




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Contents
1.ColumnInternalsSummary
3
4
5
5
7
8
12
12
14
15
19
19
21
22
31
31
33
34
50
50
52
53
56
56
58
59
2.Feed/DrawSummary
3.CS-1
3.1.TrayGeometry
3.2.ResultsSummary
3.3.HydraulicPlots
4.CS-2
4.1.TrayGeometry
4.2.ResultsSummary
4.3.HydraulicPlots
5.CS-3
5.1.TrayGeometry
5.2.ResultsSummary
5.3.HydraulicPlots
6.CS-4
6.1.TrayGeometry
6.2.ResultsSummary
6.3.HydraulicPlots
7.CS-5
7.1.TrayGeometry
7.2.ResultsSummary
7.3.HydraulicPlots
8.CS-6
8.1.TrayGeometry
8.2.ResultsSummary
8.3.HydraulicPlots
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
1.ColumnInternalsSummary
Summary
Sections
Page3of60
2019/7/14
Column1
StartStage
EndStage
Diameter(meter)
SectionHeight(meter)
InternalsType
TrayorPackingType
SectionPressureDrop(bar)
%ApproachtoFlood
LimitingStage
CS-1
2
5
9
3.2
Trayed
SIEVE
0.0425055
75.2
2
CS-2
6
9
10
3.4
Trayed
SIEVE
0.0719069
78.3651
6
CS-3
10
18
10
8.1
Trayed
SIEVE
0.157215
77.5612
10
CS-4
24
39
8
12.8
Trayed
SIEVE
0.242357
77.0859
39
CS-5
19
21
10
3
Trayed
SIEVE
0.0481658
82.6014
19
CS-6
22
23
8
1.5
Trayed
SIEVE
0.0193841
72.1763
22
Property
Value
Unit
NumberofTrayed/Packedstages
38
Totalheight
32
meter
Totalheadloss
6.56893
meter
Totalpressuredrop
0.581534
bar
Numberofsections
6
Numberofdiameters
3
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
2.Feed/DrawSummary
Feed/DrawSummary
Page4of60
2019/7/14
Stage
Stream
Feed/Draw
1
MEOAC
Draw
6
CH3COOH
Feed
10
H2SO4
Feed
24
CH4O
Feed
40
PROD1
Draw
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-1
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page5of60
2019/7/14
Property
Side
Unit
Weirheight
0.075
meter
Weirlength
5.607
meter
Property
Side
Unit
Downcomerclearance
0.0623
meter
Downcomerwidthtop
0.98
meter
Downcomerwidthbottom
0.98
meter
Downcomerareatop
3.75126
sqm
Downcomerareabottom
3.75126
sqm
Property
Value
Unit
Traytype
SIEVE
Diameter
9
meter
Trayspacing
0.8
meter
Numberofpasses
1
Holediameter
0.0127
meter
Holearea/Activearea
0.1
Deckgaugethickness
10GAUGE
Deckgaugethicknessvalue
3.4036
mm
Cross-sectionalarea
63.6173
sqm
Activearea
56.1147
sqm
Netarea
59.866
sqm
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page6of60
2019/7/14
Property
A
Unit
Flowpathlength
7.04
meter
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
3.2.ResultsSummary
Summary
Limitingconditions
Page7of60
2019/7/14
Property
Value
Unit
Tray
Location
Maximum%jetflood
75.2
2
Maximum%downcomerbackup(aerated)
41.5517
2
Maximumdowncomerloading
177.453
cum/hr/sqm
2
Side
Maximumweirloading
118.722
cum/hr-meter
2
Side
Maximumaeratedheightoverweir
0.22592
meter
2
Maximum%approachtosystemlimit
44.1093
2
MaximumCsbasedonbubblingarea
0.0810644
m/sec
2
Property
Value
Unit
Sectionstartingstage
2
Sectionendingstage
5
Traytype
SIEVE
Numberofpasses
1
Trayspacing
0.8
meter
SectionDiameter
9
meter
Sectionheight
3.2
meter
Sectionpressuredrop
0.0425055
bar
Sectionheadloss
0.48366
meter
Trayswithweeping
None
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
3.3.HydraulicPlots
Page8of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page9of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page10of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page11of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-2
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page12of60
2019/7/14
Property
Side
Center
Unit
Weirheight
0.08
0.08
meter
Weirlength
5.72364
9.97547
meter
Property
Side
Center
Unit
Downcomerclearance
0.095
0.095
meter
Downcomerwidthtop
0.9
0.7
meter
Downcomerwidthbottom
0.9
0.7
meter
Downcomerareatop
3.50118
6.99428
sqm
Downcomerareabottom
3.50118
6.99428
sqm
Property
Value
Unit
Traytype
SIEVE
Diameter
10
meter
Trayspacing
0.85
meter
Numberofpasses
2
Holediameter
0.0085
meter
Holearea/Activearea
0.07
Deckgaugethickness
10GAUGE
Deckgaugethicknessvalue
3.4036
mm
Cross-sectionalarea
78.5398
sqm
Activearea
64.5432
sqm
Netarea
71.5415
sqm
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page13of60
2019/7/14
Property
A
B
Unit
Flowpathlength
3.75
3.75
meter
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
4.2.ResultsSummary
Summary
Limitingconditions
