1、3. 控制方式 Automation control description 设中控室自动控制,机上自动控制,机上人工控制和机旁现场控制方式,方式选择 开关设在机上控制室内。 机上人工控制适用于调试过程中所需要的工况和自动控制出现 故障时,要求堆取料机继续工作,允许按非规定堆料方式堆料和取料工况。机旁现场控 制及人工控制适用于检修、调试和维护工况,此种控制方式下,堆取料机各传动机构解 除互锁,只能单独起动和停止。自动控制方式下的堆取料作业由中控室和机上控制室均可实施。There are four control modes for users to select only in the loc

2、al control room:CCRauto control , local panel auto control , local panel manual control and local site control.Local panel manual control mode is only selected for some abnormal situation, like commissioning, or that the machine has to continue working when the CCR control mode cannot work. In this

3、case, the piles location would not be pre-defined by program.Local panel manual control and local site control are set for local maintenance, commissioning or maintaining the process work in abnormal situations. In such cases, the individual devices would be started or stopped separately, and are no

4、t interlocked by program.CCR auto control & Local panel auto control modes, in these automatic modes, the machine can be controlled automatically from CCR or from local control HMI screen by pre-defined program.3.1 堆料自动控制 stacking control description 料堆按逆时针方向连续堆成。堆料区域 120 度。堆料臂从 0 度逆时针回转至 120 度,

5、 同时从 +14 度变幅至 -16 度,随后堆料臂从 120 度顺时针 回转至 0 度,同时从 -16 度变幅至 +14 度。堆料臂的回转和变幅运动均为连续运动。Material piling machine piles materials continuously anticlockwise. The piling material area is 120 degrees. The material piling cantilever revolves from 0 degree to 120 degrees anticlockwise, in the mean time luffings

6、from +14 degrees to -16 degrees. After then, the cantilever revolves back from 120 degrees to 0 degree, and amplitude changes from -16 degrees back to +14 degrees. The movements of swinging and luffing the cantilever are both continuous.当堆料臂回转往复堆料到料堆高度后,触动料位计发出信号,将水平回转移位 3 度,回 转行程将由 120 度变为 123 度,接续

7、的逆时针方式堆料的回转行程仍为 120 度。When the machine piles the material to the set height, the level switch would be triggered and the signal would be sent back to PLC. The cantilever will move back horizontally by 3 degrees. The revolving back angle would be changed to 123 degrees from 120 degrees. But the conti

8、nuous revolving angle is still 120 degrees anticlockwise.为减缓堆料臂改变回转方向时引起的振动,采用变频调速来控制堆料机的回转,使之制 动前缓减速,起动后缓加速。堆料臂架变幅机构配置变量泵液压系统。其运动是变速运 动并与基本是匀速的回转运动合成,使堆料臂落料点始终与堆顶保持等距。In order to reduce the vibration when switching the direction of the cantilever, the revolving motor is driven by frequency converte

9、r by decreasing the speed slowly before braking, and increasing the speed slowly for the next start. Hydraulic system would also be used for the luffing mechanism devices. The whole movement is combined with variable motion and constant revolving motion, thus, the distance between the pile top level

10、 and material discharge position can be maintained.变幅机构起动受回转机构起动信号控制,停止不受回转机构停止信号的控制。The starting process of the luffing mechanism would be influenced by the starting of the revolving mechanism. In contrary, the stop process would not be influenced by each.堆料臂架前端底部与堆顶间距保持在 0.81.2 米。由设在堆料臂前端的料位探测器引导

11、和控制。The distance between the cantilever material discharge position and pile top position would be kept from 0.8 to 1.2m, and is detected by the level sensor installed in the front of the cantilever 堆料机动作联锁 stacker movement interlock : 正常起动:起动指令回转和变幅起动堆料皮带机起动来料栈桥皮带机起动,各环 节起动间隔 10 秒可调。Normal start: S

12、tart comma nd revo Iving system and luffi ng system start belt conveyor for stacker start feeding belt conveyor start. The interval time between each step is set as 10 seconds and can be adjusted. 正常停机:是上述顺序的逆过程。Normal Stop: feeding belt conveyor stop - belt conveyor for stacker stop - revolving sys

13、tem and luffing system stop - Stop command. The interval time between each step is set as 10 seconds and can be adjusted.非正常停机:所有传动同时停机。Abnormal stop: All the drives stop at the same time. 堆料机正常停机时,堆料臂停到料堆堆料起始点处。In normal stop situation, the cantilever should go back to the feeding position at the f

