
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Kaizen (What is it ?)Lean FoundationsContinuous Improvement TrainingMeasureAnalyzeImproveControlDefineContinuous Improvement Process Six Sigma ProjectKaizen event5S eventWorkplace organizationRapid Implementation of Known SolutionProblem solvingVARIATION WASTE KAIZEN WHAT IS ITKaizen is a tool origi
2、nally used by Toyota to foster continued improvement within its Toyota Production System. It began as Quality Circles, a means of factory shop floor employees solving quality issues within a structured team framework, using specific new tools. It is now used around the world by many companies and ha
3、s been adapted to suit their individual needs and customs.KAIZEN WHAT IS ITKaizen in the United States usually refers to an event of from three to five days of intense improvement activities directed at a specific area of a business. It is a process based on improving Safety, Quality, and Delivery,
4、by the elimination of waste (muda) in its many forms. Its main tools are the implementation of One Piece Flow Working to Takt Time Developing a Pull SystemKAIZEN WHAT IS ITKaizen events are a way of accelerating improvementsto improve worker productivity, helping management to find new ways to gain
5、substantial savings in time, space and labor output. to collapse lead times, reduce work-in-process dramatically, reducing scrap and defects while minimizing the need for capital expenditures.KAIZEN A typical 3-5 day Kaizen events consists of:Team training (1/2 day) Lean overview Structure of Kaizen
6、 event Team conducts Kaizen on the factory floor / area (2-1/2 to 3-1/2 days) Identifying problems Defining current process Observing, sketching process and collecting data Brainstorming suggestions for improvementImplementing solutions (Rearrange equipment, Modify machines, change methods, etc)KAIZ
7、EN Team measures improvements and verifies solutions (1/2 day) Team presents results to management, co-workers and shop floor personnel (1/4 day) KAIZEN Kaizen is a way of unlocking the talents and abilities of workers and allow decisions to be made at the operating level in the organization, in the
8、 quickest time, by the people that know the situation the best.KAIZEN EventType of ProjectsEliminate long conveyor assembly lines with cellsCombine operationsReduce setup times - SMEDReduce lot sizes, reduce WIPDetermine proper tooling needed and organizeVisual factory5S onlyEstablish new metricsLoa
9、d level schedule Implement new productKAIZEN EventType of ProjectsIncrease or decrease production based on new takt timeChange the processChange from automated process to manualMove from one location to anotherSafety ImprovementsMaintenance Programs or machine overhaulProcess improvementKAIZEN EventType of Pro
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 光储氢氨一体化示范项目未来发展前景分析
- 房地产行业未来发展趋势与机遇分析
- 低空经济产业园创新设计方案
- 土方施工合同范本
- 重庆南川人民医院招聘考试真题2024
- 2024年重庆铜梁区永嘉镇公益性岗位招聘笔试真题
- 山西三支一扶考试真题2024
- 2024年绍兴上虞城建集团招聘工程管理人员笔试真题
- 当代艺术市场分析考核试卷
- 2024年湖北武汉信息公司招聘笔试真题
- 中国发作性睡病诊断与治疗指南(2022版)
- 读懂中国茶学习通超星期末考试答案章节答案2024年
- 2023-2024学年北京市通州区高一下学期期中物理试卷(解析版)
- 人教版(2019)必修第二册Unit4 History and traditions Reading and Thinking教案
- 2024艺人统筹服务合同
- 2024年机修钳工(高级技师)职业鉴定考试题库(含答案)
- 年级下册第6单元第1课时《海德薇格主题》223
- 钢结构吊装安全专项施工方案
- 2024年欧洲乙虫腈市场主要企业市场占有率及排名
- 2025届高考作文写作素材:6月时事热点素材(适用话题+运用示例)
- 《有机化学》课件-电子效应
评论
0/150
提交评论