1、工业工程培训资料IEEmaterial,1,INDUSTRY ENGINEERING TRAINING PAPERS 工业工程培训资料 English Version,工业工程培训资料IEEmaterial,2,1. Introduction to I.E.,1. What is the Industrial Engineering? 2. Waste 3. Improvement Steps,工业工程培训资料IEEmaterial,3,2. Operation Analysis,1. Introduction to operation analysis 2. Work Sampling 3.
2、 Tips for improvement 4. Practice,工业工程培训资料IEEmaterial,4,3. Process Analysis,1. Introduction 2. Implementation steps of basic analysis 3. Specific analysis 4. Process improvements 5. Case Study,工业工程培训资料IEEmaterial,5,4. Work Analysis,1.Purpose of “Work Analysis” 2. Preparation for “Work Analysis” 3. W
3、ork Improvement 4.Combined-Work Analysis,工业工程培训资料IEEmaterial,6,5. Line Operation Analysis,1. Line Operation 2. Procedure for line operation set-up 3. Line operation organization and improvement 4. Examples 5. Case Study,工业工程培训资料IEEmaterial,7,6. Performance Analysis,1. The concept of Productivity 2.
4、Performance Management 3. Performance Improvement System 4. PAC System 5. PAC SYSTEM administrative work 6. Improvement Points in Performance Loss,工业工程培训资料IEEmaterial,8,7. Standard Time,1.Standard Time 2.Rating 3.Definition of Standard Data.,工业工程培训资料IEEmaterial,9,8. MODAPTS,1. Introduction to MODAPT
5、S 2. Basic Concept 3. Explanation of LG-MODAPTS Symbols 4. Abstract from LG-MODAPTS 5. Compare time values for each method. 6. Explanation of LG-MODAPTS 7. Exercise,工业工程培训资料IEEmaterial,10,9. CASE STUDY,工业工程培训资料IEEmaterial,11,1. Introduction to I.E.,1. What is the Industrial Engineering? 2. Waste 3.
6、Improvement Steps,工业工程培训资料IEEmaterial,12,1. What is Industrial Engineering?,1. 1 Definition,“Industrial engineering(IE) is concerned with the design, improvement, and installation of integrated systems of people, materials, information, equipment, and energy. It draws upon specialized knowledge and
7、skill in the mathematical, physical, and social sciences together with the principles and methods of engineering analysis and design to specify, predict, and evaluate the results to be obtained from such systems.” IE used to be something that managers and other upper echelon staff designed and manag
8、ed, but now all levels of factory and office workers are learning to use IE techniques as part of their improvement activities. IE related themes and IE techniques have been successfully used in many types of QC circle activities. For example, workers use IE techniques to discover where waste, incon
9、sistency, and irrationality exist in their workplace, to make their work easier, and to produce better goods and services quickly and cheaply. As a result, they can create a better work environment and contribute to the prosperity of the company as a whole. IE may sound difficult, but it really is n
10、ot. Like the seven QC tools, IE should be part of the improvement activities in any workplace. IE techniques can be broken down generally into method improvement techniques and work measurement techniques; the following are commonly included: Method improvement techniques 1. Process analysis 2. Moti
11、on study 3. Conveyance and equipment layout Work measurement techniques 4. Time study,AIIE(American Institute of Industrial Engineers),工业工程培训资料IEEmaterial,13,1. Definition of Industrial Engineering,Method improvement techniques help you understand and analyze the flow of operations so that you can d
12、iscover where waste and inconsistency exist in those operations. Once you discover those, it will be easy to understand where improvements should be made. At this stage, your most valuable tool for studying the overall flow of operations is process analysis. Motion study is the IE tool used when you
13、 are surveying, for example, how workers use their bodies when they operate switches. In addition, work processes often include equipment layout schemes that evaluate their efficiency, but other IE techniques aimed specifically at equipment layout can prove to be even more useful for improving those
14、 systems.,1.2 Method Improvement Techniques,Work measurement techniques can be used to measure time values within operations and to find out how much time each operation requires. Various time study methods have been developed- methods, in fact, too numerous to describe within the scope of this cour
15、se. To use the work measurement techniques, you must have time values for the various operations to be studied. Operation planning also requires such time measurements. However, operation time values have no meaning unless they lead to improvements that become firmly established as standard work pro
16、cedures. Consequently, method improvement techniques and operation measurement techniques are mutually supportive and cannot be completely separated from one another.,1.3 Work Measurement Techniques,工业工程培训资料IEEmaterial,14,1. 4 Making Improvements by the Rules,You can not hope for much success if you
17、 improvise your approach toward making improvements. There are two basic rules; a) Follow the improvement steps. b) Use the improvement methods. IE is a hands-on activity. You learn IE by practicing it. This knowledge can be gained only through practice; a merely theoretical grasp of them is of litt
18、le value in making improvements. The next chapter focuses on the first rule. Following the improvement steps will enable you to avoid running hastily and ineffectively, like the hare who lost the race to the slow-but-steady tortoise. The second rule is to use IE improvement methods. These include th
