1、安全系統設計主要元件Security System Design Elements授課老師:黃俊能1主要工具THE TOOLSThe tools of design includedrawings, 設計圖specifications, 產品規範標準Interdiscipline coordination, 領域整合協調product selection,產品選擇project management, 專案管理client management. 客戶管理2設計圖DrawingsDrawings are the heart of the design.設計圖是設計案件的核心Drawings s

2、hould show the following包含以下The relationship of devices to their physical environment (plans, elevations, and physical details) 所有安全設備與實體環境之關係 (平面、高度建築物實體細節)The relationship of devices to the conduit system and to power (plans and risers) 所有安全設備與電路及電源之關係(平面及高度)The relationship of devices to each oth

3、er (single line diagrams) 所有安全設備與其他之關係(單線圖)The relationship of devices to the user (programming schedules) 所有安全設備與使用者之關係(時程考量)3設計圖DrawingsDrawings must serve five distinct types of users 設計圖必需服務五個主要使用者:1. The bid estimator: 標案估價師Helpful drawing tools include device schedules (spreadsheets listing de

4、vices and their attributes) 有用的設計圖應包含有設備的清單及設備的功能屬性 and plans showing device locations and conduit lengths, sizes, and wire fills. 設備裝置之位置、線路尺寸、長度、大小Other drawings useful to the bid estimator include single line diagrams, riser diagrams, and system interfacing diagrams. 各種線路圖4設計圖Drawings2. The insta

5、ller 安裝(工人)者:The installer needs drawings that show both the big picture and the smallest details. Therefore, it is helpful if the drawings are formatted in a hierarchical fashion.對安裝者而言,有用的設計圖應該是有層級清楚的說明。Single lines show the big picture. Plans show device locations and their relationship to the bu

6、ilding and conduit system.單線圖展現全圖概念,平面圖展現設備位置及建築物與電源關係Physical details and interface details show the smaller details. 建物實體細節及界面展示各細部之內容5設計圖Drawings3. The project manager專案經理:The project manager needs to manage the progress (管理所有程序)Installation 安裝, including coordinating the ordering and arrival of

7、parts and supplies and coordinating manpower to the project at the correct time,in the correct place 正確位置, and in coordination with other trades to get all devices mounted and all connections made.He or she will primarily rely on schedules完全依賴設計圖說所提供之指示for provisioning logistics, 後勤plans to measure

8、installation progress, 安裝計畫and single line diagrams to gauge how close the system is to start-up. 確認系統啟用6設計圖Drawings4. The maintenance technician 維護技師:維護工作是非常重要且煩瑣之工作will need single line diagrams to determine how the system interconnects, plans to determine where devices are located and how they co

9、nnect in the physical space, and risers and power schedules to know where to go from floor to floor and the source of power for each device.需要了解系統的各項細節、系統固定維護時程及所有維修資源之細項內容The integrator should be required to provide maintenance manuals that have all these drawings.提供必要之維護手冊7設計圖Drawings5. The next e

10、ngineer expanding the system下次系統擴充展延之需求:Many systems undergo expansion on an irregular basis.許多系統並無統一規定next engineer will need all of drawings in order to understand how to expand the system. 下一位工程師需要所有相關圖說,以方便了解如何擴充系統之展延The client should receive all your drawings in AutoCADR form and specifications

11、 in Adobe PDF form. 交付客戶時,應該有所有以AutoCAD 軟體為基礎之圖,及PDA為基礎之之文件說明。8產品規範標準SpecificationsIf drawings are the heart of the design, specifications are the head. 產品規範標準與設計圖亦是同樣重要的地位Specifications generally take precedent in legal disputes. 是重要的法律糾紛前例Specifications should includea description of what the proj

12、ect entails;descriptions of the whole integrated system and each subsystem;a description of the services the contractor will provide;and a list of acceptable products and acceptable installation, testing, acceptance, training, and warranty practices.9產品選擇Product SelectionSpecifying the correct produ

13、cts for the job can result in a wonderful system that can easily exceed the owners expectations. 正確產品選擇可達到業主的滿意期待The wrong products can leave the owner upset with the installer, the manufacturer, and the designer. 錯誤產品選擇造成工作專隊的困擾If the owner suffers, everyone suffers. The operator suffers, the maint

14、enance tech suffers, the integrator who has to listen to an unhappy client suffers, the manufacturer suffers, and the industry suffers.系統整合者必需非常小心查驗產品所帶給所有人的感受,如果客戶使用上覺得痛苦不好用、所有團隊成員都會覺得痛苦。連帶產業都會有所影響。Respect the clients interests in product selections. Have a pure heart on this. 重視客戶的興趣與選擇,是產品選擇的重要關鍵

15、。10領域整合協調Interdiscipline CoordinationThis is where enterprise and integrated security systems make it or break it. 成敗之關鍵Some designers are especially adroit at coordinating the interfaces of related systems. Their interfaces work beyond all expectations and their clients are extremely satisfied. 系統設

16、計師之經驗直接影響業主的滿意度a challenge to design an alarm/CCTV/voice communications system to protect an unmanned offshore oil platform where there was only a 60-kb satellite up/downlink throughput and only 24 watts of power available to power the security system equipment. 作者曾經有過的經驗:整合警示/CCTV/語音在無人的海岸石油平台,該系統只

