![10.11罐称重系统bulk system instrument使用维护手册usage,inspection and maintenance manual_第1页](http://file4.renrendoc.com/view/bde8b1c9127a6cc7fcfa84709c7fdcac/bde8b1c9127a6cc7fcfa84709c7fdcac1.gif)
![10.11罐称重系统bulk system instrument使用维护手册usage,inspection and maintenance manual_第2页](http://file4.renrendoc.com/view/bde8b1c9127a6cc7fcfa84709c7fdcac/bde8b1c9127a6cc7fcfa84709c7fdcac2.gif)
![10.11罐称重系统bulk system instrument使用维护手册usage,inspection and maintenance manual_第3页](http://file4.renrendoc.com/view/bde8b1c9127a6cc7fcfa84709c7fdcac/bde8b1c9127a6cc7fcfa84709c7fdcac3.gif)
![10.11罐称重系统bulk system instrument使用维护手册usage,inspection and maintenance manual_第4页](http://file4.renrendoc.com/view/bde8b1c9127a6cc7fcfa84709c7fdcac/bde8b1c9127a6cc7fcfa84709c7fdcac4.gif)
![10.11罐称重系统bulk system instrument使用维护手册usage,inspection and maintenance manual_第5页](http://file4.renrendoc.com/view/bde8b1c9127a6cc7fcfa84709c7fdcac/bde8b1c9127a6cc7fcfa84709c7fdcac5.gif)
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、SECTION/章节2(Page1/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-2USAGE, INSPECTION ANDMAENANCE MANUALFORBULKAND SURGEWEIGHT VIEWHICO PETRO-TECH CO.,ADDRESS: 13, 13 XINBEI ROAD, TANGGU,TIANJIN, CHINA 300451: +86-22-25210844: +86-22-25211319:EPHONEFACSIHICO PETRO-TECH CO.,Page 1 of 30SECTION/章节2(Page2/59)OIM
2、 FOR BULKAND SURGEWEIGHT VIEWLF7-2TABLE OF CONTENT1.RODUCTION42. DESCRIPTION OF BULKVIEW5Overview of the System5Description of Each Component6Data Acquisition Panel (DAQ)6Display Panel7Load cell systems82.2.4. Prere Transmitter83. SYSTEM SETUP OF BULKVIEW9Setup from HMI9Communication Setup9Setting o
3、f Control Panel93.1.2. Acs to Setup Mode103.1.3. Authorization to Acs10Calibration11Description for Calibration11Data Save and Recovery123.1.5 Setting Alarm Po 124. OPERATION OF BULKVIEW13Display Panel13Display Function13Alarm and Alarm Silence13Logic for Alarm Horn14Diagnosis145. DESCRIPTION OF SUR
4、GEVIEW15Overview of the System15Description of Each Component16Data Acquisition Panel (DAQ)16Load cell systems175.2.3. Prere Transmitter176. SYSTEM SETUP OF SURGEVIEW17Setup from HMI18Communication Setup18HICO PETRO-TECH CO.,Page 2 of 30SECTION/章节2(Page3/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-26.1.2
5、. Acs to Setup Mode186.1.3. Authorization to Acs19Calibration19Description for Calibration19Data Save and Recovery206.1.5 Setting Alarm Po 207. OPERATION OF SURGEVIEW21Display Panel21Display Function21Alarm and Alarm Silence21Logic for Alarm Horn228. SERVICE AND MAENANCE23Inspection while Operation2
6、3Trouble Shooting239. ORDERING INFORMATION25Figure 1.Figure 2.Figure 3.Figure 4.Figure 5.Figure 6.DAQ FOR BULK 25Display Panel26DAQ for SURGEVIEW27Alarm Horn28Prere transmitter28Load cell system2910. DRAWING30HICO PETRO-TECH CO.,Page 3 of 30SECTION/章节2(Page4/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-21
7、.RODUCTIONBULKAND SURGEWEIGHT VIEW, along with most popular dataacquisition, sensor and HMI technique, provides a vivid view of weigh and volume forall the P-.Weight of eachis gathered by means of load cells which are mounted beneath oneof legs of P-. The load cell transmits a hydraulic prere signal
8、 to the indicator bytransforming the appd loado the respective prere. Prere of load cell isgathering thru high accuracy prere transmitters and transferred to DAQ.The system includes two parts , BULKVIEW and SURGEVIEW. Eachsystem has a DAQ. The DAQ exchange data with the HMI. Setting of parameter and
9、calibration can be easily from HMI thru digital touch button.HICO PETRO-TECH CO.,Page 4 of 30SECTION/章节2(Page5/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-22. DESCRIPTION OF BULKVIEW2.1. Overview of the SystemRefer to below system diagram, the P-gauging system provides vivid monitoring forbulk storage an
