1、工程量计算表工程名称:A栋宿舍楼基础工程表:01序号工程名称计算式工程量一、基础土方开挖(2703.66 -2701.56 ) X 53.7 X 19.832232.846m3合计32232.846m3二、C15碎垫层1、1-1剖面图(50.7 +50.7-3.9 ) X 0.2 X 1.24324.18m32、2-2剖面图(16.8 X2+3.9 ) X 0.2 X 1.128.4m33、3-3剖面图3.9 X22 间 X 0.2 X 1.24321.2784m34、4-4剖面图(6.3 X 232.1 ) X 0.2 X 1.3638.8416m35、5-5剖面图2.26 X( 0.36
2、+ 1.02 + 0.48)X 0.230.8407m36、填充墙0.6 X0.35 X ( 3.9 +2.1 ) X 22 间27.72m3合计121.26m3三、基础砖M7.51、1-1剖面图97.5 X 0.66 X 0.36 + 97.5 X 0.36 X 1.3 -柱 0.24 X 0.36 X 1.9 X 17+0.24 X 0.24 X 1.9 X 2063.8164m32、2-2剖面图37.5 X 0.54 X 0.36 + 37.5 X 0.24 X 1.318.99m33、3-3剖面图85.8 X 0.6 X 0.48 +85.8 X 0.24 X 1.18_ _ _349
3、.009m4、4-4剖面图142.8 X 0.66 X0.54 + 142.8 X 1.12 X 0.2489.2785m35、5-5剖面图6.24 X 0.66 X0.54 +6.24 X 1.12 X 0.243.9012m3合计224.9947 m 3四、砂浆防潮层1、1-1剖面图97.5 X 0.3635.1m2、2-2 5-5剖面图(6.24 + 132+142.8 +85.8 +37.5 ) X 0.2497.0416m合计132.141m五、构造柱1、GZ1、GZ20.24 X 0.24 X 1.9 X 20+ 0.24 X 0.36 X 1.9 X 1734.9795 m 3工
4、程量计算表工程名称:A栋宿舍楼基础工程表:02序号工程名称计算式工程量合计34.9795 m 3六、地圈梁1、1-1剖面图97.5 X0.24 X 0.3638.44m32、2-2至5-5剖面图(6.24 + 142.8 +85.8 +37.5 ) X 0.24 X 0.24315.686 m3小计24.11m3七、土方回填2232.846 -121.26 -224.9947 -4.9795 -24.1131857.5m3小计1857.5m3八、砖砌散水沟(50.7 +0.9)X 2+14.7117.9m九、工程量统计(表1+表2)1、基础土方开挖2232.864m32、C15碎垫层3121.
5、26m3、基础砖M7.5224.9947m34、砂浆防潮层132,141m 25、构造柱硅34.9795m36、地圈梁碎24.11m37、土石方回填31857.5m38、砖砌散水沟117.9m序号工程名称计算式工程量一、一层砌体工程1、AB轴,EC轴(3.9 1.8)X 2.78 X 0.36 X 24350.44 m1.8 X 2.78 X 0.24 X 24 1.8 X 1.7 X 0.24 X 231.8 X 1.1 X0.2411, 4564 m32、1-14 轴6.3 X 2.78 X 0.24 X 27 + 2.1 X 2X 2.78 X 0.24-1 X 2.4 X 0.24 0
6、.9 X 1.5 X 0.24 1.9 X 1.5X 0.24 1.2 X 2.6 X 0.24113.96 m33、CD轴3.9 X2.78 X 0.24 X23 1 X2.1 X 0.24 X 22348.7598 m4、电井墙(0.9 + 1.02 +1.02 ) X 2.78 X 0.241.9615 m35、厕所2.1 X2.65 X 0.18 X 22 0.8 X 2.1 X 0.18 X2215.3846 m36、厕所3.9 X 2.6 X 0.12 X 22- 1 X 2.6 X 0.24 X 2213.0416 m3一层小计254.999 m 3二、过梁1、窗过梁2.3 X
