版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Chapter1.Iroduction to Supply Chain Management1. 【supply chain】The system of suppliers, manufacturers, transportation, distributors, and vendors that exists to transform raw materials to final products and supply those products to customers.2. 【supply chain management】SCM is a business network cover
2、ing from buying, making, moving, warehousing to selling.3. 【What makes supply chain management difficult?】Supply chain strategies cannot be determined in isolation. They are directly affected by another chain that most organizations have, the development chain.It is challenging to design and operate
3、 a supply chain so that total systemwide costs are minimized, and systemwide service levels are maintained.Uncertainty and risk are inherent in every supply chain.4. 【Strategies for SCM】Global Optimization(全局优化)Managing Uncertainty(管理不确定性)5. 【Why is Global Optimization Hard?】The supply chain is a co
4、mplex network.Different facilities in the supply chain frequently have different, conflicting objectives.The supply chain is a dynamic system.System variations over time6. 【Why Is Uncertainty Hard to Deal With?】Matching supply and demand is a major challenge.Forecasting doesnt solve the problem.Inve
5、ntory and back-order levels typically fluctuate considerably across the supply chain, even when customer demand for specific products does not vary greatly.Demand is not the only source of uncertainty.Recent trends such as lean manufacturing, outsourcing, and offshoring that focus on reduction incre
6、ase risks significantly.7. 【The three principles of all forecasting techniques】Forecasting is always wrong.The longer the forecast horizon , the worse the forecast.Aggregate forecasts are more accurate.Chapter2. Inventory Management, Supply Contracts and Risk Pooling1. 【何时低(高)于平均需求】If the cost of no
7、t selling an additional unit is larger than the profit from selling an additional unit, the optimal quantity in general will be less than average demand, while if the reverse is true, the optimal order quantity in general will be greater than average demand.2. 【平均需求与最优订货量的关系】The optimal order quanti
8、ty is not necessarily equal to average, or forecast demand.3. 【Coefficient of variation】Coefficient of variation=Standard deviationAverage demandThe Standard deviation measures the absolute variability of customer demands, the coefficient of variation measures variability relative to average demand.
9、4. 【Risk Pooling: three critical points】Centralizing inventory control reduces both safety stock and average inventory level for the same service level.The higher the coefficient of variation, the greater the benefit obtained from centralized systems; that is, the greater the benefit from risk Pooli
10、ng.The benefits from risk Pooling depend on the behavior of demand from one market relative to demand from another.5. 【Forecasting Methods】Judgment methods(判断方法)Market research methods(市场研究方法) 为定性方法Time Series methods(时间序列方法)Causal methods(因果方法) 为定量方法。6. 【Inventory Managements controlling methods】Co
11、ntinuous review policy(持续检查策略)Periodic review policy(定期检查策略)7. 【(s, S) Policy】Whenever the inventory position drops below a certain level, s, we order to raise the inventory position to level S.(s, S)的计算:The reorder point (s) has two components:a. To account for average demand during lead time: LT
12、215;AVGb. To account for deviations from average (we call this safety stock): z×STD×LTwhere z is chosen from statistical tables to ensure that the probability of stockouts during leadtime is 100%-SL. Since there is a fixed cost, we order more than up to the reorder point: Q=(2×K×
13、AVG)÷h The total order-up-to level is: S=Q+s 注:AVG = average daily demand STD = standard deviation of daily demand LT = replenishment lead time in days h = holding cost of one unit for one day SL = service level (for example, 95%). This implies that the probability of Stocking out is 100%-SL (f
14、or example, 5%) K = fixed cost Also, the Inventory Position at any time is the actual inventory plus items already ordered, but not yet delivered.8. 【Judgment Methods】Assemble the opinion of expertsSales-force composite combines salespeoples estimates(销售人员汇集意见)Panels of experts internal, external, b
15、oth(专家座谈)Delphi method(德尔菲方法):a. Each member surveyedb. Opinions are compiledc. Each member is given the opportunity to change his opinion.9. 【Supply Contracts】Buy-Back Contracts(回购合同): The seller agrees to buy back unsold goods from the buyer for some agreed-upon price higher than the salvage value
16、.Revenue-Sharing Contracts(收入共享合同): The buyer shares some of its revenue with the seller, in return for a discount on the wholesale price.Global Optimization Contracts(全局优化合同): This unbiased decision maker would consider the two supply chain partners, the supplier and the buyer, as two members of th
17、e same organization. That is, the transfer of money between the parties is ignored and the unbiased decision maker will maximize supply chain profit.Quantity Flexibility Contracts(数量灵活合同): Supplier provides full refund for returned items as long as the number of returns is no larger than a certain q
18、uantity.Sales Rebate Contracts(销售回扣合同): Supplier provides a direct incentive to the retailer to increase sales by means of a rebate paid by the supplier for any item sold above a certain quantity.Chapter3. Logistics Network Configuration1. 【物流网络配置】2. 【数据处理】3. 【网络技术】4. 【Solution Techniques】Mathematic
19、al optimization techniques:a. Exact algorithms: find optimal solutions(准确算法)b. Heuristics: find “good” solutions, not necessarily optimal(启发式算法)Simulation models: provide a mechanism to evaluate specified design alternatives created by the designer.Chapter4. The Value of Information1. 【“In modern su
20、pply chains, information replaces inventory”】I think it is true because information:Helps reduce variabilityHelps improve forecastsEnables coordination of systems and strategiesImproves customer serviceFacilitates lead time reductionsEnables firms to react more quickly to changing market conditions.
