版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、电气专业的英文自我评价和努力方向电气专业仅仅由别人的评价来判定自己是不全面的,当自己也沉淀下来,窥探自己的内心,写下自己的自我评价,这样才可以不断进 步。但是英文自我评价要怎么写呢?下面是为大家带来自我评价,相 信对你会有帮助的。电气专业的英文自我评价和努力方向篇一Graduated from * Technical University of Electrical Engineering and Automation, outstanding academic performance during the school, has entered the tutor electrical au
2、tomation laboratory for electrical component selection and functional testing, controller design and functional debugging, programming control and electrical systems Of intelligent control;After graduation, the company entered the State Power Automation Co., Ltd., is responsible for product design a
3、nd debugging, field equipment installation, commissioning and acceptance work for the hydropower station and power plants to provide monitoring equipment, proficient in the host computer and Under the machine system, various types of PLC and touch screen programming control; in the field during the
4、service has repeatedly praised by customers, to work seriously responsible, good communication, coordination has a strong organizational skills and team spirit, lively and cheerful, optimistic progress; Motivated, diligent in learning can continue to improve their own ability and overall quality. In
5、 the future work, I will be full of energy, assiduously study the spirit to work hard and steadily improve their ability to work with the simultaneous development of enterprises;电气专业的英文自我评价和努力方向篇二This year is coming to an end, in order to be able to work better in the next year, sum up experience, a
6、dhere to the advantages and correct deficiencies, according to company requirements, summarized as follows: in a years work, through the summary, although made some progress, A lot of shortcomings and deficiencies. As an electrical and mechanical workshop electrical technicians, in the production of
7、 work is only constantly sum up the lessons learned and found that in order to make their own faster progress.First, in-depth, solid workAs an electrical technician in the electromechanical workshop of the coal preparation plant, my main responsibility is to be responsible for the management of elec
8、trical technology in the electromechanical workshop, to work out the maintenance arrangement of the electrical equipment and the corresponding management rules and technical operation measures, organize the staff to do well in the business training; Often in-depth site, continue to promote new techn
9、ology and new technologies.Over the past year, I have been working hard, fulfilling my dutiesseriously, constantly improving myself from the technical and management level, and have made great achievements in all aspects. I work in the workshop with the same below the master of the workers, equipmen
10、t problems encountered actively to the scene to deal with failures, eliminate hidden dangers. Insist on the scene every day to check the operation of equipment, high and low voltage equipment for power supply and distribution; master production process of coal preparation to learn the principle of c
11、entralized control; understand the control signal routing layout, information transmission. Now many aspects have made great progress, for example: the communication 2 x x station system, the elevator running system, automatic control system concentrator, filter closed-loop control system, King conf
12、iguration system, pressurized filter system, the main Plant and new plant coal washing system, from shallow to deep grasp the basic control structure and principle of the system. So I have a very thorough understanding of the production process of coal washing, and have learned the knowledge and the
13、 actual production of effective combination for the future to better theory with practice, better promote the production, better reduce the workers The master of the labor intensity, more effective to improve labor productivity, for enterprises and the community to create more benefits laid a solid
14、foundation. Other aspects of meticulous improvement and completion of electrical safety regulations andmeasures to seriously monitor the implementation of the annual maintenance in the XX 11, through the replacement and overhaul of the transformer, but also learned a lot of things usually do not see
15、, so I coal washing Plant electrical equipment with a deeper understanding.Material plan to provide timely, comprehensive, accurate spare parts parameters is the guarantee of normal operation of the equipment, I am responsible for the electrical equipment materials plan to report work, at work, I ra
16、n the scene, check the problem, so that spare parts can be more comprehensive and reliable , To avoid the lack of spare parts and delay the status of production. And through the low-voltage power distribution room to find the problem, and other technical staff together proposed the transformation of
17、 low-voltage distribution room equipment plan, and through the production of selection, use, the basic solution to the production of spare parts for the purchase of passive, and Resulting in equipment failure problems. Low voltage power distribution room of the new plant are used in the domestic pro
18、duction of electrical components, AC contactor with the use of materials often aging, poor accessto auxiliary early, the signal is not normal and so on, after the decision to use imported Siemens contactor to transform it, So far, basically solved the problem caused by the contactor accident occurre
