版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、synchronous backup software does not respond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. Offsite backups that must be supported across networ
2、k segments. In accordance with the above requirements for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing source Huan of Hubei industrial investment company limited
3、 factory close to the planning of the day looks like, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I quickly people with loyalty to the cause of security, as well
4、 as previous security experience, combined with peer pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65M x 234
5、.24M rectangular site. 1.2 scope for such dachangqu, I recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. Because the factory could not spend a great deal of manpower cost to post thr
6、ee steps, five steps and a whistle. As we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. In order to better achieve the goal of planners, as well as for Active solid border defense work. We recommend that you use infrare
7、d radiation or linkage of electronic fences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electronic equipment as well as
8、 video surveillance equipment, the specific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your companys site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with reference to the relevant int
9、ernational standards and national standards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. If the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. Second, the design princip
10、les of the project design follows technology advanced, functional, stable and cost-saving principles. And considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. Design elements of the system is the system
11、atic, integrated and comprehensive; design has the scientificity, reasonability and operability. Its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex strong, upgrade easy, used
12、 module type structure, expansion convenient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simple, easy master, for Ch
13、ina conditions and this project of features. Set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. While the system is the system used for various management levels, i
14、ts functions are configured to provide the user with comfortable, safe, fast and convenient to3.1, the intelligent building design standards (GB/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (DB32/191-1998) 3.3, the code键入文字synchronous backup software does not r
15、espond to the rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. Offsite backups that must be supported across network segments. In accordance with the abo
16、ve requirements for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing source Huan of Hubei industrial investment company limited factory close to the planning of the
17、day looks like, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I quickly people with loyalty to the cause of security, as well as previous security experience, comb
18、ined with peer pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65M x 234.24M rectangular site. 1.2 scope for s
19、uch dachangqu, I recommend the solid border security deployment, for a range of reasons, whether we use infrared radiation, electronic fences, alarm had done there, where the response. Because the factory could not spend a great deal of manpower cost to post three steps, five steps and a whistle. As
20、 we all know, under the current form of human resources costs much higher than the cost of all scientific and technological input. In order to better achieve the goal of planners, as well as for Active solid border defense work. We recommend that you use infrared radiation or linkage of electronic f
21、ences with video security deployment to achieve security goals. 1.3 in accordance with the device on the wall of the compound properties and parameters to a reasonable plan to install the infrared radiation equipment or fences and electronic equipment as well as video surveillance equipment, the spe
22、cific needs of the equipment and materials quantities we will detail later. 1.4 the programme according to your companys site to see and listen to the leadership proposal, and in accordance with the actual needs of the project, with reference to the relevant international standards and national stan
23、dards, combined with the experience accumulated by the company engaged in multiple projects, prepare the technology package. If the contents or any other aspect of the programme has not detailed where we welcome your valuable comments. Second, the design principles of the project design follows tech
24、nology advanced, functional, stable and cost-saving principles. And considering construction, maintenance and operation, and for future development, expansion, reconstruction and other factors leave room for expansion. Design elements of the system is the systematic, integrated and comprehensive; de
25、sign has the scientificity, reasonability and operability. Its has following principles: 2.1, and advanced and applicability used currently most advanced of soft, and hardware and the network technology, errors rate low, compatible sex strong, upgrade easy, used module type structure, expansion conv
