1、A2011.12CFCie stage 2版次日期状态编写校对审核批准修改-说明GUANGXICHENGGANG NUCLEARER SION PROJECT PHASE I (21000MW)广西防城港核电厂一期(21000MW)工程DOC. NO.BLX17SVA004GJS045GNTITLE:题目SYSTEM DESIGN MANUAL AUXILIARYDISTRIBUTION SYSTEMCHAPTER 4 DESCRIPTION AND DEFINITION OF EQUIPMENT辅助蒸汽分配系统设计手册第四章 设备的说明和定义参考电站编码 ReferenceREV.C A T
2、 E G O R YA: Identical(+FCR,FCN,DEN,CIN,OROTHERS,IFANY)B: ModifiedC: NewIed by国 家 综 合 甲 级号: A144004317GEDI省电力GUANGDONG ELECTRICER DESIGN INSTITUTE设计院内部编码44-H0201S-J4110-04ernal Identification NumberThisis the property of GEDI. It must not be used, reproduced, transmitted or disclosed without the pri
3、or written permis of GEDI. 本文件之产权属于 省电力。未获我院 ,任何人不得擅自使用、 、传递或泄露该文件。批准:张鹏审核:校对:郑军编写:胡琨CHAPTER 4 - DESCRIPTION AND DEFINITION OF EQUIPMENT4.1DESCRIPTIONRefer to the following diagrams and assoted systems, listed below.(i)Diagram of Auxiliary BL117SVA502GJS045DDDistribution System(ii)Diagram of Auxilia
4、ry BL217SVA503GJS045DD.Distribution SystemUnit 1Refer to the diagram BL117SVA502GJS045DD.Auxiliaryat 12 bar abs and 188 is fedo the distributionmain from the pipe to supplyTransformer system (STR). There is also anerconnectingauxiliaryfrom Auxiliary boilers(XCA) via the 0SVA.A prere reducing sion ob
5、tainfrom Auxiliary boilers (XCA) via the 0SVA inUnit 1 Conventional Island only and which reduprere and temperature to4.5 bar abs and 165 for distribution to the Nuclear Island and the Auxiliary Feedwater system (ASG) .The systemppd from the auxiliarydistribution system are described below.4.1.1Hot
6、Watroduction only for unit 1(SES)Depending on the prevailing climatic conditions heatingmay bed to the above calorifier at a rate of 2.0446t/hr, 12 bar abs and 188.Of thisall will return as condensate to the auxiliarydeaerator.4.1.2Feedwater Deaeratingand Gas Stripper (Unit 1) (ADG)A supply of heati
7、ng 12 bar abs and 188.ippd to the deaerator during start up of 18t/hr4.1.3Transformer Deaerator (STR)IeABCDEFGDate2011.12BLX17SVA004GJS045GNGEDI1/4CHENGGANGUnder normal running conditions a supply of 2.355 t/hr ofat 12 bar abs188 is fed by the distribution systemo the transformer deaerator.During a
8、start up condition of one unit the demand of auxiliary4.548 t/hr.rises to4.1.4Auxiliary Feedwater (ASG)may be condition. Thed to this system for heating, although only on a standbyippd at 4.5 bar abs and 165 from the prerereducing sion in Unit 1 conventional island. The normal demand, if required,is
9、 4.3 t/h and condensate returns to thetransformer deaerator. Theflowrate can under exceptional conditions momentarily reach 10 t/h (rare occurrence).4.1.5Turbine Gland (CET)During start up conditions auxiliaryis required fland sealing. Theisd at 6.5 bar abs and 172 from the prere reducingsion. Note:
10、 When consumptionthe turbine glands are in new condition, the gland will be 6.012 t/h. When the glands are worn, theconsumption will increase to 9.0 t/h.Unit 2Refer to the diagram BL217SVA503GJS045DD.This diagram dcts three feed user sions taking theirions are on Unit 2, theirs from the auxiliarycon
11、sumptionsfeed main. Although these user s are identical to those already described.Please refer to4.1.2For Feedwater Deaerating and Gas StripperADG (at 12 bar abs 188)4.1.34.1.5ForTransformer DeaeratorSTR ( CET (at 12 bar abs 188) at 6.5 bar abs 172)For Turbine GlandIeABCDEFGDate2011.12BLX17SVA004GJ
12、S045GNGEDI2/4CHENGGANG4.2CHARACTERISTICS4.2.1System Design DataThe auxiliarytransmitted by this system is at a prere of 12 bar absand a temperature of 188. A taphemain feeds a prerereducing sion where a supply of 4.5 bar abs 165 is made available forheating the Nuclear Island and the auxiliary feedw
13、ater deaerator. A tapinthemain feeds a prere reducing sion where a supply of 6.5 bar land seal heater(CET).abs 172 is made available f4.2.2Prere Reducing SionValve Type Material Inlet pre Outlet preTo ASGGlobe Carbon steel 124.5To CETGlobe Carbon steel 126.5rerebar abs bar abs4.2.3Ref ValveDesign pr
14、e Set prererebar g bar g3.54.54.2.4Trapstraps are egrated.ofthe ball floattype and are provided with astrainerIeABCDEFGDate2011.12BLX17SVA004GJS045GNGEDI3/4CHENGGANG4.3LAYOUT4.3.1A branch from the auxiliarymain in the balance of plant, running at-9.078m level enters the auxiliaries annexe adjacent to B row column 1. Thissupply will be at 12 bar abs 188. The main rises vertically toapproximay +12m level prior to running horizontally to B row betncolumn 6 and column 7. At this poit rises to the +32m level terminating attheconverters near B row column 8
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 大学生毕业登记表自我鉴定(5篇)
- 石河子大学《历史教学技能实训》2022-2023学年第一学期期末试卷
- 石河子大学《工业药物分析综合实验》2022-2023学年第一学期期末试卷
- 石河子大学《教师语言与行为艺术》2022-2023学年第一学期期末试卷
- 沈阳理工大学《数字信号处理》2021-2022学年第一学期期末试卷
- 沈阳理工大学《美国文学史》2022-2023学年第一学期期末试卷
- 沈阳理工大学《机械工程材料》2021-2022学年第一学期期末试卷
- 沈阳理工大学《翻译工作坊》2023-2024学年第一学期期末试卷
- 合同法81条对应民法典
- 高空作业合同安全责任书模版
- 2024-2025学年七年级英语上学期期中试卷(沪教五四制2024)(含答案)
- 2024-2025学年高中政治上学期《新时代的劳动者》教学设计
- 10以内口算题每页50道
- 《短视频拍摄与制作》课件-3短视频中期拍摄
- 护理领导力培养护士的领导潜能培训课件
- 印刷业管理条例-2020
- 配电工程施工组织设计(完整版)
- 中国联通某分公司网格化管理工作指导意见
- 充电桩施工方案
- 煤矿井下主变电所安装安全技术措施
- 《呼吸科肺部查体》PPT课件.ppt
评论
0/150
提交评论