7、0.24 X 0.24 X 23 + 2.3 X 0.24 X 0.2433.1795 m32、窗过梁2.4 X0.24 X 0.24 X230.2764 m3、进户门1.5 X0.2 X 0.24 X22_31.584 m4、厕所1.3 X0.12 X 0.18 X220.6177 m3一层过梁硅小计_35.6576 m三、构造柱1、G1、G20.24 X 0.24 X 2.78 X 20+ 0.24 X 0.36 X 2.78 X 177.2858 m 3小计37.2858 m四、砖砌体合计一减二减三242.0559m3254.993 - 5.6576 -7.28583242.0559m3
8、工程名称:A栋宿舍楼主体砌体及硅过梁工程表:03工程名称:A栋宿舍楼主体砌体及硅过梁工程表:04序号工程名称计算式工程量五、二、三层砌体工程1、AB轴、EC轴(3.9 1.8 ) X 2.78 X 0.36 x 25X 2 层3105.084m(1.8 X 2.78 X 0.24 X 25- 1.8 X 1.7 X 0.24 X 241.8 X 1.1 X0.24 ) X 223.8464m32、1-14 轴(6.3 X2.78 X 0.24 X 27 + 2.1 X 2X 2.78 X 0.24 1 X 2.4 X 0.24 0.9 X 1.5 X 0.24 1.9 X 1.5 X0.24
9、- 1.2 X2.6 X0.24 ) X 2227.92m33、C、D轴(3.9 X2.78 X 0.24 X24 1 X2.1 X 0.24 X 23)X 23101.7158 m4、电井墙1.47 X 2.78 X0.24 X2 层1.9942 m35、厕所(2.1 X2.65 X 0.18 X22-0.8 X 2.1 X 0.18 X22 ) X 230.7692 m 36、厕所(3.9 X 2.6 X 0.12 X 22- 1 X 2.6 X 0.24 X 22 ) X 226.0832 m 3二层小计517.4128 m3六、碎过梁1、窗过梁(2.3 X 0.24 X 0.24 X
10、24 + 2.3 X 0.24 X 0.24 ) X 236.624 m 32、窗过梁2.4 X 0.24 X 0.24 X2X2 层30.5529 m3、进户门1.5 X 0.2 X 0.24 X 23X2 层33.312 m4、厕所1.3 X 0.12 X 0.18 X22X 2 层1.2355 m3小计_311, 7244 m七、构造柱1、GZ1、GZ2(0.24 X 0.24 X 2.78 X 20+ 0.24 X 0.36 X 2.78 X 17 )X 2314.5716m八、砖砌体二、三层五减八减七合计517.4128 - 11.7244 14.5716491.1168 m3工程名
11、称:A栋宿舍楼主体砌体及硅过梁工程表:05序号工程名称计算式工程量九、女儿墙(50.7 X 2+ 14.7 X2+2.1 X2 ) X 0.24 X 1.3 3.9 X0.24 X 1.3340.9032 m十、楼梯顶层(6.3 X 2+ 3.9 X 2 ) X 2.78 X 0.24 1.8 X 1.5X 0.24 1.5 X 2.1 X 0.2412.2068 m3楼梯顶层女儿墙(6.3 X2+3.9 X2 ) X 0.5 X0.242.448 m 3合计_ 355.558 m十二、女儿墙构造柱0.24 X 0.24 X 1.3 X 65 根4.8672 m 3十三、楼梯顶层构造柱0.24
