版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Kanban Process 看板过程1Kanban Thrown Out Process 看板扔出过程2Kanban Thrown Out Process 看板扔出过程Assembly Line Side 流水线旁Line Runner Side补料面MaterialWithdrawal物料取用MaterialWithdrawal 物料取用3Anothermaterialwithdrawal 再一次物料取用Assembly Line Side 流水线旁Line Runner Side补料面PhysicalMaterialWithdrawal 物料取用Kanban Thrown Out Pro
2、cess 看板扔出过程4Bin empty ! 料箱空了!Empty bin?ReplenishmentNecessary ! 空箱?必须补料!Assembly Line Side 流水线旁Line Runner Side补料面Kanban Thrown Out Process 看板扔出过程5Assembly Line Side 流水线旁Line Runner Side补料面KanbanCollection Box 看板收集箱Kanban Thrown Out Process 看板扔出过程Take Kanbanand place on collection box 收集看板并放入收集箱内Kan
3、ban6Empty Bin 空箱Place empty bins in dedicated shelf 把空箱放在特定的搁板上Assembly Line Side 流水线旁Line Runner Side补料面Kanban Thrown Out Process 看板扔出过程7Assembly Line Side 流水线旁Line Runner Side补料面Place empty bins in dedicated shelf 把空箱放在特定的搁板上Empty Bins 空箱Kanban Thrown Out Process 看板扔出过程8Take KanbanFrom collection
4、box 从收集箱中拿出看板Assembly Line Side 流水线旁Line Runner Side补料面Kanban Thrown Out Process 看板扔出过程9KanbanAssembly Line Side 流水线旁Line Runner Side补料面Take KanbanFrom collection box 从收集箱中拿出看板Kanban Thrown Out Process 看板扔出过程10Assembly Line Side 流水线旁 KANBAN (Card) 看板卡Material number 零件号Material description 零件名称Quant
5、ity per bin 装箱数Supply PointSection/Takt/Rack/Compartment补充点:工段/工位/料架/层Buffer Info. 内库信息 Logitic Centre Infor. 物流中心信息 Take Kanban/Receive Replenishment 拿出看板/收到补给信息KanbanLogistic Worker take Kanban Card to Buffer物流操作人员把看板送至缓冲区Line Runner Side补料面Kanban Thrown Out Process 看板扔出过程11Consolidation Process备料
6、过程12Consolidation directly in Buffer 缓冲区直接备料13Buffer receive Material 内库接收物料Office办公室Receive Kanban Card 收到看板卡Consolidation directly in Buffer 缓冲区直接备料过程Receive Kanban Info 收到看板信息14Verify bin确认料箱Verify binand location确认料箱及位置Consolidation directly in Buffer 缓冲区直接备料过程15Place Kanban放置看板卡Kanban Card看板卡Co
7、nsolidation directly in Buffer 缓冲区直接备料过程16Move Box to Cart料箱移至小车Consolidation directly in Buffer 缓冲区直接备料过程17KanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanBox sorted on carts by Takt料箱区分工位放置在不同的小车上Takt 29 to 4529-45 工位Takt 46 to 6446-64工位T
8、akt 65 to 9265-92工位Consolidation directly in Buffer 缓冲区直接备料过程18Transfer to production line 料箱运输至生产线KanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanConsolidation directly in Buffer 缓冲区直接备料过程Takt 29 to 4529-45 工位Takt 46 to 6446-64工位Takt 65 to
9、 9265-92工位19Material from logistic centre物流中心拨料20Buffer receive Material 内库接收物料Office办公室Receive Kanban Card 收到看板卡Material from logistic centre 物流中心拨料Receive Kanban Info 收到看板信息21Material from logistic centre 物流中心拨料缓冲区 Buffer物流中心 Logistic Centre看板信息传递Kanban InfoTransfer内库办公室 Buffer Office物流中心办公室Logist