10、d transferring system, including six P-.HICO PETRO-TECH CO.,Page 5 of 30现场控制盘SECTION/章节2(Page6/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-2The system comprises the following components.1ea 1ea 6ea6eaData acquisition panel (DAQ)Local display panelPrere transmitterLoad Cell systemsDescription of Each Comp
11、onentData Acquisition Panel (DAQ)This DAQ panel is used to acquire signal from. All components of the DAQare enclosed in a stainless steel control box with IP66 enclosure, Explolevel is Exde IIB T4.-proofSmart data acquisitionand pros unit,S7-200 Programmable LogicController (PLC) is used for acquir
12、e field signals of prere transmitters. All sitesignals are standardized within PLC program and transferred to HMI for dataexchange.HICO PETRO-TECH CO.,Page 6 of 30SECTION/章节2(Page7/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-2PS1 is a LOGOfor equipment.ER high reliableer supply to provide 24VDCer usedM1
13、is CPU unit withcustomstored in.rogramThe CPUunit digitaloutpalsohasits andtoinputhannelacquire field signals.M2, M3 are EM231og input moduleusedpreforacquiringre signals.IB1,are preIB2, IB3, ZB1barriersforre transmittersand alarm horn.2.2.2. Display PanelThe display panel is mountednearbytheP-.316L
14、stainless steel housings areused food performance inoffshore atmosphere.TheHMIisdualdoor panelinnerdesigned, one 7” touch(HMI) is installed atdoor, usedfromand the outer door isto protect the screenpotentialmechanicalhazard. A sight window is soarranged within outer door soas to provide protection f
15、or the screen.Function of the HMI will be described in Paragraph 3 and 4.HICO PETRO-TECH CO.,Page 7 of 30SECTION/章节2(Page8/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-22.2.3. Load cell systemsSystemsareproductbyM/DTOTCO.Includingindicator, hydrauliccoulplingloadcell,hose, disconnectand tubing. Loadcells
16、mounted beneath oneof legs of P-mounted. IndicatornearbytheP-.The load cell may be mounted in any attitude, depending on application requirement.The SW Series CompresCells should be installed in such a mannert themating surfaare within 1to 2of parallel. The lolate (piston) and retainerring (cylinder
17、) should not be eccentric greatern l/16 inch. Eccentricity orexsive out of parallel loading may produce an indication error and inducepremature failure of the diaphragm.The nominal gap of load cell is 11mm.2.2.4. Prere TransmitterElectronics diaphragm isolated prethrough a four-way valve.re transmit
18、ters are connected to the indicatorsTheSITRANSP220preretransmitter are two wires loopered smart type instruments Accuracy is ashigher as 0.075% of full span.The transmitters are originally ranged160bar.HICO PETRO-TECH CO.,Page 8 of 30SECTION/章节2(Page9/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-23. SYSTE
19、M SETUP OF BULKVIEWOnce the system is installed and electrically terminated, it requires proper setup to makeit work properly. Setup can be made from screen function of HMI.For the field devi, the prere transmitters are not site settable or serviceable.CAUTIONSetup and calibration of the system must
20、 be done by an authorizedtechnin,inexperiencedchangingofanyparametermaycausemalfunction of the system.3.1. Setup from HMIAfter field transmitters have been checked for correct functioning, setup has to be made on HMI screen to make the system work properly.The following paragraph shows correct proce
21、dures for setup of system data.3.1.1. Communication SetupHMI communicates with DAQ throughPPI network.Communication baud rate is se9600 bps. Setting of Control PanelThe displays are designed working as human machineerface (HMI) in industry pros control. Miniatureoperating system Win CE is pre
22、installedprior to ex work.he displayWhile the HMI is energized, the program loadageis displayed, control panel can be ackey CONTROL PANEL option.sed by pressingIf any change may be required during operation,you can entero control panel by pressing EXITTO CONTROL PANEL from the setting page.The belog