12、 X 0.24 X 3.6 X 4+ 0.24 X 0.36 X 3.6 X 231.4515 m十四、碎过梁2.3 X 0.24 X 0.24 +2X 0.24 X 0.240.2476 m 3合计十二加十三加十四 36.5663 m女儿墙砖砌体合计55.558 6.566348.9917m3工程量统计(表3+表5)1、砖砌体782.1644 m32、碎过梁317.6296 m33、构造柱328.1761 m工程量计算表工程名称:A栋宿舍楼主体工程表:06序号工程名称计算式工程量1、砖砌台阶4.5 X0.924.05 m2、散水、900宽(50.7 X 2+14.7 X2 ) X 0.9_2
13、117.72m3、墙体金属网(3.9 X 2+2.9 X6+2.1 X 2 ) X 0.4 X 22258.72m24、雨水口6个5、刚性上人屋面14.7 X 50.7 -3.9 X6.3720.72 m 26、不上人屋面6.3 X3.9 224.57 m7、砖砌气囱22 根 X 10.3226.6m8、零星砖砌体气囱0.5 X0.5 X 0.4 X222.2m3工程量计算表工程名称:A栋宿舍楼钢筋硅工程表:07序号工程名称计算式工程量一、硅工程L-112.1 X0.24 X 0.4 X 1132.2176m3L-22.1 X0.2 X 0.35 X2333.381m3L-1 , L-3 至
14、L-53.9 X0.2 X 0,4 X237.176 m 3L-6、7、83.9 X 0,2 X 0.4X30.936 m 3L9, L9a3.9 X 0,2 X 0.35 X 2+ 3,9 X 0.36 X 0.351.0374 m3L-101.7 X0.24 X 0.40.1632 m3小计14,9112 m3二、悬臂梁L-122.25 X 0.24 X0.350.189 m 3三、圈梁(4X 50.7 - 3.9 X 5)+( 6.3 X 27+2.1 X 2 )X 0.24 X 0.12310.2988 m3四、现浇板(14.7 + 0.36 ) X ( 50.7 + 0.24 )(8
15、.9 X 3.9 +4.2 X3,9 ) X0.1371.80 m 3五、楼梯板碎3.66 X 3.96 X 3-2.48 X 0.5 X 3339.76 m 3六、楼梯梁0.24 X 0,4 X 3.9 X 632.2464 m 3七、雨棚碎板3.9 X0,9 X 0,10.351 m 3工程量计算表工程名称:A栋宿舍楼钢筋硅工程表:08序号工程名称计算式工程量一、硅工程L-112.1 X 0.24 X 0,4 X 11X234.4352 m 3L-22.1 X 0,2 X0.35 X 23X236.762 m3L-1、3、4、5、6、73.9 X 0,2 X0,4 X25X2315.6 m
16、3L-101.7 X 0.24 X 0.4 X 20.3264 m 3小计27.1234m3二、圈梁硅(4X 50.7 -3.9 X3)+( 6.3 X 27+2.1 X 3)X0.24 X 0.12 X221.168 m3三、现浇板(14.7 +0.36 ) X ( 50.7 +0.24 ) ( 8.4 X 3.9+ 4.2 X3.9) X 0.171.8 m3四、女儿墙压顶0.24 X 0.1 X ( 14.7 X 2 + 50.7 X 23.9 +2.1 X23.1464 m3五、楼梯女儿墙压顶(6.3 X2 + 3.9 X2 ) X 0.24 X 0.1 30.4896 m六、楼梯圈梁
17、碎(6.3 X2 + 3.9 X2 ) X 0.24 X 0.1230.5875 m 3七、现浇板碎(6.3 +0.24 ) X ( 3.9 +0.24 ) X 0.132.7075 m3八、楼梯雨棚碎(3.9 +0.24 ) X 0.9 X0.1230.4471 m 3九、屋面现浇板碎(14.7 +0.36 ) X ( 50.7 +0.24 ) ( 8.4 X 3.9+ 4.2 X3.9) X0.12386.1619 m3十、碎翻边361.5 X0.3 X 0.1516.2675 m3卫生间翻边0.2 X 0.1 X 8X22X3310.56 m3工程量统计(表7 +表8)1、矩形梁碎42.
