




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、PMP认证考试试题精选(1)1. A Project Manager is imst likely to have the strongest influence in an organizationtbat is: A. Balanced Matrix B. Functional C. Projectized D. Strong Matrix 2. Project Management processes are: A. A series of actions bringing about a result B. Concerned with describing and orga
2、nizing the work of the project C. Concerned wit specifying and creating the product D. Broken into core and non-core processes3. Executing processes are concerned with: A. Recognizing that a project or phase should begin B. Coordinating people and other resources to carry out the plan C. Devis
3、ing and maintaining a workable method to accomplish the business need that the project was undertaken to address D. Ensuring that the project objectives are met by monitoring and measuring progress and taking corrective action when necessary4. Controlling processes are concerned with: A. Coord
4、inating people and other resources to carry out the plan B. Recognizing that a project or phase should begin C. Ensuring that the project objectives are met by monitoring and measuring progress and taking corrective action when necessary D. Devising and maintaining a workable scheme to accomplish th
5、e business need that the project was undertaken to address5. A conplex project will fit best in what type of organization? A. Functional B. Cross-functional C. Matrix D. Balanced.6. Core planning processes: A. Include scope planning, cost planning, schedule planning and performance reporting B. Prov
6、ide a framework for the project C. Are used to track the progress of a project D. Have clear dependencies so they must be executed in essentially the same order on most projects7. In a weak matrix organization, functional managers are usually responsible for: A. Monitoring personnel performance B. A
7、pproval for changes to the project schedule C. Monitoring their project team member抯 deliverables D. Changes that impact their team member participation8. As a Project Manager onreplacing2 miles of sewer pipe part of your job is to determine if there are cbanges to the scope of the project, the sche
8、dule, the budget and the tecbnical requirements. These responsibilities are part of wbich process: A. Executing B. Controlling C. Planning D. Closing9. You are one of four full-time project managers in an organization You all sbare an administrative person There are generally 8-10 projects per year
9、tbat involve about 25% of the organization enployees, however, these employees do not report to you. Your organization can best be classified as: A. Functional B. Strong matrix C. Projectized D. Balanced matrix10. During the course of a project you have motivated team members, managed conflict, perf
10、ormed personnel administrative functions and negotiated for more resources. These are examples of: A. General Management B. Project Human Resource Management C. Project Execution D. A Projectized organization11. You have been promoted to Manager, Continuous Process Improvement. Your new position: A.
11、 Is a project because the work will be performed by people B. Is not a project because Continuous Process Improvement will continue indefinitely C. Is a project because it is constrained by limited resources D. Is a project because improvements must be plained, executed, and controlled 12. Wbich of
12、the following is not a Project Management knowledge area? A. Project Quality Management B. Project Procurement Management C. Project Configuration Management D. Project Risk Management13. In a matrix organization, which of the following is not a responsibility of the project manager? A. Complete tas
13、k definitions B. Resource requirement definitions C. Major timetable milestones D. Personnel perfonmnce measurements14.Of the following, which usually exhibits the slowest rate of change? A. People B. Technology C. Organizations D. The Environment15.The state of being totally answerable for the sati
14、sfactory completion of a specific assignment is called: A. Authority B. Accountability C. Responsibility D. Fiduciary16. During the planning phase of your current project, you prepare a detailed financial plan. For this process, you are using: A. A general imnagement skill B. An industry specific sk
15、ill C. A skill that is common to general management and project management D. A project management skill17. You are responsible for the communication controls for the Genesis series of satellites. Your current assignment is: A. Project management B. Functional management C. Facility management D. Pr
16、ogram management18. Which of the following knowledge areas are part of Project Closure? A. Communications B. Scope C. Cost D. Human Resources19. The process of detemuining who needs what infonnttion, when they need it, and how it will be given to them is: A. Information distribution B. Communication
17、s requirements C. Communications planning D. Communications management20. Communication planning is most titly linked with what process: A. Cost estimating B. Organizational planning C. Cost budgeting D. Performance reportingMP认证考试试题精选(2) 21. Which of the following is not a technology factor th
18、at may affect the project communications plan: A. Immediacy of the need for the information B. Length of the project C. Expected project staffing D. Logistics of how many individuals will be involved with the project and at what locations 22. Where is the bulk of the project budget spent? A. S
