4100DWT轴舵系技术协议922_第1页
4100DWT轴舵系技术协议922_第2页
4100DWT轴舵系技术协议922_第3页
4100DWT轴舵系技术协议922_第4页
4100DWT轴舵系技术协议922_第5页
已阅读5页,还剩5页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、4100吨加油船技术协议书(CCS)4100DWT BUNKER TANKER(CCS)TECHNICAL AGREEMENTSUBJECT: 4100DWT油船项目名称: 4100DWT油船HULL NO. : KDZ-5-1625船号:KDZ-5-1625供货范围:轴、舵系外协加工订货船厂:日照港达船舶重工有限公司 签字:制造厂: 盐城市江华船舶设备科技有限公司签字:1. 总则 1.1 This agreement is the appendix of contract, and regarded as the integral part of the contract. This agr

2、eement shall become effective on the date when the contract has been duly executed. 本协议作为采购合同的附则,是采购合同的组成部分。本协议将在采购合同正式实施时生效。1.2 Classification society Rules船级符号: CSA Oil Tanker,Double hull, F.P.60,ESP,BWMP ,IWS ,PSPCCSM 1.3 Put up banner (Ship registry) 挂国旗(船籍): China 中国1.4 Rule and Regulation规范及规则

3、:All machinery and devices of this vessel shall be constructed in accordance with the following Rules and Regulations (the edition and amendments thereto being in force as of the signing date of this Contract or which notice has at the signing date of the Contract been promulgated and which come int

4、o effect after the signing date of this contract but before the delivery of the vessel) 本船设备应满足以下规范及规则(且包括在合同签署时、合同签署日期之后以及交船前生效的版本、修正案或颁布的声明)1) The rules and regulation for classification of sea-going steel ships 2009. 钢质海船入级规范2009.2) The rules and regulation for materials and welding 2009. 材料与焊接规范

5、2009.3) The rules for lifting appliances of ships and off shore installations 2007, CCS. CCS2007船舶与海上设施起重设备规范.4) The technical regulations for statutory survey of international seagoing ships 2008, Maritime safety administration of the P.R. China (中华人民共和国海事局2008国际航行海船法定检验技术规则) and the amendments of

6、2009, 2010.5) The technical regulations for statutory survey of lifting appliances of ships 1999, Register of shipping of the P.R. China. (中华人民共和国船舶检验局1999起重设备法定检验技术规则) 6) International convention for the safety of life at sea consolidated edtion2004(IMO国际海上人命安全公约2004综合文本,包括2003,2004,2005,2006,2007,

7、2008修正案), including the Amendments of 2003, 2004, 2005, 2006, 2007 and 2008.7) The international convention on load lines, 1966 and as modified by the protocol of 1988, IMO (IMO 1966年国际载重线公约和经1988年议定书修订的1966年国际载重线公约), including the Amendments of 2003, 2006, 2008.8) The international regulations for

8、preventing collisions at Sea 1972, IMO and its amendments of 1981,1987,1989,1993,2001.( IMO 1972年国际海上避碰规则及其1981,1987,1989,1993,2001修正案)9) International Convention for the Prevention of Pollution国际防污染公约(MARPOL)from ships 1973 (Annex I, IV, V & VI for NOx), as modified by the protocol of 1978 rela

9、ting thereto consolidated edition 2006.10) International convention on the control of harmful anti-fouling system on ships. IMO国际控制船舶有害防污底系统公约。11) International Tele Communication Convention, 1973 and Radio Regulations, 1974 国际电讯公约及1974年无线电规则and those Amendments of Geneva 1979,1982,1983,1990 and 199

10、2 with GMDSS. 全球海上遇险呼救及安全系统。12) OCIMF, Standards for Manifolds and Associated Equipment, 1991. (for reference only) 1991年石油公司国际海事论坛(OCIMF)关于集油管和相关设备的标准(仅作参考)。13) Rules and Regulations of Authority Government政府主管部门的规范和规则14) Regulation for bunkering vessel of Maritime and Port Authority of Singapore (