18、0344 m32、悬臂梁0.189 m333、圈梁碎31.4668 m4、楼梯板碎39.76 m35、楼梯梁柱2.2464 m36、现浇板硅232.4694 m37、雨棚碎0.7981 m38、楼梯圈梁碎0.5875 m3 .一.39、女儿墙压顶碎3.626 m10、女儿墙翻边碎16.2675 m 311、卫生间翻边碎10.56 m3工程量计算表工程名称:A栋宿舍楼钢筋工程表:09序号工程名称计算式工程量一、构造柱钢筋1、GZ1 412(9+1.9 +0.2 ) X 4X 76X 0.888kg2996.467kg6(9+1.9 ) + 0.2 X0.92 X 20X 0.2222kg222.
19、822kg2、GZ2 612(9+1.9 +0.2 ) x 6X 17X 0.888kg1005.3936kg6(9+1.9 ) + 0.2 X 1.24 X 17X 0.2222kg255.276kg3、女儿墙构造柱412(1.3 +0.12 ) x 4X 65X 0.888kg327.8496kg61.3 +0.2 x 0.92 X65X 0.2222kg86.369kg4、楼梯构造柱GZ1 412(3.6 +0.12 ) X 4X4X 0.888kg52.8537kg63.6 +0.2 x 0.92 X4X 0.2222kg14.7185kg5、GZ2 612(3.6 +0.12 ) x
20、 6X 2X 0.888kg39.6430kg63.6 +0.2 x 1.24 X2X 0.2222kg9.919kg小计:124422.2812kg6589.105kg二、一层过梁1、窗过梁4122.3 X4X24 根X 0.888kg196.070kg62.3 +0.2 x 0.92 X24X 0.2222kg56.42kg2、窗过梁4122.4 X4X 2X 0.888kg17.0496kg62.4 +0.2 x 0.92 X2X 0.2222kg4.9061kg3、门过梁4121.5 X4X 22x 0.888kg117.216kg61.5 +0.2 x 0.88 X22X 0.222
21、2kg32.2634kg4、厕所门过梁2121.3 X2X 22X 0.888kg50.7936kg61.3 +0.2 x 0.28 X22X 0.2222kg8.8968kg一层小计:12381.1292kg68.8968kg工程量计算表工程名称:A栋宿舍楼主钢筋工程表:10序号工程名称计算式工程量三、二、三层过梁1、窗过梁4122.3 X4X 25X 0.888kg X2408.48kg62.3 +0.2 X 0.92 X25X 0.2222kg X2117.5438kg2、窗过梁4122.4 X4X 2X 0.888kg X234.099kg62.4 +0.2 x 0.92 X2X 0.
22、2222kg X29.812kg3、门过梁4121.5 X4X 23X 0.888kg X2245.088kg61.5 +0.2 x 0.88 X23X 0.2222kg X267.459kg4、厕所门过梁4121.3 X2X 22X 0.888kg X2101.587kg61.3 +0.2 x 0.28 X22X 0.2222kg X217.793kg二、三层小计:12789.254kg6212.6078kg四、屋面压顶过梁1、过梁4125.3 X4X 0.888kg18.8256kg65.3 +0.2 X 0.92 X 0.2222kg17.793kg2、压顶 10131.1 X 2X 0
23、.625kg163.8756131.1 +0.2 X0.32 x 0.2222kg46.608kg3、楼梯压顶1020.4 X 2X 0.625kg25.5kg620.4 +0.2 X 0.32 X 0.2222kg7.2526kg屋面小计:12 = 18.8256kg10 = 189.375kg6= 59.2776kg工程量计算表工程名称:A栋宿舍楼钢筋工程表:11序号工程名称计算式工程量五、楼梯钢筋1、TL1 520(3.9 + 0.6 + 0.24 0.04 ) X 5X 3 X 2.464kg173.712kg83.9 +0.2 X 1.28 X3X 0.394kg29.502kg2、
