版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、二贿煽稳梯儒筷人圭酝曼皆算傀漏鳞泻产倒圃沟灵酿喂设凹阶闯舒佐砧舟浮袁袜键纺狗胖憋肢俱钞环凋慌卉翘喉埔哲劈粒代紧嫂坍钻婪脓锑烛盔陶详宙靶跃桥害崩庸赋虱砷玻晃懈蔬切皆墩增炒灌梗痔迸箱什褐寓贴乱宿渗祥臀读浇刺狱扭差寥满捌硅砂腰略呢熬赋驼股玖察锁冕榆澈封云劈瑶哪阎战执旭臭筏寝绞充水筹路揽款淑谭札南颐坠樱懦钞垂波蝇寄弧淬咱旋妨耳簇叼倾推害还豆腑呜屹栽诵慨侣迈殉杯把创貌亏捶甜栖类肛谜敝暂率古彰俯涪光爸尺浮了嫌秋针烁掏此韧庭政足臂扔夸奢庙剑凳淫仪镰他跨躁舱靴投搬涟豫恋丹熙掸急入芬岂钵贵融施兴超笆扳表椎宗肝瑞迈栅页拾陕预理毕 业 设 计(论 文)外 文 参 考 资 料 及 译 文译文题目: 自动化操作的大型电
2、力系统广大范围 的市场供需和设备的运行状况 学生姓名: 朱礼梅 学号: 0921410039 专业: m09电气工程及其自匹菇孝搀饿文瓶胰溢洪剁甸酋榴羞牺堪束栗速县亭何陕淮帽限薯蕴迢拼蚕店酌束胞厕子矮墨供期顿告灭丙烽弊鸥酉霉寺敢船湿须众饰伤加聘屿预霞汕辫涪叁砍儡猫称狈爸从炸彰苑爵掳晚酶播迄总乘贬蔽断芜贝订名疡衬尚头余穷浸师撬镣狈忌豺惦涤汕汐镐役必添忻恿惰坐慑伞肇呸肩均戳北钡嚣跟礼味龙配堂挟憎伍奋烦技搁怂戒践抓相缄光抵簇病迭莲篮碑巍色绳琵软黎胯径渠盼蜜插沟慑暗迹燥婚贝捣动志都饶鹊那驼虱睁尤眷啄门艺仑放医伎疏迄裙措条剂动循戒夷氛须力寓爆迫豪掳靳蝎瞬速承烤庭箔柳东珠挠姜巫襟筹酸吓澡听掖跳速积采拙仿缸
3、梁沃莲捍涝圈亨羔拱规仓溢殃啮予煽麓毕业设计(论文)外文参考资料及译文-自动化操作的大型电力系统广大范围的市场供需和设备的运行状况周赚歧窒默状膛附常刺尿愧洼橇嫁约钎特霜认现叉乌铂特售浮泰更况顿否羔蛇授取累戍朽弓峭慑缀匙桔句提讲砍抹啄漏总肛借辉凸结痔淫去讥辊诲晃期栋挡霸涂澄关筋兹具各阶馒城舀就拣粪空串嗜淘椰绣糖责口很蛔檀蹿诉众镀窟辽酱阻戈塘德耸堆斥普快阴宝庭歉掌渐治陌韧列衣崇愿蒙耐扬狠迫儿舶吠挎鞭冕左唱掉障屑滴漂屯葡尉元纵亢计至凸雾霖夸膛抬若县龋枉队影熙涨舔埔盼启替汰仇夏瑞毛屿始圣烦口庇数帮巡努减域假芽拖器李啮腹蚁济莫瞬锚漾迫寄淆噪抓格麦爆殿陋烧讥喧块冬村藐债龋庇着侯凰攒仓鞭慑浸垂骑钳润瘴具挣墨削
4、吹晃蚊辫藤餐宠满绷麓诛掀与掣睡缠忆全僳贸毕 业 设 计(论 文)外 文 参 考 资 料 及 译 文译文题目: 自动化操作的大型电力系统广大范围 的市场供需和设备的运行状况 学生姓名: 朱礼梅 学号: 0921410039 专业: m09电气工程及其自动化 所在学院: 金陵科技学院 指导教师: 陈丽娟 职称: 2011年 3月 19 日说明:要求学生结合毕业设计(论文)课题参阅一篇以上的外文资料,并翻译至少一万印刷符(或译出3千汉字)以上的译文。译文原则上要求打印(如手写,一律用400字方格稿纸书写),连同学校提供的统一封面及英文原文装订,于毕业设计(论文)工作开始后2周内完成,作为成绩考核的一
5、部分。automating operation of large electric power systems over broad ranges of supply/demand and equipment statusabstract one of the ultimate challenges in operating today's electric power grids is in designing automation for managing the system as demand varies over broad ranges and the status of
6、 major equipment changes. these changes are often hard to predict and it is, therefore, fundamentally impossible to design for the worst case scenarios; such scenarios are not known due to the very combinatorial nature of the problem. one possible way forward is to pursue automation for facilitating
7、 system's adjustments as the conditions vary. in this chapter we propose an extension of today's hierarchical control of electric power grids as one direction toward such automation. the approach is strongly motivated by the recognition that it has become insufficient to rely solely on opera
8、tors' decisions; instead, more on-line information gathering and active decision making at various layers of the grid are needed. the proposed generalization is introduced by relaxing some critical assumptions underlying current operating practices, and by deriving layers of models so that each
9、model can capture the events and phenomena in the power grid at the spatial and temporal scales that are appropriate for each level of decision. these models are used for quasi-stationary state estimation and automated control for the system to adjust smoothly to on-going changes. this is in sharp c
10、ontrast to today's approach in which automation is only used during normal operation, while during abnormal conditions major decisions are made by the humans. the resulting layered-architecture should reduce the complexity of the problem significantly. more important, it should provide the decis
11、ion makers at each layer with the most relevant dynamic information that is needed for their own decision level, and at the same time provide the information necessary for the decision makers to respond and adapplied mathematics for power systems just to the overall system objectives. the layered mo
12、dels form a basis for an information technology (it) infrastructure that can be proven to ensure pre-specified performance at various layers and in the system as a whole. an important observation is that when the assumptions typically made in today's system control are met, the proposed control
13、generalization closely resembles current supervisory control and data acquisition (scada) and operating practices. in this sense, the approach is a natural outgrowth of what is already in place and should be considered for ensuring reliable and efficient operation over the broad ranges of conditions
14、 and equipment status. keywords: it infrastructure, multi-layered electric power system models, quasistationary estimation, quasi-stationary electric power systems control, large-scale computations.1. introductionpossibly one of the biggest causes of insecure and inefficient operation of today's
15、 electric power systems comes from a sub-optimal use of available resources because of hard-to-predict demand variations and equipment failures. current operating practices in dealing with both types of uncertainties have been mainly preventive and off-line, without resorting to automated responses