23、e show details in control panel, in which you can make setting of system, regionalsetting, date and time, screen saver etc. to make it satisfactory to customers need.HICO PETRO-TECH CO.,Page 9 of 30SECTION/章节2(Page10/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-2Practically,customersregional setting has t
24、o be changed to make numerical display to suithabit. Parameter fortransferring has to be customizedfor the programmer to down anduprerogram.3.1.2. Acs to Setup ModeSetting page will show up once pushbutton SETTING is pressed at main display page.Setting of system comprises three parts.-SETTING AND C
25、ALIBRATION is used to set proper values for system;ALARM PO;SET is used to set high alarm value for material weight in each-EXIT TO CONTROL PANEL is used to acto initialized system information.s control panel of screen in order3.1.3. Authorization to AcsRight side page shows up torequest propassword
26、 toacpages calibration functionaftushbutton ANDpressedSETTING CALIBRATION ishe setting page,HICO PETRO-TECH CO.,Page 10 of 30SECTION/章节2(Page11/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-2Calibration page can be show up if correct password is typed in. (Customer defaultpassword is 1438).3.1.4 Calibratio
27、n Description for CalibrationBy pressing pushbutton SETTING AND CALIBRATION, the CALIBRATIONpage shows up after correct acs password is typed in.hispages,data as located in boldwindowwith white background allowed modified. gravity windowsdesignedareto be The inputareforoperator toinputknown g
28、ravity of material, normally 2.2 for barite, 1.5 for cement, 0.94 for bentonite depending on actual gravity of material. Inputs of gravity will influence accuracy ofvolume percentage.The push button HELP ON DATA SAVE AND RECOVER is on-line help forproperly use the save and recover function while sit
29、e commising icsful.Tare is weight of the.Offset is usually caused by connecting pi, or surrounding structures.Beforesetting the offset, the follow precaution should be observed:1)2)Please make sure theto be work on is in empty sus.The offset value normally reflect calculation error as influenced by
30、connectingpipe and structure, please always make sure flexible connectors are used for allpijos, and none structure contacts thebody.3)In our experience, difference beforetare and reading at HMI is alwayswithin 1 tons. Extra large value reflect problem unknown, please never try toamends offsets to b
31、ring reading as correct before all faults have been eliminated.HICO PETRO-TECH CO.,Page 11 of 30SECTION/章节2(Page12/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7- Data Save and RecoveryThe system is designed with data save andrecovery function so as to avoidunentional change of setting.While the sys
32、temisproperlysetandproveningoodworkingorder, dan besaved by pressingpushbuttonDATAand hold secondsSAVEfor 5 untiladjacent light turns on, all the setting data is saved to PLC memory space. To recover the data, just press the DATALOAD and hold for 5 seconds until adjacent lightturns on, then data as
33、saved can be reloaded.3.1.5 Setting Alarm PoThe system provides visual and audible alarm while weigh of material exceeds highlimit, and filling percentage of material exceeds high limit.The alarm pofor signals can besetALARMPOSETpage shown figure.heasheHICO PETRO-TECH CO.,Page 12 of 30SECTION/章节2(Pa
34、ge13/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-24. OPERATION OF BULKVIEWAll parameter which required for operating bulk system can be seen thru HMI screeninstalled within display panel. The HMI is designed for rugged situation. For each,volume and weight can be displayedhepage as shown at the next para