10、ic Centre Office22Verify bin确认料箱Verify binand location确认料箱及位置Material from logistic centre 物流中心拨料Supply Zone备料区PartA 零件A23Material from logistic centre 物流中心拨料Supply Zone备料区Move Box in Supply Zone料箱移至备料区PartA 零件A24Material from logistic centre 物流中心拨料Supply Zone备料区Move Box to Palette 料箱移至托盘Part A,B,C,
11、D,E,F 零件 A,B,C,D,E,F 25Material from logistic centre 物流中心拨料Load Palette to LKW 托盘装车26Material from logistic centre 物流中心拨料Palette Transport to Buffer 托盘运输至缓冲区物流中心 Logistic Centre内库办公室 Buffer Office物流中心办公室Logistic Centre Office缓冲区 Buffer27Material from logistic centre 物流中心拨料unload Palette from LKW 托盘卸
12、货28Place Kanban放置看板卡Kanban Card看板卡Material from logistic centre 物流中心拨料29Move Box to Cart料箱移至小车Material from logistic centre 物流中心拨料30KanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanBox sorted on carts by Takt料箱区分工位放置在不同的小车上Takt 29 to 4529-45
13、 工位Takt 46 to 6446-64工位Takt 65 to 9265-92工位Material from logistic centre 物流中心拨料31Transfer to production line 料箱运输至生产线KanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanKanbanTakt 29 to 4529-45 工位Takt 46 to 6446-64工位Takt 65 to 9265-92工位Material from
14、logistic centre 物流中心拨料32Linefeeding Process物料上线过程33Assembly Line Side 流水线旁Line Runner Side补料面Linefeeding Process 物料上线过程34Supply PointSequenced Delivery 补料小车按次序放置物料Verify bin确认料箱Verify binand location 确认料箱及位置Assembly Line Side 流水线旁Line Runner Side补料面Linefeeding Process 物料上线过程KanbanKanbanKanbanKanbanK
15、anbanKanban35Kanban confirm 看板确认Assembly Line Side 流水线旁Line Runner Side补料面Linefeeding Process 物料上线过程KanbanKanbanKanbanKanbanKanbanKanban KANBAN (Card) 看板卡Material number 零件号Material description 零件名称Quantity per bin 装箱数Supply PointSection/Takt/Rack/Compartment补充点:工段/工位/料架/层Buffer Info. 内库信息 Logitic C
16、entre Infor. 物流中心信息 36Place bin放置料箱Assembly Line Side 流水线旁Line Runner Side补料面Linefeeding Process 物料上线过程KanbanKanbanKanbanKanbanKanban37Assembly Line Side 流水线旁Line Runner Side补料面Linefeeding Process 物料上线过程KanbanKanbanKanbanKanbanKanban38Empty Bins空箱Removeempty bins空箱回收Assembly Line Side 流水线旁Line Runner Side补料面Linefeeding Process 物料上线过程39Empty Bins空箱Removeempty bins空箱回收Assembly Line Side 流水线旁Line Runner Side补料面Linefeeding Pro
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 《心脏康复培训》课件
- 小学一年级20以内加减法混合运算
- 小学五年级数学小数乘除法计算练习题 集
- 二年级上册21 雪孩子(教案)
- 2025年1月内蒙古自治区普通高等学校招生考试适应性测试(八省联考)历史试题
- 《新地产营销新机会》课件
- 混凝土路面施工协议书
- 口腔科护士的工作总结
- 育人为本点滴栽培班主任工作总结
- 浴室用品销售工作总结
- 2024年领导干部任前廉政知识考试测试题库及答案
- 中医辨证-八纲辨证(中医学课件)
- 冠脉介入进修汇报
- 蒋诗萌小品《谁杀死了周日》台词完整版
- 生涯发展展示
- 【家庭自制】 南北香肠配方及28种制作方法
- 厂房施工总结报告
- 先进物流理念主导和先进物流技术支撑下的日本现代物流
- 建筑小区生雨水排水系统管道的水力计算
- 公务员职务和级别工资档次套改及级别对应表
- 社会团体选举办法
评论
0/150
提交评论