19、d, reducing the accident rate, a substantial increase in the driving rate, to ensure the normal production of coal washing.In the work, the first is strict on their own, do not allow the staff to do, their firm quit, for the field workers to set an example. In the implementation of the implementatio
20、n of procedural measures, the strict on-site, the work of a number of measures do not quit. The illegal behavior of workers and non-standard behavior resolutely stop. In the production of security incidents and accidents affecting the production of serious organizational analysis, do not go through
21、the motions, accountability does not take the form, so that the implementation of responsibility, education, alert everyones purpose. The second is to consider the work of small, so that the overall balance, that is, there are safety education and specific work arrangements, taking into account the
22、production and taking into account the electrical and mechanical and business, so that the face of all non-leakage control, the work done a layout, , There are checks. Third, pragmatic, through the daily study, and constantly improve their theoretical level, operational level, practical experience a
23、nd personal qualities. Fourth, a solid work, the work does not remain on the surface, not afraid of difficulties, not afraid of wounding, truth-seeking results, and further improve their management level.Second, join the technical innovation, never in innovationIn the work, seriously to the old comr
24、ades to learn, and constantly improve themselves, and use other time, learn more new knowledge.And actively participate in the plant plc program control system to the transformation, and achieved certain results, including the following: First, seriously involved in the flotation automation system,
25、and basically mastered the flotation automatic control system, mastered the The new control system, learned to solve and deal with problems in ways and methods; followed by the thickener automatic control system transformation, the OMRON plc with updated understanding; Third, the design of the plant
26、 ash measurement system configuration screen Designed to make better use of gray instrument in the production, to make the configuration screen, you can use the unit time of the various instantaneous ash, the unit time to calculate the average ash to solve the ash analyzer average ash value The desi
27、gn and transformation of the chain of 302 chain-link protection procedures, and in the configuration screen to add 302 chain-link chain protection alarm, reducing the chain once the parking chain will be mistaken for a broken chain protector Motion problems, and solve the previous chain protection d
28、evice action, the alarm can also start the car issue, reducing the electrician to determine the fault and solve the problem of processing time; Fifth, add the belt belt ash tester fault alarm device, the use of Ash measured ash content of the actual value, compared with the set percentage, when the
29、ash over 12.00ash, that is audible and visual alarm (now only the optical signal, not the use of sound alarm), the other is now on the ash measuring instrument Adjustments are being made to meet actual production requirements. So that the driver in accordance with the production needs of the timely
30、adjustment of ash to avoid excessive ash caused unnecessary losses.Third, shortcomings and shortcomingsAs the time to the coal preparation plant is still small, so in many aspects of technology and experience are inadequate, less problems encountered, the problem can not be handled handy. In the fut
31、ure work, we must adhere to run more than the scene, dare to find, solve and deal with problems encountered problems, never escape, humbly to the experienced veteran workers, the old master learning; In addition, the timely organization of lessons learned, Of the problem, do not understand the probl
32、ems are recorded, and seize the time to resolve the deal, do a good job in the record in order to encounter the same problem in the future, can be faster to deal with the organization. Serious study of management methods and methods to make their own production organization in the future, to better
33、complete the leadership of the work and tasks assigned. In previous work, consider the problem is often not comprehensive, do not consider the consequences of doing things, not only delayed their own, but also affected the others, in the future work and study, must strengthen the study to make thems
34、elves more quickly mature.Fourth, self-evaluationIn short, through a year of productive labor and technical learning, I thought and technically have been greatly improved and progress. That is, broaden the horizons, a wealth of knowledge, but also improve their management and operational level, the
35、most important thing is for their own work in the future, to better completion of the task to lay a good foundation.In the political and ideological aspects have also made great progress, I actively move closer to the party organization, through the cadre study, understanding of the social developme
36、nt of the new situation and new trends, deepened understanding and understanding of the Communist Party of China in the spirit of the 17th CPCNational Congress Under the guidance of more efforts to achieve individual ideological progress and leap in the struggle more than.Summed up the work of the p
