1、外文资料Research on Fuzzy Control for Steam Generator Water LevelWei Peng Da-fa ZhangINTRODUCTIONThe steam generator is one of the main devices in PWR nuclear power plant, in order to ensure the safety of nuclear power plant during operation; the steam generators water level must be controlled in a cert
2、ain range. When the nuclear power plant is running, as the steam flow or the water flow changing, the amount of boiling bubbles in the steam generator will change due to local pressure or temperature change, the instantaneous water level showed “false water level” phenomenon . The existence of “fals
3、e water level” made it difficult to control the water level. The introduction of feed-forward control to the traditional single-loop PID control can, in a certain extent, overcome the false water level phenomenon. But the conventional PID control method in the process of steam generator water level
4、control has some shortcomings. To the steam generator that has highly complex, large time-delay and nonlinear time-varying characteristics, the PID parameters tuning is a tedious job and the control effect is very poor. Furthermore, to achieve good control performance still as conditions changing, i
5、t often needs to change the PID controller parameters. But the analog PID controller parameters are difficult to regulate online. Fuzzy control is a kind of nonlinear control strategy based on fuzzy reasoning, which express operating experience of skilled manipulation men and common sense rules of i
6、nference through vague language. Fuzzy control do not need to know precise mathematical model of controlled object, is not sensitive to the change of process parameters, is highly robust and can overcome non-linear factors, so, fuzzy control has faster response and smaller ultra- tone, can get bette
7、r control effect. Based on understanding above, this paper design a steam generator water level fuzzy controller, the simulation shows that the controller has good control performance and practical value.DYNAMIC CHARACTERISTICS OF STEAM GENERATORThe transfer function of PWR steam generators mathemat
8、ical model of the general form shows below:y(s)=GW(s)QW(s)+GS(s)QS(s)(1)where y is the steam generator water level; QW for the water flow; QS for the steam flow; GW (s) for the impact of the water flow to the steam generator water level; GS (s) for the effect of the steam flow (load) to the steam ge
9、nerator water level.The balance of the steam generator water level is maintained through the match between the water flow and steam flow. The process that water level changes with the steam flow or water flow changing can be regarded as a simple integration process, but impact of the water flow and
10、steam flow s change on water level is different.Dynamics Characteristics under Water Flow DisturbanceSuppose steam flow GS remains unchanged, and water flow GW step increases, on the one hand because the temperature of feed water is much lower than the temperature of saturated water in the steam gen
11、erator, so that , when feed water entering, it will absorb a lot of extra heat, the vapor phase bubble contents will reduce, resulting in water level decreasing; on the other hand, the increase in water flow GW made it greater than steam load, and cause water level increases linearly. Comprehensive
12、two factors, after the step increase of the water flow, the water level rise has a time delay process, showing a down then up.Dynamic Characteristics under Steam Load DisturbanceSuppose feed water flow GW remains unchanged, and steam load GS step increases, on the one hand the water level will flow
