传递特性的管理2013_第1页
传递特性的管理2013_第2页
传递特性的管理2013_第3页
传递特性的管理2013_第4页
传递特性的管理2013_第5页
已阅读5页,还剩19页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Pass Through Characteristics Pass Through Characteristics Management(Management(传递特性的管理)传递特性的管理)FoA Supplier DevelopmentFoA Supplier DevelopmentFord Motor CompanyFord Motor CompanyWhat is Pass Through Characteristics?(什么是传递特性)Pass Through Characteristics are those internal and external supplied char

2、acteristics with potential fit or function issues that will not get 100% detected within a production assembly and test area (essentially anywhere verifiable within a plant.) Quality defects are therefore at risk of being “Passed Through” to our customers.传递特性就是那些内部或者外部供应产品的特性的潜在的或运行的问题在生产装配和检测时(车间内

3、部任何一个能做验证的)没有被100%的识别,因此就存在质量缺陷被“传递”到我们的客户那里的风险。Pass Through Characteristic Management(传递特性的管理) Proper fit assures the mating part(s) will assemble properly when required, i.e. bores and bosses are present, located to print, with good threads, etc.配套件装配时需要有适当的试验证明, Functionality assures the componen

4、t is 100% fully functional over its entire operating range, i.e. for a sensor, thermostat, or pump assembly purchased and installed in assembly. PTC SCOPE AT (PTC SCOPE AT (传递特性的定义范围)传递特性的定义范围) Analyze all T and TR final line stations for possible component, hardware, and installation failure modes

5、and their current detection. Develop short and long-term corrective action plans for high-risk issues that may affect our customers.分析所有的T和TR由于可能存在的组成和装配失败的样件以及当前的检测方式。针对可能影响到我们的客户的高风险问题开展短期和长期的整改活动计划。GOALGOAL(目标)(目标) Reduce T and TR warranty.减少T和TR的依据 Line Technicians 生产线上的技术人员 Process Engineers 工艺

6、工程师 Controls Engineers管理工程师 Quality Engineers质量工程师 Quality Technicians质量技术员 Supplier Quality供应商的质量 Quality Manager质量经理PROJECT TEAMPROJECT TEAM(攻关小组)(攻关小组)CONTROL PHASESHORT TERM CORRECTIVE ACTIONSIMPROVE PHASECONTROL PHASELONG TERM CORRECTIVE ACTIONSIMPROVE PHASEALLOCATE RESOURCESIMPROVE PHASEPRIORI

7、TIZE FAILURE MODESANALYZE PHASEANALYZE FAILURE MODES MEASURE AND ANALYZE PHASESDATA ENTRY INTO EXCEL MATRIXMEASURE PHASEINDIVIDUAL STATION REVIEWMEASURE PHASEPTC PROCESS FLOWPTC PROCESS FLOW传递特性的工艺流程传递特性的工艺流程个别工位的评审(测量个别工位的评审(测量阶段)阶段)分析失效模式(测量和分析失效模式(测量和分析阶段)分析阶段)判定失效模式的优先次判定失效模式的优先次序(分析阶段)序(分析阶段)分配

8、资源(改进阶段)分配资源(改进阶段)临时措施临时措施(改进阶(改进阶段)段)永久性措施永久性措施(改进阶段)(改进阶段)控制阶段控制阶段12345678910111213141516ABCSTATION: 40Kit or Part Number / Descriptions1 Manual one-way clutch2 Wave SpringCan this component be INSTALLED IMPROPERLY? Yes NoYes No How? (ie.Upside Down, Backwards)Wrong HeightCockedIs there a method f

9、or DETECTING mis-assemblies? Yes No N/AYes No N/AWhere or What Station?Missing is not detected at Sta.#43 or 47, wrong height is caught at #43Sta. #40If this component is LEFT OUT, can it be detected? Yes NoYes NoWhere or What Station?Sta. #43Can a SIMILAR BUT WRONG component be installed? Yes NoYes

