版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
目 录
················································································································
·········································································································································9
·········································································································································9
·····················································································································9
···································································································································10
·····································································································
!
···············································································································································12
·····································································
!
···································································································································12
···············································································································13
·················································································································12
·······································································································
·····························································································
·····························································································
·······································································································
2.2《民用建筑热工设计规范》GB50176-932.3《公共建筑节能设计标准》GB50189-20052.4《建筑工程施工质量验收统一标准》GB50300-20112.5《外墙外保温工程技术规程》JG144-20042.6《膨胀聚苯板薄抹灰外墙外保温系统》JG149-20032.8《建筑涂饰工程施工及验收规程》JGJ/T29-20032.9《采暖居住建筑节能检验标准》JGJ132-2001(J85-2001)2.10《夏热冬冷地区居住建筑节能设计标准》JGJ134-2001(J116-2001)2.11《上海市民用建筑节能工程施工质量验收规范》(DGJ32/22-2006)
性应用标准)
项 目耐候性抗风压吸水量抗冲击性
性
能
指
标表面无裂缝、空鼓、剥落、起泡现象。抹面层和保温层的拉伸粘结强度不小于0.10MPa。系统在水中浸泡
1h
后的吸水量≤500g/m建筑物首层以下墙面:10J
级;建筑物二层以上墙面:3J
级
试
验
方
法JGJ
144JGJ
144JGJ149JGJ
14410
次冻融循环后,系统无空鼓、脱落,无渗水裂缝;抹面层、保温层的拉伸粘结强度不小于0.10MPa,破坏耐冻融 JGJ抹面层、保温层的拉伸粘结强度不小于0.10MPa,破坏界面应位于保温层内。水蒸气湿流密度 ≥1.67g/m2·h抹面层不透水性 2h
试样内侧无水渗透
JG
149JGJ
144
10%),MPa垂直于板面方向的抗拉强度,MPa
吸水率(体积分数),%
A级
MPa(与水泥砂MPa(与改性聚
拉伸粘结强度,MPa
向),%
含量为(14.5±0.8)%,
含量≥16.0%
冻融循环(5
50mm,无裂纹
GB50210-2011《建筑装饰装修工程
JGJ63-89。
硅酸盐水泥:中细砂:胶:水=1:3:0.3:适量(重量比)。
施工时用手持式电动搅拌机搅拌,拌制的粘结砂浆重量比为水:砂浆=1:5,边加水边搅
200mm。
据,在门窗洞口部位的真金板,不允许用碎板拼凑,需用整幅板切割,裁成“L”型进行铺贴,
粘贴真金板时,板缝应挤紧,相邻板应齐平,施工时控制板间缝隙不得大于2mm,板间
220mm、厚为实际粘贴厚度
1.2~1.3
结宽度≥80mm,且翻包网格布本身不得出现搭接(目的是避免面层大面施工时在此部位出现三
100%,严禁出现干搭接。
80mm,用网格布和粘
200mm。
300mm,防止结构沉降引起保温系统破坏。
墙体基层应符合《建筑装饰装修工程质量验收规程》(GB50210-2011)中一般抹灰工
目应符合《上海市民
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- SolidWorks建立模型导入到maxwell中仿真分析
- 胰腺癌手术护理查房
- 培训Excel表的使用与技巧
- 03 科学技术-2025年中考英语新热点时文阅读
- 山东省日照市莒县2024-2025学年八年级上学期期中考试物理试题(含答案)
- 河北省衡水市桃城区2024-2025学年高三上学期10月月考英语试题(含答案无听力原文及音频)
- 第一单元 小数除法 2024-2025学年数学北师大版五年级上册单元检测(含解析)
- 2024-2025学年江苏省南京市玄武区科利华中学九年级(上)第一次月考数学试卷(含答案)
- T-YNRZ 020-2024 珠芽黄魔芋采收与贮运
- T-XYTX 001-2024 地理标志农产品 新沂水蜜桃
- GB/T 13915-2013冲压件角度公差
- GB/T 13663.2-2005给水用聚乙烯(PE)管道系统第2部分:管件
- FZ/T 97035.3-2015针织机用针第3部分:复合针
- 护士值班及交接班制度测试卷附答案
- 基础生命科学导论:第七章-进化课件
- 制药工程导论课件
- 传染病学-伤寒及副伤寒课件
- 国开电大软件工程形考作业3参考答案
- (第三单元)第一课追寻美术家的视线(wcy)
- 社会主义发展历程课件
- 2023届高考有机化学试题分析及信息题备考策略
评论
0/150
提交评论