




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、VMT.DF FFG 2000/2400/2800 OPERATION MANUAL General Operation1 OverviewThis sect ion describes safety precauti ons duri ng mach ine operatio n, in stallati on and running test ing.2 Safety Requirements2-1 Safety Rules Obey safe product ion rules of the mach ine manu facturer as well as the pla ntKeep
2、 the work areas clea n and tidyCheck the mach ine before start ing up, to make sure all protective devices are available and safety switches are in no rmal con diti on. Wear right uniform, and prepare all necessary articles (for example, gloves are needed while in stall ing, check ing and cha nging
3、blade).Tie up hair and uniform or they may be caught by the running mach ine. Check if the machine is damaged or any component is worn and torn. The machine should be repaired or maintained by professi onal pers on al.Never touch the running parts with your hand or tools.The power supply should be c
4、ut while repairi ng, and take keys at any time.Read the releva nt materials provided by the manu facturer, and prepare the releva nt medicati ons for leak accide nts.Keep other pers ons away from the work areas whe n start up or switch off the mach ine2-2 Safe Operation RequirementsTo assure safety
5、and correct ness while operat ing, the followi ng basic requireme nts should be kept. Read this manual, and make sure you understand all contents:The operati on manual in troduces safe and correct operati ons, and uses bold characters where n ecessary for warning. Do read and un dersta nd the conten
6、ts and n ever attempt to try any operati ons which are not in troduced in this manu al.Our company won t assume any liability for any injury or loss arising from operation not in line with this manual.Only those persons who receive special trainings and are qualified can operate the machineOnly trai
7、ned and qualified pers ons can operate the mach ine. They must be approved by safety supervisors of your compa ny, and strictly observe releva nt rules and regulatio ns. Particularly, the operators must go through official electric safety review proceed ings before mai nta ining and operat ing relev
8、a nt electric equipme nt.Inexperienced personnel are not allowed to operate.Carefully keep this operation manualSome pers on should be appo in ted to keep this manu al, which should be placed closely to the machi ne for convenient use. If lost or ruin ed, please provide us with the mach ine model an
9、d con tract nu mber and we will provide you ano ther manual at a reas on able price.Very clear about the emergency stop buttonAll pers ons must know where the emerge ncy stop butt on is and how to use it in case of hazard. When hazard does happe n, an ybody can press the emerge ncy stop butt on.If y
10、ou have any questio n, please do not hesitate to con tact us.7vmt.df FFG 2000/2400/2800 OPERATION MANUAL Attention2-3 Safety SignsThis manual gives the following safety signs to warn, notice or alarm. Special attention should be paid to those places which have the following signs. Keep all the signe
11、d mark in mind all time.Dan gerous area. Death may happe n if ignored.It indicates potential hazards areas. Serious injury may happe n if igno red.It indicates areas of the machine with potential hazards. Injury as well as property loss may happe n if igno red.#vmt.df FFG 2000/2400/2800 OPERATION MA
12、NUAL 2-4 Preconditions for Work Safety2-4-1 Requirements on machine installation siteFree from direct sunshine or other heat sources, or the machine may be partially heated up. Keep the mach ine away from any other machi ne that may splash water or oil.The mach ine should not be placed in foul envir
13、onment with too much dust, fog, salt, acid or alkali.There must be sufficie nt space for maintenance. For in sta nee, space for door ope ning and clos ing, an ilox roller replaci ng and other devices.There should be sufficie nt space for paperboard feed ing and out after prin ti ng.The foun dati on
14、must be sufficie ntly strong and with high accuracy of in stallati on, and won i ncli ne or sink.Suitable worki ng environment: air temperature 040 C; humidity 060%2-4-2 Requirements on installation and transportation Use suitable hoister or crane to load and unioad the machine Use suitable steel ca