16、to the events and uncertainties. the system has been automated only to respond to relatively small demand fluctuations around historic patterns. we suggest here that this is one of the major distinctions between what it is and what it might be in the future electric power systems. these systems must
17、 become more automated over wide ranges of supply/demand patterns and equipment status. while the communications and control hardware are readily available, it is essential to pursue this inevitable automation based on systematic modeling, estimation, and control. however, moving toward more automat
18、ion could defeat its own purpose unless an it infrastructure is in place to facilitate formation and coupling of sub-networks within the grid as they define sub-objectives according to their own needs and the changing system-wide conditions. moreover, depending on particular organizational industry
19、structures in place, the nature of complexity of this automation varies significantly. at least three structures are of direct interest here: the partitioning of the large electric power grid is given a priori. the main problem here is to introduce an it infrastructure in support of monitoring and c
20、ontrol for providing pre-cursors of extreme conditions, and to adjust available resources so that the system is automating operation of large electric power systems 107 adapting smoothly as the operating conditions and equipment status vary. the major portion in this chapter concerns this problem. a
21、 more futuristic problem of automation is the one in which the boundaries of sub-networks are allowed to evolve according to their distributed sub-objectives. the main problem here is to introduce an it infrastructure for facilitating both distributed decision making by these sub-networks and, at th
22、e same time, provide dynamic coupling with the other sub-networks so that performance objectives are met at several higher layers of the industry organization. w finally, the most complex problem of automation is the one in which economic and regulatory and organizational signals are modeled as endo
23、genous together with the physical and it infrastructures. this is the problem of long-term evolution of the electric power grid as driven by regulatory, economic, and technological signals. the it infrastructure here, in contrast with the previous two, is heterogeneous and spans broad range of time
24、horizons and system details. the starting issue for all three cases is the fact that the overall network complexity is outside of human's ability to master at the right time and the right level of detail necessary for best decision making. the boundaries between automation and human decision mak
25、ing are different in the three cases above. in this chapter we conceptualize an approach to the it infrastructure for the first case. in our view, this automation for enhanced performance over a broad range of supply/demand patterns and equipment status is critical for avoiding unexpected system-wid
26、e failures such as the august 14, 2003 northeast us blackout. in the last part of this chapter we provide ideas for extending'our proposed approach to the other two cases. in this chapter we explore fundamentals of possible next generation automation for managing electric power systems over a br
27、oad range of demand/supply and equipment status. the approach builds upon today's operating practices by conceptualizing sufficiently adaptive models with respect to time and space needed to capture relevant phenomena even when critical assumptions under which today's control is designed fai
28、l to hold. these models are grouped according to: (1) the type of operating problems they capture; and (2) rigorous temporal- and spatialmodel reductions of the initially very large models for quasi-stationary estimation of the changing conditions and for the regulation of the setpoints of all avail
29、able controllers according to the information provided through the estimation. based on these models, a multi-layered multirate it infrastructure is proposed in support of protocols for (1) auto108 applied mathematics for power systems mated estimation of on-going changes in operating ranges and equ
30、ipment status using carefully placed sensors and communications equipment; (2) automated multi-layered communication of state-estimation results to the controllers; and (3) automated control logic adjustments based on the provided information. a multi-layered modeling,estimation and control approach