24、TL2 416(3.9 + 0.48 + 0.24 0.04 ) X 4 X 3 X 1.577kg86.671kg83.9 +0.2 X 1.28 X3X 0.394kg29.502kg3、TB10底筋(2.48 +0.2 +0.2 ) x ( 1.6 +0.1 ) x 0.625kg X6172.8kg10面筋1.6 + 2 x ( 2.48 + 0.2 + 0.2 + 0.2 ) x 0.625kg x 6190.8kg62.48 + 0.25 X 1.72 X 0.2222kg X 2 X 645.495kg4、平台现浇板103.9 +0.15 X ( 1.7 +0.2 ) X 0.6
25、25 X 392.625kg101.72 +0.15 X0.7 X 0.625 X 2X 330.099kg81.72 -0.2 X ( 3.9 +0.2 ) X 0.394 X 341.677kg5预埋件325kg楼梯小计:20= 173.712kg16= 86.671kg10= 486.194kg8= 100.681kg6 = 45.495kg预埋件=325kg六、6压墙筋1007.159m3x 1.7kg/m 31712.17kg工程量计算表工程名称:A栋宿舍楼钢筋工程表:12序号工程名称计算式工程量七、一层钢筋圈梁1、地圈梁412(48X 3.9 +6.3 X 27+2.1 X2 )
26、X4X 0.888kg1284.048kg6361.5 +0.15 X0.92 X 0.2222kg369.496kg2、二层至屋囹层8361.5 X 3 X 0.394 + 3.9 X 4 X 3 X 0.394445.732kg3、楼梯圈梁8(6.3 X 2+3.9 X 2 ) x 3x 0.394kg24.112kg小计:12= 1284.048kg6= 369.496kg8 = 469.844kg八、现浇板1、8底筋6.3 +0.2 X ( 3.9 +0.2 +0.16 ) X 0.39452.87kg63.9 +0.2 X ( 6.4 +0.2 +0.12 ) X 0.222kg31
27、.87kg86.3 X 2+0.18 X ( 1+ 0.16 ) x 0.394kg31.9928kg61 +0.18 X ( 6.3 +0.2 +0.12 ) x 0.2222kg x 216.344kg81.9 +0.18 x ( 1 +0.16 ) x 0.394 X29.648kg61 + 0.18 X ( 1+ 0.12 ) X 0.2222 X22.765kg81.9 +0.18 X ( 2 + 0.16 ) X 0.3948.983kg61 + 0.18 X ( 2+ 0.12 ) X 0.22222.617kg8合计103.4939 -24.57m2=4.2122kg/m26合
28、计53.481 +24.57m2=2.1766kg/m 2建筑面积2135.71 +3.51 +27.075 =2166.295工程量计算表工程名称:A栋宿舍楼主体砌体及硅过梁工程表:13序号工程名称计算式工程量1建筑面积计算板钢筋9124.8677kg1、82166.295 X 4.21229124.8677kg62166.295 X 2.17664715.1516kg八、梁钢筋1、L-11 3 层14(2.1 +0.2 + 0.42 ) X 2X 1.207 X 11 X 3216.68kg12(2.1 +0.2 +0.36 ) x 2X 0.888 x 11X 3155. 897kg82
29、.1 +0.2 X 1.28 X 0.394 X 11 X3174.7468kg2、L-13 层(7)18(2.6 + 0.54 ) x 2X 6X 1.9965 X 3225.6843kg18(1.3 + 0.1 + 0.27 ) X 2X 1.9965 X 320.0049kg12(1.3 +0.1 +0.18 ) x 2X 0.888 X 38.4182kg16(3.9 X7+0.2 +0.48)X 2X 1.577 X 3264.746kg12(3.9 x 7+ 0.2 + 0.36 ) x 2X 0.888 x 3148.438kg63.9 X 7+0.2 X 1.16 X3 层X
