文本教程设备及op50press motor nov23_第1页
文本教程设备及op50press motor nov23_第2页
文本教程设备及op50press motor nov23_第3页
文本教程设备及op50press motor nov23_第4页
文本教程设备及op50press motor nov23_第5页
已阅读5页,还剩39页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、1. Sequence of Operation & Targets1.1. Process Sequence of operationMotor press force: TBD1.2. Process Output1.4. TargetsTargetST 50Cycle time (sec)20FTQ (%)0.34%Uptime (%)99.5%OP 50 target 1.1. Equipment Sequence of operationOperation Sequence:Unload FGLoad error proofing tooling on the motorLoad m

2、otor into the castingLoad casting on the toolingInitiate toggle switchDetecting Casting and motor presentsClamping the castingRead part label for traceability Press tooling go down, Check the motor directionpress motor to the correct position.Press tooling return.Unclamping the casting1.3. Part Orie

3、ntation and operator motionsLoad motor vertically inside casting motor boss3. Review Machine / Tooling Design Concepts3.1. Product print / KPC / QCINA3.2 Part to tool interface Components support areas Motor press zoneCylinder surface of motorCylinder surface of motorMotor press zoneMotor press zone

4、3. Machine Design ConceptsOperator load error proofing tooling on the motor Load motor and casting into the clamping toolingError proofing sensor for motor presents RF TAG reader for traceability.Servo drive the press tooling go down press motor to correct positionServo machinePress toolingClamp too

5、ling3. Tooling Design ConceptsPress toolingServo drive the tooling go down, Tooling touch the motor press zone.Press motor towards the bottom of motor bossPress force and stroke meet spec, Servo stop, then drive the tooling return.AA 3.7 Change over model to model3.7 Change over Change press tooling

6、 stroke Quick change tooling 3. Review Machine / Tooling Design Concept3.9 Standards for the RegionErgonomic standard.Machine height 2000 mm.Total Height 2200 mm.Bench height 900 mmWork area height 1100 mm Equipment Voltage: 380/220 Vac Frequency: 50 HzColor: light blue Akzo Nobel 51042. Review Prel

7、iminary Process Documentation2.1. Specific Documentation PFD2.2. Specific Documentation PFMEA2.3. Specific Documentation PCP9. Review Measurement & Calibration Methodology9.0 Review Measurement & Calibration MethodologyNA7.1. What is measured?NA7.2. How it is measured?NA7.5. Hardware requirementsNA1

8、8. Supplier Exceptions to the Equipment17. Equipment Timing Plan 17.1. Equipment timing plan11. Review MQ Plan11.2. Review MQ1 plan4. Review Electrical Design Concept4.1 Sensor strategy / error proofingThe equipment has the follow poke yokes:Load cell monitor the press forceDisplacement measure pres

9、s strokeSensor check motor presents5. Review Hydraulic Design Concept6. Review Pneumatic Design Concept7. Review Data acquisition & Measurement System Concept8. Review Machine Controls Program Design Concept10. Ergonomic / Safety Requirements12. Supplier Documentation Requirements12.Supplier Documen

10、tation Requirements13. Spare parts 14. Equipment Warranty Requirements14. Discuss warranty periodWarranty -Two years warranty from the validation date for workmanship and design.Technical support from supplier site by phone, support in site need be quote.15. Facility Utility Requirements15.1. Region

11、al StandardErgonomic std per Design- in Ergonomics Check list for China. Total equipment height 2.2 mtsVoltage 380/220 50 hzPressure Air 6 barOP 60 Motor assembly16. Shipping / Rigging / Installation Requirements16. Shipping/Rigging/ Installation requirement16.1 Shipping.Equipment will be send by lorry.16.2 Riggi

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论