1、水利工程三峡水利枢纽工程外文翻译文献(文档含中英文对照即英文原文和中文翻译)The Three Gorges ProjectsFirst. The dam site and basic pivot disposalThe Three Gorges Projects is select to be fixed on San Dou Ping in Yichang, located in about 40 kilometers of the upper reaches of key water control project of Ge Zhou Ba which was built. River
2、 valley, district of dam site, is widen, slope, the two sidesof the bank is relatively gentlely. In the central plains have one island (island, fort of China,), possess the good phased construction water conservancy diversion condition. The foundation of pivot building is the hard and intact body of
3、 granite. Have built Yichang and gone to stride bridge that place of 4 kilometers in the about 28 -km-long special-purpose expressway of building site and dam low reaches -West Yangtze Bridge of imperial tomb. Have also built the quay of district of a batch of dams. The dam district possesses the go
4、od traffic condition.Two. Important water conservancy project buildingsdamThe dam is a concrete gravity dam, which is 2309 meters long, it s height is 185 meters , the dam is 181 meters high the most. Release floodwater dam section lie riverbed, 483 of the total length, consist of 22 form hole and 2
5、3 release floodwater in the deep hole, among them deep hole is imported 90 meters , the mouth size of hole is 7*9 meters; Form hole mouth is 8 meter wide, overflow weir is 158 meters, form hole and deep hole adopt nose bank choose, flow way go on and can disappear. Dam section lies in and releases f
6、loodwater on a section of both sides of the dam in the hydropower station, there are hydropower stations that enter water mouth. Enter water mouth baseplate height 108 meters. Pressure input water pipeline for carry person who in charge of, interior diameter 12.40, adopt the armored concrete to rece
7、ive the strength structure. Make and let out flow of 102500 cubic meters per second the most largely in the dam site while checking the flood.power stationsThe power stations adopt the type after the dam to assign the scheme, consist of two groups of factory buildings on left, right and underground
8、factory building altogether. Install 32 sets of hydroelectric generating set together, 14 factory buildings of left bank among them, 12 factory buildings of right bank, 6 underground factory buildings. The hydraulic turbine, in order to mix the flowing type, the specified capacity of the unit of the
9、 unit is 700,000 kilowatts.open up to navigation buildingThe open up to navigation buildings include permanent lock and ship lift (of the the technological public relations, the steel cable that plans to be replaced with spiral pole technology in the original plan promotes technology), lie in the le
10、ft bank. Permanent lock double-line five continuous chain of locks. Single grades of floodgate room effective size for 280*34*5, can pass the 10,000 ton-class fleet. The promoting type for single track first grade vertically of the ship lift is designed, it is 120*18*3.5 meters to bear the effective
11、 size of design of railway carriage or compartment of ship, can pass a combination vessel of 3000 tons once. Total weight is 11800 tons to bear the design of railway carriage or compartment of ship when operating, it is 6000 newtons to always promote strength.Three. The major project amount and arra
12、nges in time limitThe subject building of the project and major project amount of the water conservancy diversion project are: Excavate 102,830,000 cubic meters in cubic metre of earth and stone, fill out and build 31,980,000 cubic meters in cubic metre of earth and stone, concrete builds 27,940,000
13、 cubic meters, 463,000 tons of reinforcing bars, make and fit 32 with hydroelectric generating set. All project construction tasks were divided into three stages and finished, all time limit was 17 years. The first stage (1993-1997 year) is preparation of construction and the first stage of the proj
14、ect, it takes 5 years to construct, regard realizing damming in the great river as the sign. The second stage (1998-2003 year) is the second stage, it takes 6 years to construct, lock as initial conservation storage of the reservoir, the first batch of aircrews generate electricity and is open up to
15、 navigation with the permanent lock as. The third stage (2004-2009 year) is the third stage of the project, it takes 6 years to construct, regard realizing the sign all aircrews generate electricity and finish building with all of multi-purpose project as. One, two project finish as scheduled alread