10、 No If so, can it be detected? Where? Can this component be installed in the WRONG MODEL? Yes NoYes No If so, can it be detected? Where? Can we install a DAMAGED component? Yes NoYes No If so, can it be detected? Where?Broken with parts inside detected at Sta.#47 Missing bearings and springs not.Sta

11、. #43Are there installation tools required? Yes NoYes NoAre they used?Yes No N/AYes No N/A12345678910111213141516DE3 Friction/Steel Plates4 Pressure PlateYes NoYes NoSteel on bottom ( upside down )Cocked/ not in groovesYes No N/AYes No N/ANo DetectionSta. #43Yes NoYes NoSta. #43Sta. #43Yes NoYes NoT

12、hick/Thin pressure plates have no known detection ( 4 vs. 5 plate design)Can detect thick/ thin at Sta. #43Yes NoYes NoSame as aboveSame as aboveYes NoYes NoBent-Sta. #43, cracked plate-no detectionSta. #43Yes NoYes NoYes No N/AYes No N/AINDIVIDUAL STATION REVIEWINDIVIDUAL STATION REVIEW个别工位的评审个别工位的

13、评审INDIVIDUAL STATION REVIEWINDIVIDUAL STATION REVIEW个别工位的评审个别工位的评审DescriptionDescription Review each assembly & repair station 评审每一个装配和返修工位* Identify all parts installed 识别所有的安装部分* Interview techs to determine what quality issues have been observed.技术部门确定已经出现过的质量问题* Review each station during pa

14、rt installation for process related quality issues.评审每一个和质量问题有关的零部件装配工位* Document model complexity,and review QPS sheets and visual factory for effects.* Run tests to verify assumptions运用测试手段去验证假设INDIVIDUAL STATION REVIEWINDIVIDUAL STATION REVIEW个别工位的评审个别工位的评审ResponsibleResponsible Core team:团队核心成员*

15、 Quality Manager and Engineer 质量管理人员和工程师* Manufacturing tech “expert” from area 生产技术员* Controls Engineer操作工程师CONTROL PHASESHORT TERM CORRECTIVE ACTIONSIMPROVE PHASECONTROL PHASELONG TERM CORRECTIVE ACTIONSIMPROVE PHASEALLOCATE RESOURCESIMPROVE PHASEPRIORITIZE FAILURE MODESANALYZE PHASEANALYZE FAILUR

16、E MODES MEASURE AND ANALYZE PHASESDATA ENTRY INTO EXCEL MATRIXMEASURE PHASEINDIVIDUAL STATION REVIEWMEASURE PHASEPTC PROCESS FLOWPTC PROCESS FLOW传递特性的工艺流程传递特性的工艺流程MATRIX: ASSESS RISK AND PRIORITIZEMATRIX: ASSESS RISK AND PRIORITIZE矩阵图:矩阵图: FAILURE MODESFAILURE MODES 评估失效模式的风险和优先级评估失效模式的风险和优先级HOW IS

17、THIS FAILURE DETECTED? WHAT STATION?Error ProofIn Process at stationIn Process within TeamIn Process After TeamAt Final Test or Leak TestDetection Unknown (less than 100%)No DetectionCurrent Controls, visual inspection, manual gage, auto gage, air test, etc.WHERE IS THIS FAILURE DETECTED?SEVERITY (S

18、)OCCURRENCE (O)DETECTION (D)CRITICALITY (SxO)RPN (SxOxD)HISTORYCOMMENTSCORRECTIVE ACTION PLANSTATIONPART NUMBER / PROCESS DESCRIPTIONPOTENTIAL FAILURE MODEPOTENTIAL FAILURE EFFECTSARE HANDTOOLS REQUIRED?POTENTIAL CAUSE(S)Final Line station.What is this station supposed to do? Whats the part number(s

19、)?How could this process go wrong? Examples: can the part be installed incorrectly, missing the part, damaged part, or wrong model?What is the impact to the customer? (next team, VO plant, end customer) This drives severity rating.Are handtools required for installation? Are they used?What could cau