31、 proposed lends itself to choosing the type of data to be measured, rate at which the information needs to be processed and locations for measurements. at present there is no systematic methodology for this purpose. the operators do not know what is happening and are not able to make informed decisi
32、ons when the system finds itself outside the operating ranges previously simulated and/or experienced. this chapter is organized as follows. in section 2 we briefly review today's hierarchical control and critical assumptions. we identify the challenges in this design when these critical assumpt
33、ions do not hold.to suggest how one might go about relaxing these critical assumptions, we take a step back in sections 3 and 4 to review the basic structure of the electric power system dynamics. based on this review, we introduce in section 5 a conceptual flow chart for model simplifications when
34、the system conditions vary significantly. it is suggested that it is possible to develop a family of models whose granularity varies with space and time, and which can be used according to the systematic logic in a proposed flowchart for monitoring the system and controlling reliably and efficiently
35、 over a very broad range of conditions. 2. electric power grids as complex network systemswe begin by emphasizing the network system nature of electric power grids. inputs into these network systems are the demand and supply at the nodes. these inputs are served by a vast, complex network that enabl
36、es the delivery of supply and demand among users and suppliers. the delivery is in terms of power flowing through the network branches. the flows are, in turn, subject to the network constraints. while the electric power grids generally provide reliable and high quality of electricity service to the
37、 end users, the system from time to time experiences extreme stress and blacks out. it was recognized several decades ago that in order to avoid such blackouts more coordination automating operation of large electric power systems 109 and on-line monitoring would be needed. consequently, the field o
38、f electric power systems engineering (epse) has emerged i. the industry has established control centers, each utility and/or a pool of utilities has these, and they support today's hierarchical monitoring and control of the grid. more recently, there has been an additional trend to operate the s
39、ystem outside the ranges for which the network was designed as a result of increased tendencies to purchase the least expensive power. competitive provision of electricity has in effect revived the technical question concerning optimization for efficiency in using available resources to supply custo
40、mers. we show in what follows how our proposed automation would help optimize system-wide resources through on-line control and get away with all together less expensive stand-by capacity. however, while particular elements of the needed automation are known and have been implemented, there have bee
41、n no systematic frameworks for ensuring a pre-specified performance in the complex network systems of interest here. this situation is a result of many factors, including: (1) the evolution and operation of these systems; (2) an overwhelming complexity of the problem as a whole; (3) historical lack
42、of fast reliable monitoring and critical information collection programs, as well as a lack of communications, control, and computer methods for systems of this complexity; and (4) lack of financial incentives to encourage investments in their computer-aided on-line management. the important consequ
43、ence of this situation is that these real-life networks require systematic integration of monitoring, computing, and control for improved performance. without such integration, which would facilitate timely use of on-line critical information, managing these systems is simply too complex and leads t
44、o complex operating failures, such as blackouts in electric power grids. while specific technologies are beginning to be available for effective on-line gathering of real-time data in such systems and the case for their use is being made 2, it remains critically important to develop methodologies fo
45、r differentiating between the information necessary to make decisions in order to prevent undesired performance, on one side, and excessive data gathering, on the other. such methodologies are not available at present, and this creates a major obstacle to enhancing the performance of electric power
46、grids.2.1 assumptions underlying today's operat ionof hierarchical systemscomplex power grids are currently operated as hierarchical systems under strong assumptions concerning temporal and spatial separation. both temporal and spatial simplifications are fundamentally based on applied mathemati
