路面路基工程 第六章 挡土墙的设计ppt课件_第1页
路面路基工程 第六章 挡土墙的设计ppt课件_第2页
路面路基工程 第六章 挡土墙的设计ppt课件_第3页
路面路基工程 第六章 挡土墙的设计ppt课件_第4页
路面路基工程 第六章 挡土墙的设计ppt课件_第5页
已阅读5页,还剩53页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、第六章第六章 挡土墙设计挡土墙设计Design of the Retaining WallDesign of the Retaining Wall6-16-1:概述:概述 Introduction Introduction一、挡土墙的用途一、挡土墙的用途 Use of the Retaining Wall Use of the Retaining Wall定义定义 Definition Definition1.1.路基位于陡坡地段路基位于陡坡地段plat with the subgrade at abrupt plat with the subgrade at abrupt slopesslo

2、pes或岩石风化的路堑边坡地段或岩石风化的路堑边坡地段slope of cut plat with slope of cut plat with rock decayed rock decayed ;2.2.为防止大量挖方及降低边坡高度的路堑地段为防止大量挖方及降低边坡高度的路堑地段cut plat for cut plat for avoiding mass cutting and lowering the height of the avoiding mass cutting and lowering the height of the side slopeside slope;3.3.能

3、够产生塌方,滑坡的不良地质地段能够产生塌方,滑坡的不良地质地段geologically bad geologically bad plat with possible eboulement and landslideplat with possible eboulement and landslide;4.4.水流冲刷严重或长期受水浸泡的沿河路基地段水流冲刷严重或长期受水浸泡的沿河路基地段riverside riverside subgrade plat seriously scoured by current or steeped subgrade plat seriously scoure

4、d by current or steeped in water for a long perioudin water for a long perioud5.5.桥梁或隧道与路基的衔接地段桥梁或隧道与路基的衔接地段 connecting section between connecting section between bridge and subbasebridge and subbase6.6.为节约用地,减少拆迁或少占农田地地段为节约用地,减少拆迁或少占农田地地段plat for plat for conserving land, reduce removal or farming

5、landconserving land, reduce removal or farming land7.7.为维护重要建筑物,生态环境或其它特殊需求的地段为维护重要建筑物,生态环境或其它特殊需求的地段plat plat for protecting important buildings, ecological for protecting important buildings, ecological environment or other special needsenvironment or other special needs2.2.用途用途 UseUse路堑墙路堑墙 cutti

6、ng wallcutting wall路肩墙路肩墙 shoulder wallshoulder wall山坡墙山坡墙 hillside wallhillside wall路堤墙路堤墙 embankment wall桥头挡土墙桥头挡土墙bridgehead retaining wall路堑墙 cutting wall:1在山坡陡峻处,用以减少挖方量,降低边坡高度,防止山坡因开挖而失去稳定;2在地质不良地段,用以支挡能够滑塌的山坡土体。路堤墙路堤墙 Embankment WallEmbankment Wall:1 1在山坡陡峻处填筑路堤,用以支挡路堤下滑;在山坡陡峻处填筑路堤,用以支挡路堤下滑;2

7、 2收缩坡脚,防止与其它建筑物相互关扰,减少填方量;收缩坡脚,防止与其它建筑物相互关扰,减少填方量;3 3保证沿河路堤不受河水冲刷保证沿河路堤不受河水冲刷路肩墙 Shoulder Wall:1.支挡陡坡路堤下滑;2.抬高公路;3.收缩坡脚,减少占地,减少填方量;山坡墙 Hillside Wall:支挡山坡覆盖层或滑坡下滑二二. .挡土墙的类型挡土墙的类型 Types of the retaining wall Types of the retaining wall1.1.按墙的位置分类:按墙的位置分类:Classification based on the wall positionClass

8、ification based on the wall position山坡墙、路堤墙、路堑墙、路肩墙山坡墙、路堤墙、路堑墙、路肩墙2.2.按墙的墙体资料分类:按墙的墙体资料分类:Classification based on the building types of the wallClassification based on the building types of the wall石砌、混凝土、钢筋混凝土、砖砌、木质、钢板墙石砌、混凝土、钢筋混凝土、砖砌、木质、钢板墙3.3.按墙的构造方式分类:按墙的构造方式分类:Classification based on the struct