16、y, the third stage of the project in inside the plan to construct too, ship lift tackle key problems of not going on intensely.Four. Enormous benefit of the Three Gorges ProjectsThe Three Gorges Projects is the greatest water control project in China ,also in the world , it is the key project in con
17、trolling and developing the Changjiang River. The normal water storage level of the Three Gorges Projects reservoir is 175 meters, installed capacity is 39,300 million cubic meters; The total length of the reservoir is more than 600 kilometers, width is 1.1 kilometers on average; The area of the res
18、ervoir is 1084 sq. km. It has enormous comprehensive benefits such as preventing flood, generating electricity, shipping,etc.prevent floodPrimary goal of building the Three Gorges Projects is to prevent flood . The key water control project in Sanxia is the key project that the midstream and downstr
19、eam of the Changjiang River prevent flood in the system. Regulated and stored by the reservoir of Sanxia, form the capacity of reservoir in the upper reaches as river type reservoir of 39,300 million cubic meters, can regulate storage capacity and reach 22,150 million cubic meters, can intercept the
20、 flood came above of Yichang effectively, cut down flood crest flow greatly, make Jingjiang section prevent flood standard meet, improve from at present a about over ten years to once-in-a-hundred-year. Meet millennium first special great flood that meet, can cooperate with Jingjiang flood diversion
21、 partition application of flood storage project, the crushing calamity of preventing the occurrence of both sides of section of Jingjiang and bursting in the main dike, lighten midstream and downstream losing and flood threat to Wuhan of big flood, and can create conditions for administration of Don
22、gting Hu district.generates electricityThe most direct economic benefits of the Three Gorges Projects is to generate electricity . Equilibrate the contradiction that contemporary China develops economic and serious energy shortage at a high speed, the hydroelectric resources that a clean one can be
23、regenerated are undoubtedly optimum choices. The total installed capacity of power station of Sanxia is 18,200,000 kilowatts, annual average generation is 84,680 million kilowatt hours. It will offer the reliable, cheap, clean regenerated energy for areas such as East China, Central China and South
24、China of economic development, energy deficiency,etc.It play a great role in economic development and environmental pollution of reducing.Electric power resource that the Three Gorges Projects offers, if given a workforce of electricity generation by thermal power, mean building 10 more thermal powe
25、r plants of 1,800,000 kilowatts, excavate more 50 million tons of raw coals every year on average. Besides environment of influencing of the waste residue, it will also discharge a large number of carbon dioxide which form the global greenhouse effects every year, cause the sulfur dioxide of acid ra
26、in, poisonous gas carbon monoxide and nitrogen oxide. At the same time, it will also produce a large amount of floating dust, dustfall,etc. Thermal power plant and abandon dreg field extensive occupation of land seize more land from East China, Central China area that have a large population and a f
27、ew land just originally this. This not only makes China bear the pressure that greater environment brings in the future, cause unfavorable influence on the global environment too.shippingSanxia reservoir improve Yichang go to Chongqing channel of the Changjiang River of 660 kilometers notably, the 1
28、0,000 ton-class fleet can go to the harbour of Chongqing directly. The channel can rise to 50 million tons from about 10 million tons at present through ability in one-way year, transporting the cost can be reduced by 35-37%. Unless until reservoir regulate, Yichang low water flows minimum seasons d
29、ownstream,whose name is can since at present 3000 cubic meters /second improve until 5000 cubic meters per above second, the shipping condition get greater improvement too to enable the Changjiang River in low water season of midstream and downstream.Five. The questions in building the Three Gorges
30、Projectssilt issuethe Changjiang River Yichang Duan Nian amount of sand failed 530 million tons, silt the reservoir of Sanxia up. The reservoir blocks water level is 175 meters high, installed capacity is 39,300 million m 3 normally,its die water level is 145 meters, the minimum capacity of a reserv
31、oir is 17,200 million m3, storage capacity 22,100 million m3, the conservation storage regulates the capacity of reservoir 16,500 million m3. The operation scheme of the reservoir is: Limit height is 145 meters of water level, in flood season, meet flood adjust big under56700 m3 per second, and powe