Page14of60
2019/7/14
Property
Value
Unit
Tray
Location
Maximum%jetflood
78.3651
6
Maximum%downcomerbackup(aerated)
45.7238
6
Maximumdowncomerloading
223.245
cum/hr/sqm
6
Center
Maximumweirloading
136.403
cum/hr-meter
6
Side
Maximumaeratedheightoverweir
0.191686
meter
6
Maximum%approachtosystemlimit
44.3523
6
MaximumCsbasedonbubblingarea
0.0848665
m/sec
6
Property
Value
Unit
Sectionstartingstage
6
Sectionendingstage
9
Traytype
SIEVE
Numberofpasses
2
Trayspacing
0.85
meter
SectionDiameter
10
meter
Sectionheight
3.4
meter
Sectionpressuredrop
0.0719069
bar
Sectionheadloss
0.783047
meter
Trayswithweeping
None
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
4.3.HydraulicPlots
Page15of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page16of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page17of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page18of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-3
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page19of60
2019/7/14
Property
Side
Center
Unit
Weirheight
0.03
0.03
meter
Weirlength
5.80865
9.97476
meter
Property
Side
Center
Unit
Downcomerclearance
0.1
0.1
meter
Downcomerwidthtop
0.93
0.71
meter
Downcomerwidthbottom
0.93
0.71
meter
Downcomerareatop
3.67417
7.09403
sqm
Downcomerareabottom
3.67417
7.09403
sqm
Property
Value
Unit
Traytype
SIEVE
Diameter
10
meter
Trayspacing
0.9
meter
Numberofpasses
2
Holediameter
0.0085
meter
Holearea/Activearea
0.065
Deckgaugethickness
10GAUGE
Deckgaugethicknessvalue
3.4036
mm
Cross-sectionalarea
78.5398
sqm
Activearea
64.0974
sqm
Netarea
71.3186
sqm
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page20of60
2019/7/14
Property
A
B
Unit
Flowpathlength
3.715
3.715
meter
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
5.2.ResultsSummary
Summary
Limitingconditions
Page21of60
2019/7/14
Property
Value
Unit
Tray
Location
Maximum%jetflood
77.5612
10
Maximum%downcomerbackup(aerated)
45.2965
10
Maximumdowncomerloading
221.299
cum/hr/sqm
10
Center
Maximumweirloading
135.135
cum/hr-meter
10
Side
Maximumaeratedheightoverweir
0.192001
meter
10
Maximum%approachtosystemlimit
44.2338
10
MaximumCsbasedonbubblingarea
0.0850892
m/sec
10
Property
Value
Unit
Sectionstartingstage
10
Sectionendingstage
18
Traytype
SIEVE
Numberofpasses
2
Trayspacing
0.9
meter
SectionDiameter
10
meter
Sectionheight
8.1
meter
Sectionpressuredrop
0.157215
bar
Sectionheadloss
1.7016
meter
Trayswithweeping
None
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
5.3.HydraulicPlots
Page22of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page23of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page24of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page25of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page26of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page27of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page28of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page29of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page30of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-4
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page31of60
2019/7/14
Property
Side
Center
Unit
Weirheight
0.1
0.1
meter
Weirlength
5.03106
7.96477
meter
Property
Side
Center
Unit
Downcomerclearance
0.1
0.1
meter
Downcomerwidthtop
0.89
0.75
meter
Downcomerwidthbottom
0.89
0.75
meter
Downcomerareatop
3.05855
5.9912
sqm
Downcomerareabottom
3.05855
5.9912
sqm
Property
Value
Unit
Traytype
SIEVE
Diameter
8
meter
Trayspacing
0.8
meter
Numberofpasses
2
Holediameter
0.0085
meter
Holearea/Activearea
0.07
Deckgaugethickness
10GAUGE
Deckgaugethicknessvalue
3.4
mm
Cross-sectionalarea
50.2655
sqm
Activearea
38.1572
sqm
Netarea
44.2113
sqm
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page32of60
2019/7/14
Property
A
B
Unit
Flowpathlength
2.735
2.735
meter
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
6.2.ResultsSummary
Summary
Limitingconditions
Page33of60
2019/7/14
Property
Value
Unit
Tray
Location
Maximum%jetflood
77.0859
39
Maximum%downcomerbackup(aerated)
47.4988
39
Maximumdowncomerloading
218.658
cum/hr/sqm
39
Center
Maximumweirloading
130.194
cum/hr-meter