14、irst beginning for this pile .3.2 取料机自动控制 Reclaimer automation control 取料机始终按逆时针方向回转取料。The machine always revolves anticlockwise to reclaim the material. 取料机运行包括端梁行走,刮板链运行和料耙驱动三部分。Reclaimer operation includes three parts of end beam travelling, scraper chain motion and material harrow drive motion.取

15、料机取料能力的调整,采用改变端梁运行速度(变频调速)来实现。Reclaiming capacity can be adjusted by changing the speed of the end beam travelling through VVVF control.取料机行走驱动装置 2 套,同时工作,取料时工作电机采用电机变频调速, 转向不可逆; 行走装置中还设有调车运行电机,为恒速可逆。There are two sets of travelling drives for reclaimer motion, both working simultaneously. The recla

16、im working motor is driven by VVVF, and irreversible. The transfer motion motor speed is constant and reversible. 取料和调车运行工况对行走驱动装置的要求如下:The requests for the travelling motion control when reclaiming materials and transferring are as fellow: 取料运行:磁粉离合器结合,调车电机断电,取料运行电机接通起动。Material reclaiming operatio

17、n: electromagnetic clutch engaged, transfer motor power off, reclaim motor power on and started.调车工况:磁粉离合器松开,取料运行电机断电,调车运行电机接通起动。取料运行电 机、离合器和调车电机互锁。Transferring operation: electromagnetic clutch disengaged, reclaim motor power off and transfer motor power on and started. Reclaim motor and transfer m

18、otor are mechanical interlocked by electromagnetic clutch.刮板驱动装置 2 套,恒速不可逆。Two scraper drives are constant and irreversible. 料耙驱动的变频电机单向不可逆,料耙的双向运动,由行程两端接近开关使电磁换向阀 换向,实现料耙油缸带动料耙正反向行程连续运行,电控系统控制变频电机实现液压缸 的缓慢起动和停止。Material harrow is driven by VVVF and the motor direction is irreversible. The continuou

19、s two-way motion of harrow is driven by the hydraulic system. When the proximity switches detect the harrow motion at each set point of the travelling, the electromagnetic directional valve will be energized or deenergized to change the direction. The hydraulic system is controlled by the PLC throug

20、h VVVF. 取料机动作联锁:Interlock for Reclaimer Motion: 正常起动:起动指令出料皮带机起动刮板链驱动起动料耙驱动起动工作取料运 行机构起动,各环节间隔 10 秒可调。Normal start: Start comma nd - material tran sport belt con veyor start - scraper chain drive start - material harrow drive start - material reclaiming system start. The interval time between each s

21、tep is set as 10 seconds and can be adjusted. 正常停机:停机指令下达后是上述顺序的逆过程。Normal Stop: after stop command, then the reverse sequence of the start procedure as mentioned above.非正常停机:所有传动同时停机。Abnormal stop: All the drives stop at the same time.4. 监控和保护 monitoring and protection4.1 堆取料机的堆料臂与桥梁之间相对角度实施监控。堆料机悬

22、臂与取料机桥梁之间 设双道行程限位开关。 当相对角度为 64 度或 269 度时发出报警, 指令由控制系统发布, 64 和 269 度报警为预警信号,在机上都有显示,断续声光显示在机上, 61 和 272 度停 机,停机信号在中控室显示。堆料机自动进入正常停机,声光信号依然存在,报警信号 可通过按钮消除。The angle between the cantilever of the stacker and the bridge would be monitored and recorded, and between which double limit switches would be eq

23、uipped to ensure the safety. When the relative angle is 64 degrees or 269 degrees, sound light warning would be triggered and displayed on the HMI, lasted until the alarm release button is pressed. When the relative angle is 61 or 272 degrees, stop command would be triggered and the alarm would be g

24、enerated and sent to CCR. In this case, the normal stop sequence would be executed then.4.2 堆料臂架的变幅角度通过铰轴处编码器控制。 堆料臂卸料点下方设料位计 ,通过料 位计控制使堆料臂始终与堆顶保持尽可能小的等距落差 。The amplitude angle of the stacker cantilever is measured and controlled by the encoder located at the boom pivot. Also the level meter would b

25、e installed under the discharge outlet of the cantilever, through which the min. possible distance between the discharge outlet and pile top would be maintained.4.3 堆取料机各驱动机构电机设短路和过载保护并能予以显示。Short circuit and overload protection should be set and can be displayed for all the drive motors on stacker.