9、ural form of the wallClassification based on the structural form of the wall重力式、半重力式、衡重式、锚杆式、薄壁式、加筋土、垛式重力式、半重力式、衡重式、锚杆式、薄壁式、加筋土、垛式 挡土墙的特点及适用范围挡土墙的特点及适用范围 Features of all types of wallsFeatures of all types of walls1 1、重力式挡土墙、重力式挡土墙重力式挡土墙重力式挡土墙 Gravity retaining wallGravity retaining wall普通重力式挡土墙0rdi

10、nary gravity retaining wall:依托墙自重接受土压力,构造简单,施工简便,由于墙身重,对地基承载力地要求比较高。衡重式挡土墙dead gravity retaining wall:设置衡重台使墙身重心后移,并利用衡重台上的填土,添加墙身稳定。上墙背俯斜而下墙背仰斜,可降低墙身及减少根底开挖,以及节约墙身断面尺寸。适用于陡山坡的路肩墙、路堤墙和路堑墙混凝土半重式:half- gravity concrete retaining wall在墙背设少量钢筋,并将墙趾展宽,以减薄墙身,节省圬工.普通适用于低墙锚定式挡土墙锚定式挡土墙( (锚杆式锚杆式) )Tied retain

11、ing wallTied retaining wall(anchored bar)(anchored bar)锚杆式挡土墙Tie rod anchored retaining wall:由肋柱,挡板和锚杆组成,靠锚杆锚固在山体内拉住肋柱。肋柱,挡板可预制。普通适用于墙身较高的路堑墙或路肩墙。锚定式挡土墙(锚定板式)Tied retaining wall(anchor plate)锚定板式挡土墙 Anchor plate retaining wall:类似于锚杆式挡土墙,仅锚杆的固定端用锚定板固定在山体内。普通适用于路堑墙或路堤墙。薄壁式挡土墙 Slipsheet retaining wall(

12、悬臂式、扶壁式)悬臂式挡土墙cantilever retaining wall:由立壁,墙趾板和墙踵板组成,利用墙踵板上的填土分量来维持土体稳定。适用于缺乏石料地域及挡土墙高度不大于7m的情况。扶壁式挡土墙扶壁式挡土墙 buttress retaining wallbuttress retaining wall:相当于沿悬臂式挡土墙的墙长,每隔一定间隔设置一道扶壁,相当于沿悬臂式挡土墙的墙长,每隔一定间隔设置一道扶壁,使墙面板与墙踵板衔接起来,以接受较大的弯矩作用。适用于高使墙面板与墙踵板衔接起来,以接受较大的弯矩作用。适用于高墙。墙。加筋土挡土墙加筋土挡土墙 reinforced earth

13、 retaining wallreinforced earth retaining wall: 由面板,拉筋和填料组成,依托拉筋与填料之间的摩擦力来由面板,拉筋和填料组成,依托拉筋与填料之间的摩擦力来抵抗侧向土压力,面板可预制。适用于缺乏石料地域及在脆弱抵抗侧向土压力,面板可预制。适用于缺乏石料地域及在脆弱地基上修筑路肩墙与路堤墙。地基上修筑路肩墙与路堤墙。垛式挡土墙垛式挡土墙buttress retaining wallbuttress retaining wall:用钢筋混凝土预制杆件,纵横交错装配成框架,内填土石,以抵用钢筋混凝土预制杆件,纵横交错装配成框架,内填土石,以抵抗土压力。适用

14、于缺乏石料地域的路肩墙与路堤墙。抗土压力。适用于缺乏石料地域的路肩墙与路堤墙。桩板式挡土墙桩板式挡土墙pile-baffler retaining wallpile-baffler retaining wall:由桩柱和挡板组成,利用深埋的桩柱前土层的被动土压力来平衡由桩柱和挡板组成,利用深埋的桩柱前土层的被动土压力来平衡墙后自动土压力。适用于土压力大,要求根底埋置深地段,可用墙后自动土压力。适用于土压力大,要求根底埋置深地段,可用于路堑墙、路肩墙。于路堑墙、路肩墙。一一. .挡土墙的构造挡土墙的构造 Structure of the Retaining Wall Structure of t