13、down because the steam flow rate is greater than the water flow rate. On the other hand, as the steam load increased, vapor pressure is reduced; the bubble volume on the liquid surface increases, causing the water level increased. Comprehensive two factors, after the step increase of the steam flow
14、rate, the water level down has a time delay process, showing a up then down.The impact on the water level of water flow or steam flow stepping decreased has similar principle as above.As analysis can be seen as above, when the water flow or steam load change, the water level did not follow the chang
15、e immediately, but there is an opposite process at first. This phenomenon is called false water level phenomenon.DESIGN OF WATER LEVEL FUZZY CONTROLLERThe conventional PID controller has a poor control performance to the steam generator that exist “false water level” characteristics, showing a great
16、er overshoot in the tracking time. But a well-designed fuzzy controller is able to overcome the false water level phenomenon, and has good control performance.A. Sstructure of Fuzzy ControllerFigure 1. Structure of steam generator water level fuzzy controllerChoose the water level error (e) and chan
17、ge rate of error (ec) as input of the fuzzy controller, the output of the fuzzy controller is the added value of the valve opening signal Au. Meanwhile, use the steam flow feed-forward to overcome the false water level phenomenon, use water flow feedback to overcome fluctuations in water supply side
18、 . k1, k2 were water flow and steam flow transmitter conversion factor. To ensure the water flow to match the steam flow, k1 and k2 values should be equal to.B. Fuzzy theory, fuzzy subset and Membership FunctionThe fuzzy Analects of e, ec and u are -6, 6, both with seven fuzzy sets NB (negative big)
19、, NM (negative middle), NS (negative small), ZO (zero), PS (positive small), PM (positive middle) and PB (positive big) to describe. e, ec and, Au are all using triangular membership function (see Figure 2).-6-4-20246e-, ec-,加Figure 2. Input and output variable membership functionFuzzy control rule
20、tableThe establishment principle of fuzzy control rules are: when the error is large, the output control volume should give priority to eliminate error as soon as possible; when the error is small, the output control volume should givepriority to prevent overshoot. Where ec isnegative ,it shows that
21、 water level has a rising trend, if the water level is high at this time, then we should reduce the valve opening signal; whereas, we should open the valve more. Through a comprehensive analysis of expertise, the establishment of rule table shown in Table 1.Table 1. Fuzzy control rule tablee ecNBNMN
22、SZOPSPMPBNBNBNBNMNMNSNSZONMNBNMNMNSNSNSZONSNMNMNSNSZOPSPSZONMNSNSZOPSPSPMPSNSNSZOPSPSPMPMPMNSNSZOPSPSPMPMPBZOPSPSPMPMPBPBFuzzy Reasoning and SolutionThis fuzzy inference system uses Mamdani. The basic properties of fuzzy inference system set to: and operation with a very small operation; or operatio
23、n uses the maximum operation. Using a very small operation fuzzy implication, fuzzy rules integrated with great operations center Defuzzification method used.SIMULATION EXAMPLESA pressurized water reactor steam generator in Chinese Qinshan nuclear power station has empirical model G1 (s), G2 (s) bel