17、有60-kb衛星傳輸及24 watts電力之安全設備11領域整合協調Interdiscipline Coordination原設計:A normal system design would have required the client to spend an additional $6,000 per month on satellite throughput and a new capital investment of $100,000 in additional solar panels to power it. (將花掉業主大量的費用,額外安裝衛星傳輸及太陽能發電設備)作者的創作設

18、計:Our design incorporated the existing satellite throughput and required no additional power investment. (整合現有衛星傳輸及無增加任何的用電投資)This was done with off-the-shelf equipment simply by using an existing SCADA system and programmable logic controller to do alarm processing instead of adding a separate alar

19、m system and by manipulating the video data packet size and system operation so that only one camera was ever on the satellite at one time to limit video throughput. (增加了控制系統及邏輯運算器而把警示器程序整合,最後只使用一個攝影機設備即解決了衛星傳輸的問題)12領域整合協調Interdiscipline Coordination原設計:A normal system design would have required the

20、 client to spend an additional $6,000 per month on satellite throughput and a new capital investment of $100,000 in additional solar panels to power it. (將花掉業主大量的費用,額外安裝衛星傳輸及太陽能發電設備)作者的創作設計:Our design incorporated the existing satellite throughput and required no additional power investment. (整合現有衛星

21、傳輸及無增加任何的用電投資)This was done with off-the-shelf equipment simply by using an existing SCADA system and programmable logic controller to do alarm processing instead of adding a separate alarm system and by manipulating the video data packet size and system operation so that only one camera was ever on

22、 the satellite at one time to limit video throughput. (增加了控制系統及邏輯運算器而把警示器程序整合,最後只使用一個攝影機設備即解決了衛星傳輸的問題)13領域整合協調Interdiscipline Coordination作者其他創見:sequenced one frame of video at a time across the satellite link in order to prevent contention between the cameras or trying to stuff too much data across

23、 a too small pipe. This sort of design expertise makes very happy clients and can be the difference between impossible and doable designs. (調整資料傳輸前後順序,解決了大量資料一次傳輸的大量傳輸需求)14專案管理Project ManagementDesign project management is all about delivering a design that meets the clients needs, the integrators n

24、eeds, and the clients project managers needs. 專案經理的重要任務是滿足業主的需求、整合者的需求、及業主專案管理的需求The designer must do all this while working on other projects; he or she must provide the project deliverables on time and complete, and keep all parties happy. 設計者需要使各專案在即定時程及各項要求下完成,提供所有專案成員歡愉的工作環境與流順。Project manageme

25、nt has four main phases(四階段):Initiating the project 啟始專案Planning the project 規劃專案Executing the project 執行專案Controlling and closing the project 監控專案進行及專案順利結束完成15專案管理Project ManagementDesign project management is all about delivering a design that meets the clients needs, the integrators needs, and th

26、e clients project managers needs. 專案經理的重要任務是滿足業主的需求、整合者的需求、及業主專案管理的需求The designer must do all this while working on other projects; he or she must provide the project deliverables on time and complete, and keep all parties happy. 設計者需要使各專案在即定時程及各項要求下完成,提供所有專案成員歡愉的工作環境與流順。Project management has four

27、main phases(四階段):Initiating the project 啟始專案Planning the project 規劃專案Executing the project 執行專案Controlling and closing the project 監控專案進行及專案順利結束完成16專案管理Project ManagementThe Project Management Institute (PMI) certifies project managers with both the Project Management Professional (PMP) and PMI cert

28、ifications. The PMP process includes the following 專案管理學會認證之專案管理師,專案管理應有以下程序:Establishing the framework for project managementManaging the scope of the projectManaging timeManaging costManaging qualityManaging peopleManaging communicationsManaging riskManaging procurementManaging the projects integr

29、ation aspectsMaintaining a high level of professionalism throughout the project17專案管理Project ManagementThere are three main aspects to each project(有三項主要工作):Project scope of work 確認工作規模與範圍 Project schedule 掌握工程進度Project cost 控制專案成本專案管理重要性:without the necessary structure, project management quickly d

30、escends into crisis management and then frequently damage control.Millions of dollars are lost each year by firms that entrust large projects to unqualified project managers.18專案管理Project ManagementOne of the most important aspects of project management is design management. (設計圖管理是重點) Here is the p

31、riority:Get project requirements.Get environmental information.Get and give coordination requirements information.Design the system.Check for accuracy.Revise design.Deliver the final design.19專案管理Project ManagementOne of the most important aspects of project management is design management. (設計圖管理是重

32、點) Here is the priority:Get project requirements.Get environmental information.Get and give coordination requirements information.Design the system.Check for accuracy.Revise design.Deliver the final design.20專案管理Project ManagementTips on Schedule ManagementThroughout the project, keep everyone else

33、on your schedule.Successful project management is the intersection of schedule control, scope control, and cost control. Experience helps more than a little. Project management is a science, but it is also an art.21專案管理Project ManagementI recommend two fine books to help with this (作者介紹兩本書):PMPR Exa

34、m PrepA Course in a Book (RMC Publications, ISBN 0-9711647-3-8)Project Rescue by Sanjiv Purba and Joseph J. Zucchero (McGraw-Hill/Osborne)22客戶管理Client ManagementTips on Relationship ManagementSomeday, you will find yourself sitting in a conference room full of people. They will includethe owners representative, the project manager (these two might be the same person),several architects (building shell and core, structural, interiors, and landscape),consultants (electrical, mechanical, plumb

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论