20、se this to go wrong? Locate yellow pad incorrectly- shipping stap to transaxleCould result in an assembly plant returnYThere are two different locations for yellow pad depending on model- operator errorMissing shipping strapYOperator ErrorLoose bolt that comes with shipping strapCould drop a transax

21、le resulting in APRYFaulty torque gunStripped bolt , not part of shipping strapCould drop a transaxle resulting in APRYOperator Error/Faulty torque gunMissing bolt that is not part of shipping strapCould result in dropped transaxle in-house causing scrap or repairYOperator Error301Auto rotate and in

22、dexIncomplete rotate and indexStop BuildNMechanical malfunctionMissing kitStop BuildNOperator ErrorMisoriented filterStop BuildUnofficial toolOperator ErrorDamaged filter-crackedContamination/ shift qualityUofficial toolSupplier Issue/installation problemExtra filter grommet from teardownStop BuildU

23、nofficial toolProcess IssueBreak neck of filterContamination/ shift qualityUnofficial toolOperator Error/or faulty partMissing oil filterContamination/ shift qualityUnofficial toolOperator ErrorWrong model filter Unknown /no effectUnofficial toolOperator ErrorBroken clip on filterUnknown /no effectU

24、nofficial toolSupplier IssueNo rubber grommet on filterStop Build wherever grommet falls outNSupplier IssueFill tube grommet missingNOperator IssueFill tube not seated completelyPotential leakNOperator IssueBlocked end on fill tube grommetNSupplier IssueFill tube grommet from General MotorsCustomer

25、will not be impactedNSupplier IssueMount kit on pallet and install filter and fill tube grommet ( black)302Install shipping strap with included bolt and loose bolt300MATRIX REVIEW-ASSESS CUSTOMER RISKMATRIX REVIEW-ASSESS CUSTOMER RISKDescriptionDescription Enter all data in matrix spreadsheet 将所有的资料

26、数据输入矩阵图* Failure modes determined from station reviews 评审工序存在的失效模式* Potential cause of failure 潜在的可能导致失效* Categorize risk to customer (red, yellow, green) 对顾客冒的风险进行分类(红、黄、绿)* Enter all APRs NEs and other warranty 记录所有的APRs、NEs和其他的依据* Rank risk to customer based on FMEA ranking with Severity, Occurre

27、nce and Detection* Prioritize where error proofing/controls are needed base on risk to customer (master rank)ResponsibleResponsible Core team plus:* Quality review engineer* Resident engineer* Process engineerError ProofIn Process at stationIn Process within TeamIn Process After TeamAt Final Test or

28、 Leak TestDetection Unknown (less than 100%)No DetectionXXXXXXXXXXXXXXXXXXXXXWHERE IS THIS FAILURE DETECTED?Red, Yellow, Green ChartRed, Yellow, Green ChartGreenGreenError Proofed orCaught in Sta.Caught in TeamCaught in next teamAt Final Test or AirTestRedRedDetected Less than 100%No DetectionSEVERI

29、TY (S)OCCURRENCE (O)DETECTION (D)CRITICALITY (SxO)RPN (SxOxD)KNOWN DEFECTHISTORYMASTER RANKCOMMENTSSee Rating Sheet. 1rst priority.See Rating SheetSee Rating Sheet2nd priority.3rd priority.Defect found on APR, NE, or FQAHistory of NE, APRs, or FQAs associated with this failure mode? (Example: NE 11/

30、12/00)Ranks issue 1-5 (5 most severe) based on FMEA Severity and History to determine resource allocation.11515REAR SUN AND DRUM BUSHING WAS SEIZED TO THE FINAL DRIVE SUN GEARAPR 5/09/013REAR SUN DRUM DIAMETER THAT MATES WITH OWC IS UNDERSIZED, OWC WILL NOT ENGAGE UNTIL HIGH RPMAPR 7/19/013Inner rac