24、ow:s(29s + 1)(3s +1)3.19e -5 s0.415s(29s + 1)(3s +1) (28s +1)(90% Ps )(15% Ps )(6)(7 )(8 )G 2( s) = -3.19 e 一 8 s + 整,(90% Ps )s (24 s +1)4 s +1where Ps denote the rated load. When load at 15% 90% Ps, use (6) and (8); when load less than 15% Ps, use (7) and (8).Figure 3. Expected water level step re
25、sponse diagramThe coefficients in Control system are k1=k2=0.5. Water control valve is a king of linear valve, its gain is 4. The quantitative coefficients of e and ec are 6 and 60 respectively; the scale factor of u is 0.5. We limit water flow the range of 0 kg / s to the rated flow 258kg / s when
26、simulation. Consider the expected level step from the initial 0m to 10m, water level response is shown use the solid line in Figure 3. For contrasting the increase effect of fuzzy controller, we also carried out using the traditional PID control simulation. We can see, compared with traditional PID
27、control, fuzzy controller has reported significant improvements in overshoot, settling time, steady degrees.V. CONCLUSIONThis paper designed a water level fuzzy control system aimed at steam generators characteristics of large time delay and model uncertainty. We also gave a simulation to the steam
28、generator of Qinshan nuclear power plant, and achieved satisfactory results. The method can also be used for other large time -delay and time-varying process control model, and has broad application prospects.蒸汽发生器水位模糊控制研究彭威张达发导论蒸汽发生器是压水反应堆式核电厂里的一个重要的设备。为了保证核电厂运行 的安全性,蒸汽发生器的水位必须控制在一定的范围内。核电厂的运行中,因为蒸
29、 汽流量和给水流量的改变,蒸汽发生器里沸水中的气泡数量会随着局部气压和温度 的变化而改变,瞬时水位呈现“虚假液位”现象。正是由于“虚假液位”的存在使 得水位控制变得困难。将前馈控制引入到传统的单回路PID控制中,可以在一定程 度上克服“虚假液位”的问题。但是蒸汽发生器的传统PID控制仍然存在着一些不 足。对于具有高度复杂,大滞后,非线性特征的蒸汽发生系统,不仅?1。参数的调 整单调乏味,控制效果也很差。并且当条件改变时,为了获得好的控制性能,通常 需要改变PID控制器的参数,但是模拟量的PID控制器参数的在线调整是很难的。模 糊控制是一种基于模糊推理的非线性的控制方法,它体现了熟练操作人员的实
30、际经 验和模糊语言推理的一般规则。模糊控制不需要知道被控对象的精确的数学模型, 它对过程参数的变化并不敏感,鲁棒性很强,能够克服非线性因素,因此,模糊控 制有更快的响应速度,更小的超调,更好的控制效果。基于以上了解,本文设计了 一个蒸汽发生器水位的模糊控制器,仿真结果表明这个控制器有更好的控制效果和 实用价值。蒸汽发生器的动态特性压水堆蒸汽发生器一般形式的数学模型的传递函数如下所示:y(s)=GW(s)QW(s)+GS(s)QS(s)( 1)其中,y代表蒸汽发生器的水位;QW代表给水流量;QS代表蒸汽流量;GW代表给 水流量对蒸汽发生器水位的作用;GS代表蒸汽流量对蒸汽发生器的水位的作用。蒸汽
31、发生器水位的平衡是靠蒸汽流量和给水流量的匹配来维持的。可以将水位 随蒸汽流量或者给水流量变化而变化看作一个简单的一体化过程,蒸汽流量变化和 给水流量变化对水位的影响又是不同的。给水流量扰动下的动态特性假设蒸汽流量保持不变,而给水流量阶跃增加,一方面,由于新增给水的温度 要比蒸汽发生器中的饱和水的温度低很多,因此,当新水进入后就会吸收大量的额 外热量,水中的气泡含量大大减少,从而导致水位下降;另一方面,给水流量大于 蒸汽负荷,引起水位线性增加。综合以上两点,当给水阶跃增加,水位增长会有一 个延迟的过程,表现为先下降后上升。蒸汽负荷扰动下的动态特性假设给水流量保持不变,蒸汽负荷阶跃增加,一方面,由
32、于蒸汽流速比给水流 速大,水位会下降;另一方面,随着蒸汽负荷的增加,内部蒸汽压力降低,液面的 气泡容积增加,从而引起水位增加。综合以上两个因素,当蒸汽流量阶跃增加以后, 水位下降会有一个延迟的过程,表现为先上升后下降。给水流量或者蒸汽流量阶跃减少对水位的影响与上述有相似的原理。综上所述,当给水流量或者蒸汽负荷变化,水位不会立即跟随变化,开始会出 现一个相反的过程。这个现象就称为“虚假液位”现象。水位模糊控制器的设计传统PID控制器对于蒸汽发生器水位的控制效果不佳,存在“虚假液位”的现 象,表现为跟踪设定值时有较大的超调。但是,一个设计合理的模糊控制器能够克 服“虚假液位”的现象,有较好的控制效果。(1)模糊控制器的结构模糊控制器的结构如图1所示。图1蒸汽发生器水位模糊控制器的结构选择水位偏差(e)和偏差变化率(ec)作为模糊控制器的输入,模糊控制器的 输出量为阀门开度的增量信号Auo同时,以蒸汽流量作为前馈信号来克服“虚假液 位”现象,以给水流量作为内反馈信号来克服给水波动。k1,k2是给水流量和蒸汽 流量的传感器的转换系数。为了保证给水流量等于蒸汽流量,k1和k2应该相等。 (2)模糊理论、模糊子集和隶属函数e、ec和u的模糊论域是-6, 6,用NB (负大)、
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年银川客运资格证考试答题
- 吉首大学《教学技能训练2》2021-2022学年第一学期期末试卷
- 吉首大学《传感器原理及应用》2021-2022学年第一学期期末试卷
- 《机床夹具设计》试卷25
- 吉林艺术学院《音乐创作软件基础》2021-2022学年第一学期期末试卷
- 吉林艺术学院《三维设计基础与应用》2021-2022学年第一学期期末试卷
- 2024年共同合作农产品协议书模板
- 2024年供货合同范本21篇范文
- 2024年大宗交易互赔协议书模板
- 吉林师范大学《新闻伦理与法规》2021-2022学年第一学期期末试卷
- 《艺用透视学》教案
- 变压器磁芯参数表汇总
- 钢管及支架除锈及防腐施工方案
- 威斯敏斯特小要理问答(修正版)
- 制动系统设计计算报告
- 04-04寰枢关节错位型颈椎病
- 新型建筑材料结业论文
- TZZB2483-2021食品包装用耐蒸煮、高阻隔塑料复合膜、袋
- 四川省项目建设工作咨询3000以下收费标准
- 论《城南旧事》的叙事艺术
- (本范本为邀请从事经贸活动的香港邀请函样本,仅供参考)
评论
0/150
提交评论