15、he Retaining Wall 墙身、根底、排水设备与伸缩缝构成墙身、根底、排水设备与伸缩缝构成1.1.墙身墙身6-26-2:挡土墙的构造与布置:挡土墙的构造与布置墙背墙背墙面墙面墙趾墙趾墙踵墙踵 墙顶墙顶墙背墙背仰斜、俯斜、垂直、凸形折线和衡重式仰斜、俯斜、垂直、凸形折线和衡重式n仰斜挡墙墙背所受土压力小,墙背比较经济。但根底外移,地面横坡比较陡时,添加墙高,断面增大;n俯斜式所受土压力较大,通常在地面坡度较陡时采用,借助于陡直的墙面,减小高度;n衡重式在上下墙之间设一衡重台,采用陡直的墙面,适宜于陡峻的地形。n墙背的坡度普通在1:0.251:0.4,仰斜式坡度在1:0.25左右。v墙面

16、墙面 wall spacewall space:墙面普通为平面,其坡度与墙背坡度相协:墙面普通为平面,其坡度与墙背坡度相协调,还应思索到墙趾处地面的横坡度。调,还应思索到墙趾处地面的横坡度。v墙顶墙顶 wall crestwall crest:v护栏护栏 guard railguard rail:2.2.根底根底 foundationfoundation根底方式的选择和根底埋置深度确实定根底方式的选择和根底埋置深度确实定挡土墙普通采用浅根底,只需特殊情况下,才运用桩基。挡土墙普通采用浅根底,只需特殊情况下,才运用桩基。根底类型根底类型 foundation typesfoundation ty

17、pes扩展根底扩展根底 spread foundation spread foundation 台阶根底台阶根底 step foundationstep foundation钢筋混凝土根底钢筋混凝土根底 armored concrete foundationarmored concrete foundation拱形根底拱形根底 vaulted foundation vaulted foundation 换填根底换填根底 refilled foundationrefilled foundation扩展根底扩展根底spread foundation钢筋混凝土根底armored concrete f

18、oundation换填根底refilled foundation拱形根底拱形根底vaulted foundationvaulted foundation台阶根底footstep foundationv根底埋置深度 embedment depth of foundationv影响要素:地质条件、水文情况、冻结深度、临近建筑物的根底影响v普通情况下,地表下不小于1米。3.3.排水设备排水设备 drainage facilitiesdrainage facilities排水设备:排水设备:drainge facilities drainge facilities 地面排水和墙身排水地面排水和墙身排水

19、地面排水:地面排水:ground drainge ground drainge 主要防止地表水渗入墙背填料或主要防止地表水渗入墙背填料或地基地基墙身排水:墙身排水:body drainge body drainge 主要为了迅速排除墙后积水主要为了迅速排除墙后积水v沉降缝与伸缩缝沉降缝与伸缩缝 settlement joint and expansion jointsettlement joint and expansion joint为防止因地基不均匀沉陷而引起墙身开裂,需根据地质条件为防止因地基不均匀沉陷而引起墙身开裂,需根据地质条件的变异和墙高,墙身断面的变化情况设置沉降缝。的变异和墙高

20、,墙身断面的变化情况设置沉降缝。为防止圬工砌体因收缩硬化和温度变化而产生裂痕,应设置为防止圬工砌体因收缩硬化和温度变化而产生裂痕,应设置伸缩缝。伸缩缝。根据地形及地质情况:每隔根据地形及地质情况:每隔10-1510-15米设一道沉降伸缩缝。米设一道沉降伸缩缝。填料:胶泥填塞,沥青麻筋或涂以沥青的木板渗水量大、填料:胶泥填塞,沥青麻筋或涂以沥青的木板渗水量大、冻寒严重地域,当墙背为填石或冻寒不严重时,可仅留空冻寒严重地域,当墙背为填石或冻寒不严重时,可仅留空缝,不嵌填料。缝,不嵌填料。二、挡土墙的布置二、挡土墙的布置 set-up of the retaining wallset-up of t