26、enient, no repeat construction investment, system of technology performance and quality index should reached international leading level; while, system of installation debugging, and software programming and operation using and should simple, easy master, for China conditions and this project of fea
27、tures. Set the number of advanced technology in a the systems, reflects the current level of the latest development of computer and network technology, adapted to the requirements of the times. While the system is the system used for various management levels, its functions are configured to provide
28、 the user with comfortable, safe, fast and convenient to3.1, the intelligent building design standards (GB/t 50314-2000) 3.2, the design standard for intelligent building systems engineering (DB32/191-1998) 3.3, the codefor engineering design of generic cabling system for city residential buildings
29、(CECS/119-2000) 3.4, code for design of buildings and campus cable systems engineering (GB/T50311-2000) 3.5, the code for electrical design of civil buildings (JGJ/ T16-92) 3.6, the code for civil closed circuit monitoring TV system engineering technology (GB/50198-94) 3.7, the types of system earth
30、ing and safety technical requirements (GB14050-93) 3.8, of the security engineering procedures and requirements (GA/T75-94) 3.9, the rules of security engineering acceptance (GA/T308-2001) 3.10, the industrial design of TV system code (GBJ 115) 3.11, the Security checks prevention system pass for gr
31、aphics symbol (GA/74-94) 3.12, and fire linkage control equipment General technology conditions (GB 16806-1997) four, and system function and features in system both advanced, and practical, and mature, and reliable, and do system open, and can extended sex good, both investment reasonable, and bene
32、fits best of purpose, border security alarm system on site equipment for concentrated monitored, and control and management, makes these equipment to security, and reliable, and efficient to run, Maximize intelligent management role to create a safe, healthy, comfortable and pleasant, and to improve
33、 the efficiency of a good environment and save energy, and reduce maintenance personnel. According to the projects environmental needs, and engagement functions to establish the project boundary security alarm system, in a Word, this boundary is a project of the security alarm system is highly autom
34、ated and efficient hospitality for a comfortable, convenient, and highly secure environment. Five, scheme design based on design principles, design specifications and according to international and domestic standards, and in accordance with user needs, as well as drawings and related information pro
35、vided by, and joining the projects actual situation and future development trends, border security alarm systems for the project design. 5.1. principle of system and burglar alarm system from detectors, regional directors, and the alarm control centre composed of three parts. Its principles as in th
36、e following chart: detectors for burglar alarm system is inside and outside the building in key areas, important places, protection, when the probe to illegal invaders, the signal transmitted to the alarm control: sound and light alarm, display address, about the person on duty after receiving the a
37、larm, take measures according to the situation, to control the development of the situation. Anti-theft alarm system alarm function in addition to the above, there is linkage function. Such as: open the alarm light (including infrared lamp), interactive audio and video matrix controller, switch on t
38、he alarm camera on the spot, matrix controller TV series of control: monitor displays an image, video footage, multimedia controller automatic or human . 8.1 the three guarantees period warranty 1, warranty 1) service period from date of acceptance of engineering, a 1-year warranty, warranty process
39、ing is completed within the response time is 48 hours. 2) service within the warranty period, we all accessories unconditional warranty for all equipment and replacement, all parts for all equipment (including all machine parts) maintenance and parts are free and provide on-site cleaning, test equip
40、ment services. During the warranty period, all equipment repair and maintenance services for on-site services, the resulting fees are waived. Free for system expansion, upgrade-related technical support services. 3) system warranty contact information to provide users with free technical advice, det
41、ailed answer to any problem in the system, to ask, answers will come detail. In the users if unable to solve the problems by themselves, directly by telephone, fax, Internet, letter, such as getting in touch with my company (which calls for 24-hour service), we will respond within 4 hours, consultat
42、ion with users to solve the problem. 2, service response times, we are committed to the warranty period on the operation of the system on a regular basis carry out comprehensive inspections, found that the problem solving on the spot,for engineering design of generic cabling system for city resident
43、ial buildings (CECS/119-2000) 3.4, code for design of buildings and campus cable systems engineering (GB/T50311-2000) 3.5, the code for electrical design of civil buildings (JGJ/ T16-92) 3.6, the code for civil closed circuit monitoring TV system engineering technology (GB/50198-94) 3.7, the types o
44、f system earthing and safety technical requirements (GB14050-93) 3.8, of the security engineering procedures and requirements (GA/T75-94) 3.9, the rules of security engineering acceptance (GA/T308-2001) 3.10, the industrial design of TV system code (GBJ 115) 3.11, the Security checks prevention syst
