1、IV Construction Method, Technical Measurement of Road Works道路工程施工方法及技术措施1、Road Structure道路构造:Heavy load road重型道路:Soil compacting150 mm thick 12% lime soil220mm thick fly-ash200mm thick C30 concrete素土压实-150厚碎石基层。-300mm厚二灰结石-150mm厚C 20砼(内配钢筋 C15予制砼平石、侧石安放-60mm厚粗粒式沥青砼-30mm厚细粒式沥青砼-Light load road轻型道路:So
2、il compacting200mm thick 12% lime soil220mm thick fly-ash200mm thick C30 concrete素土压实-150厚碎基层。-50mm粗砂找平层-150mm厚C30砼面层。Pavement人行道:Soil compacting200mm thick fly-ash bedding30mm thicksandprecast cement tile C30素土压实,100厚碎石基层-50MM厚粗砂上铺彩色予制人行道砖。2、Road working procedure道路施工流程2.1 Plain soil compacting-soi
3、l density teat-pipe embedding under the road-150*2mm thick 12% lime soil bedding-lime soil test-220mm thick fly-ash beddng-220mm thick C30 concrete finish-concrete curing-curbs paving 素土压实-土密实度侧试-路基下管线埋设-150*2厚12%石灰土基层。-灰土试验-220mm厚二灰结石-220mm厚C30砼面层。-砼养护-路沿石施工2.2、Main Construction Method主要施工方法施工放线:根据
4、平面坐标控制点及设计施工图,测放出道路中心线桩及边线桩。管线标志:在道路工程开工前,安排专人认真复核地下管线和地下隐蔽设施的位置和标高,对外露的各种井口设置标志杆牌,以免埋没或堵塞。路基压实2.2.3.1、When compacting road base, to abide the rules as follows: first light second heavy, first table second vibrate, first slow second quick, first edge second center, first high second low. And compact
5、ion roller should exceed construction joints.路基碾压时,应遵循先轻后重、先稳后振、先慢后快、先边后中、先高后低以及轮迹要重叠等原则,且碾压轮应超过分段施工的接缝。2.2.3.2、When compacting road, to first compact stably then 45 times of vibrating compaction last stably compact again.路基压实时先稳压一遍,再振动碾压四五遍,最后再稳压一遍(碾压遍数现场试验后再作调整。2.2.3.3、To compact longitudinally, a
6、nd first edge side them central part.碾压顺道路纵方向进行,且先边后中;轮迹重叠>30cm。2.2.3.4、After compaction, to test compaction coef., through frequency &quantity for quality control.碾压速度均匀,轮迹重叠,压路机碾压不到的部位,应采用小型机夯实或人力夯认真夯实,夯击面在纵横方向均应相互重叠一半,防止漏夯。路基压实后不得有松散、弹簧、翻浆及表面不平整现象,若下层未达到压实度要求,不得铺筑上层。2.2.3.5、Take the soil d
7、ensity test after compaction to judge the quality of the compacted soils.土路基碾压后,按规定频率,数量进行土的密实度试验,以判断碾压质量。进行环刀试验2.3Construction of fly-ash bedding二灰结石的施工:1、The fly-ash will be supplied by as the finished product and delivered on site for paving二灰结石的材料由供货商成品生产后及时运往工地,铺设施工。2、The material mixing scale
8、is strictly comply with the national standard (JTJ034-2000, producing after approval by testing ,材料级配严格按照设计要求进行配合比设计,试验确定后生产执行。配比为:熟石灰:粉煤灰:碎石=1:2:33、Lime: cinder: aggregate= 5:15:18三灰碎石混合料配比为:石灰;粉煤灰;集料=5:15:184、The fly-ash paving after road compaction, use machine for construction, leveling, compact
9、ing and sloping, we will strictly fulfill the regulation and code during construction.在道路基土压实,测试合格进行二灰结石的施工,施工用机械化施工,铺设平整(适当放坡压实密实,严格按规范要求进行。5、Must care for the curing after fly-ash paving, no vehicles pass through during curing period, set barricade for separation.施工完成后的二灰结石,必须确保养期,在保养期内禁止车辆通行,采取道路隔离措施。6、The material inspection w
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 淮阴师范学院《解析几何》2021-2022学年第一学期期末试卷
- 淮阴师范学院《政治哲学》2023-2024学年第一学期期末试卷
- 淮阴师范学院《西方音乐史专题研究》2022-2023学年第一学期期末试卷
- 课件怎样播放教学课件
- 淮阴师范学院《普通生态学》2023-2024学年第一学期期末试卷
- 淮阴工学院《研究方法与论文写作》2022-2023学年第一学期期末试卷
- DB4420T+54-2024《企业商业秘密保护管理规范》
- DB2310-T 151-2024珍珠梅播种育苗技术规程
- 2020年科普知识竞赛题库及答案(完整版)
- 公共设施管理的城市景观规划考核试卷
- 2016年7月自考00324人事管理学试题及答案含解析
- 视光门诊运营计划方案
- 护理评估单工具的使用
- 2021年大庆精神铁人精神知识竞赛题库
- 浙江泰隆商业银行员工手册
- 审计技能实训教程(喻竹 第二版) 教案全套 1.1-9.2 业务承接与评价-审计底稿归档
- 徐州市2023-2024学年八年级上学期期末数学试卷(含答案解析)
- 某户外亮化工程冬雨季、夜间施工措施
- 生涯发展报告通用模板
- 越人歌音乐分析报告
- 年轻干部优势分析报告
评论
0/150
提交评论