1、透明玻璃隔热涂料施工流程Painting Guide of Transparent Glass Heat Insulation Paint自流法Curtain Coating施工工序:Painting Procedure1、 玻璃清洁 Glass cleaning2、 涂料调配 Mixing paint3、 贴胶纸及回收槽 Stick glue paper and recovery tank4、 涂玻璃涂料 Curtaining the glass paint5、 拆除胶纸及回收槽 Tear glue paper and recovery tank6、 清洁现场 Cleaning surrou

2、ndings一、玻璃清洁流程Glass Cleaning Procedure玻璃清洁工具:Glass Cleaning Tools钢丝球、海绵清洁球、清洁水、磨擦剂、喷水壶、水桶、玻璃雨刮、玻璃铲刀、裁纸刀、无纺布、毛巾、酒精等Wire wool, Sponge cleaning ball, Cleaning water, Abrasive, Water can, Water barrel, Glass spatula, Paper knife, Non-woven fabric, Washcloth, Alcohol, etc.清洁前的准备Preparation before cleanin

3、g1、 整理、清洁施工现场(一般直径在一米范围内),适当时允许地面有微量洒水Clean up the painting place (within one square meter), sometimes need watering2、 地面无油脂、异物、灰尘Without grease, dust, smudginess3、 准备好清洁用的所有工具及清洁用品,整齐摆放Prepare all cleaning tools and cleaning things, put in order玻璃清洁程序及要求Glass Cleaning Procedure and Requirement1、 用手

4、动喷水壶喷洒清水在玻璃表面,玻璃铲刀在玻璃表面从上到下清理顽固异质。Watering on the glass surface, then clean out the smudginess attached on the glass surface with the glass spatula.2、 用玻璃清洁剂喷洒水在玻璃表面,用普通清洁球在玻璃表面从上到下清洁,然后用玻璃雨刮刮除玻璃上的杂物Use the glass cleanser and cleaning ball to clean up the glass surface, then clean out the smudginess

5、 attached on the glass surface with the glass spatula.3、 用手动喷水壶喷洒清水在玻璃表面,用玻璃雨刮刮除玻璃面上的水分。重复2次,让玻璃彻底清洁干净。Watering on the glass surface, then clean out the water attached on the glass surface with theglass spatula, repeat two times, make the glass clean completely.4、 让玻璃自然干燥10分钟,用白色无纺布加上工业酒精后再擦一遍。Make

6、the glass natural dry 10 minutes, then use the non-woven fabric and alcohol wipe the glass again.注意事项Remarks1):玻璃有裂痕不得施工Do not painting if the glass has crack.2):玻璃表面有不规则或异样应向用户明确反映和说明事实情况Explain the factual circs for customers when the glass has abnormity.3):彻底清洁玻璃表面Cleaning the glass surface compl

7、etely.4):彻底清洁玻璃表面四周Cleaning the glass around completely.5):彻底铲除和清洁玻璃表面四周不明显的玻璃胶脂Clean up the unconspicuous glass resin attached on the glass surface and around二、涂料调配流程Mixing the paint调配工具:Mixing Tools量杯、磁力搅拌器、涂料(A、B组)、400目过漏纱布、漏斗、针管Measuring cup, Magnetic force stirrer, Glass paint (A,B group), Filt

8、ration cloth for 400 mesh, filler, Needle syringes调配前的准备Preparation before mixing按工程大小准备好足够的涂料和所用工具Prepare enough paint and tools according to the project涂料调配程序及要求Procedure and Requirement of Mixing the Paint1、 将A组份水性涂料倒入量杯并将磁力搅拌器的磁铁放入量杯中,放在磁力搅拌器上均衡搅拌3-5分钟Put the A group paint and magnetic stick int

9、o the measuring cup, the put it on the magneticforce stirrer and stir the paint 3-5 minutes.2、 按比例91加入B组份水性涂料继续均衡搅拌8-10分钟Put the B group into the measuring cup according to the proportion of A:B=9:1 and stir the two group 8-10 minutes3、 搅拌完成后,通过400目过漏纱布和漏斗将搅拌好涂料装进施工专用的压力喷壶中并盖上封口。After mixing, put th

10、e mixing paint into the special watering can with the 400 mesh filtration cloth and filler.将装有涂料的喷壶静置3-5分钟,进入施工状态。Put the filled watering can 3-5 minutes, then ready to painting.注意事项Remarks1、 涂料调配过程中可适当加入1%的蒸馏水,但一定是在加入B组份水性涂料后2-5分钟内一次性完成并继续均衡搅拌;It can add 1% distilled water when mixing the paint aft