45、em pass for graphics symbol (GA/74-94) 3.12, and fire linkage control equipment General technology conditions (GB 16806-1997) four, and system function and features in system both advanced, and practical, and mature, and reliable, and do system open, and can extended sex good, both investment reason
46、able, and benefits best of purpose, border security alarm system on site equipment for concentrated monitored, and control and management, makes these equipment to security, and reliable, and efficient to run, Maximize intelligent management role to create a safe, healthy, comfortable and pleasant,
47、and to improve the efficiency of a good environment and save energy, and reduce maintenance personnel. According to the projects environmental needs, and engagement functions to establish the project boundary security alarm system, in a Word, this boundary is a project of the security alarm system i
48、s highly automated and efficient hospitality for a comfortable, convenient, and highly secure environment. Five, scheme design based on design principles, design specifications and according to international and domestic standards, and in accordance with user needs, as well as drawings and related i
49、nformation provided by, and joining the projects actual situation and future development trends, border security alarm systems for the project design. 5.1. principle of system and burglar alarm system from detectors, regional directors, and the alarm control centre composed of three parts. Its princ
50、iples as in the following chart: detectors for burglar alarm system is inside and outside the building in key areas, important places, protection, when the probe to illegal invaders, the signal transmitted to the alarm control: sound and light alarm, display address, about the person on duty after r
51、eceiving the alarm, take measures according to the situation, to control the development of the situation. Anti-theft alarm system alarm function in addition to the above, there is linkage function. Such as: open the alarm light (including infrared lamp), interactive audio and video matrix controlle
52、r, switch on the alarm camera on the spot, matrix controller TV series of control: monitor displays an image, video footage, multimedia controller automatic or human . 8.1 the three guarantees period warranty 1, warranty 1) service period from date of acceptance of engineering, a 1-year warranty, wa
53、rranty processing is completed within the response time is 48 hours. 2) service within the warranty period, we all accessories unconditional warranty for all equipment and replacement, all parts for all equipment (including all machine parts) maintenance and parts are free and provide on-site cleani
54、ng, test equipment services. During the warranty period, all equipment repair and maintenance services for on-site services, the resulting fees are waived. Free for system expansion, upgrade-related technical support services. 3) system warranty contact information to provide users with free technic
55、al advice, detailed answer to any problem in the system, to ask, answers will come detail. In the users if unable to solve the problems by themselves, directly by telephone, fax, Internet, letter, such as getting in touch with my company (which calls for 24-hour service), we will respond within 4 ho
56、urs, consultation with users to solve the problem. 2, service response times, we are committed to the warranty period on the operation of the system on a regular basis carry out comprehensive inspections, found that the problem solving on the spot,synchronous backup software does not respond to the
57、rest of the data to be modified. In order to ensure maximum server exception, saving some data, synchronization of real-time backup software should have high, that delay does not exceed 1 minute. Offsite backups that must be supported across network segments. In accordance with the above requirement
58、s for development our dedicated backup software. After development, wing that opened in salt on high speed test results meet the design requirementsWith the passing of time, it is preparing source Huan of Hubei industrial investment company limited factory close to the planning of the day looks like
59、, planning human ideals gradually into an entity, spread out before us. Security plan enters the deployed State. After listening to your business objective for the leaders of security, I quickly people with loyalty to the cause of security, as well as previous security experience, combined with peer
60、 pioneers of success stories or experiences. Border security on your business ideas and suggestions to make as follows: 1.1 after careful analysis of a blueprint of the enterprise, taking into account your enterprise factory boundary: 540.65M x 234.24M rectangular site. 1.2 scope for such dachangqu,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 《电子商务法律规范》课件
- 房地产营销技能培训-闵新闻
- 脱硫故障快速检测技术-洞察分析
- 协作机制创新与实践-洞察分析
- 隧道防水施工质量控制-洞察分析
- 微波辅助催化反应器在危废处理中的应用-洞察分析
- 网络舆论生态安全-洞察分析
- 虚拟现实技术在CRM客户体验中的应用研究-洞察分析
- 遥感信息在资源调查中的应用-洞察分析
- 铁路基础设施检测-洞察分析
- 新入职员工年终工作总结课件
- 静脉导管维护
- 年度先进员工选票标准格式
- 患者告知及知情同意签字制度
- 公司各中心事业部独立核算运营实施方案
- 幼儿园大班综合《我们和手机》课件
- 中小企业内部控制与风险管理(第二版)项目五:销售业务内部控制与风险管理
- 中铁二局工程项目全员安全教育培训考试试题(普工)附答案
- 08坦白检举教育
- 10、美的微波炉美食创意拍摄脚本
- 07FK02防空地下室通风设备安装PDF高清图集
评论
0/150
提交评论