37、ast year, that there are many problems and shortcomings. In the future work, only the continuous careful summary, found deficiencies, correct shortcomings, individuals can get faster progress. I think I work well. 电气专业的英文自我评价和努力方向篇三At present, he works in the domestic and international famous steel
38、enterprise engineering technology limited company (metallurgy grade A, civilian grade A), mainly engaged in the industry and the people electrical engineering project design work and the project manager work.Mainly for the iron and steel metallurgy, such as rolling, steel, sintering, ironmaking, che
39、mical and civil construction projects such as electrical design work, mainly involved in the design project are:Large-scale sintering desulfurization project, domestic sewage treatment, waste acid treatment, chemical companies for power distribution system transformation, lime cellar frequency and c
40、ontrol system transformation, a district police station and other industrial and civil project design work.Participate in the project both industrial electrical automatic control system design, and high and low voltage power supply and distribution systems, substations, transmission systems, residen
41、tial, office buildings and other public construction projects electrical design.Up to now, the company has completed more than 100 projects of large and small projects with more than 10 million yuan of investment, mainly in charge of department of electrical professional, chief engineer, registered
42、electrical engineer and project manager. 电气专业的英文自我评价和努力方向篇四Time flies, blink of an eye to the company has been a year, feeling a lot, a lot of harvest. Into the * City * Electrical Equipment Co., Ltd., for me is a good opportunity for development, is also a good exercise andenhance their ability to
43、various aspects of the opportunity. In this first special thanks to the leadership and colleagues to give me the strong support, care and help so that I can quickly adapt to the companys management system, and strive to do their jobs. Into the company, I seriously understand the companys development
44、 profile, learning the companys rules and regulations, familiar with the companys processes. At the same time, it is truly feel positive, inspiring corporate culture, so I benefited from. Now I work over the past year summarized as follows:First, solid workI entered the workshop from the sheet metal
45、 began to do chest box shell, can be said that the sheet metal shop is my first impression of the company. Have to say, in the sheet metal workshop a month, the master who gave me a good image, so I benefited.Last September, I went into the assembly workshop internship, I deeply feel my colleagues w
46、ork diligently, and strive to perfect the spirit. In the assembly workshop, I focus on access to relevant information, manuals, drawings and instructions to understand the operation of electrical equipment and principles, learning equipment layout, wiring, do row, the second line. Into the assembly
47、plant began, I know that their burden is very heavy, I always remember this sentence to give others a bowl of water, they will have a bucket of water. Because I know that in order to become a qualified technician is not an easy task, as a technician not only to be able to deal with the requirements
48、of customers, more importantly, to be able to solve the problems on the scene, on-site equipment operation Situation to be aware of.In May this year, following the installation team to Panzhihua, I seize the time familiar with the drawings, construction plans, drawings, the construction site managem
49、ent, acceptance and other requirements. In the face of difficulties and problems, take the initiative to consult the leadership, and design units and construction units to communicate and coordinate relations, in order to smooth the work of the project. The actual work, due to some local civil engin
50、eering changes and drawings, resulting in the wall without leaving holes, bridge and pipe unreasonable, need to open or re-layout to take the line, increase the workload, and after the leadership communication has been resolved. Therefore, in future work, I will pay attention to relevant knowledge,
51、so that their own from the civil, decoration, budget and other aspects of strengthening, good external coordination, and actively design units, construction units and government departments to communicate, to develop a good overall planning, Where the interests of the main companies.Second, efforts
52、to learn and progressIn the work, serious study, and constantly improve themselves, and the use of other time, learn more advanced knowledge. From the simplest manufacturing standards start to do a complete set of equipment, where both their own studious, but also inseparable from the workshop colleagues Q A FAQ. From the old engineer who I not only learned a lot, b
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 医院与清真食堂协议书
- N-Acetylglycine-Standard-生命科学试剂-MCE
- 花道-插花技艺养成学习通超星期末考试答案章节答案2024年
- 学校食堂安全卫生管理制度
- 消防应急灯安装工程安装方案
- 公司工作规章制度
- 零基础乐理教学课程设计
- 医院突发事件应急处置预案
- 友谊合伙合作投资合同协议书(2篇)
- 组织绩效管理制度
- 酒精戒断综合症的护理
- (高清版)TDT 1037-2013 土地整治重大项目可行性研究报告编制规程
- 山东省青岛市市南区2023-2024学年九年级上学期期中数学试题
- 爱国卫生工作培训课件
- 与某地政府医疗领域合作框架协议
- 外卖骑手劳动权益保障机制
- 卵巢癌腹腔化疗方案
- 双层罐改造施工方案
- 肿瘤放射规培出科小结
- 光通信芯片十大品牌简介
- 小学劳动教育一年级第一单元2《洗漱》教学设计
评论
0/150
提交评论