11、er adding B group 2-5 minutes.2、 磁力搅拌器不能加热和保温Do not heat up and heat preserve the magnetic force stirrer.3、400目过漏纱布始终保持潮湿,并且当过滤纱布在过滤完涂料后应立即水清洗纱布. Keep the 400 mesh filtration cloth wet, cleaning it immediately after using it.4、 A+B=5公斤标准调配 ,循环施工使用According to the standard proportion of A+B=5 kg, cir

12、cular painting.三、贴胶纸及回收槽流程Stick glue paper and recovery tank工具:Tools小型气泵、下料盛料器、下料塑料管、下料调节开关、扁形出料口、铝铂纸、收料器、美工纸、胶纸、收料槽、平面地胶、锡泊纸、塑料胶管刷子Minitype pump, Container for paint, Plastic pipe, Adjust switch, Flat discharge hole, Foil paper, Incoming equipment, Art design paper, Glue paper, Incoming tank, Silve

13、r paper, Brush, etc. 贴胶纸及回收槽程序及要求Procedure and Requirement of Sticking Glue Paper and Recovery Tank1、 玻璃两边框架粘贴专用胶纸Stick special glue paper on glass frame both sides.2、 玻璃上面框架粘贴专用美工纸Stick special art design paper on the top glass frame.3、 玻璃下面框架粘贴专用收料槽Stick special incoming tank on the underside glas

14、s frame.注意事项Remarks1、 粘贴部位无气泡No air bubble on the stickup place.2、 粘贴部位间隙大小误差不得大于1毫米The size error of stickup place is not more than 1 mm.3、 粘贴胶纸与玻璃接触面应在2毫米范围内The glass interface and stickup glue paper should within 2 mm bound.4、 粘贴胶纸后一定要用塑料刮刀收理粘贴部位Use the glass spatula to clean up the stickup place

15、 after sticking the glue paper.5、 玻璃下方框架粘贴专用收料槽,四周应稳固无气泡Stick special incoming tank on the underside glass frame, it should fixing and no air bubble.四、涂玻璃涂料流程Procedure of Curtaining the Glass Paint工具Tools专用喷壶Special watering can涂料前的准备Preparation before painting淋涂玻璃涂料的程序及要求Procedure and Requirement o

16、f Curtaining the Glass Paint1、 将调配好的涂料过滤到专用喷壶加压Filtrate the mixing paint into the special watering can.2、 向喷壶内加压,并静置2-3分钟;Adding pressure for watering can, the put 2-3 minutes.3、 用干的白色无纺布将玻璃表面再抹擦一次Clean up the glass surface again with the dry non-woven fabric.4、 左肩背涂料喷壶,右手持枪,大母指控制枪栓Take the watering

17、 can on the left shoulder, hold the spray gun with the right hand, control the gun bolt with the thumb.5、 试枪,枪头放置玻璃左边底部(长1.5米以下玻璃)或玻璃左边中部(长1.5米以上玻璃)大拇指缓慢开动枪栓,枪头均匀缓慢向上部移动至上部美工纸处;Test the spray gun, put the gun mouth on the bottom of left side of glass (less than 1.5 meter height glass) or on the midd

18、le of left side of glass (more than 1.5 meter height glass), open the gun bolt slowly, then move the gun mouth to the top of the glass.6、 均匀、缓慢、平滑向玻璃右部移动至玻璃最右部,枪头停留、紧靠玻璃最右部框架2-3秒钟后向玻璃右边底部均匀、缓慢、平滑移动,目测涂膜无流到之处应将枪头移至该处补枪(涂料)直到整块玻璃完全均匀涂上涂料为止。Move the gun mouth to the right side along the top of glass su

19、rface symmetrically and slowly, stop the gun mouth on the right top side of glass 2-3 seconds, then move to the right bottom side of glass, check the coat and mend it if there any place does not paint until glass surface all coated symmetrically.7、 涂料涂层完成后控制枪栓,将专用喷壶放置地面,Control the spray gun bolt af

20、ter finishing painting, put the special watering pot on the ground.8、 仔细观察涂膜玻璃上是否有可疑物体及杂质,如有用灰尘夹子清除可疑物体或杂质,Check the coated glass carefully, if there have any impurity and dust, clean out it with clamp.9、 完成涂膜20分钟后,清除玻璃保护粘贴胶纸和收料槽并清洗干净,有序依次摆放,Clean out the glue paper and recovery tank after 20 minute

21、s when finish the painting.10、 其他玻璃继续按以上施工流程有序涂膜,直到所有玻璃完成涂膜。Use the same procedure to painting for other glass until all glass be painting.注意事项Remarks1、 玻璃涂膜补枪(涂料)应控制在1分钟内Mend the coat should within 1 minute.2、 玻璃涂膜清除可疑物体应控制在1分钟内Clean out the dirt attached on the glass surface during the painting sh

