


下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、摘要本设计包括三个部分:一般部分、专题部分和翻译部分。一般部分共包括 10 章:1.矿区概述及地质特征;2.境界和储量;3.矿井工作制度、设计生产能力及服务年限;4.开拓;5.准备方式带区巷道布置;6.采煤方法;7.井下矿井基本技术经济指标。;8.矿井;9.矿井通风与安全技术;10.一般部分为平煤二矿 1.8Mt/a 新井设计。平煤二矿位于省平顶山市,交长约 4.9 km,倾向长约 5.2 km,总面积为 25.48km2。主通便利。采煤层为四 1(戊 )煤,倾角 317,平均 8。煤层平均厚度为 3.45 m。210地质条件较为简单。工业储量为 197.18Mt,矿井可采储量 159.32
2、Mt。矿井服务年限为 63.2a,涌水量不大,矿井正常涌水量为 548 m3/h,最大涌水量为 1070 m3/h。矿井相对瓦斯涌出量为 5.94 m3/t,为低瓦斯矿井。根据地质条件,提出四个技术上可行的开拓方案。方案一:立井单水平上下山(岩石大巷);方案二:立井单水平上下山(煤层大巷);方案三:立井两水平暗斜井延深(岩石大巷);方案四:立井两水平暗斜井延深(煤层大巷)。通过粗略和详细技术经济比较,最终确定方案一为最优方案。一水平标高-430m,整个划分为 2 个带区和 2 个盘区。矿井采用 矿井采用带区式准备方式,工作面设计长度全高采煤工艺。矿井年工作日为 330d,昼夜净并列式通风方式。
3、200m,采用综合机械化一次采时间为 16h。矿井采用“四六”制工作制度,三班生产,一班检修。循环进尺为 0.6m,日产量为 5402.7t。专题部分题目为浅析巷旁充填技术的研究与应用。翻译部分题目为 Geotechnical considerations:新井设计,立井,单水平,带区,ine backfilling in Australia。并列式ABSTRACTThe three parts is includedand translation.his design,i.e.,teral part, spel subject partThis general part includes t
4、en chapters: 1.An outline of the mine field geology; 2.Boundary and the reserves of mine; 3.The service life and working system of mine;4.Development engineering of coalfield; 5.The layout of panels; 6. The method usedin coal mining; 7. Transporion of the underground; 8.The lifting of the mine; 9. T
5、heventilation and the safety operation of the mine; 10.The basic economic and technicalnorms.Tmillion t/a.eral part is a new design ofdingshan mine lines indingshan mine wiproduction of 1.8dengshan city, HeNan province. Thetraffic of road and railway is very convenience to the mine. The run of the m
6、inefield is 4.9 km ,the width is about 5.2 km, well farmland total area is 25.25 km2. No. 4 are the main coal seam, and its dip angle is 217, 8 for average. The thickness of the mine are about 3.45 m. The geological conditions of the minefield is relatively simple. The proved reserve of the minefiel
7、d is 197.18 Mt. The designed productive capacity is159.32Mt, and the service life of the mine is 63.2years. The normal water flow of the mine is 548 m3/h and the max flow of the mine is 1070 m3/h. The relativegas emisrate of the mineral well is 5.94 m3/t, for low gas mineral well.Based on the geolog
8、ical conditions of the mine, I bring forward four availableprojectechnology. Theis vertical shaft development with one mining levels,the deep extenof blind slope; the second is vertical shaft development with twomining levels; the third is vertical shaft development with one mining levels and thedee
9、p extenof blind slope,and the last is slope shaft development with two mininglevels. The four project is the best comparing with other three projectsechnologyo four strip he east andand economy. Themining level is -430m. The mine field is divideddistricts and one mining district. Takingo account the
10、 long distancewest direction, The type of mine ventilation is the centralized juxtae ventilation.Designedmining district makes use of the method of the mining districtpreparation. The design length of working face is 200 m, which uses fully mechanized mining with full-seam mining technology. The wor
11、king days in one year are 330. Everyday it takes 16 hours in lifting the coal. The operation mode in the mine is“four-six” with three teams mining and the other overhauling. Every mining teammakes three working cycle, and the overhauling team makesorking cycle. Soeveryday there are 6 working cycles. The advance of a working cycle is 0.6 m, and thety of 5402.7 ton coal is maked everyday.Spel subject part of topics is:ysis the study and applicatioon of roadsidepacking technology.The translated academi
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 幼儿园后勤工作计划范文(29篇)
- 提升县域中职教育质量的有效路径与对策
- 农村生活污水治理新策略与实施路径分析
- 滑雪场项目市场前景分析与投资策略
- 2025年安全应急装备行业发展趋势与市场机会分析
- 漆酶AhLAC48参与花生木质素合成及抗逆性的功能研究
- 2025至2030年中国粮食架盘天平市场现状分析及前景预测报告
- 2025至2030年中国粉蜡笔市场分析及竞争策略研究报告001
- 2025至2030年中国箱条数据监测研究报告
- 2025至2030年中国空调库市场分析及竞争策略研究报告
- 生态文明智慧树知到答案章节测试2023年
- GB/Z 26337.1-2010供应链管理第1部分:综述与基本原理
- 幼儿园绘本:《超级细菌王国》
- 土壤污染及防治课件
- 污水处理及配套管网工程-项目管理机构配备情况
- 视频编码技术课件
- 《2022年基础教育省级教学成果奖申报书》
- 道法《我们的公共生活》第一课时课件
- 科学教学仪器设备借用登记表(精品文档)
- 火灾报警系统安装检查记录
- 压力性损伤管理制度
评论
0/150
提交评论