1、PowerPoint presentation to accompanyChopra and Meindl Supply Chain Management, 5e1-1Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.1-1Copyright 20
2、13 Pearson Education, Inc. publishing as Prentice Hall.1-1Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.8-1Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.8Aggregate Planning in a Supply Chain8-2Copyright 2013 Pearson Education, Inc. publishing as Prentice Hal
3、l.Learning Objectives1. Identify the decisions that are best solved by aggregate planning.2. Understand the importance of aggregate planning as a supply chain activity.3. Describe the information needed to produce an aggregate plan.4. Explain the basic trade-offs to consider when creating an aggrega
4、te plan.5. Formulate and solve basic aggregate planning problems using Microsoft Excel.8-3Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Role of Aggregate Planning in a Supply ChainCapacity has a cost and lead times are often longAggregate planning: process by which a company det
5、ermines levels of capacity, production, subcontracting, inventory, stockouts, and pricing over a specified time horizon goal is to maximize profit decisions made at a product family (not SKU) level time frame of 3 to 18 months how can a firm best use the facilities it has?8-4Copyright 2013 Pearson E
6、ducation, Inc. publishing as Prentice Hall.Role of Aggregate Planning in a Supply ChainSpecify operational parameters over the time horizon Production rateSubcontracting WorkforceBacklog OvertimeInventory on hand Machine capacity levelAll supply chain stages should work together on an aggregate plan
7、 that will optimize supply chain performance8-5Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.The Aggregate Planning ProblemGiven the demand forecast for each period in the planning horizon, determine the production level, inventory level, and the capacity level for each period t
8、hat maximizes the firms (supply chains) profit over the planning horizonSpecify the planning horizon (typically 3-18 months)Specify the duration of each periodSpecify key information required to develop an aggregate plan8-6Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Informatio
9、n Needed foran Aggregate PlanAggregate demand forecast Ft for each Period t over T periodsProduction costs Labor costs, regular time ($/hr) and overtime ($/hr) Subcontracting costs ($/hr or $/unit) Cost of changing capacity hiring or layoff ($/worker), adding or reducing machine capacity ($/machine)
10、Labor/machine hours required per unitInventory holding cost ($/unit/period)Stockout or backlog cost ($/unit/period)Constraints overtime, layoffs, capital available, stockouts, backlogs, from suppliers8-7Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Outputs of Aggregate PlanProdu
11、ction quantity from regular time, overtime, and subcontracted timeInventory heldBacklog/stockout quantityMachine capacity increase/decreaseA poor aggregate plan can result in lost sales, lost profits, excess inventory, or excess capacity8-8Copyright 2013 Pearson Education, Inc. publishing as Prentic
12、e Hall.Identifying Aggregate Units of ProductionAggregate unit should be identified in a way that the resulting production schedule can be accomplished in practiceFocus on the bottlenecks when selecting the aggregate unit and identifying capacity and production timesAccount for activities such as se
13、tups and maintenance8-9Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsFamilyMaterial Cost/ Unit ($)Revenue/ Unit ($)Setup Time/Batch (hour)Average Batch SizeProduction Time/ Unit (hour)Net Production Time/Unit (hour)Percentage Share of Units SoldA15548505.605.7610
14、B73061503.003.0425C93981003.803.8820D124910504.805.0010E93661003.603.6620F13485754.304.3715Table 8-18-10Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsWeighted average approachMaterial cost per aggregate unit = 15 x 0.10 + 7 x 0.25 + 9 x 0.20 + 12 x 0.10 + 9 x 0.2