39
Side
Maximumaeratedheightoverweir
0.188058
meter
39
Maximum%approachtosystemlimit
37.7736
39
MaximumCsbasedonbubblingarea
0.0803356
m/sec
39
Property
Value
Unit
Sectionstartingstage
24
Sectionendingstage
39
Traytype
SIEVE
Numberofpasses
2
Trayspacing
0.8
meter
SectionDiameter
8
meter
Sectionheight
12.8
meter
Sectionpressuredrop
0.242357
bar
Sectionheadloss
2.85329
meter
Trayswithweeping
None
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
6.3.HydraulicPlots
Page34of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page35of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page36of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page37of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page38of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page39of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page40of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page41of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page42of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page43of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page44of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page45of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page46of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page47of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page48of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page49of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-5
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page50of60
2019/7/14
Property
Side
Center
Unit
Weirheight
0.06
0.06
meter
Weirlength
8
9.85444
meter
Property
Side
Center
Unit
Downcomerclearance
0.045
0.045
meter
Downcomerwidthtop
2
1.7
meter
Downcomerwidthbottom
2
1.7
meter
Downcomerareatop
11.1824
16.9178
sqm
Downcomerareabottom
11.1824
16.9178
sqm
Property
Value
Unit
Traytype
SIEVE
Diameter
10
meter
Trayspacing
1
meter
Numberofpasses
2
Holediameter
0.015
meter
Holearea/Activearea
0.08
Deckgaugethickness
10GAUGE
Deckgaugethicknessvalue
3.4036
mm
Cross-sectionalarea
78.5398
sqm
Activearea
39.2573
sqm
Netarea
58.8986
sqm
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page51of60
2019/7/14
Property
A
B
Unit
Flowpathlength
2.15
2.15
meter
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
7.2.ResultsSummary
Summary
Limitingconditions
Page52of60
2019/7/14
Property
Value
Unit
Tray
Location
Maximum%jetflood
82.6014
19
Maximum%downcomerbackup(aerated)
42.4333
19
Maximumdowncomerloading
71.1632
cum/hr/sqm
19
Center
Maximumweirloading
75.2451
cum/hr-meter
19
Side
Maximumaeratedheightoverweir
0.154915
meter
19
Maximum%approachtosystemlimit
38.3096
19
MaximumCsbasedonbubblingarea
0.105446
m/sec
19
Property
Value
Unit
Sectionstartingstage
19
Sectionendingstage
21
Traytype
SIEVE
Numberofpasses
2
Trayspacing
1
meter
SectionDiameter
10
meter
Sectionheight
3
meter
Sectionpressuredrop
0.0481658
bar
Sectionheadloss
0.529263
meter
Trayswithweeping
None
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
7.3.HydraulicPlots
Page53of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page54of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
Page55of60
2019/7/14
HydraulicAnalysisReport-T101:INT-1
UserName:
Project:
JobCode:
Description:
CS-6
TrayGeometry
Section
Downcomergeometry
Weirgeometry
Panels
Page56of60
2019/7/14
Property
Side
Center
Unit
Weirheight
0.08
0.08
meter
Weirlength
5.2915
7.94921
meter
Property
Side
Center
Unit
Downcomerclearance
0.08
0.08
meter
Downcomerwidthtop
1
0
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 江西婺源茶业职业学院《区域地质调查工作方法》2023-2024学年第二学期期末试卷
- 上海交通大学《家蚕遗传育种学》2023-2024学年第二学期期末试卷
- 山西省阳泉市重点中学2024-2025学年高三3月第一次月考英语试题含解析
- 长沙航空职业技术学院《基础德语》2023-2024学年第二学期期末试卷
- 吉林市蛟河市2024-2025学年数学五下期末经典模拟试题含答案
- 湖南文理学院《近代生物学研究》2023-2024学年第二学期期末试卷
- 天津中医药大学《中国现当代文学(4)》2023-2024学年第二学期期末试卷
- 湖北科技职业学院《现代数学选讲》2023-2024学年第一学期期末试卷
- 曲阜远东职业技术学院《马克思主义哲学原著(下)》2023-2024学年第一学期期末试卷
- 浙江纺织服装职业技术学院《高等电磁理论》2023-2024学年第二学期期末试卷
- 杂质研究课件
- 输液港的植入和并发症处理课件
- 世界史知识点总结
- 公司IPQC巡检记录表
- 施工现场建筑垃圾处置专项方案
- 环形锻件的轧制过程的基本原理和工艺流程
- 妇幼保健院医疗保健服务转介工作制度和流程
- 监察机关执法工作规定学习测试
- 超细干粉灭火系统施工质量记录表格
- 2022职业病防治法宣传周PPT
- (高清版)外墙外保温工程技术标准JGJ144-2019
评论
0/150
提交评论