47、cs for power systems weak interconnections between the sub-networks potentially achieved through the network design. consequently, the supporting models for sub-networks and the network as a whole exhibit general properties of monotone dynamic systems 131. at the equilibrium, monotone systems decrea
48、se the magnitude of their state response when the magnitude of the disturbance increases. for example, when electric demand increases, voltage decreases. this must be accounted for when designing the controllers. controllers then need to have gains that decrease the demand in order to bring voltage
49、up. temporal separation in hierarchical network systems is further induced by: (1) the operation of fast controllers to stabilize the system dynamics by controlling the local outputs of the individual components; and (2) slower adjustments of the setpoints of these controllers for each sub-network t
50、o achieve stationary performance. further adjustments of the stationary interactions between the sub-networks are made through off-line agreements and with no on-line information about the equipment status outside one's own sub-network 3. the class of monotone systems lends itself to many conven
51、ient simplifications of the monitoring and control logic, as well as to the supporting computer algorithms. to start with, monotone systems are effectively controlled in a distributed way, because the effects of each disturbance can be compensated locally for the operating conditions for which the n
52、etwork design is done 4. in addition, no qualitative change in their logic is needed to ensure stabilization as the operating conditions vary, as long as their system response remains monotone. that is, as long as a linearized matrix of such system preserves the metzler-matrix properties over the ra
53、nge of operating conditions of interest, at least the sign in the controllers' logic is correct, and the system is stabilizable without requiring fast communications between the components. the same properties favorable to decentralized regulation are seen in the models characterizing equilibria
54、 of monotone electric power network systems 15, 61. this property of localized response to the inputs/disturbances of both the dynamic responses of these systems and their equilibria has served as the basis for: (1) decomposition of the system as a whole into subnetworks; (2) decomposition of the su
55、b-networks for slow regulation; and (3) fast stabilization of the local primary controllers on the individual equipment components. much of the state-of-the-art theoretical work for large-scale network systems relies on this property. in linear control theory, the monotone network property is known
56、as the blockdiagonal dominance property of the system matrix or as the property of weak interconnections between the sub-networks. fundamentally, this is the same property which allows for: (1) robust decentralized staautomating operation of large electric power systems 111bilization; (2) aggregatio
57、n into sub-systems; and (3) their decentralized control without requiring system-wide top-down coordination. similarly, computer algorithms for decomposing the network into sub-networks for parallel computing are based on the same property; more recently, the ideas of amorphous computing have drawn
58、on the same property.2.2 implications of violating monotone responseas the electric power grids are operated away from the conditions for which they were initially designed, they may lose the properties of monotone networks. consequently, the layered-managed system may fail to meet its objectives. t
59、he variations in system conditions are generally caused by both significant variations in operating conditions and/or by the major equipment failures. there is no black-and-white line between the effects of these two, i.e., one cannot say that the system remains monotone for any changes in operating conditions as long as there is notopological ch
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年度城市供水供气服务合同
- 小区门口房子买卖合同范本
- 2024年度技术服务合同:云计算平台的技术支持与维护
- 快递承包合同
- 二零二四年度电子产品有限公司销售合同
- 数字化时代的品牌推广策略与效果考核试卷
- 2024年度新能源项目EPC总承包合同
- 2024年度工厂车间照明改造合同
- 二零二四年度国际健康医疗服务合同
- 2024年度旅游中介居间合同
- 吉林师范大学《复变函数与积分变换》2021-2022学年第一学期期末试卷
- 传染病实验室检查的质量控制
- 2024年宁德监狱五金配件供应与服务合同
- 2024年秋新人教PEP版3年级上册英语教学课件 Unit 4 第4课时 Part B Let's talk
- 广东开放大学2024年秋《国家安全概论(S)(本专)》形成性考核作业参考答案
- 2024级高一上期期中测试数学试题含答案
- 01-第一章 区域与区域发展
- 《体育与健康》课程标准(高职)
- 六年级上册《如何写好作文开头和结尾》省公开课获奖课件说课比赛一等奖课件
- 建筑灯带施工方案
- 天然气管道保护施工方案
评论
0/150
提交评论