15、0 + 13 x 0.15 = $10SimilarlyRevenue per aggregate unit = $40Net production time per aggregate unit = 4.00 hours8-11Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Aggregate Planning StrategiesTrade-off between capacity, inventory, backlog/lost salesChase strategy using capacity as
16、 the leverTime flexibility from workforce or capacity strategy using utilization as the leverLevel strategy using inventory as the leverTailored or hybrid strategy a combination of strategies8-12Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Chase StrategyVary machine capacity or
17、 hire and lay off workers as demand variesOften difficult to vary capacity and workforce on short noticeExpensive if cost of varying capacity is highNegative effect on workforce moraleResults in low levels of inventoryUsed when inventory holding costs are high and costs of changing capacity are low8
18、-13Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Time Flexibility StrategyUse excess machine capacityWorkforce stable, number of hours worked variesUse overtime or a flexible work scheduleFlexible workforce, avoids morale problemsLow levels of inventory, lower utilizationUsed wh
19、en inventory holding costs are high and capacity is relatively inexpensive8-14Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Level StrategyStable machine capacity and workforce levels, constant output rateInventory levels fluctuate over timeInventories carried over from high to l
20、ow demand periodsBetter for worker moraleLarge inventories and backlogs may accumulateUsed when inventory holding and backlog costs are relatively low8-15Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Aggregate Planning Using Linear ProgrammingRed Tomato Tools Highly seasonal dem
21、and Develop a forecastMonthDemand ForecastJanuary1,600February3,000March3,200April3,800May2,200June2,200Table 8-28-16Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsItemCostMaterial cost$10/unitInventory holding cost$2/unit/monthMarginal cost of stockout/backlog$5/
22、unit/monthHiring and training costs$300/workerLayoff cost$500/workerLabor hours required4/unitRegular time cost$4/hourOvertime cost$6/hourCost of subcontracting$30/unitTable 8-38-17Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsDecision VariablesFor t = 1, ., 6Wt=
23、 Workforce size for month tHt= Number of employees hired at the beginning of month tLt= Number of employees laid off at the beginning of month tPt= Production in month tIt= Inventory at the end of month tSt= Number of units stocked out at the end of month tCt= Number of units subcontracted for month
24、 tOt= Number of overtime hours worked in month t8-18Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsObjective FunctionMinimize(Regular-time labor cost + Overtime labor cost + Cost of hiring and layoffs + Cost of holding inventory + Cost of stocking out + Cost of su
25、bcontracting + Material cost)Min640Wtt=16+6Ott=16+300Htt=16+500Ltt=16+2Itt=16+5Stt=16+10Ptt=16+30Ctt=168-19Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsConstraints1. Workforce, hiring, and layoff constraintsAll for t = 1,., 6Wt=Wt1+HtLt2. Capacity constraintsPt
26、40Wt+Ot43. Inventory balance constraintsIt1+Pt+Ct=Dt+St1+ItSt4. Overtime limit constraintsOt10Wt8-20Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsAverage inventory =(I0+IT) / 2+Itt=1T1()T=(I0+IT) / 2+Itt=1T1()T Dtt=1T1()TAverage timein inventory8-21Copyright 2013
27、 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsTotal cost over planning horizon = $422,275Revenue over planning horizon = 40 x 16,000 = $640,000Period, tNo. Hired, HtNo. Laid Off, LtWorkforce Size, WtOvertime, OtInventory, ItStockout, StSubcontract, CtTotal Production, Pt000800