11、MPA) 新加坡港务局海上加油船规定。15) ISO 6954 Guidenlines for Vibration on board ship. 船舶振动ISO6954要求。16) IMO Resolution A468 (XII) Code of noise level on board ship.船舶噪声IMO A468 (XII)规则要求。17) ILO convention concerning Crew Accommodation on board ship No.92,No.133.国际劳工组织关于船员住舱要求No.92,No.133。1.5 Certificate证书1) The

12、 equipments should be delivered with the product certificates issued by the China Classification Society. 设备应持有中国船级社颁发的产品证书。(1正4副)2) Builders Certificate. 船舶建造者证书2. Drawings and documents图纸及文件2.1 Approval drawing认可图:船厂:2 sets hard copy+ 1 set AutoCAD soft copy(2套图纸+1套CAD电子版)船东:2 sets hard copy(2套图纸)

13、+1 套CAD电子版设计公司:1 sets hard copy+ 1 set AutoCAD soft copy(1套图纸+1套CAD电子版)生产设计公司:1 sets hard copy+ 1 set AutoCAD soft copy(1套图纸+1套CAD电子版)2.2 Working drawing工作图:船厂:2 sets hard copy+ 1 set AutoCAD soft copy(2套图纸+1套CAD电子版)船东:2 sets hard copy(2套图纸)1 套CAD电子版设计公司:1 sets hard copy+ 1 set AutoCAD soft copy(1套图

14、纸+1套CAD电子版)生产设计公司:1 sets hard copy+ 1 set AutoCAD soft copy(1套图纸+1套CAD电子版)2.3 Final drawing完工图纸:船厂:4 sets + 2 CD(4套图纸+2套电子副本)2.4 Drawing list or provided drawings including following content: 图纸清单或提供的图纸应包括以下内容:(All plans and documents are to be in English and Chinese所有设计图及文件均以英/中文书写)NoDrawing listAu

15、toCAD DiscAgreementfor contractApprovaldrawingWorking drawingFinaldrawing1Catalogue and reference drawing目录及相关图纸42Outline size & mounting dimension & Weight list外形参数、安装尺寸及重量表16643Components list构件列表16644System diagram系统图16645Electrical principle diagram电气原理图16646Outer elec. wiring diagram外部电

16、路图16647Spare parts list备件清单16648Test program试验纲要169Test report试验报告410Class certificate & manufacturer certificate船级社及制造商认可1+311System function installation Operation & maintenance manual系统性能安装、操作及维修指南66412The Biography to contain particulars of all machinery main components (e.g. pumps, cons

17、oles, etc.)and equipment main components所有机器的主要部件(如泵、控制板等)及设备主要部件的详细描述1642.5. After the contract is executed, Vender should submit the approval drawing to shipyard/owner/design institute within 2 weeks and one set of drawing in AutoCAD by e-mail. Approval comments to be gathered by fast far design c

18、ompany, and to be supplied to vender ASAP. 合同生效后,设备厂应在2周内向建造方/船东/设计公司递交认可图纸,并通过电子邮件发送AutoCAD版图纸。各方审核意见由港达船厂归口处理,并尽快发送至设备厂商。2.6.After shipyard/owner/design institute supply the comments, Vender should modify the drawing and submit the working drawing with CAD copy to Owner/shipyard/design institute w

19、ithin 2 weeks. 船厂/船东/设计公司提出审核意见后,设备厂应根据意见进行修改,并在2周内向各方递交工作图纸以及CAD版图纸。2.7 Final drawings should be sent to shipyard/owner with equipments. 完工图纸应随设备一同送至船厂/船东。3. Technical Standard技术标准3.1 Standards: 标准 CBM/GB/CB -Chinese standard中国标准 DIN/ISO/JIS -International standard国际标准Metric system measuring units公

20、制计量单位: Volume体积 立方米(m3)或升(L) Weight重量 1吨(t)=1000千克(kg) Pressure压力 巴(bar)或兆帕(Mpa) Temperature温度 摄氏度() Velocity速度 米每秒(m/s)或节(knots) 3.2 Painting喷漆The outer painting of electrical and machinery equipment should be accordance with ship owners requirement (no-luminous paint to be used for the equipment p