19、cope management B. Production C. Labor and materials D. Project plan execution 23. Which of the following is not a type of performance reporting: A. Status reporting B. Progress reporting C. Forecasting D. Benchmark reporting 24. Which tool and technique integrates scope, cost and schedule in measur
20、ing project perfonmnce? A. Variance analysis B. Earned value C. Trend analysis D. Performance report 25. Inputs to Administrative Closure include all of the following except: A. Perfonmnce measurement documentation B. Other project records C. Documentation of the product D. Project archives
21、60; 26. Which equation correctly illustrates the cost variance of a project, in cunency? A. BCWP-ACWP B. BCWP/ACWP C. BCWP-BCWS D. BCWP/BCWS 27.You are approximately 30% through your project and the sponsor wants a forecast of the final budget based on what has already been spent. You create a
22、n S curve chart display of what kind of perfonmnce report: A. Earned value B. Trend analysis C. Variance analysis D. Cost distribution curve 28. At 40% through your project you have a BCWS of ,000 and a BCWP of ,000. Your project is: A. Ahead of schedule B. Behind schedule C. A positive cost v
23、ariance D. A negative cost variance 29. In preparing for a team meeting you want to let the team know how they are doing on the project schedule over all. You calculate the task achievements as follows: planning has a BCWS of ,000 and a BCWP of ,000, testing has a BCWS of,000 and BCWP of,000,
24、and design has a BCWS of ,000 and a BCWP of ,000. As a whole your project is: A. 15% ahead of schedule B. 15% behind schedule C. 15% ahead of schedule, but over budget D. 15% behind schedule and budget 30. In order to let the project sponsor know the percentage of cost variance of your p
25、roject, you calculate: A. BCWP-BCWS B. BCWP/BCWS C. BCWP/ACWP D. BCWP-ACWP 31. As the project manager, you chair a weekly exchange of information meeting among team leaders. This is an example ofcommunicationthat is: A. Internal, formal, and horizontal B. External, informal, and vertical C. O
26、ral, internal, and informal D. Oral, external, and formal 32. Manual filing systems, electronic text databases, and project management soflware that allow team members to share information about the project are exanples of A. A communication management plan B. An information retrieval system C. An i
27、nformation distribution system D. A project management information system 33. During project team formation and during the early phases of a project, the most common source of conflict within the project teamis likely to be: A. Schedules B. Priorities C. Technical opinions D. Cost 34. During e
28、xecution of a project, the most common source of conflict within the project team is likely to be: A. Schedules B. Priorities C. Technical opinions D. Cost 35.Of the following, which conThct resolution strategy is likely to yield the most productive results? A. Withdrawing B. Forcing C. Compro
29、mising D. Collaborating 36. During execution of your project plan, you discover that a task team is unaware that deliverables from another task will be late, holding up their o progress. As a result you should: A. Revise the project schedule B. Revise the project budget C. Revise the communica
30、tion plan D. Revise the quality plan 37. In assigning your new project to you, the programmanager tells you that this is a very high visibility project and that executive management will be following your progress very closely with particular interest in use of the pyrotechnics that will be i
31、nvolved. This infonmtion is valuable input for your: A. Risk management plan B. Communication management plan C. Scope management plan D. Technical specification 38. The Communication Management Plan provides all of the following except: A. A collection and filing structure for project informa
32、tion B. Communication barriers C. A distribution structure for project information D. Project communication schedules 39. Life-Cycle Costing is: A. The concept of including acquisition, operating, and disposal costs when evaluating various alternatives B. Considers the information needs of the stake
33、holders C. The term used on smaller projects when all the components ofProject Cost Management are viewed as a single process D. Used to estimate the life of the product 40. The two phases used in Project Cost Management are: A. Planning and executing B. Executing and controlling C. Planning a
34、nd close outD. Controlling and planning1) ANS: C Reference: PMBOK 2.3.3 (2) ANS: B Reference: PMBOK 3.1(3) ANS: B Reference: PMBOK 3.3.3(4) ANS: C Reference: PMBOK 3.2(5) ANS: C Reference: PMBOK 2.3.1(6) ANS: D Reference: PMBOK 3.3.2(7) ANS: A Referenc
35、e: PMBOK 2.3.3(8) ANS: B Reference: PMBOK 3.3.4(9) ANS: D Reference: PMBOK 2.3.3(10) ANS: A Reference: PMBOK 2.4(11) ANS: B Reference: PMBOK 1.2(12) ANS: C Reference: PMBOK 1.3.2(13) ANS: D Reference: Project Management:(14) ANS: A Reference: Project Management: A Systems Approach to Planning, Scheduing, and Controlling, 7th Edition P.33(15) ANS: B Reference: Project Management: A
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年机床附件及辅助装置项目发展计划
- 清华大学中学2025年高三六校第一次联考化学试卷含解析
- 2025年微波和高频波解冻设备项目建设方案
- 2025年力学计量标准器具项目建设方案
- 跨境水系流域2025年生态保护性承包经营约束协议
- 2025年VOD系统设备合作协议书
- 陕西铁路工程职业技术学院《土木工程施工》2023-2024学年第二学期期末试卷
- 随州市2024-2025学年三下数学期末质量跟踪监视试题含解析
- 集美大学《新能源试验设计与统计分析》2023-2024学年第一学期期末试卷
- 青岛大学《古代汉语语法研究》2023-2024学年第一学期期末试卷
- GB/T 27030-2025合格评定第三方符合性标志的通用要求
- (二模)温州市2025届高三第二次适应性考试数学试卷(含答案详解)
- 2025年安全教育培训考试:消防安全隐患排查标准操作试题
- 2025年信阳职业技术学院单招职业技能考试题库含答案
- 2024年下半年池州市投资控股集团公开招聘工作人员25人笔试参考题库附带答案详解
- 员工手册(化妆品行业)
- 2025年新版七年级下册英语单词表
- 2024年广西高考化学试卷真题(含答案解析)
- 水利水电工程建设用地设计标准(征求意见稿)
- GB/T 3683-2023橡胶软管及软管组合件油基或水基流体适用的钢丝编织增强液压型规范
- 保洁岗位培训
评论
0/150
提交评论