15、bles and hoist ing tools to hoist and in stall the mach ine Only qualified pers ons are allowed to operate the hoister or cranes2-4-3 Power supply and earthing requirementsObserve the electric rules and regulati ons of your compa ny Onl yqualified electric staffs are allowed to make connections Stab
16、le voltage and current are required (It depends on the configuration. Please refer to the Electrical Manu al). For differe nt con figuratio n, the curre nt will be differe nt. Details please see then ame plate on the electric cab in et.Voltage applicable:voltage 380V 5%; frequency: 50Hz 5; Stphase a
17、nd 5 wires Keep it away from the source of in terfere nee, like weldi ng mach ine Never share earthead with any source of in terfere nee, like weldi ng mach ine Earth ing resista nee should be less tha n 100hcajid berth leadm.2-4-4 Requirements on cooling lubricant Mixed lubricant not allowed to use
18、Add sufficie nt lubrica nt before start ing up the mach ine after a long term of stop (such as a long holiday)2-4-5 Ambient Requirements Clea n aisles, mach ine in side and platform. Or the sun dries may affect operati on and maintenance of the mach ine.No water or oil on the floor.Sufficie nt light
19、 ing in the work ing areas Foreig n matters should be preve nted from falli ng onto the moving parts, or they may damage the mach ine while movi ng.Water supply and dra in age facilities beside the mach ine for ink wash ing2-4-6 Requirements on operator clothesDo not wear gloves, n ecklaces, watches
20、 or loose clothes, or the mach ine may catch and injure you Operators with long hair should tie up hair and put it into the safety helmet, or may be rolled. Buckle clothes faste ners, or maybe be caughtNever operate the mach ine after drinking2-4-7 Safety management systemAppo int authorized pers on
21、s to keep operati on manual Place operation manual in a place easy to findAppo int a adm ini strator to guide the product ion112-5 Machine Dangerous PointTo assure safe operation, this machine is equipped with some protective devices. However, hazard may still happen if the machine runs in an abnorm
22、al state or the operators run the machine against rules. Therefore, atte nti on should be paid to the follow in gs:2-5-1 Electric appliance installation areas:Gen eral power supply, con trol pan el, con trol pan els on each un its, motors, and tran sformers are all dan gerous for high voltage power
23、in side. Only professi onal electric engineers are allowed to touch their interior parts in maintenance, or pers ons may be serious injured.Don touch butt ons or switches with wet or dirty han ds, or it may result in injury.2-5-2 Movable parts and high-speed feeding partsThe mach ine has a variety o
24、f motors and movable parts drive n by the motors, as well as high-speed feedi ng parts. Keep away from these parts whe n the mach ine runs, and make sure the mach ine stops moving if it is n ecessary to en ter these areas for maintenance or other purposes. Or, injury may happe n.2-5-3 Safety protect
25、ive devicesk AttentionWarningDon move any safety protective devices, such as self-locking device, limited switch, etc. Or, injury may happe n.Before operating , maintainers should check all safety devices and make sure they are in good con diti on.vmt.df FFG 2000/2400/2800 OPERATION MANUAL 132-6 Gen
26、eral Rules for Work SafetyISDangerAttention Main motor, main con sole, con trol pan els, motors, and tran sformers all have high voltage power in side, un experie need pers onel shouold not ope n and touch the wire. Do not move or cha nge any pan el, butt on or protective gate without prior approval
27、.Don touch any butt on with wet or dirty hands.Repeatedly check the butt ons and con duct correct operati ons Let each staff know where the emerge ncy stop butt on is, and know its functions as wellKeep the floor and platform free from water and oilKeep the aisle and platform clea n and free from un
28、n ecessary articles Don touch water or ink with n aked han ds, or let your eyes or mouth sta ined with water or inkDo not operate the mach ine with gloves (except tak ing tools or paperboards, or clea ning the machi ne)Use the same brand lubricating oilCha nge the spare parts with the same brandWhe
29、n power is off, turn off the master switch of power supply and the mach inePaperboard pil ing: place the paperboards by sort at the place where it is not easy to collapsePile the paperboards uprightly, or they may collapse Do not remove the warnin gboard, no sta in and rustvmt.df FFG 2000/2400/2800