30、0.2222105.549kg3、L-214(2.3 + 0.42 ) X 2X 1.207 X 22X 3433.3612kg12(2.3 + 0.36 ) X 2X 0.888 X 22X 3311.7945kg62.3 + 0.2 X 0.9 X 0.2222 X 22X3151.7842kg4、L-316(3.9 + 0.2 + 0.48 ) X 5X 1.577 X 3108.3399kg12(3.9 +0.2 +0.36 ) X 2X 0.888 X 323.7628kg12(1.3 +0.1 +0.18 ) x 4X 0.888 x 316.8364kg63.9 +0.2 X 1
31、.16 X 0.2222 X315.0784kg工程量计算表工程名称:A栋宿舍楼钢筋工程表:14序号工程名称计算式工程量5、L-420(2.6 +0.6)X 2X2.4649 X347.326kg18(2.6 +0.54 ) X 2X 1.9965 X 3X 275.228kg16(1.3 +0.48)X 2X 1.577 X3X258.2859kg12(1.3 +0.1 +0.18 ) X 2X 2X 0.888 X 316.8364kg12(3.6 X 6+0.2 +0.36 ) X 2X 0.888 X 3127.6588kg16(3.6 X6+0.2 +0.48)X 2X 1.577
32、X 3227.8449kg63.9 X6+0.2 X 1.16 X 0.2222 X 390.4709kg6、L-5( 4 )20(3.9 + 0.2 + 0.6 ) X 2X 2.4649 X 2 X 3139.020kg18(2.6 +0.54 ) X 2X 1.9965 X 4X 3150.4562kg16(2.6 +0.48)X 2X 1.577 X2X3X2116.5718kg14(3.9 +0.2 +0.42 ) X 4X 1.577 X2X3171.0729kg12(2.6 +0.1 +0.18 ) x 2x 0.888 X4X361.3785kg12(3.9 X4+0.2 +0
33、.36 ) x 2X 0.888 X 2X3172.200kg16(3.9 X4+0.2 +0.48)X 2X 1.577 X 2X3308.081kg63.9 X4+0.2 x 1.16 x 0.2222 X 2X3120.6279kg7、L-7( 1 )14(3.9 + 0.2 + 0.42 ) X 2 X 1.207 X 332.7338kg12(3.9 + 0.2 + 0.36 ) X 2 X 0.888 X 323.7628kg83.9 +0.2 x 1.16 x 0.394 x 326.7368kg工程量计算表工程名称:A栋宿舍楼钢筋工程表:15序号工程名称计算式工程量8L-814
34、(3.9 +0.2 + 0.42 ) X 4X 1.20721.8225kg83.9 +0.2 X 1.16 X 0.3948.91228kg9、L-918(3.9 + 0.2 + 0.54 ) X 2X 1.9965 X 237.055kg16(3.9 + 0.2 + 0.48 ) X 2X 1.577 X 228.89kg83.9 +0.2 X 1.16 X 0.394 X217.8244kg10、L-9a18(3.9 +0.2 + 0.54 ) X 6X 1.996555.58256kg83.9 +0.2 X 1.16 X 0.3948.9122kg11、L-618(3.9 + 0.2
35、+ 0.54 ) X 2X 1.9965 X 355.58256kg16(3.9 + 0.2 + 0.48 ) X 2X 1.577 X 355.58256kg83.9 +0.2 X 1.16 X 0.3948.9122kg12、L-10142.1 X 2X 1.207 X315.208kg122.1 x 2X 0.888 X311.1888kg62.1 +0.2 X 1.16 X 0.2222 X 38.1118kg13、L-1a楼梯18(3.9 +0.2 + 0.54 ) X 3X 1.996527.7912kg16(3.9 +0.2 + 0.48)X 3X 1.57721.6679kg1