21、2. 【What is the Bullwhip Effect?】Order variability is amplified(放大)the supply chain; upstream echelons(梯度)face higher variability.3. 【What are the causes the Bullwhip Effect?】Promotional sales:Forward buyingVolume and transportation discounts:BatchingInflated orders:IBM Aptiva orders increased by 2-
22、3 times when retailers thought that IBM would be out of stock over ChristmasDemand forecasting:Order-up-to points are modified as forecasts change orders increase more than forecastsLong cycle times:Long lead times magnify this effect4. 【Methods for Coping with the Bullwhip Effect】Reduce uncertainty
23、:POS; Sharing information; Sharing forecasts and policiesReduce variability:Eliminate promotions; Year-round low pricingReduce lead times:EDI; Cross dockingStrategic partnerships:Vendor managed inventory (VMI); Data sharing5. 【集中信息】Chapter5. Supply Chain Integration1. 【Supply Chain Strategies】Push S
24、trategies:特点:a. Production decisions based on long-term forecastsb. Ordering decisions based on inventory & forecasts缺点:a. Inability to meet changing demand patterns.b. The obsolescence of supply chain inventory as demand for certain products disappears.c. The bullwhip effect: Excessive inventor
25、y(库存过多),Excessive production variability,Poor service levelsPull Strategies:特点:Production is demand drivena. Production and distribution coordinated with true customer demandb. Firms respond to specific orders优点:a. Reduced lead times (better anticipation)b. Decreased inventory levels at retailers an
26、d manufacturersc. Decreased system variabilityd. Better response to changing markets缺点:a. Harder to leverage economies of scaleb. Doesnt work in all casesPush-Pull Supply Chains2. 【模型图】3. 【The impact of lead time and demand uncertainty】Chapter6. Strategic Alliances1. 【Strategic Alliances】Strategic a
27、lliances are typically multifaceted(多方位的), goal-oriented, long-term partnerships between two companies in which both risks and rewards are shared.2. 【The alliance will help address the following issues】Adding value to products(增加产品价值)Improving market access(改善市场进入)Strengthening operations(强化运作管理)Add
28、ing technological strength(增强技术力量)Enhancing strategic growth(促进战略成长)Enhancing organizational skills(提高组织技能)Building financial strength(建立财务优势)3. 【Types of Strategic Partnering】4. 【Advantages of SP】Fully utilize system knowledgeDecrease required inventory levelsImprove service levelsDecrease work dup
29、licationImprove forecasts5. 【Disadvantages of SP】Expensive advanced technology is required.Supplier/retailer trust must be developed.Supplier responsibility increases.Expenses at the supplier often increase.6. 【What are the advantages of 3PL?】Focus on core strengthsProvides technological flexibility
30、Provides Other flexibility in geography,workforce size,additional services and resource flexibility7. 【What are the disadvantages of 3PL?】Loss of control 3PL employees may interact with customers Sharing of confidential infoChapter7. Procurement and Outsourcing1. 【Outsourcing Benefits】Economies of s
31、cale reduce manufacturing costsRisk pooling demand uncertainties are transferredReduce capital investmentFocus on core competencyIncreased flexibility2. 【Outsourcing Risks】Loss of competitive knowledgeConflicting objectives3. 【Reasons for outsourcing】Dependency on capacityDependency on knowledge4. 【
32、Product architecture】 Modular products:a. Components are independent of each otherb. Components are interchangeablec. Standard interfaces are usedd. A component can be designed or upgraded with little or no regard to other Componentse. Customer performance determines the product configuration Integr
33、als productsa. Not made from off-the-shelf componentsb. Designed as a system by taking a top-down design approachc. Evaluated based on system performance, not based on component performanced. Components in integrals products perform multiple functions5. 【A Framework for Outsourcing】6. 【Procurement S
