mwp10模块仪表散料采购申_第1页
mwp10模块仪表散料采购申_第2页
免费预览已结束,剩余1页可下载查看

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、计划编号(Requisition Number):青 岛 公 司 物 资 需 求 建 议 计 划(CPOE Material Requisition for Purchase Order)工程项目(使用单位)(Project):YAMAL LNG 项目事业部经理:(Division Manager)事业部主管领导:(Vice Manager)物资装备科:(Materials and Equipment Department)审核:(Check)制表:(Compile)2016 年 04 月 08 日(/Month/Day/ Year)20 16 年 04 月 物 资 需 求建 议 计 划 表M

2、aterial Requirement Procurement Requisition in _Month, _Year2016 年 04 月 08 日Month/Day/ Year申报单位(Requisition Department)技术中心物资大类(Material Categories)工程项目(Project)YAMAL LNG PROJECT MWP10A提报依据(Requisition basis)序号(No.)物料组编码(Material Group Code)物资编码(Material Code)产品名称(Material Name)规 格 型 号(Specification

3、)质量标准(Quality Standard)单位(Unit)需求数量(Requirement Quantity)平库数量(Inventory Quantity)采购数量 (Procurement Quantity)预算价格(元)(Budge,RM B)备注(Remarks)1Teflon tape1/2*288.in(12.7mm*732cm) Teflonroll80Swagelock2Rubberseal stripT=2mm;W=50mm; 25mrollsilicone rubberroll33Cable tieUV Resistant Stainless SteelCoated 9

4、.6mm0.38mm 25mROLL316ssroll60See Note14Cable tieHeadAssort With Above CableTie L type316SSea5000See Note15Tube clampFor 1 tube sized 12mmODBundle tubing, 316SS fix plate , with 316SS bolt/nut, suitable for installation on angle bar, (refer theset520See Note2following picture).合计(Total)到货地点(Deliverie

5、dPlace)要求到货日期(Require Deliveried Place)领料人(联系方式)Demander说明(Other Information):1. 技术要求见附件,供货前,供货方必须与我方技术确认。2. 本料单为 MWP10A 仪表专业第一批散料,根据已提交业主审核 MR 文件 “YAMCOPE-SD-MWP10ACOMMOM-IN-BT-MR-0001”。填报人(联系电话)(Compile):部门主管( Check ):Notes:All material should meet the working environment temperature from -50 to +

6、37. Especially can resist -50 environmental condition long- time. Resist the Chemical Corrosion Environment.The Coated should resistant acid and smear .The material should be flame retardant,and ensure the good tensile elongation at Working environment temperature.Stainless steel strip with a minimu

7、m thickness of 0.35mm(notinclude coating).The coating thickness should not less than the steel strip thickness.Provide the certificates. Require third-party certification authority, require form certification. Certificates of Origin to be consistent with the actual origin of the product.Provide the performance in low temperature.Tube clamp 5 size must meet the bundle tubing installment, see the following the detailed bundle tubing size.As for A and B dimension: please CTR confirm it, after that CPOE can decide the size of tube

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论