1、A全 issuestage2广西防城港核电厂一期(2x1000MW)PHASE I(2x1000MW)DOC.BLX17ACO005GJS045GN题SYSTEMDESIGNFEEDWATERHEATERSDRAINRECOVERYSYSTEM(ACO) CHAPTER 5 OPERATING PARAMETERS给水加热器疏水回收系统设计手参考电A:编B: C: Issued by设计院编-H0201S-J0210-Internal Identification This is the property of GEDI.It must not beused,reproduced,transm
2、itted or disclosed without the prior written permission of GEDI. 本文件之属于省电力。未获我院,任何人不得擅自使用、传递或该文件。准 核 张 对 郑 写 全控 CHAPTER 5 - OPERATING NORMAL OPERATING Normal operating conditions are at turbine rated continuous electrical output of 1086.0 MW with no section of the feed train bypassed.DrainstoLPheate
3、rdrainsflow(perDrainsfromLPheaterdrainsflow(perABCDEFGPARTICULAR STEADY OneBankofHeaters3and4One bank of LP heaters 3 and 4 isolated with 50% of flow through the active bank and 50% through the bypass. The turbine load is 1077.010 MW, the main turbine stop valves are considered to be wide open.Drain
4、sto LP heaterdrains receivers DrainsfromLPheaterdrainsreceiverTwoBanks of LPheaters1 and2 All banks of duplex heaters isolated. The reactor output is 100% and the turbine load is 1066.388 MW, the main turbine stop valves are considered to be wide open. Under this mode of operation the operator must
5、stop the LP heater drains pumps, all drainage is automatically diverted to the standpipe upon HHWL R in the LP drains receiver. Flow rate of the third bledhigh ,so this mode of operation can not be long.One HP Heater Bank ABCDEFGOne bank of HP heaters 6 and 7 isolated with the flow split 65% through
6、 the activebankand35%throughthebypass.Thereactoroutputis100%andthe main turbine stop valves are considered to be wide open.DrainstoLPheaterdrainsflow(perDrainsfromLPheaterdrainsflow(perABCDEFGPARTICULARTRANSIENTLoad Loadrejectionisdefinedasalargedropinturbinegeneratorloadwithoutturbinetrip Upon load
7、 rejection the pressures in the LP heaters will drop suddenly due to the drop in bledpressures. This may lead to cavitation and/or flashing in the heater drains pumps. The pumps are designed to withstand operation in the cavitating mode, but there should be a loss of generated head of 50% normal for
8、 greater than 1 minute, the pumps will trip automatically.Reverse flow due to the drop in pressure is prevented via the NRVs (GPV31 51 VV /GPV32 51 VV). The LP heater 3 and the LP heater 3 drains receiver are sustained at the same pressure via the interconnecting vent and drain pipework which also e
9、nsures that reverse flow will not take place.Load rejection results in the LP heater 3 and 4 drainage flow rate falling due to the reduced bledflow. Consequentially the LP heaters drains receiver level control valves will modulate to suit the lower flow rate as described in sections4.1.6.2andShould
10、LP heater drains pump ACO 301 PO (302PO) trip take place then the LP heaters drains receiver will flood to the HHWL R, automatic opening of the emergency overflow valve ACO 102VL (202VL) then takes place.TurbineNone of the components of the ACO system impose any limitations on the rates of turbine l
11、oading.BothBanksofLPHeaters3and4The automatic isolation of the LP heaters 3 and 4, due to fault conditions in the ABP system, also effectively isolates the ACO system by closing the pump discharge isolating valve ACO106VL (ACO206VL). Closure of this valve fully opens the drain pump recirculation con
12、trol valve leaving the pump running on recirculation flow. The LP drains pumps should be stopped by the operator if operation of the associated LP heater bank cannot be re-established within one hour. On restoration of the associatedLPheaterbankforwarddrainsflowisrestoredwhen theoperatorreopensABCDE
