1、June 2013 Civil Engin eeri ng Training ReportessayWrite papers Network:By the end of this semester, Civil Engin eeri ng Con structi on After this course, summer school arranged for us two professional civil engin eeri ng and project man ageme nt to build Vocati onal and Tech ni calCollege campus xxx
2、 Natio nalBuild ingtech no logytrainingbase trainingfor five days, time isfrom June 27 to July 1. It is five days since our first outi ng universitytrainingto learn, so we cherish this rareopportunity,we have come up during training is verypassi on ate clamori ng to work hard to complete the base ta
3、sks assig ned by the in structor, the final day of the task we are ahead of the quality and quantityto complete.The training process, we con ducted a total of five types of han ds-on training, were rein forced jobs, scaffold ing jobs, plastering jobs, masonry jobs, template types, which is now the c
4、on structi on site using a lot about the five types of .Here I simply carried out these five days to daily tasks and caveats listed 1, the steel works: First,accord ing to the sta ndards set by thein structorreas on ablepillars, eachpers onmake yourself asta ndards-complia nt and the error is within
5、 the allowable range like stirrups; Second, each person making stirrups and vertical to muscle force set up by the in structor pillar reinforcementlayout positionand tighten with a smallwire rack sta nd up.In the producti on process, the pointis that I think should be in place in the corner so that
6、the inten sity corner accurate, there is in the bend of the time to keep the whole stirrup level, and will not appear somewhere in the tilt.The final step is to controlthespacing of stirrupsand stirrup to ensure horizontalandvertical bars of the vertical force, so as to en sure a good erect steel st
7、ructure stability.2, scaffolding project: The project s missionis toerect a two-storey l-type exterior scaffold ing.In erect theprocess must be strictly con trolled two large dista nee between the rails, but the key to ensure a shelf stable, because the big bar in the whole scaffold ing outside the
8、mai n part.The n faste ner in stallati on should be in placein differe nt parts of the in stallati on faste ners are differe nt, and must be tight and the rod member is goodlap, inshort, is to stabilize the structure more robust. Lon ger than the len gth of the pole, lead ing the en tire operati on
9、of the floor space is relatively large, and there is a certa in risk, so we n eed ano ther two or three peopleon the outsideon-site care. From a security con siderati ons, site owners duri ng operati on must wear helmets.3, plasteri ng works: Each team in the outdoor area specified plaster finish ar
10、ea 1 to 1.5 square meters of plasteri ng work.Prior to prepare for work, materials andtools are ready, the sand and lime water mixi ng eve nly, the amount of the three must be con trolled,otherwise toodilute slurry after mixingor not conducive to excellentplasteri ng work carried out.Then you want t
11、o clea n upthe wall but also add water to wet the plaster prior to the official start of productionof specimens, made afterspecime ns un deroperatio n.Specific sub-layerthickening,the bottom is thin, middle thicker, mainly toen sure that the surface layer of the thinn est flat surface.This work can
12、be said to be the most tiredof these fivetypes of the dirtiest jobs, because you want to do has bee n kept repeati ng the same thing.This is every one sstamina and arm strengthare rigorous test, but half an hour dow n the body and mortar dust everywhere.4, masonry works: Each team masonry a long met
13、ereighty sixty cen timeters wide an gledwalls, high eightleather tiles. Puzzle before to prepare for work, that will be a goodact ino mycetes peripheralwall con tour, indeterm ining the n eed to use both sides of the vertical wall hook three stra nds four stri ngs five (Pythagorea n theorem), throug
14、h the in tersectio n of two arcs determ ine ano ther point.Before the tili ng mortar should be used toen sure that the floor is covered in a layer of brick bottom is flat, the n in the top layer of the small brick mortar as a base. A group of brick masonry can be used three ways along a small, one a
15、long a small, plum and other group D puzzle mode. Both sides of the corner first puzzle together to pull through the line to en sure the puzzle tiles in horiz on tal and vertical directi ons are flat, from time totime in the course of puzzle with the horizontalruler tomeasure whether the bricklaying block
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年中国办公商业空间设计行业市场投资可行性调研报告
- 时尚购物中心品牌入驻专柜委托运营合同
- 教育机构在线教材版权收益分成协议
- 石墨烯地暖系统隐蔽工程验收及维护保养合同
- 金融平台虚拟货币交易资金存管补充协议
- 数据安全与隐私保护法律顾问服务合同
- 装配式钢结构住宅项目施工总承包与装配式建筑技术创新协议
- 拼多多平台客服服务外包与质量监管合作协议
- 档案馆消毒杀虫设备租赁与档案数字化未来合同
- 足浴店股东合同范本
- 建标造函【2007】8号文
- 一型糖尿病患者健康宣教
- 高中历史学科知识讲座
- 陪诊服务的项目计划书
- 井控设备课件
- 假设检验完整
- 14S501-2 双层井盖图集
- 吉林市生育保险待遇申领审批表
- 2021年成人高等教育学士学位英语水平考试真题及答案
- 人教版八年级下册数学期末试卷综合测试卷(word含答案)
- 卵巢过度刺激综合征(OHSS)
评论
0/150
提交评论