31、e undersized. NO FORWARDAPR 10/26/01 (4), APR 5/29/01 #169, APR 7/19/01, APR 7/19/01411111112481REVERSE CLUTCH SNAP RING GROOVE NOT MACHINED CORRECTLY. SNAP RING POPPED OUT.APR #16, APR 9/09/004REVERSE CLUTCH EXTRA SET OF PLATES AND THE CUSHION SPRING WAS MISSINGAPR 8/28/003FRONT CARRIER MISSING LUB

32、E HOLESNE 2/01/200141MISSING T13NE 10/25/2000, NE 3/29/2001, NE 6/06/2001, NE 8/30/20015Rank Risk To CustomerRank Risk To Customer FMEA Ranking Warranty Information Master RankCONTROL PHASESHORT TERM CORRECTIVE ACTIONSIMPROVE PHASECONTROL PHASELONG TERM CORRECTIVE ACTIONSIMPROVE PHASEALLOCATE RESOUR

33、CESIMPROVE PHASEPRIORITIZE FAILURE MODESANALYZE PHASEANALYZE FAILURE MODES MEASURE AND ANALYZE PHASESDATA ENTRY INTO EXCEL MATRIXMEASURE PHASEINDIVIDUAL STATION REVIEWMEASURE PHASEPTC PROCESS FLOWPTC PROCESS FLOWCORRECTIVE ACTION PLANSCORRECTIVE ACTION PLANSShort Term ActionsShort Term Actions Creat

34、e awareness of issue (not sustainable)* Install Pass-Thru signs at high risk stations describing the failure mode to the customer* Alert management to risk Temporary fixes/upgradesLong Term ActionsLong Term Actions Solicit ideas from manufacturing techs and engineers for error-proofing ideas In-Proc

35、ess Verification Stations (IPVs) CORRECTIVE ACTION PLANSCORRECTIVE ACTION PLANSTarget dateStatusStaStation FunctionObjectivesProposalsBeforeAfterCost To Implement (matl only)Potential SavingsMaster Risk(5 Highest Risk)1/14/02Comp.109Manual backup for Sta.# 107, which installs 3 bolts into the chain

36、cover to case and TSS model check.Eliminate missing or mistorqued boltsComp.Used a control box with push buttons and a red/green light. The only information to the operator is O.K or not O.K to build-no info. on which bolt needs torque. No logic to prevent releasing the pallet without torque of any/

37、all bolts or stud. Also, wrong torque may be achieved due to tray malfuction.Pallets cannot be released unless torque is achieved on any/all bolts. Installed 3 new green lights at top indicate which and how many bolts need to be torqued. Lights go out when achieved. Also repaired socket to torque co

38、rrelation.Included in costs for station # 13If caught in-house results in 12 teardowns/yr or $1917.00/yr or APRs $20,400. Depends on degree of leak2Logged in 1/15/02Complete and in tryout350-1/2Sta. #350 Manual install chain cover plug, TSS plug, C-clip, (1) cooler fitting plug and bulkhead plugEnsu

39、re Chain Cover plug is installed.Add elec. Eye after Sta. #350, just before index station to detect presence of plugManual install of Chain Cover Plug. Plug is at back of transaxle, so is never seen visually for check of presence.Elec. Eye senses transaxle presence first and then detects chain cover

40、 plug presence$1000. EstimateMultiple NE with estimated value of $12,500./yr5 Low Trans. Fluid, water 12/20/01Comp.73Backup station installs bolts for O.D. servo coverEnsure all 3 bolts installed and torqued prior to release of palletComp.Used a control box with push buttons and 1 red light ( not O.

41、K. to build) and 1 green light ( O.K. to build). A pallet could be released without achieving torque on any/all bolts.Added 3 torque lights and changed logic so that individual torques must be completed prior to pallet releaseModified existing equipment with materials in-houseInverted delta item-could result in APRs Rated 4 based on safety8/1/01Comp.99Install 4 accummulator springs and chain cover gasketAdd detection for spring on sideComp.Spring could fall over and be detected as there, depending on orientation when on-side.Recalibrated

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论