版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、新产品导入程序管理uIntroduction for NPIuThe Focus for NPIuWhat is customers most concern during NPI process?uNPI ProcessNPI is becoming more and more important in most manufacturing companies. It is the first step to win customer confidence on both production capability and business management.Full Name of N
2、PI: New Product IntroductionCONTENTNPI locates between design and mass production and it is a verifying process to product design and production. How to get profit from the NPI business; Standing as manufacturing service provider, we need focus on followings: How to manage the NPI business; How to c
3、ome out a proper NPI report to customer to get customer approval; How to transfer the NPI to factory to implement mass production smoothly; For the supplier: a Quality b Capacity For the product: a Enough training to operators and engineers b Product requirement are clear and implemented solidly c P
4、rocess setup adequately d Process evaluation is ready -The practice and lesson learnt in NPI phase are most important as customer is prefer to solve all problems which are related to design and system fault at this phase, not mass production phase. Pre-study Phase Planning Phase Execution Phase Tria
5、l-run Phase Ramp-up Phase Transfer Phase Pre-study Phase-Sales manager will call related people to review the sales offer, forecast, project budget and agreement.At the same time,product engineers need to ask for the informations such as product specifics and production requirement from PM or custom
6、er to know the prouct in advance. Planning Phase -This phase is very important to whole program. PM should have a detailed list to review one by one to ensure all information are ready and all plan have responsible people and deadline.ITEMRELATED PLANSaProject milestonebProject organizationcInvestme
7、nt plandFacility planeMaterial management planfQuality plangManufacturing planhRisk management planiECR/ECO planjCPM analysis and back-up solution considerationa Project milestone(Schedule) b Project organization(Team) -Process Engineer/SMT Engineer/Diagnostic Engineer/Quality Engineer/Program Manag
8、er / Sales/Buyer/Planner/PDM(product document manager)/Finance etc. c Investment plan -PM or higher hierarchy to define the investment. The investment includes equipment cost, tooling & jig & fixture cost, training cost and renovation cost. Most cost has been put into quotation and now we ne
9、ed control it by items. d Facility plan. PM should call production manager, WH manager, facility manager to define the location: -which SMT line can be adequate use? -where to allocate the production line? -where to store the finished goods ? e Material management plan. -We need Material Manager to
10、discuss the purchasing plan and delivery plan if consigned material there is. -This plan is very serious to make sure there is no material shortage. -Shortage is very easy occurred on three cases: single sourceDOS (days of supply) too long bad BOM usage For this case, we can use safe stock to contro
11、l. f Quality plan. -Quality dept. should provide quality control plan, sub-supplier management plan, FMEA, environment report (if applicable). g Manufacturing plan: -Production manager should report the manpower allocation and make the training plan to operators. -IE should finished the layout plan
12、and standard time calculation, based on the volume, shift arrangement, operator quantity, line layout, tooling & equipment balance, technical people support. -Test engineer should also feedback the running status to PM. h Risk management plan: -Not all potential problems would occur, but if occu
13、r, some plan and work may going to “death”. i ECR/ECO plan: -PDM and product engineer should control this plan. PM have to concern about once the engineering change would cause cost change. So, to define an ECR/ECO handling procedure and cost control process are necessary. j CPM analysis and back-up
14、 solution consideration: -CPM:Critical Path Method -When all plans were ready, PM should have a review to all these activities as a by-stage come-out. We title the review meeting as “planning review” or “start-up review”. The purpose is to make sure all activities are under control and running as wh
15、at we expected. -Following here are some Items which are critical and need high attention in the review meeting:NO.Critical ItemsaGeneral InformationbSupply chain managementcProduction line settingdQualityeOther problemlGeneral Information: -customer milestone -capacity -volume -dedicated project pe
16、rsonnellSupply Chain Management: -the focus is on procurement management and component coding (or BOM coding). Before the meeting, Material people should review the BOM and check out which ones are critical components. The critical component mainly means supplier-controlled market and/or high-value
17、unique component. lProduction Line Setting: -SMT package (Gerber, X-Y, PCN drawing) -assembly process -packing requirement (domestic and export) -traceability -testing software and hardware -tooling preparation -delivery method -cosmetic specification and checking method -plant layout -operator trai
18、ning and shift arrangement lQuality: -control plan and flow chart, -environment audit -process audit -GR&R -golden sample -trial run premises -process qualification requirementlOther Problem: -finance -logistics -security Execution phase As soon as customer gives go signal, the NPI is promoted i
19、nto “executive phase” and a checklist need to be made.NO.Check ItemaAVL and BOM bProduction cPacking Design and InstructiondQuality documentseCustomer Specification and Golden Sample fCapital Expenditure l Production documents: a Process Flow-chartb SOP (or MI/WI)c Test Instructiond Final Inspection
20、 Instructione Packing Design and Instruction.a PFMEAb Control Planc GR&Rd Capability Studye PQP Plan.l Production documents:l AVL(AML) and BOM:l Customer Specification & Golden Sample (if applicable): a Make sure the latest quality and product specification was got, and renewal of test softw
21、are. b Quality engineer should transfer the specification into internal format.c Testing engineer should have a software upgrade list. d Final Inspection Instruction.e Different document version may be applied to different product version. l CapEx: -Check that approved CapEx is available. Trial-run
22、Phase-Customer released formal PO# and confirmed price, we start trial run. The output is trial run report from engineer team. The result is trial run sample approved by customer and give ramp-up signal. -The trial run report should cover the processes from SMT to packing and shipment. We should rai
23、se action plan for all critical problems and potentials necessarily. After trial run, sample would be sent to customer based on request. -After trial run, sample would be sent to customer based on request. -In most cases, the whole NPI can be lengthened or shortened due to many factors, and it is al
24、so naturally have direct correlation to customer demand. functionalitycomplexity requirement predicted volume There are 4 basic factors: Ramp-up Phase-The trial run sample was approved by customer and “go-signal” was released, it means we can move to “ramp-up phase” successfully. -This is the final
25、phase for NPI. We must check what is lost or need further improvement for factory production. -In fact, customer would give updated forecast and MRP plan now.Planner can make production schedule based on that. Transfer Phase-When customer approved the Ramp-up plan, NPI PM has to call a meeting with factory steering to transfer the project and report to customer about the transfer.-prepare a completed NPI report to factory members to make the transfer successful.- KPI
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 教育培训管理考核办法
- 建筑设计招投标管理规程
- 城市规划管理消缺管理办法
- 医院改造私人施工合同
- 橡胶制品厂车辆通行条例
- 火车站水电改造施工分包合同
- 翻译公司钥匙管理规则
- 航天工程客户意见反馈指南
- 旅游设施招投标授权委托书
- 医疗聘用合同医院物业管理
- 住院医师规范化培训临床小讲课指南(2021年版)
- 《旅游管理信息系统》课程教学
- 乡村医生健康教育培训讲稿课件
- 成人癌性疼痛护理-中华护理学会团体标准2019
- 产品销售培训心得
- GB/T 42698-2023纺织品防透视性能的检测和评价
- 《无机化学》课程标准
- 二年级下册道德与法治教案-3.2节约粮食北师大版
- 行政法与行政诉讼法
- 创业修炼知到章节答案智慧树2023年同济大学
- 急诊剖宫产分级
评论
0/150
提交评论