 牛津自然拼读Oxford Phonics WorldLevel1Unit1 lesson1课件
- 中药材储存仓库技术规范
- 与月亮有关的古诗
评论
0/150
提交评论