21、laced in wheel house) Munsell7.5. 电器及机器设备的外部喷漆应满足船东要求(驾驶室内不应使用反光涂料)。Munsell 7.53.3 Name plate铭牌:Material材料: Brass plate黄铜; Letter文字: Chinese &English 中英文3.4 Instrument指示计Amperemeter, voltmeter, frequency indicator and Revolution indicator etc. shall have red-line index marks on their respective

22、rate value. The class of accuracy is not less than 1.5. 电流表、压力计、频率计以及转速计等应有红线刻度指示标准值。仪表精确度不应低于1.5级。3.5 Supply供电Ships Power supply system船舶动力供电系统AC 440V three phases 60Hz three wires三相三线制Inter communication system内部通讯系统AC 220V, single phase, 60Hz单相Navigation and Radio 导航及无线电通讯AC 440V, three phases, 6

23、0Hz, three wires三相三线制AC 220V,single phases, 60Hz, two wires单相Communication system 通讯系统AC 220V, three/single phases, 60Hz三相/单相DC 24VControl and monitoring system控制及监控系统AC 220, Single phase, 60Hz单相DC 24V +/-20%4. 提供全球联保global service5. 质保期:交船后12个月或安装后18个月;arranty period:12 months after vessel delivery

24、. Man 18months from goods installation.6. 温度/压力传感器或开关选用DANFOSS或等同品牌,浮子开关选用上海柯普乐或等同品牌7. 设备出厂试验提前15天通知船厂和船东并提供试验大纲供认可,shipyard and owerner to be informed before FAT and test programe to be provided.8. 11kw以上电机及潮湿处所电机配空间加热器,15kw-40KW电机星三角启动,40kw以上电机自耦启动,5kw以上电机原则上配电流表及计时器,9 Spare part 备件部分The necessary

25、 number of spare parts to be supplied according to requriements of the Classification Society and makers standard . 根据船级社要求和厂商标准,除此外提供如下备件:9.1 提供1年厂家标准备件Supply the standard spares for one year purpose.9.2 For total sets generator (electric part only, engine part to be specified in machinery spec.)对所

26、有发电机Each1 set of bearing 每台备有轴承一个1Set of air filter element空气滤器一个1Set of rectifier整流器一个1Set of AVR自动调压器一个9.3 For total sets motors and motor controls 所有的电机和电机控制1 Motor bear for each 1每个备有轴承一个1 Connector for each 5 or less (same size)每5个备有一个继电器(或接触器)2 Bulb/globe of lamp for each 1每个备有2个指示灯3 Fuse elem

27、ents for each 1每个备有3个熔断丝 1 Fuse case for each 10 or less (same size) 每10个备有一个熔断器盒 1 Push bottom switch for each 10 or less (same size) 每10个备有一个按钮10外接管路提供配对法兰。内容:日照港达船舶重工有限公司(甲方)建造的4100DWT油船,选用盐城市江华船舶设备科技有限公司(乙方)生产的轴系、舵系产品,乙方所提供的产品须按照甲方提供的退审图及生产设计图纸生产,外购附件(例如轴承、尾轴密封等)应根据厂商表采购,符合CCS船检社检验规范。产品生产、试验和验收按

28、照CCS钢船规范(2010)和国际航行海船法定检验技术规则(2008)及相关船舶行业标准,满足图纸设计的要求。双方经协商,达成如下协议:1、乙方轴、舵系铸锻件应符合CCS的要求,所有铸、锻件表面及内部无影响使用的缺陷,所有产品按图纸要求提供CCS检验证书、机械性能、化学成分报告、无损探伤报告和热处理报告。2、乙方按照甲方提供的图纸进行加工、验收;加工精度及表面粗糙度须符合图纸规定的要求,乙方提供的产品按图纸要求加工到位。轴系主要供货设备清单 序号名称及图号规 格 型 号材 料单位数量/船备 注1螺旋桨轴210×648535#锻钢件22联轴节见图35#锻钢件23中间轴见图35#锻钢件24前艉管定位套见图ZG25件25后艉管支架定位套见图ZG25件26货物泵输出轴见图35#锻

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论