28、1,0000010156501,983002,5832006501,567002,583300650950002,583400650026702,583500650117002,583600650500002,583Table 8-48-22Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato Tools=(I0+I6) / 2+Itt=15()T=5,3676= 895Average seasonal inventoryAverage flow time =8952,667= 0.34 =
29、0.34 months8-23Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsHigher demand variabilityMonthDemand ForecastJanuary1,000February3,000March3,800April4,800May2,000June1,400Table 8-5=(I0+IT) / 2+Itt=1T1()T=6,4506=1,075Average seasonal inventory8-24Copyright 2013 Pears
30、on Education, Inc. publishing as Prentice Hall.Red Tomato ToolsTotal cost over planning horizon = $432,858Period, tNo. Hired, HtNo. Laid Off, LtWorkforce Size, WtOvertime, OtInventory, ItStockout, StSubcontract, CtTotal Production, Pt0008001,0000010156502,583002,5832006502,167002,583300650950002,583
31、40065001,26702,583500650068302,583600650500002,583Table 8-6Average flow time =1,0752,667= 0.40 months8-25Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsLower hiring and layoff costs=(I0+IT) / 2+Itt=1T1()T=2,5006= 417Average seasonal inventoryAverage flow time =417
32、2,667= 0.16 monthsTotal cost over planning horizon = $412,6888-26Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Red Tomato ToolsPeriod, tNo. Hired, HtNo. Laid Off, LtWorkforce Size, WtOvertime, OtInventory, ItStockout, StSubcontract, CtTotal Production, Pt0008001,0000010354501,20
33、0002,2672004500002,2673420870300002,26740087001,26702,267502661025068302,267600610500002,267Table 8-78-27Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Forecast Error in Aggregate PlansForecast errors must be consideredSafety inventorySafety capacity Use overtime as a form of saf
34、ety capacity Carry extra workforce permanently as a form of safety capacity Use subcontractors as a form of safety capacity Build and carry extra inventories as a form of safety inventory Purchase capacity or product from an open or spot market as a form of safety capacity8-28Copyright 2013 Pearson
35、Education, Inc. publishing as Prentice Hall.Aggregate Planning In ExcelFor t = 1, ., 6Wt= Workforce size for Month tHt= Number of employees hired at the beginning of Month tLt= Number of employees laid off at the beginning of Month tPt= Production in Month tIt= Inventory at the end of Month tSt= Num
36、ber of units stocked out at the end of Month tCt=Number of units subcontracted for Month tOt=Number of overtime hours worked in Month t8-29Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Aggregate Planning In ExcelFigure 8-18-30Copyright 2013 Pearson Education, Inc. publishing as
37、Prentice Hall.Aggregate Planning In ExcelFigure 8-28-31Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Aggregate Planning In ExcelFigure 8-38-32Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.Aggregate Planning In ExcelFigure 8-48-33Copyright 2013 Pearson Educat
38、ion, Inc. publishing as Prentice Hall.Building a Rough Master Production ScheduleDisaggregate an aggregate planFamilySetup Time/Batch (hour)Average Batch SizeProduction Time/Unit (hour)Production QuantityNumber of SetupsSetup Time (hours)Production Time (hours)A8505.602585401,445B61503.006464241,938C81003.805175401,965D10504.802585501,238E61003.605175301,861F5754.303875251,664Table 8-88-34Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall.The Role of IT in Aggregate PlanningThe ability to handle large problemsThe ability to handle complex problems (through either nonline
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 个人临街租赁合同
- 2024年矿山开采土石方运输服务合同
- 2025消防工程承包合同范本
- 商丘医学高等专科学校《信息图形设计》2023-2024学年第一学期期末试卷
- 商丘医学高等专科学校《数字化室内建筑制图AutoCAD》2023-2024学年第一学期期末试卷
- 商丘医学高等专科学校《材料热力学基础》2023-2024学年第一学期期末试卷
- 2024年简化版无子离婚合同参考版B版
- 2024年版聘用协议编号及管理规章版
- 委托生产医疗设备合同范例
- 汽车代理授权合同范例
- 华北水利水电大学《自然语言处理课程设计》2023-2024学年第一学期期末试卷
- 国家开放大学《宣传工作实务》专题测验1-12参考答案
- 2024年初级电焊工理论考试复习题库(含答案)
- 2024年资助政策主题班会课件
- 2024年度人工智能AI技术服务合同3篇
- 江苏省2025届高三第一次模拟考试英语试卷含解析
- 教研组汇报课件
- 贵州省贵阳市2023-2024学年高一上学期语文期末考试试卷(含答案)
- 化学必修一人教版知识点总结(超全)
- 高中化学解题方法大全
- 2024赞助合同模板
评论
0/150
提交评论