21、he retaining wall 路基横断面和墙趾纵断面路基横断面和墙趾纵断面cross section of the subgrade cross section of the subgrade or profile of the wall toeor profile of the wall toe1 1挡土墙的横向布置挡土墙的横向布置 how to locate the retaining wall how to locate the retaining wall 在墙高最大处,墙身断面或根底方式有变异处,以及其在墙高最大处,墙身断面或根底方式有变异处,以及其它必需桩号处的横断面上进展。

22、它必需桩号处的横断面上进展。2 2挡土墙的纵向布置挡土墙的纵向布置 longitudinal set-up of the longitudinal set-up of the retaining wallretaining wall1 1确定起讫点和墙长,选择挡土墙与路基或其它构造物衔确定起讫点和墙长,选择挡土墙与路基或其它构造物衔接方式;接方式;to decide the starting point, the end and to decide the starting point, the end and the length of the wall, and choose the jo

23、ining way the length of the wall, and choose the joining way between the retaining wall and the subgrade and between the retaining wall and the subgrade and other stucturesother stuctures2 2按地基及地形情况进展分段,确定沉降缝与伸缩缝按地基及地形情况进展分段,确定沉降缝与伸缩缝 divide the retaining wall into sections according divide the reta

24、ining wall into sections according to the subgrade and topographic features and locate to the subgrade and topographic features and locate the settlement joint and the expansion joint the settlement joint and the expansion joint ;3 3布置挡土墙的根底布置挡土墙的根底 arrange the subgrade of the retaining wallarrange

25、the subgrade of the retaining wall;4 4布置泄水孔的位置布置泄水孔的位置 locating the weep-holelocating the weep-hole3平面布置 floor plan layout 6-3:挡土墙土压力计算:挡土墙土压力计算Earth pressure calculation of the retaining wall主要力系主要力系assemblage of main forces:1挡土墙自重及位于墙上的衡载挡土墙自重及位于墙上的衡载2墙后土体的自动土压力墙后土体的自动土压力3基底的法向反力及摩擦力基底的法向反力及摩擦力4墙前

26、土体的被动土压力墙前土体的被动土压力附加力系附加力系assemblage of additional forces: 季节性作用于挡土墙的各种力。季节性作用于挡土墙的各种力。特殊力系特殊力系assemblage of special forces: 偶尔出现的力。偶尔出现的力。二、普通条件下二、普通条件下CoulombCoulomb自动土压力计算自动土压力计算土压力的类型土压力的类型 :自动土压力、被动土压力、静止土压力:自动土压力、被动土压力、静止土压力 普通地域,挡土墙设计仅思索主要力系,在浸水地域应思索附加力,地震地域还应思索地震对挡土墙的影响,按最不利的组合进展设计。 自动土压力与被动

27、土压力的区分:自动土压力与被动土压力的区分: 假定挡土墙处于极限挪动形状,土体有沿墙及假想破裂假定挡土墙处于极限挪动形状,土体有沿墙及假想破裂面挪动的趋势,那么土推墙即为自动土压力,墙推土即为被面挪动的趋势,那么土推墙即为自动土压力,墙推土即为被动土压力。动土压力。 路基挡土墙的土压力思索:路基挡土墙的土压力思索: 路基挡土墙普通都有能够有向外的位移或倾覆,因此,路基挡土墙普通都有能够有向外的位移或倾覆,因此,在设计中按墙背土体到达自动极限平衡形状思索,且取一定在设计中按墙背土体到达自动极限平衡形状思索,且取一定的平安系数以保证墙背土体的稳定。墙趾前土体的被动土压的平安系数以保证墙背土体的稳定

28、。墙趾前土体的被动土压力普通不计。力普通不计。路堤墙为例路堤墙为例5 5种计算图式:破裂面交于内边坡、破裂面交种计算图式:破裂面交于内边坡、破裂面交于路基内侧、中部和外侧、破裂面交于外边坡于路基内侧、中部和外侧、破裂面交于外边坡cos()sin()xayaEEEE计算自动土压力的步骤:计算自动土压力的步骤:计算挡土墙的土压力,首先确定产生最大土压力的破裂面,求出破裂角。试计算挡土墙的土压力,首先确定产生最大土压力的破裂面,求出破裂角。试算法算法先假定破裂面位置能否经过荷载中心,按此图式及相应的公式求出破裂角,与先假定破裂面位置能否经过荷载中心,按此图式及相应的公式求出破裂角,与原假定的破裂面位