32、r stationsmooth to let out through deep hole over 3 years, can reduce the sand of the reservoir to deposit. Great flood comes, the reservoir is adjusted bigly, still put and let out 56700 m3 per second; Deposit towards the reservoir after the flood. The reservoir begins conservation storage, between
33、 about two months and normal water storage level 175 meters high in September. The water level of the storehouse is dropped to 155 meters high before the flood next year, utilize conservation storage to generate electricity. In 155 meters water level, can keep the river shipping of Sichuan. By flood
34、 season, the water level was dropped to 145 meters water level again, because the flow was large at that time, could keep the river shipping of Sichuan. This is a reservoir operation scheme of innovation.question that the slope comes down by the bank of reservoir areaThe question that the slope come
35、s down is through detailed geological survey by 2 reservoir area banks, there is several to come down potentially on water bank of Kuku of Sanxia, the big one can be up to millions of m3. But closest to dam site potential landslide, too far on 26 kilometers, such as happen, come down, shock wave tha
36、t evoke get dam disappear, reduce 2-3 meters to to be high, it is safe not to influence the dam. In addition, if the slippery wave happens in the bank of the storehouse, because the reservoir is wide and deep, will not influence shipping.engineering question of the pivotThe pivot of Three Gorges is
37、185 meters high concrete gravity dam pivots and 18,200,000kW, the project amount is large, but all regular projects after all, our country has more experience. The stability problem of some foundation can meet the safe requirement through dealing with. 700,000kW hydroelectric generating set, importe
38、d from foreign countries in the first batch, was made by oneself at home later. The more complicated one is lock of five grades of Line two, deep-cut in the rock bank, slope reaches 170 meters at the supreme side, the underpart floodgate room vertical 60 meters, high rock slope stability worries abo
39、ut. But the meticulous research of engineer and constructors is designed, blown up and the anchor is firm and excavating, the rock slope is steady in a long-term. There is ship lift of 3000t passenger steamer, it is the biggest in the world, in course of designing and studying, and repair the test a
40、nd use the ship lift first.ecological environment problemThe respect useful to ecological environment of the Three Gorges Projects is: Prevent and cure downstream land and cities and towns to flood, reduce the air pollution of electricity generation by thermal power, improve some climate, the reserv
41、oir can breed fish etc. The respect disadvantageous to ecology is: Flood more than 300,000 mu of cultivated land, ground of fruit is more than 200,000 mu, immigrants reach the highland by the storehouse, will destroy the ecological environment, the still water weakens the sewage self-purification ab
42、ility, worsen water quality, influence reproduction of the wild animal,etc. in the reservoir. So is both advantageous and disadvantageous, do not hinder building the Three Gorges Projects. Should reduce being unfavorable to minimum extent, it is mainly that reservoir immigrants want to plant trees a
43、nd grass, build the terraced fields, ecological environment protection, does not require the self-sufficiency of grain. Accomplish these, want making a great effort and fund. Control blowdown such as Chongqing, Fuling, Wan County, carry on sewage disposal, protect the water quality of the reservoir,
44、 protect the wild animal, set up the protection zone. Although ecological environment protection is difficult, must solve and can solve. As for the scenery of Sanxia, because the high near kilometer of rock bank, and Sanxia dam is only in fact higher than the river surface 110 meters. The scenery ba
45、sically remains unchanged, the high gorge produces Pinghu, increase even more beautifully.Six. Immigrants question in the reservoir areaThe reservoir of Sanxia will flood 632 sq. km. of land area, will involve Chongqing, 20 county (market) of Hubei. The reservoir of Sanxia floods and involves 2 citi
46、es, 11 county towns, 116 market towns; Flood or flood 1599 of industrial and mining enterprises that influence, reservoir flood line there are 24,500 hectares of cultivated land in all; Flood 824.25 kilometers of highways, 92,200 kilowatts of power stations; The area of house of flooding area is 34,