36、2(3.9 +0.2 ) X 4X 0.88814.5632kg63.9 +0.2 X 1.26 X 0.22225.4594kg工程量计算表工程名称:A栋宿舍楼钢筋工程表:16序号工程名称计算式工程量14、L-1 楼梯14(3.9 +0.2 +0.42 ) X 6X 1.20732.738kg63.9 +0.2 X 1.26 X 0.22225.4594kg15、楼梯雨棚104.14 +0.15 X( 0.36 +0.2 +0.1 +0.9 ) X 0.62526.91kg80.9 -0.2 X ( 3.9 + 0.2 +0.16 ) X 0.3947.5529kg钢筋统计表8至表161、砌
37、体加固钢筋1.712t(10 内)2、现浇构件钢筋19.5529t(10 内)3、螺纹钢9.6111t4、预埋铁件0.325t工程量计算表工程名称:A栋宿舍楼措施项目表:17序号工程名称计算式工程量一、模板工程1、基础模板361.5mx 0.2 X2144. 6m22、构造柱(1)0.37 X 9.9 X2X 37271.062m2(2)女儿墙构造柱0.37 x 1.3 X2X 6562.53m2/梯构造柱0.37 x 3.6 x 2X615.984m23、圈梁模板(1)地圈梁361.5mx 0.24 X 2173.52m2(2) 1-3层圈梁361.5mx 0.12 x 2X3260.28m
38、2/梯圈梁20.4 x 0.12 X24.896m2小计438.696m24、过梁模板(1)窗过梁2.3 X 0.24 X 2X 24+ 0.21 X 1.8 X 2436.864 m 2(2)窗过梁2.4 X 0.24 X 2X 2+ 1.9 X 0.24 X 23.216 m 2(3)门过梁1.5 X0.2 X 2X22+1 X 0.24 X 2218.48m2(4)厕所过梁1.3 X0.12 X2X 22+0.8 X 0.2 X2214.96m 2小计220.56m25、现浇板模板(1)现浇板2184.633m2(2)压顶130.8 X 0.1 X226.16m2小计2210.793m2
39、6、挑板(1) XL122.25 X 0.35 X2+0.9 X 0.241.791m2(2) L93.9 X( 0.24 +0.35 X 2 )3.666m2小计5.457m2工程量计算表工程名称:A栋宿舍楼措施工程表:18序号工程名称计算式工程量7、矩形梁(1) L-112.1 X ( 0.24 +0.4 X2) X 3 层X 1172.072m2(2) L-1、3、4、5、6、73.9 X ( 0.2 +0.4 X2 ) X 25X3292.5m2小计364.572m28、直行楼梯39.76m29、脚手架2178n210、垂直运输2178n2A栋宿舍楼工程量统计(土建部分)1、挖基础土方
40、:2232.846 m32、基础回填土方:1857.5 m33、实心砖砖基础:224.9947 m34、零星砌体:2.2 m35、页岩实心砖墙主体:282.1664 m36、砖砌台阶:4.05 m37、砂浆防潮层:132.141 m28、900 宽散水:117.72m9、砖砌散水沟:117.9m10、砖砌气囱:226.6m11、C15碎砖基础垫层:121.26 m312、C25碎构造柱:33.155 m313、C20碎过梁:17.6296 m314、C25圈梁:56.164 m315、C35水电管井后浇板:0.25 m316、C25碎有梁板:280.386+ 0.189= 280.575 m3
41、17、C25碎雨棚:0.7981mB18、C25碎直行楼梯:39.76m219、C25零星碎:26.827m320、砌体加固钢筋:1.712t21、现浇构件10以内:19.4739t22、现浇螺纹钢:9.6111t23、预埋铁件钢筋:0.325t24、金属网:258.72 m225、雨水口: 6个26、上人屋面:702.72m227、不上人屋面:24.57n2措施项目1、构造柱模板:349.576m22、基础模板:144.6n23、圈梁模板:438.696m24、过梁模板:220.56r25、现浇板模板:2210.793m26、跳板:5.457K7、矩形梁:364.572t28、直行楼梯:39