26、4.4 堆料机变幅液压站 ,取料机料耙液压站油温予以监控并能予以显示。Oil temperature for hydraulic system, including stacker cantilever amplitude control system and reclaimer material harrow control system, should be displayed and monitored.4.5 堆料机堆料臂卸料点下方设防撞保护 ,传感元件为料位计( CONASEN TC-1 )。 Level meter would be equipped under the disch

27、arge outlet of the stacker cantilever to avoid the collision.4.6 刮板输送链尾轮处设断链监测,传感元件为接近开关。Chain scission monitoring would be equipped at the tailpulley of the scraper chainwith the proximity switch.4.7 堆料机悬臂变幅行程两端各设 1 道极限行程限位开关和工作限位开关。Double limit switches would be equipped at each end of the stacker

28、 cantilever luffing range. One for ultimate limit and another for working limit.4.8 堆料机上胶带输送机上设两组跑偏保护装置 ,胶带第 1 级跑偏发出故障报警信号 , 胶带第 2 级跑偏信号发出,堆料机停机。胶带输送机正常停机延时 5 秒制动或断电,取 料刮板机正常停机延时 60 秒断电。The belt conveyors on the stacker are equipped with two sets of misalignment switches. One set for the first level

29、 belt misalignment will generates the waning. Another one for the second level misalignment will note only generates the alarm, but also stop the system. In normal stop sequence, there should be 5 seconds time interval before the belt conveyor stop or brake, and 60s for the scraper chain.4.9 堆料机设有 5

30、 套干油润滑泵站,控制系统对各泵站油位监控,泵站油位发讯号动 作,控制系统报警。There are totally 5 sets of grease oil station for the system. The grease oil level would be monitored. Once the oil is too low, system would generate the alarm.4.10 取料机料耙油缸工作行程的两端设接近开关,控制料耙液压站系统中电磁换向 阀换向,实现料耙油缸正反行程运行。为防止料耙与支撑系统碰撞增设两个极限行程开 关。At two ends of the

31、 hydraulic system stroke for the material harrow drive, proximity switches would be equipped to control the electromagnetic direction valve, which is set to control the direction of the harrow. In order to protect the harrow from crashing into the supporting system, two ultimate limit switches will

32、be set.4.11 堆料机急停设置如下 Emergency stop system for stacker are as fellow:4.11.1 堆料机上沿堆料臂设置两套胶带机驱动急停拉线开关。Two sets of pull cord switches for the belt conveyor on the stacker cantilever.4.11.2 堆料机回转平台上设急停开关组,可控制堆料机急停。Emergency stop button is set on the revolving platform of stacker to stop the system imme

33、diately.4.11.3 堆料机回转驱动, 堆料胶带机驱动, 取料刮板链驱动, 行走驱动就近设置现场 控制开关组,可控制本机构起动、停止、堆料机或取料机急停。For stacker revolving drive, belt conveyors, reclaimer scraper chain drive, travelling drives, local push buttons are set to start, stop or emergency stop the stacker & reclaimer in local control.4.11.4 堆料机变幅液压站和取料机

34、料耙液压站控制, 参考液压系统厂家提供的控制原 理图。For the hydraulic system of cantilever amplitude and material harrow control, please refer to the vendor 's schematic diagrams and specifications.4.12 堆料机变幅油缸和取料机料耙油缸设置手动控制行程限位装置。For the hydraulic system of cantilever amplitude and material harrow control, devices to a

35、djust the stroke limits are equipped.4.13 中心落料斗中设置堵料检测料位计 (CONASEN TC-1 ),当料位计发出信号时, 向 DSC 发出堵料报警信号,取料机各运行机构按顺序停机。Level meter (CONASEN TC-1 ) is set to detect the material blockage in the falling hopper. When the sensor is triggered, DCS would generate the alarm, and the reclaimer should stop by seq

36、uence.5. 润滑控制 Lubrication Control本堆取料机对 3 个回转支承(油缸铰接点和外齿) ,端梁行走车轮,料耙车轮实施 自动定时干油润滑,共设置 5 个独立的干油润滑泵站。润滑制度为:上部和中部回转支 承(油缸铰接点和外齿) ,堆料机回转起动即供油,之后供油间隔 60 分钟,每次供油时 间为 10 分钟;下部回转支承和端梁行走,取料机行走机构起动即供油,之后间隔 120 分钟,每次供油时间为 15 分钟;料耙系统启动即供油,之后间隔 120 分钟,每次供油 时间为 15 分钟。上述各润滑泵供油间隔时间可调。5 independent grease oil statio

37、ns are set for the stacker & reclaimer system, 3 sets of which are for 3 slewing bearings (cylinder pivot point and external gear), one for end beam travelling wheel, and the other for the material harrow wheel. The control principle is as follows: for the upper and middle slewing bearings, grea