47、596,000 square meters, total population of living in the flooding area is 844,100 people (agricultural population 361,500 people among them). Consider population growth and other factors of moving etc. two times during construction, the total population of trends of reservoir immigration allocation
48、of Sanxia will be up to 1,130,000 people. The task is arduous, but must find a room for good immigrants, make its life improve to some extent, help immigrants to create the working condition, live plainly and struggle hard through 20 years, grow rich. Most immigrants retreat to the highland, it is n
49、onlocal that some immigrants get. The reservoir of Sanxia will flood 632 sq. km. of land area, will involve Chongqing, 20 county (market) of Hubei. The reservoir of Sanxia floods and involves 2 cities, 11 county towns, 116 market towns; Flood or flood 1599 of industrial and mining enterprises that i
50、nfluence, reservoir flood line own cultivated land (suck the ground of mandarin orange) 24,500 hectares in common; Flood 824.25 kilometers of highways, 92,200 kilowatts of power stations; The area of house of flooding area is 34,596,000 square meters, The total population of living in the flooding a
51、rea is 844,100 people (agricultural population 361,500 people among them). Consider population growth and other factors of moving etc. two times during construction, the total population of trends of reservoir immigration allocation of Sanxia will be up to 1,130,000 people.exploration and opening of
52、 the immigrants in SanxiaThe exploration of an immigrant in Sanxia and open country are in the engineering construction of Sanxia, implement immigrants policy of the exploration, relevant peoples governments organize and lead immigrants to arrange work, use immigrants funds in a unified manner, expl
53、oit natural resources rationally, based on agriculture, the agriculture,industry and commerce combine, through many channel, many industries, multi-form, many method find a room for immigrants properly, immigrants living standard reach or exceed originally and competently, and create the condition f
54、or long-term economic development and improvement of immigrants living standard of reservoir area of Three Gorges. Immigrants policy of the exploration, is a great reform of the reservoir immigrants of our country. Policy this, and reservoir area of Three Gorges immigrant put forward at the foundati
55、on of pilot project eight year in experience and lessons that immigrant work since new China set up of summarizing. At the beginning of reservoir immigrants in Sanxia, carry out exploration immigrants principles and policies, insist the country supports, the policy is favourable, each side supports,
56、 principle of relying on ones own efforts, appeared by the government, develop local resources in a planned way, expand the capacity of placing, help, offer service of forming a complete set, wide to open up, produce the life way, make it reach take out offing, goal that so steady as to live, can ge
57、t rich progressively . Meanwhile, the country approves reservoir area of Three Gorges as the open economic region of Sanxia , enjoy some special policies opening to the outside world in the coastal area, call the immigrants in Sanxia of the developed coordinated cooperation of province and city, imm
58、igrants enterprises and relevant The factor of production has been pushed to the broader large market. The governments at all levels of reservoir area of Three Gorges have issued some development coordinated cooperation, favourable measure inviting outside investment too. Reservoir area immigrant de
59、monstrate with open to urge, develop, in order to develop, urge benign situation that place.reorganization and expansion of the immigrants in SanxiaThe reorganization of immigrants in Sanxia and the expansion immigrants in Sanxia are that one involve undertaking that the society of reservoir area re
60、construct, resources are recombinated, the recombinating is one of the prominent characteristics of the immigrants in Sanxia, move the fundamental difference duplicated with traditional simple compensation immigrants, former state too. Implement immigrants policy of the exploration, must demand to c
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 健身房砌墙施工合同
- 幼儿园景观照明电工招聘
- 保健分公司管理手册
- 知识产权侵权行为处罚办法
- 商业促销设备短期租赁合同
- 旧城改造项目密封条样本
- 建筑咨询项目经理施工协议
- 商铺自动门施工合同
- 剧院音响租赁合同
- 环保信息化管理行动计划
- 胃癌根治术的手术配合课件
- 安吉游戏培训课件(全)
- 高边坡专项施工方案 (需专家论证)
- 餐饮服务和管理说课名师优质课赛课一等奖市公开课获奖课件
- DB21T 3314-2020 生物炭直接还田技术规程
- 股骨颈骨折课件课件
- (中职)化工总控工应会技能基础模块1 化工生产准备-1-化工生产过程认知教学课件
- 小学主管后勤副校长岗位职责共3篇 学校后勤副校长岗位职责
- 钎探数据记录
- 施工电梯安装(拆卸)安全技术交底
- 北京应急指挥系统建设
评论
0/150
提交评论