29、置相对比,看能否相符;如与假定不符,重新计算假定原假定的破裂面位置相对比,看能否相符;如与假定不符,重新计算假定破裂面,直至相符为止;破裂面,直至相符为止;根据破裂角计算最大自动土压力。根据破裂角计算最大自动土压力。三三. .车辆荷载换算及计算参数车辆荷载换算及计算参数 vehicle loading conversion and calculation factors vehicle loading conversion and calculation factors 1. 1.车辆荷载换算车辆荷载换算 vehicle loading conversion vehicle loading c

30、onversion (1)(1)按墙高确定的附加荷载强度进展换算按墙高确定的附加荷载强度进展换算(2)(2)根据破裂棱体范围内布置的车辆荷载换算根据破裂棱体范围内布置的车辆荷载换算qh0LBQh002.2.计算参数计算参数 calculation factors calculation factors (1)(1)填料的计算内摩擦角和重度见表填料的计算内摩擦角和重度见表6-66-6 inner friction angle and gravity of fill materials inner friction angle and gravity of fill materials (2)(2

31、)墙背摩擦角墙背摩擦角 back wall friction angle back wall friction angle 见表见表6-76-76-4:挡土墙设计原那么retaining wall design principle一.挡土墙的荷载组合 Loading combination v挡土墙的荷载v1永久荷载恒载:墙重、填土重,填土的侧压力。v2可变荷载:汽车土压力,浮力,静水压力、施工荷载v3偶尔荷载:v常用荷载组合:二二. .挡土墙的设计原那么挡土墙的设计原那么 design principledesign principle极限形状分项系数法极限形状分项系数法 limit sit

32、uation item factorslimit situation item factors挡土墙设计极限形状分构件承载力极限形状和正常运用极限形挡土墙设计极限形状分构件承载力极限形状和正常运用极限形状状. .Retaining wall limit situation:Retaining wall limit situation:Bearing loads limit situation and normally Bearing loads limit situation and normally application limit situationapplication limit s

33、ituation承载力极限形状出现任一即以为超越承载力极限形状:承载力极限形状出现任一即以为超越承载力极限形状:1 1整个或一部分挡土墙作为刚体,失去平衡;整个或一部分挡土墙作为刚体,失去平衡;2 2构件或衔接部分强度破坏或过度塑性变形;构件或衔接部分强度破坏或过度塑性变形;3 3变为机动体系或部分失去平衡;变为机动体系或部分失去平衡;正常运用极限形状出现任一即以为超越正常运用极限形状:正常运用极限形状出现任一即以为超越正常运用极限形状:1 1影响正常运用或外观变形影响正常运用或外观变形2 2影响正常运用或耐久性部分破坏包括裂痕影响正常运用或耐久性部分破坏包括裂痕3 3影响正常运用的其它特点形

34、状影响正常运用的其它特点形状 挡土墙按构件承载才干极限形状设计,采用以下表达式:挡土墙按构件承载才干极限形状设计,采用以下表达式:),()()(0dfkRRRRS一一. .挡土墙稳定性验算挡土墙稳定性验算 stability computations of the retaining wallstability computations of the retaining wall允许应力法 allowable stress computation极限形状分项系数法 ultimate stress computation 1.挡土墙的破坏方式 destruction types of the r

35、etaining wall 1由于根底滑动而呵斥的破坏; 2由于绕墙趾转动所引起的破坏; 3由于根底产生过大或不均匀的沉陷而引起的墙身倾斜; 4因墙身体料强度缺乏而产生的墙身剪切破坏;6-5:重力式挡土墙设计xQyQEGEG101tan9 . 0)9 . 0 (xyCEfEGK)(2.抗滑稳定性验算 anti-slippery stability computation 验算在土压力及其他外力作用下,基底磨阻力抵抗挡土墙滑移的才干.3.3.抗倾覆稳定性验算抗倾覆稳定性验算 tilt stability computationtilt stability computation 验算挡土墙抵抗墙