38、se pump starts in accordance with the stacker revolving system, and the pump only continues working for 10 min. every 60min. For the lower slewing bearing and end beam travelling wheel, the oil pump starts in accordance with the relaimer travelling system. Working for 15 min every 120 min. For mater

39、ial harrow system, pump starts when the harrow drive starts, then working 15 min. every 120 min. The mentioned interval time can be adjusted.刮板链设置稀油润滑装置,润滑制度为刮板起动即供油,之后间隔 4 小时即供油, 每次供油时间为 10 分钟。The scraper chain drive is equipped with oil lubrication system, which starts in accordance with the scrap

40、er motor, then working for 10 min. every 4 hours.在人工控制和机旁现场控制方式下,上述润滑方式为手动润滑。In the mode of local manual auto control or local site control, all the oil lubrication and grease lubrication can only be controlled at site manually, not by program.6. 照明 Illumination要求在堆料机落料区域, 取料机取料区域, 堆取料机的各转台区域、 堆取料机的

41、各 套驱动装置就近设置亮度足够和适宜的照明,满足巡视和检修的需要,堆取料机各人行 通道,扶梯设置安全照明。Local illumination system should be considered to fulfill the request of on-site inspection and maintenance work for such locations: material discharge area, material reclaiming area, each revolving platform and each drive system. Safety illuminat

42、ion should be considered for the pathway and stairs.7. 机械主机受控元件的电气技术数据 electrical drive technical specifications7.1 堆料机堆料胶带输送机驱动装置 1套,含下述元件各 1 台:Material piling belt conveyor drive system, consist of:电机 EM4400-T 75kw 1800 rpm575V 60Hz, 带加热器、测温元件Motor EM4400-T 75kw 1800rpm 575V 60Hz, with heater and

43、temperature measurer.液力偶合器带温控开关Liquid coupling, with a temperature switch 。制动器: YWZD-315/50 ,575V,60HZ,0.5KW 。Brake: YWZD-315/50 ,575V,60HZ,0.5KW.保 护 装 置 含 下 列 控 制 元 件 protect devices include the following control component :DIM1.1 打滑检测器 1 个, 24V ,DC (详见附件样本)DIM1.1 Belt slip detector, one set, 24V,D

44、C( attached with the specifications )T3Z068 双向拉绳开关 2 个, 24V ,DC (详见附件样本)T3Z068 two-way belt pull cord switch, two sets, 24V ,DC ( attached with the specifications )ZS73SR 跑偏开关 4 个 24V ,DC (详见附件样本)ZS73SR Belt misalignment switch, four sets, 24V,DC ( attached with the specifications )ZQ900-11防撕裂开关2个,2

45、4V ,DC (详见附件样本)ZQ900-11 Belt tear detector, two sets, 24V,DC(attached with the specifications )7.2 堆料机回转驱动装置 1 套,含下述元件 1 台:Stacker revolving drive system includes:变频电机( Nema 标准) 5.5kw 1800rpm 575V 60Hz 变频调速 , 带加热器、 测温元件,强冷风扇 :575V,60HZ,0.5KWVVVF motor (NEMA standard): 5.5kw, 1800rpm, 575V at 60Hz. W

46、ith heater, temperature measurement, and cooling air fan: 575V, 60Hz, 0.5kW.制动器, 575V,60HZ,0.3KWBrake, 575V, 60Hz, 0.3kW.7.3 堆料机变幅液压站 1 套,变幅功率 15kw ,参考液压系统厂家提供的电气原理图。 Hydraulic system for stacker cantilever amplitude control, 15kw. Specifications refer to the vendor 'sschematic diagram.7.4 取料机刮板

47、链驱动装置 2 套,每套含下述元件 1 台:Two sets of scraper chain drive system for reclaimer, each contains:电机 EM445T-4 ,110kw 1800rpm 575V 60Hz ,带加热器,测温元件Motor EM445T-4, 110kw, 1800rpm, 575V, 60Hz, with heater and temperature measurement.液力偶合器带温控开关Liquid coupling, with a temperature switch7.5 取料机运行驱动装置 2 套,每套含下述元件 1

48、 台:Two sets of reclaimer drive system, each contains:取料运行电机 143T-0.75-4P 0.75kw 1800rpm 575V 60Hz (变频调速) , 带加热器、测温元件调车运行电机 EM2334T-5 ,,5.5kw 1200rpm 575V 60Hz ,带加热器、测温 元件磁粉离合器 DLK1-40 24V ,DC,2250W,0.9A( 详见样本 )7.6 取料机料耙液压站 1 套,功率 75kw ,参考液压系统厂家提供的电气原理图。 Hydraulic system for reclaimer material harrow