34、trategy】7. 【Characteristics of Functional Versus Innovative Products(功能性产品VS创新性产品)】(了解)Chapter8. Global Logistics and Risk Management1. 【Forces Driving Globalization(全球供应链的驱动力)】 Global Market Forces Technological Forces Global Cost Forces Political and Economic Forces2. 【Many Sources of Risks】 Natur
35、al disasters Geopolitical risks Epidemics Terrorist attacks Volatile fuel price Currency fluctuations Port delays Market changes Suppliers performance Forecasting accuracyExecution problems以上属于不可控风险,介于可控与不可控风险之间,属于可控风险,剩余的为可控风险。3. 【Managing the Unknown-unknown(处理不可控风险的方法)】 Invest in redundancy(缓冲能力)
36、:Redundancy is built at the design stage Increase velocity in sensing and responding(感应与应对):Sensing and responding require accurate information in a timely fashion Create an adaptive supply chain community:An adaptive supply chain is a supply chain in which all its elements share similar culture, wo
37、rk toward the same objectives, and benefit from financial gains4. 【Managing Global Risks(处理全球化风险的策略)】 Speculative Strategies(投机策略):a. Bet on a single scenariob. Japanese auto manufacturing in Japan Hedge Strategies(规避策略):a. Losses in one area offset by gains in anotherb. Volkswagen in US, Brazil, Me
38、xico, Germany Flexible Strategies(柔性策略)5. 【Approaches can be utilized to implement flexible strategies effectively】 Production shifting(产品转移) Information Sharing(信息共享) Global coordination(全球协调) Political leverage(政治杠杆)6. 【Requirements for Global Strategy Implementation】Five Basic Functions of Firms(
39、五种基本职能): Product development Purchasing Production Demand management Order fulfillment7. 【Regional Products】8. 【International Products】9. 【Major Differences Between Different Regions】Chapter9. Coordinated Product and Supply Chain Design1. 【Key Concepts of Design for Logistics】 Economic Packaging and
40、 Transportation Concurrent and Parallel Processing Standardization2. 【Modular Process(模块化流程)】 Consisting of discrete operations, such that inventory can be stored in partially manufactured form between options Each product undergo a set of making it possible to Products differ from each other in ter
41、ms of the subset of operations that are performed on them3. 【Types of Standardization】 Part Standardization(部件标准化):a. Common parts are used across many processesb. Product redesign might be necessary Process Standardization(流程标准化):a. Standardizing as much of the process as possible, making a generic
42、 or family productb. Delaying differentiationc. Called “Delayed differentiation”, “Postponement”d. Postponement: Key Concepts Product Standardization(产品标准化):Downward Substitutiona. Produce only a subset of products (because producing each one incurs high set-up cost)b. Guide customers to existing pr
43、oductsc. Substitute products with higher feature set for those with lower feature setd. Which products to offer, how much to keep, how to optimally substitute? Procurement Standardization(生产标准化):a. Processing equipment that manufactures these wafers are very expensive with long lead time and are made to orderb. The firm reduces risk of investing in the wrong equipment by pooling demand across a variety of products4. 【Operational strategies for standardization】5. 【Su
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024至2030年小型通讯机控制线路板项目投资价值分析报告
- 2024年二手房按揭贷款合同范本
- 2024年速冻红小豆项目可行性研究报告
- 2024年烟雾净化器项目可行性研究报告
- 2024年发布:数据处理与分析合同
- 2024年体育俱乐部合伙协议
- 佳木斯大学《园林艺术原理》2021-2022学年第一学期期末试卷
- 佳木斯大学《卫生统计学》2021-2022学年第一学期期末试卷
- 服装印花调色课程设计
- 服务语言培训课程设计
- DFM培训资料ppt课件(PPT 14页)
- 水利水电建设工程验收规程.ppt课件
- K3 BOS开发手册
- 马克思主义与大学生活——马原小组展示高端ppt2013powerpoint
- 纵梁式及桁架式管廊结构设计浅析_图文
- 110Kv变电站二次电气部分设计
- 火力发电厂设计各阶段及其主要内容
- 光伏电站安全检查表
- 精通版小学四年级上册英语教案全册
- 水利工程监理工作程序
- 索道施工方案分享版
评论
0/150
提交评论