30、OPERATION MANUAL 2-7 Installation -Start-up Safety Direction Check the power cables before turning on the power supply for protection against leakage or unstable voltage, and report to the supervisor immediately if cables are damaged or not conn ected properlyWarningSwitch on the power supply accord
31、ing to the following steps: turn on the power switch of the whole pla nttur n otrthe master power switch of the machi ne Turn off the power supply according to the following steps: turn off the power switch of the mach ineturn-off the power switch of the whole pla nt Close the electric control cabin
32、et door to prevent water, card board pieces or dust from en teri ng Power line and con trol li ne should not in tercross each otherMake sure the protective devices are in good con diti on and n ot damaged Gas pressure is normalIn spect the follow ings whe n gas, power, and water supply facilities ar
33、e in stalled: Motors and gears run without any abno rmal no iseMake regular in spect ions accord ing to this manual2-8 Machine Safety Operation Directions Do not remove the safety devices, and do not expose the high voltage connectionsDo not remove the limit switch or self-lock ing device for tempor
34、ary convenienceKeep away from the movable and high-speed feedi ng areas whe n the mach ine runsDo n ot touch the running parts directly or in directlyDo not press the butt ons on the con trol panel with gloves When clea n the scrap from the mach ine, wear gloves and use brushes. Naked hands are not
35、allowedMake sure that there is n obody or nothing preve nt the mach ine from runningDo not continue to operate the machine before the cause is found out when the mach ine stops moving abruptly duri ng automatic runningDo not ope n any door or cap whe n the machi ne runs Do not leave any tool or meas
36、uring instrument on the control table or cases during operationDo n ot touch any butt on or switch whe n the mach ine runs automatically Attention should be paid to prevent operators from being engulfed into the mach ine:a) Tie up hair and wear safety helmetb) Tie up trousers edges, and n ever appro
37、ach the mach ine whe n wear skirt When any problem is found, stop the machine and report to the supervisor immediatelyStop all machine actions and turn off the master power switch while cleaning the mach ine (except while elim in at ing ink)2-9 Safety MaintenanceAttentionTo preve nt other workers fr
38、om tur ning on any switch or con tact any butt on on the con trol pan els by mistake, please hang a warning board in a con spicuous place close to the operating point, saying: Machine in Maintenance! Not Touch!Tur n off the master power switch before mai nta ining and repairi ngNever move the limite
39、d switch without prior approval of our compa nyOnly qualified electric engineers are allowed to maintain the electric components Wear protective shoes and safety helmets when maintain the machine from a high placeClose the mach ine cover after maintainingClea n the work ing area, remove the blocks f
40、rom the aisles or floors, elim in ate water and oil on the ground and keep a safe working environment after maintenance Con duct maintenance accord ing to this operati ng manu al, and con tact our compa ny if you have any questi onCheck maintenance work together with the supervisorRecord the content
41、s and results of the maintenance work, and give the records to the supervisorKeep the records for a reas on able period of time2-10 Safety Inspection ItemsCheck if all electric con trol switches, valves or butt ons are in no rmal con diti onCheck the tension of the tran smissi on beltsCheck if the f
42、eeding rolls, printing rolls and anilox rolls are in normal conditionCheck if the ink circuit system is blocked or damaged or contains any impurityCheck if the air compressor and cylinder are in good conditionCheck if the mach ine contains any excessive thing15vmt.df FFG 2000/2400/2800 OPERATION MAN
43、UAL 2-11 Safety Warning SignThere are safety warning sig ns in those places where dan ger may happe n. So we must keep those warnings always in mind duri ng the mach ine running, maintaining, repairi ng and stopp ing.2-12 Other Things to Be Noticed Machine noise: Noise will be produced while machine
44、 running for some fans are adopted in vacuum transfer and dust removal system. To protect the operator health, they are suggested to wear earplug or take other measures. Mach ine radiati on: Our mach ine will not produce radiati on. The sig nal is preve nted from in terferi ng other mach in es. But