22、ould within 1 minute.3、 枪头不得面对玻璃上面的美工纸Spray gun mouth does not face to the art design paper stick on the glass frame.4、收料槽因特殊条件允许下可在3-4分钟内清除,应适当处理涂料流动The incoming tank can be clean out within 3-4 minutes in some special conditions, do justice to the paint flow.5、 施工流程适宜弧形玻璃、异形玻璃The painting procedur

23、e also suitable for the arc glass and abnormity glass.6、 协调施工前,应多次演示,达成默契Before painting, different construction persons should do enough practice and manage to privity.7、 始终保持同时、同方向、同速度涂膜Keep the same time, same way and same speed when painting.8、 确保施工现场安全Insure the safety for construction place.出厂

24、玻璃施工流程Painting Procedure of glass without installing五、拆除胶纸及回收槽流程Procedure of Cleaning Out the Glue Paper and Recovery Tank拆除胶纸及回收槽程序及要求Procedure and Requirement of Cleaning Out the Glue Paper and Recovery Tank1、 清除玻璃框架上面粘贴美工纸Clean out the art design paper stick on the top glass frame2、 清除玻璃框架两边粘贴胶纸C

25、lean out the glue paper stick on the top glass frame both sides.3、 清除玻璃框架收料槽Clean out the recovery tank stick on the underside glass frame.4、 清除玻璃框架外的保护Clean out the protection attached on the glass frame.注意事项Remarks1、 裁纸刀沿美工纸、胶纸与玻璃接触面划开Rip the art design paper and glue paper with the paper knife.2、

26、 清除美工纸、胶纸应控制速度,缓慢清除Clean up the art design paper and glue paper slowly.3、 保持人体头部与玻璃涂膜距离Keep distance between human body and glass coat.六、清洁现场流程Cleaning Surroundings1、 清洁整理玻璃涂膜周围现场Clean up surroundings.2、 清除施工中的一切无用杂物Clean up the sundries during painting.3、 还原移动的物体原样或按用户要求摆放Put the objects according

27、to the customers.透明玻璃隔热涂料施工流程Painting Guide of Transparent Glass Heat Insulation Paint涂刷法Brush Coating施工工序:Painting Procedure1、 玻璃清洁Glass cleaning2、 涂料调配Mixing paint3、 涂玻璃涂料 Brush the glass paint4、 清洁现场Cleaning surroundings一、玻璃清洁流程Glass Cleaning Procedure玻璃清洁工具:Glass Cleaning Tools钢丝球、海绵清洁球、清洁水、磨擦剂、

28、喷水壶、水桶、玻璃雨刮、玻璃铲刀、裁纸刀、无纺布、毛巾、酒精等Wire wool, Sponge cleaning ball, Cleaning water, Abrasive, Water can, Water barrel, Glass spatula, Paper knife, Non-woven fabric, Washcloth, Alcohol, etc.清洁前的准备Preparation before cleaning4、 整理、清洁施工现场(一般直径在一米范围内),适当时允许地面有微量洒水Clean up the painting place (within one squar

29、e meter), sometimes need watering5、 地面无油脂、异物、灰尘Without grease, dust, smudginess6、 准备好清洁用的所有工具及清洁用品,整齐摆放Prepare all cleaning tools and cleaning things, put in order玻璃清洁程序及要求Glass Cleaning Procedure and Requirement1、 用手动喷水壶喷洒清水在玻璃表面,玻璃铲刀在玻璃表面从上到下清理顽固异质。Watering on the glass surface, then clean out the

30、 smudginess attached on the glass surface with the glass spatula.2、 用玻璃清洁剂喷洒水在玻璃表面,用普通清洁球在玻璃表面从上到下清洁,然后用玻璃雨刮刮除玻璃上的杂物Use the glass cleanser and cleaning ball to clean up the glass surface, then clean out the smudginess attached on the glass surface with the glass spatula.3、 用手动喷水壶喷洒清水在玻璃表面,用玻璃雨刮刮除玻璃面

31、上的水分。重复2次,让玻璃彻底清洁干净。Watering on the glass surface, then clean out the water attached on the glass surface with theglass spatula, repeat two times, make the glass clean completely.4、 让玻璃自然干燥10分钟,用白色无纺布加上工业酒精后再擦一遍。Make the glass natural dry 10 minutes, then use the non-woven fabric and alcohol wipe th