49、 control, 75kw. Specifications refer to the vendor 'sschematic diagram.7.7 干油润滑泵站 5 套,每套含 1 台:Five sets of grease oil system, each contains:电机 0.25kw, 1800rpm, 575V, 60Hz ,带油位发讯器 , DC24VMotor 0.25kw, 1800rpm, 575V, 60Hz, with oil level meter, DC24V.7.8 刮板链润滑 1 套,参考液压系统厂家提供的电气原理图。Oil lubrication

50、system for scraper chain drive, specifications please refer to vendor'sschematic diagram.8. 电机电压 575V 60Hzmotor voltage 575V 60Hz.9. 控制主机、变频控制器控制台置于机上控制室内,控制室内设空调。Plc panel and VVVF converter are located in the control room on the machine,with air conditioning.10. 堆取料机所需低压元件及变频器采用施耐德或 AB 产品(有 UL

51、 或者 CSA 认证), 主机设计考虑安装。The brand of Schneider or AB would be considered for the LV components and VVVF drive (with UL or CSA certificate).11. 回转碥码器选用径向接线方式。Radial lead-out connection is used for the rotation encoder.12. 电控系统应控制堆取料机实现下述功能:The control principles of the PLC system are described as:12.1

52、堆料机在正常堆料作业时,电控系统应控制堆料臂如 3.1 条所述的动作要求进 行堆料作业。For material piling work, the stacker should follow the control instructions as item described in item 3.1.12.2 初始料堆。料场没有料的情况下, 要能够先堆出满足正常堆料要求的初始料堆。 建立初始料堆的原则是:Initial material piling is taken place when there are no material piles at the first begging. Th

53、en the first qualified material pile should be acquired. The principles are as follows:(1) 尽可能保证物料得到均化;Ensure the materials are homogenized.(2) 在 120 °扇形区域内建立初始料堆;The initial material pile should be formed in the 120 degrees sector range.(3) 建立完成的初始料堆的堆顶要 120 °范围内顺时针由标准堆高降到 0,并保证 在正常堆料时堆料臂

54、卸料点轨迹与堆顶为等落差。堆料臂前端距堆顶高度保持在0.81.2 米。The top level of the formed initial material pile is requested to decrease from the standard level to 0 (bottom) in the 120 degrees sector range clockwise. The parallel distance between the track of the cantilever discharge outlet and pile top level should be const

55、ant and maintained between 0.8 to 1.2m.12.3 残余料堆恢复。当来料系统出现故障时,控制取料机在取到料堆高度只有标准 堆高的 1/2 时取料机停止作业。来料系统故障排除,堆料机再次起动进行堆料时,控制 系统要控制堆料机将料堆恢复至正常作业时的形状,即堆顶满足正常堆料作业的要求,然后堆料机转入正常堆料作业。Material piling recoveryOnce the material feeding belt conveyor fails, the reclaimer should stop running if the material piles

56、drops to half level of the set value. After the feeding belt is recovered, the stacker can start, and only when the material piles level can fulfill the request for normal operation, the reclaimer can be put into operation again.12.4 错位堆料。当取料机运行至靠近堆料区域出现碰撞危险时,即取料机与堆料臂 逆时针行程起点的夹角为 64 度时控制系统应控制堆料臂自动逆时

57、针位移 55 度,此时堆 料机要在按层堆料的形状下将料堆恢复至正常堆料作业时的形状即堆顶满足正常堆料 作业的要求,然后堆料机转入正常堆料作业。Anti-collision operationTo avoid the collision, when the reclaimer runs near the stacker piling region, the stacking cantilever should revolve by 55 degrees anticlockwise if the angel between the reclaimer and the stacking cantil

58、ever in anticlockwise direction reaches 64 degrees. In this case, the stacker should work to recover the material piles tofulfillthe normal operation request, and then the stacker would switch to normal operation mode.12.5 紧急堆料。 当取料机停止工作, 而此时堆料还在运行, 堆料臂逆时针运行的终点 与取料机的夹角为 269 度时,控制系统应控制堆料机不再前行。 此时如来料系统已没有 物料,应控制堆料机停机,如还在继续给料,要发出信号给中控室的同时,控制堆料机 分层将物料堆在没有达到标准堆高的料堆区域在。当堆料区堆尾达到自然安息角37 °时应控制堆料机及整个来料系统停机。Emergency material pilingWhen the stacker is running while the reclaimer system shuts down, if the angle between the reclaimer and the end position of the stacking cantilever in the anticlock

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论