35、graph.4.1. Display PanelThere is a display panel equippedpanel.he system. All the data ofare displayedhe4.1.1. Display Function7 inch display panel is installed. Setting and diagnosticsis preprogrammedandstoredhe flash memory.The page shows customerserface while itisenergized.Parametersrelated P-wei
36、ght,tothe,such asvolumepercentage,aredisplayedeachwithbar.While material in each isvolume bar.set correspondingly, total cement is displayed under4.1.2. Alarm and Alarm SilenceThe system is designed with visual and audible alarm. A pushbutton ALARM ACKis located at upper rightcircumstance,of the mai
37、n screen. The horn soundhe following1) Too muaterialheWhile materialis detected highern alarm podisplay flash atas described in1HZ until alarmparagraph 3.1.5, the horn sounds and weightHICO PETRO-TECH CO.,Page 13 of 30SECTION/章节2(Page14/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-2condition disappear.2)
38、Percentage of materialheis too highWhile materialis detected highern alarm poas described inparagraph 3.1.5, the horn sounds and percentage display flash at 1HZ until alarmcondition disappear.4.1.3. Logic for Alarm HornWhen the alarm horn sounds, it can be silenced by means of pressing pushbutton at
39、 upper right of screen. The horn will sound again if the alarm condition still existsafter 5 minutes delay, or a new alarm arises.The alarm horn is with multi-tone function, tones can be altered by changing combination of micro switches inside.4.2. DiagnosisThe system has minimized function for diag
40、nosis in order to reflect stransmitter.us of filedLeft column displays engineering values which are calculated by thesystem. Middlehannels.column displays digital raw values which are gathered fromog inpSet:0-160 Bar g=6400-32000rawRight columnshows sus offielddevi automatically,thesystemis monitori
41、ngworkingsusoffieldtransmitters and sign “ CHECKTRANSMITTER” is shown if field device is faulty.HICO PETRO-TECH CO.,Page 14 of 30SECTION/章节2(Page15/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-25. DESCRIPTION OF SURGEVIEW5.1. Overview of the SystemRefer to below system diagram, the S-gauging system is sho
42、wn.现场控制盘The system comprises the following components.1ea1eaData acquisition panel (DAQ)Prere transmitter1ea Load Cell systemsHICO PETRO-TECH CO.,Page 15 of 30SECTION/章节2(Page16/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-2Description of Each ComponentData Acquisition Panel (DAQ)This DAQ panel is used to
43、 acquire signal from. All components of the DAQ areenclosed in a stainless steel control box with IP56 enclosure, Explo Exde IIB T4.-proof level isSmart data acquisition and pros unit,S7-200 Programmable LogicController (PLC) is used for acquire field signals of prere transmitters. All sitesignals a
44、re standardized within PLC program and transferred to HMI for data exchange. The display panel is fixed on the door of the DAQ. The data of SURGEVIEW is shown by display panel.HICO PETRO-TECH CO.,Page 16 of 30SECTION/章节2(Page17/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-2PS1 is a LOGOER highreliableersu
45、pplytoprovide 24VDCfor equipment.er usedM1 is CPU unit with customer program stored in. The CPUunit also has its digital inputand outpfield signals.hannel to acquireM2 is EM231og inputmodule used for acquiringprere signals. IB1, ZB1 arebarriersforpreretransmitters and alarm horn.5.2.2. Load cell sys
46、temsSystems are product by M/D TOTCO.Includingindicator,loadcell,hydraulic hose, disconnect coulplingand tubing. Load cells hang one of legsofsurgenearby the.Indicatormounted.The SD Series TenCell should beinstalled in such a mannert when aload is appd, the components matingwith the eye nuts, hooks,
47、 padeyes, etc.bear at the center of these attaents.The nominal gap of load cell is 19mm.5.2.3. Prere TransmitterThe prere transmitter is same as the one of BULKVIEW.6. SYSTEM SETUP OF SURGEVIEWOnce the system is installed and electrically terminated, it requires proper setup to makeit work properly.