36、身绕墙趾向外转动倾覆的才干验算挡土墙抵抗墙身绕墙趾向外转动倾覆的才干. .0)(9 . 01yxxyQGZEZEGZyyyyGyZEZEGZMMK00二二. .基底应力及合力偏心距的验算基底应力及合力偏心距的验算 computation of the subgrade stress and the excentricity computation of the subgrade stress and the excentricity of composite forcesof composite forces 为了保证挡土墙基底应力不超越地基承载力为了保证挡土墙基底应力不超越地基承载力, ,应

37、进展基底应应进展基底应力验算力验算, ,为了防止挡土墙不均匀沉陷为了防止挡土墙不均匀沉陷, ,控制造用于挡土墙基底的控制造用于挡土墙基底的合力偏心距合力偏心距. .1.1.根底地面的压应力根底地面的压应力 compression stress in foudationcompression stress in foudation(1)(1)轴心荷载作用轴心荷载作用 axis loadingaxis loading(2)(2)偏心荷载作用偏心荷载作用 eccentric loadingeccentric loading1NpA11010()cossinGQyQxNGEWE1MeN当当eB/6eB

38、/6当当e eB/6B/6)61 ()61 (1min1maxBeANpBeANp032min1maxpCNp2 2 基底合力偏心距基底合力偏心距 eccentric moment inend of foundationeccentric moment inend of foundation3.3.地基承载力抗力值地基承载力抗力值 bearing capacity of subsoil bearing capacity of subsoil ( (地基应力的设计值应满足地基承载力的抗力值地基应力的设计值应满足地基承载力的抗力值) )(1)(1)当轴向荷载作用时当轴向荷载作用时(2)(2)当偏心

39、荷载作用时当偏心荷载作用时fp fp2 . 1(3)(3)地基承载力抗力值的规定地基承载力抗力值的规定 definition of bearing capacity of subsoil definition of bearing capacity of subsoil )5 . 0()3(2211hkbkffk三三. .墙身截面强度的验算墙身截面强度的验算 computation of the sectional dependability of the computation of the sectional dependability of the wall bodywall body

40、为了保证墙身具有足够的强度为了保证墙身具有足够的强度, ,应根据阅历选择应根据阅历选择1 12 2个控制个控制断面进展验算断面进展验算. .)(/110QiGiQiQQGGjkkkjNNNNARN1.1.强度计算强度计算 strength calculationstrength calculation2.2.稳定计算稳定计算 stability calculationstability calculationkkkkjARN/3.3.弯曲抗拉极限强度弯曲抗拉极限强度 bend tensile limit strengthbend tensile limit strengthkWLjWAeARN

41、)1(04.4.正截面直接受剪时验算正截面直接受剪时验算 direct shear strengthdirect shear strength1/NfRAQmkjjj)61 (2111!12, 1!11111!11AYYxxyYGBeBEGEGZEZEGZBe法向应力验算 normal stress check BEATx11B.剪应力验算 shear stress check四四. .添加挡土墙稳定性的措施添加挡土墙稳定性的措施ways to enhance the stability of the retaining wallways to enhance the stability of

42、 the retaining wall1.添加抗滑稳定性的方法 ways to enhance the anti-slippery stability1设置倾斜基底 set up slanting foundation 设置倾斜基底表示图2采用凸榫根底 adoption of tenon foundation 采用凸榫根底表示图3采用人工根底 adoption of manpowered foundation2.添加抗倾覆稳定性的方法 ways to enhance the tilt stability1展宽墙趾 broaden the wall toe2改动墙面及墙背坡度change gra

43、de of wall space and wall back2改动墙身断面类型change types of section of the wall body3.提高地基承载力或减小基地应力的方法 ways to enhance the bearing capacity of subsoil and reduce the bastion stress1采用人工根底 adoption of manpowered foundation 2采用扩展根底 adoption of spread foundation6-36-3:浸水挡土墙设计:浸水挡土墙设计 design of the immerseable retaining wall design of the immerseable retaining wall与普通挡土墙的区别 difference from ordinary retaining wall: 1土压力因填料受浮力的影响而减小; 2有附加力系的作用,如动水压力、静水压力、上浮力; 3浸水挡土墙的稳定性降低; 4) 砂性土的内摩擦角在浸水前

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论