




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、靠离泊作业2讲解 Berthing means bringing a vessel to her berth until the ship is made fast. A ship may berth port or starboard side on or bow or stem on.vThe term “berth” refers to the quay, or wharf, or, pier or jetty where the ship comes alongside, but it may also mean a place in which a vessel is moored
2、or anchored.vThe berthing and unberthing manoeuvres require great knowledge and skill by the master, officers vand the crew, as well as an excellent team-work with the rope-runners and the mooring party ashore.vA ship may berth port or starboard side to, with no wind or tide, with the tide ahead, wi
3、th the wind onshore or offshore. The master, the pilot and the tug skippers must have good local knowledge of the tides, wind conditions, depths and aids to navigation, but they also have to take into consideration the transverse and axial thrust of the propeller, how the ship responds to the rudder
4、 and how much power she develops when running astern.vBerthing starboard side to quay right hand fixed propeller calm conditionsv1. Approach the quay at a shallow angle, say about 15 degrees, engines dead slow ahead.vStop engines on approach taking account of the headway which the ship will carry.v2
5、. Approaching the berth, apply port helm to cause the stern to swing towards the berth. Engines astern to stop the ship and the effects of transverse thrust will check the stern swing.v3. Stop engines. Send away head and stern lines and make fast.vNB. In the event that there is limited room ahead of
6、 the vessel, the forward spring line should be sent first.v1. Approach the quay at a shallow angle, say about 15 degrees, engines dead slow ahead.vStop engines on approach taking account of the headway which the ship will carry.v2. Approaching the berth, apply port helm to cause the stern to swing t
7、owards the berth. Engines astern to stop the ship and the effects of transverse thrust will check the stern swing.v3. Stop engines. Send away head and stern lines and make fast.vNB. In the event that there is limited room ahead of the vessel, the forward spring line should be sent first.Berthing sta
8、rboard side to quay right hand fixed propeller calm conditionsvThe objective is to clear the berth when a tidal stream is ahead of the vessel. The action allows a wedge of water to flow between the dock wall and the ships side to forcing the vessel off the berth.v1. The vessel should be singled up t
9、o a head line, and an aft spring.v2. The aft spring line should initially be kept tight, while the head line is slacked down. The tidal stream effect would pivot the vessel about the spring and cause the bow to move off the berth. The weight of stream water moving between the berth and the ships side, forces the stern a little away from the dock.v3. Dead slow ahead on engines and let go forward. Stop engines and let go aft.v4. Engines ahead to clear the berth into the tidal st
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 体育装备购买合同范例
- 包装材料合同范例
- 包装印制合同范例
- 产品宣传合同范例
- 内乡活动板房合同范例
- 高标准农田建设土壤改良与保护
- 黑龙江彩瓦翻新施工方案
- 2024年《公务员法》相关法律法规知识考试题库【a卷】
- 2024年“巴渝工匠”杯竞赛负荷控制理论考试题库大全-下(判断题)
- 课题开题报告:区块链背景下建筑工程质量协同治理机制与策略研究
- 压力容器年度检查表
- 2023-2024学年湖北省洪湖市初中语文九年级下册期末通关试题
- YY/T 1269-2015血液透析和相关治疗用水处理设备常规控制要求
- DG-TJ 08-2198-2019 装配式建筑评价标准 附条文说明
- GB/T 1.2-2020标准化工作导则第2部分:以ISO/IEC标准化文件为基础的标准化文件起草规则
- 电气接地施工规范
- VTE预防优质课件
- 路灯照明工程施工组织设计路灯施工组织设计方案
- 湘教版《美术》六年级毕业班复习题
- 纪念抗日战争暨世界反法西斯战争胜利70周年主题班会课件
- 分娩恐惧量表
评论
0/150
提交评论