32、e glass again.注意事项Remarks1):玻璃有裂痕不得施工Do not painting if the glass has crack.2):玻璃表面有不规则或异样应向用户明确反映和说明事实情况Explain the factual circs for customers when the glass has abnormity.3):彻底清洁玻璃表面Cleaning the glass surface completely.4):彻底清洁玻璃表面四周Cleaning the glass around completely.5):彻底铲除和清洁玻璃表面四周不明显的玻璃胶脂Cle

33、an up the unconspicuous glass resin attached on the glass surface and around二、涂料调配流程Mixing the paint调配工具:Mixing Tools量杯、磁力搅拌器、涂料(A、B组)、400目过漏纱布、漏斗、针管Measuring cup, Magnetic force stirrer, Glass paint (A,B group), Filtration cloth for 400 mesh, filler, Needle syringes调配前的准备Preparation before mixing按工

34、程大小准备好足够的涂料和所用工具Prepare enough paint and tools according to the project涂料调配程序及要求Procedure and Requirement of Mixing the Paint1、 将A组份水性涂料倒入量杯并将磁力搅拌器的磁铁放入量杯中,放在磁力搅拌器上均衡搅拌3-5分钟Put the A group paint and magnetic stick into the measuring cup, the put it on the magnetic force stirrer and stir the paint 3-

35、5 minutes.2、 按比例91加入B组份水性涂料继续均衡搅拌8-10分钟Put the B group into the measuring cup according to the proportion of A:B=9:1 and stir the two group 8-10 minutes3、 搅拌完成后,通过400目过漏纱布和漏斗将搅拌好涂料装进施工专用的压力喷壶中并盖上封口。After mixing, put the mixing paint into the special watering can with the 400 mesh filtration cloth an

36、d filler.将装有涂料的喷壶静置3-5分钟,进入施工状态。Put the filled watering can 3-5 minutes, then ready to painting.注意事项Remarks1、 涂料调配过程中可适当加入1%的蒸馏水,但一定是在加入B组份水性涂料后2-5分钟内一次性完成并继续均衡搅拌;It can add 1% distilled water when mixing the paint after adding B group 2-5 minutes.2、 磁力搅拌器不能加热和保温Do not heat up and heat preserve the

37、magnetic force stirrer.3、400目过漏纱布始终保持潮湿,并且当过滤纱布在过滤完涂料后应立即水清洗纱布. Keep the 400 mesh filtration cloth wet, cleaning it immediately after using it.4、 A+B=5公斤标准调配 ,循环施工使用According to the standard proportion of A+B=5 kg, circular painting.三、涂玻璃涂料流程Procedure of Brush the Glass Paint工具Tools海绵条、涂料器、涂料槽、涂料架、涂

38、料收料器Sponge piece, Coating implement, Coating tank, Coating frame, Incoming implement 涂刷前的准备Preparation before painting1、 将调配好的涂料过滤到专用喷壶加压Filtrate the mixing paint into the special watering can.2、 向喷壶内加压,并静置2-3分钟;Adding pressure for watering can, the put 2-3 minutes.3、 用干的白色无纺布将玻璃表面再抹擦一次Clean up the

39、glass surface again with the dry non-woven fabric.4、 用无水酒精内外磨擦施工工具、涂料槽、涂料架、涂料收料器Use the alcohol to wipe all the tools, coating tank, coating frame, incoming implement.5、 将海绵条均匀地装入涂料器内;Put the sponge into the coating implement6、 将喷壶内的涂料压至涂料槽内,涂料深度以涂料器厚度为宜;Put the mixing paint into the coating tank, t

40、he depth of paint should equal to the height of coating implement.7、 仔细观察涂膜玻璃上是否有可疑物体及杂质,如有用灰尘夹子清除可疑物体或杂质,Check the coated glass carefully, if there have any impurity and dust, clean out it with clamp.8、 其他玻璃继续按以上施工流程有序涂膜,直到所有玻璃完成涂膜。Use the same procedure to painting for other glass until all glass

41、be painting.涂刷玻璃涂料的程序及要求Procedure and Requirement of Painting the Glass Paint1、 双手轻握清洁后的涂料器的两端,将涂料器轻轻放入涂料槽中,待涂料器上的海绵浸泡在涂料槽中5分钟左右;Put the coating implement into the coating tank, make the sponge attached on the coating implement dip in the coating tanks about 5 minutes.2、 将浸泡后的涂料器上下积压3至4次,让多余的料回收Press the dipped sponge 3-4 times, recovery the redundant paint.3、 保持身体与被涂玻璃间的适当距离,用涂料器中的海绵斜面接触玻璃表面, 自上而下将涂料器缓缓滑动,用力匀衡,速度匀衡;Keep the proper distance between the body and glass, make the sponge touch the glass

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论