13、FGACO106VLABCDEFGNORMALSHUTDOWNAND START-Prior to start-up it is necessary to correctly position all the system valves as per flow diagram BLX17ACO501GJS045DD.OTHERLossofLPDrainsTheLPdrainspumpwilltripforthefollowingLoss of discharge head; if the developed head drops below 50% of normal in excess of
14、 1 minute duration. This may occur if the pumps are running in the cavitating mode during load rejection operation.LLWL F in the drains receiver; this may occur upon malfunction of the level control system.Turbine trip; this action occurs as part of the main turbine automatic shutdown. Should a drai
15、n pump trip then the drains receiver will flood to HWL R and initiate the alarm LP heater drains receiver ABP 301BA (302BA) HWL , hence warningtheoperatorofafaultcondition.Shouldtheoperatorbeunabletotake remedial action to restart the pump then the level in the drains receiver will achieve HHWL R.CO
16、NTROLControlThefollowingtextdescribeshigh water level indicates falling levelindicatesrisingindicatesLP Heater No. 3A Drains Receiver ACO 301BA (302BA identical) Level 2RD Alarm LWLStartassociatedACOdrainpump Level 3RD Alarm HWLStartACOdrainpump Level 4RD Alarm HHWLOpen emerge drain valve ACO 102VL
17、(202VL) Level3FD CloseemergedrainvalveACO102VL(202VL). Level 2FD Alarm LWL.NotpermittostartassociatedACOdrainpump Level 1FD Alarm LLWL.Stop associated ACO drain At level HHWL R the operator must associated LP Heater Drains pump to help maintain the emergency drain line flooded. The operator should s
18、top the LP Heater Drains pump to rectify the high drain level before restarting the associated LP Heater Drains pump.FunctionalRequirementsofControl ValvesforBankA(BankBidentical) Receives a modulating signal from LP heater drains receiver level controller which is located on the s of the vessel. Th
19、e flow discharges into the condensate discharge line from the LP heater 3 (ABP system).Risingcontrolsignaltendstoopenthevalve. Spring tends to close the valve.On control air failure valve closes. Onsupplyairfailurevalvefailsfixed.LP Heater Drains Pump A Recirculation Control Valve ACO 108VL Receives
20、 a modulating signal from LP heater drains receiver level controllerwhichislocatedonthesofthevessel.Theflowdischarges back into the LP heater ACO 301BA (302BA).Risingcontrolsignaltendstoclosethevalve. Spring tends to open the valve.On control air failure valve opens. Onsupplyairfailurevalvefailsfixe
21、d.Valveopenswhen106VL(206VL)isnotfullyLP Heater 4 Drain Control Valve ACO 109VL Receives a modulating signal from LP heaters 4 level controller which is located on the s of the vessel. The flow cascades to the LP heater No. 3 drains receiver ACO 301BA (302BA).Risingcontrolsignaltendstoclosethevalve.
22、 Spring tends to close the valve.On control air failure valve closes. Onsupplyairfailurevalvefailsfixed.LP Heater 4 Emergency Drain Control Valve ACO 110VL (210VL): ReceivesamodulatingsignalfromLPheaters4levelcontrollerwhichis located on the s of the vessel. The flow cascades to the condenser Risingcontrolsignaltendstoclosethevalve. Spring tends to open the valve.On control air failure valve opens. Onsupplyairfailurevalvefailsfixed.5.6.3.2 MotorizedLP Heater 3A
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年度床上用品行业数据共享与分析合同3篇
- 2024石料批发市场运营与管理采购合同3篇
- 2024熟料绿色采购与节能减排合作协议3篇
- 2025年会展中心场地租赁分成及会展服务合同3篇
- 二零二五年度餐饮企业冷链物流配送合同9篇
- 2024年高性能电动汽车交易协议一
- 专项不良资产尽职调查服务协议版
- 2024税务代理委托合同样本
- 2024离婚协议范本及注意事项
- 2025年健康医疗大数据分析承包合同2篇
- MT/T 199-1996煤矿用液压钻车通用技术条件
- GB/T 6144-1985合成切削液
- GB/T 10357.1-2013家具力学性能试验第1部分:桌类强度和耐久性
- 第三方在线纠纷解决机制(ODR)述评,国际商法论文
- 第5章-群体-团队沟通-管理沟通
- 肾脏病饮食依从行为量表(RABQ)附有答案
- 深基坑-安全教育课件
- 园林施工管理大型园林集团南部区域养护标准图例
- 排水许可申请表
- 低血糖的观察和护理课件
- 计量检定校准技术服务合同协议书
评论
0/150
提交评论