48、 Setup can be made from screen function of HMI.HICO PETRO-TECH CO.,Page 17 of 30SECTION/章节2(Page18/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-2For the field devi, the prere transmitters are not site settable or serviceable.CAUTIONSetup and calibration of the system must be done by an authorizedtechnin,i
49、nexperiencedchangingofanyparametermaycausemalfunction of the system.6.1. Setup from HMIAfter field transmitters have been checked for correct functioning, setup has to be made on HMI screen to make the system work properly.The following paragraph shows correct procedures for setup of system data.6.1
50、.1. Communication SetupHMI communicates with DAQ throughPPI network.Communication baud rate is se9600 bps.The Setting of Control Panel is the same as setting for BULK(paragraph 3.1)VIEW.6.1.2. Acs to Setup ModeSetting page will show up once pushbutton SETTING is pressed at main display page.Setting
51、of system comprises three parts.-SETTING AND CALIBRATION is used to set proper values for system;ALARM POSET is used to set high alarm value for material weight;EXIT TO CONTROL PANEL is used to acto initialized system information.s control panel of screen in orderHICO PETRO-TECH CO.,Page 18 of 30SEC
52、TION/章节2(Page19/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-26.1.3. Authorization to AcsRight side page shows uptorequestproperpasswordtoacscalibration function pageaftSETTINGushbutton ANDisCALIBRATIONpressedhe setting page,Calibration page can beshow up if correct password is typed in. (Customer default
53、 password is 1438).6.1.4 Calibration Description for CalibrationBy pressing pushbutton SETTING ANDCALIBRATION, the CALIBRATIONpage shows up after correct acs password is typed in.his pages,data as locatedin window white groundallowedbold with back areto bemodified. Thegravity windows designed
54、operatorinput are forto input known gravity of material, normally 2.2 for barite, 0.94 forbentonite depending on actual gravity of material. Inputs of gravity will influenceaccuracy of volume percentage.he middle of this page, Left column displays engineeringvalues which arevalues which arecalculate
55、d by the system.Middle column displays digital rawhannels.gathered fromog inpHICO PETRO-TECH CO.,Page 19 of 30SECTION/章节2(Page20/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-20-160 Bar g=6400-32000rawRight column shows sus of field devi, the system is automatically monitoringworking sus of field transmitt
56、ers and sign “ CHECK TRANSMITTER” is shownif field device is faulty.The push button HELP ON DATA SAVE AND RECOVER is on-line help forproperly use the save and recover function while site commising icsful.Tare is weight of the.Offset is usually caused by connecting pi, or surrounding structures.Befor
57、esetting the offset, the follow precaution should be observed:4)5)Please make sure theto be work on is in empty sus.The offset value normally reflect calculation error as influenced by connectingpipe and structure, please always make sure flexible connectors are used for allpijos, and none structure
58、 contacts thebody.6)In our experience, difference beforetare and reading at HMI is alwayswithin 1 tons. Extra large value reflect problem unknown, please never try toamends offsets to bring reading as correct before all faults have been eliminated. Data Save and RecoveryThesystemisdesigned wi
59、th data save and recoveryfunction so as toavoid unentionalchange of setting.While the system isproperlysetandproveningoodworking order, datacan be saved by pressing pushbutton DATA SAVE and hold for 5 seconds until adjacent light turns on, all the setting data is saved to PLC memory space. To recove
60、r the data, just press the DATA LOAD and hold for 5 seconds until adjacent light turns on, then data as saved can be reloaded.6.1.5 Setting Alarm PoHICO PETRO-TECH CO.,Page 20 of 30SECTION/章节2(Page21/59)OIM FOR BULKAND SURGEWEIGHT VIEWLF7-2The system provides visual and audible alarm while weigh of
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年度环境安全管理借读生实习协议-@-1
- 咨询服务居间协议
- 衢州波形沥青瓦施工方案
- 鞍山2024年小升初数学试卷
- 药品配送应急服务方案
- 陇南电梯内部装潢施工方案
- 代签工程质保金合同范例
- 茂名工厂道路划线施工方案
- 公司出售股权合同范例
- 单招湖南数学试卷
- 2025年北京广播电视台招聘(140人)历年高频重点提升(共500题)附带答案详解
- 2024复工复产安全培训
- 中学生宿舍日常与管理
- 2025中国南光集团限公司校园招聘高频重点提升(共500题)附带答案详解
- 机加工行业安全生产风险辨识及控制清单
- 江苏省苏州市2024-2025学年第一学期八年级数学期末模拟卷(一)(无答案)
- 【历史】秦汉时期:统一多民族国家的建立和巩固复习课件-2024-2025学年统编版七年级历史上册
- 社区中心及卫生院65岁及以上老年人健康体检分析报告模板
- 化工过程安全管理导则AQT 3034-2022知识培训
- 第02讲 导数与函数的单调性(教师版)-2025版高中数学一轮复习考点帮
- 2024届新高考语文高中古诗文必背72篇 【原文+注音+翻译】
评论
0/150
提交评论