45、our suggesti on is that the mach ine should be kept away from those mach ines with radiati on in terfere nee. Machine dust: Machine itself will not produce dust. But for the paperboard storage and other reasons, there will be dust on the paperboard surface. Some dust will float in the air even dust
46、removal facility is adopted. So the workers are required to wear respirator and nose cup or take other measures.193 Machine Brief IntroductionThis equipment is only for multi-color printing, slotting and die-cutting of corrugated paperboards, withhigh precisi on, easy and convenient con trol. Follow
47、i ng are the in troduct ions:3-1 Machine FunctionThis machine is made for corrugated paperboard gluing, counting and stacking. With high precision,it seasy be con trolled and operated.3-2 Machine AdvantagesThis mach ine is one of the flex folder & gluer models developed on the basis of the adva need
48、 tech no logies of similar intern ati onal products and the research achieveme nts and tech no logies of our compa ny, and it owns the follow ing adva ntages:Nice appeara nee, compact structure, reas on able layout, high tran smissi on precisi on, stable running, and low no iseReas on able material
49、select ion for the comp onen ts, adva need process ing tech no logies,excelle nt quality, high assembli ng precisi on, and long service life;Comb ined structure, visual con trol pan el, PLC, touch scree n with multifu ncti onal con trol, 999 orders can be saved.Automatic zero returni ng and resetEas
50、y to repair and maintain3-3 Different Machine Part FunctionFolder un it: Glue the paperboard into a cart onCo un ter & Ejector un it: Coun ti ng, stack ing and tran sport ing the catr ons.4 Machine Performance ParametersModel(Foldersection)700X1800900X2000900X24001200X2800Max. machine speed (sheets/
51、minute)350300280250Max feedi ng size (mm)650X1800900X 2000900X 24001200X2800Max. processing size(mm) (glue tab with 45 in cluded)650X1800900X 2000900X 24001200X2800Maxprin ti ngsize(mm)610X1760900X1960900X 23601200X2760Max.slott ingsize(mm)650X1800900X 2000900X 24001200X2800Min.feedi ng size(mm)220X
52、 750260X 750260X 750300X 750Prin ti ngplatethick ness(withscaleboard)7.27.27.27.2Max. operat ing size827.5mm gluetab side912.5mm glue tab side1100mm glue tab side1100mm glue tab side697.5mm opposite glue tab side747.5mm opposite glue tab side947.5mm opposite glue tab side1145mm opposite glue tab sid
53、eMin slott ing space230mm glue tab side230mm glue tab side230mmgluetab side230mmgluetab side120mm opposite glue tab side120mm opposite glue tab side120mm opposite glue tab side120mm opposite glue tab sideEar side width (mm)45mm45mm45mm25 sheets350 sheets/mPaperboard height700mmVMT.DF FFG 2000/2400/2
54、800 OPERATION MANUAL Fc dinq size flcnX.J/5 Machine Installation and Test5-1 Machine TransportationThe machi ne must be tran sported to the in stallati on site by con veya nee. Before being shipped out of the factory, we will offer transportation rack (Those rack will be taken by us after the machin
55、e reaches the destination) Each unit will be fixed on the rack and so accidents will not happen during transportation for vibrati on. Each un it should choose suitable con veya nee and the carry ing ability should be much more tha n the unit itself.5-2 Rail Installation5- 2-1 Preparations before rai
56、l installationThe foun dati on for in stallati on of the rail should be prepared accord ing to the foun dati on draw ings that our compa ny provides. It should be assured that the ceme nt stre ngth and in stallati on size should meet the requireme nts (the foun dati on draw ings have bee n provided to the customers before mach ine shipme nt).Before pavi ng the rails, make sure the horiz on tal deviatio n of the foun datio n is with in 5mm.Check if the rails and
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年湖南邮电职业技术学院单招职业倾向性测试题库附答案
- 机器学习原理与应用课件 第12章 深度学习(基本原理+回归)
- 第12课《与朱元思书》教学设计 2024-2025学年统编版语文八年级上册
- 新型储能的社会与环境效益
- 输电线路迁改项目管理与监控机制
- 2025年医用基础设备器具项目合作计划书
- 商业街商业策划书9篇
- 1《白鹭》(教学设计) 2024-2025学年-统编版语文五年级上册
- 机械设计 第10章 齿轮传动学习课件
- 2025至2030年中国弹力绉面料数据监测研究报告
- 湖北省武汉市洪山区2024年七年级下学期期末数学试题附答案
- 《研学旅行市场营销》课件-1.2.3研学旅行营销理论发展
- 居民住宅小区电力配置规范
- 部编版版语文三年级下册全册教案
- 山东省2023-2024学年高一下学期3月月考物理试题(A卷)(解析版)
- 2024-2034年中国形体矫正鞋行业市场现状分析及竞争格局与投资发展研究报告
- 项目保密工作实施方案
- (完整版)所罗门学习风格量表
- 商会成立筹备方案
- 电竞产业园方案
- 隧道桥过渡段结构设计与分析
评论
0/150
提交评论