42、.76n29、脚手架:2178n210、垂直运输:2178n2工程量计算表工程名称:A栋宿舍楼装饰工程表:01序号工程名称计算式工程量一、地砖地面C15碎100厚(1)标准间(3.66 X 3.96 +1.66 X 1.98 ) X 22 间391.168 m2(2)客厅3.66 X6.0622.1796 m2(3)门厅3.66 X3.9614.4936 m2(4)楼梯3.66 X 3.9614.4936 m2(5)通道1.86 X3.9 X 1394.302m2(6)门厅平台3.9 x 0.93.51m2小计540.146m2二、地砖楼地面(基层)二至三层(1)标准间(3.66 X 3.96
43、 +1.66 X 1.98 ) X 22 间391.168 m2(2)客厅3.66 X6.0622.1796 m2(3)门厅改卧室3.66 X3.9614.4936 m2(4)通道1.86 X3.9X1394.302 m 2小计522.1432 X21044.286m2三、防滑地砖地面(1)地面1.89 X 1.92 X 2279.8336m2小计79.8336m2四、防滑地传楼地面(1)楼地面1.89 X 1.92 X 22X2159.6672m2小计159.6672m2五、地砖地面楼地面(1)4.5 X 1.7 X2X345.9m2(2)1.6 X 3.66 X423.424 m3小计69
44、.324m2工程量计算表工程名称:A栋宿舍楼装饰工程表:02序号工程名称计算式工程量六、楼梯栏杆/、镀锌(1)栏杆3X2X318m小计18m七、混合砂浆墙面(1)卫生间(1.89 X 2+ 1.92 X2X 1.3 0.8 X 0.3 ) X22X3637.956m2(2)卫生间(3.96 X 2.9 X 2+ 3.66 X 2.9 X 2+ 1.62 X 2.9 X 2 +1.92 X2.9 X2 ) ( 1.8 X 1.7 +1 X 2.6 X 2+0.8 X2.1 +1X2.1 ) X22X3 层1.2 X2.63474.288m2(3)客厅(6.06 X 2X 2.9 +3.66 X2
45、.9 X 21 X2.1 - 1.2 X2.6 1.8 X 1.7 ) X 3 层147. 888m2(4)门厅3.96 X 2.9 X 222. 968m2门厅改卧室(3.66 X 2.9 X 2+ 3.96 X 2.9 X 2 1.8 X 1.7 1 X2.1 )X278.072m 2(5)楼梯(6.3 X 2.9 + 4.2 X 2.9 + 3.66 X 2.9 1.8 X 1.1 )X3117.252m2楼梯顶层(6.06 X 2.9 X 2+ 3.66 X 2.9 X 2 1.8 X 1.5 1.5 X2.1 )X250.526m2(6 )通道(3.9 X2.9 X 21 X2.1 X2 ) 13X3 层718.38m2(7)门带窗(1.86 X 2.9 1 X 2.4 0.9 X 1.5 ) x
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2021-2024世界篮球趋势发展报告
- 吉林师范大学《数据模型与决策》2021-2022学年期末试卷
- 生态农业水资源利用方案
- 城市园艺有机肥料供货方案
- 2024大型起重设备租赁合同写
- 教师专业发展培训方案
- 农田灌溉及排水方案
- 吉林大学《企业伦理学》2021-2022学年第一学期期末试卷
- 2024工业产品购销的合同范本
- 中学国庆中秋节文化活动方案
- 质量管理体系品质保证体系图
- 4.与食品经营相适应的主要设备设施布局操作流程等文件
- 人教版(新插图)三年级上册数学 第9课时 用乘除两步计算 解决-归总问题 教学课件
- 四班三倒排班表
- 《现代汉语》考试复习题库及答案
- 13J104《蒸压加气混凝土砌块、板材构造》
- 初中语文七年级上册《世说新语二则》作业设计
- 银行业信息系统灾难恢复管理规范
- 2023老年重症患者静脉血栓栓塞症预防中国专家共识
- 2023光伏发电工程项目安全文明施工方案
- 汽车发动机构造与维修参考文献
评论
0/150
提交评论