19、e seven QC tools (cause-effect diagrams, Pareto diagrams, check sheets, histograms, scattergrams, graphs and measurement charts, and stratification) as well as IE techniques. Another improvement method is function analysis, which sometimes falls under the category of value engineering. The most impo
20、rtant thing in making improvements is to start by obtaining an accurate understanding of the facts, such as the current conditions in the workplace. You must carefully analyze the current conditions in the workplace to find out just where the problems lie and to gain a full understanding of these cu
21、rrent conditions. This is a slow, painstaking process, but it is a crucial part of making improvements the right way: according to the rules.,1. Definition of Industrial Engineering,工业工程培训资料IEEmaterial,15,Like a mountain full of undiscovered gold, every factory is rich in potential improvements, wai
22、ting to be found. This is true even if every imaginable improvement has already been made, for in todays climate of rapid technological progress, standing still means falling behind. That is just one reason why there is always room for improvement. You must resist the temptation to look at minor imp
23、rovements as trivial matters. The sum total of all the minor improvements leads to large company savings. The company gains not by direct cash back but by not wasting money and draining company resources. You also need to consider not only the improvements that will make your own workplace better bu
24、t also those that will produce positive effects downstream and open opportunities in the future. This is “next process is our customer” philosophy. You will find increasing importance in this concept of providing the best possible service to the next stage of production. Successful companies are mad
25、e up of people who want improvement and are guided by a company policy that emphasizes the need for improvement. In manufacturing companies, process analysis is perhaps the most fundamental method in carrying out the endless and limitless process of making improvements.,1. Definition of Industrial E
26、ngineering,1. 5 Every Factory is a Mountain of Gold,工业工程培训资料IEEmaterial,16,Unfortunately, there is too much waste in our work environment. While we talk constantly about the difficulties in making money, we tend to ignore the waste that surrounds us and to overlook opportunities for improvement. We
27、tend to look at time as something that adds value. Job experience, for example, is considered a function of time based on accumulated experiences or hours spent in producing goods. So instead, we should view time as something that erodes value when it is misspent. We should take specific actions to
28、accelerate the improvement of operations and thereby run our workplaces more efficiently-so that we can move forward. 2.1 “Scenes from a Factory” Before talking about what we can or should do to improve our workplaces, Let us first get a few comments from the people in the factory: Shop foreman: “Mo
29、st of our people are working very hard. We are doing everything possible to improve our practice here. It just takes time for us to get to where we want to be.” Plant manager: “We have many things going on in our factory. We are doing SPC (statistical process control) training and quality circle act
30、ivities. We have implemented a suggestion program. We have MRP (material requirement planning). We have even introduced robotics and an automated warehouse. But somehow, I have a feeling that things are not going well. For example, the numbers of suggestions are low, machines are still breaking down
31、, quality level is not as high as I want to see it, sudden schedule changes are still common, and so on. Because of these things, I spend too much time chasing fires and attending daily meetings.” Chief executive officer: “I dont know whats going wrong. I have attended seminars and conferences; I ha
32、ve looked around and hired consultants for help. But what I have accumulated so far are lots of documents, papers, fragments of thoughts, and so on. Somehow I havent been able to integrate them into a plan of action yet.”,2. Waste,工业工程培训资料IEEmaterial,17,These are comments I hear quite often. People
33、are concerned about day-to-day problems, chasing fires in the factory, and the like. They are attending seminars and reading about new management techniques. But they are missing something they need to know, and they feel confused. Perhaps there is even feeling of resignation (or satisfaction) that
34、people have done their best and cannot do better. While developing an integrated understanding and setting priorities are important processes in our work, a fundamental question is whether we have spent enough time finding out whats really happening on the factory floor. So let us spend some time he
35、re to review some typical operations found in the factory. In one area, we see an operator carrying a heavy work-piece by hand. In another area, we see people working frantically to stay on schedule after finding that an entire batch produced a few hours earlier was out of tolerance. We also see peo
36、ple watching a machine run, sorting good parts and bad parts, waiting for the delivery of material, stacking up inventory, and fixing machine breakdowns. When we check the way people are producing, we find they may be working just because materials are there to work on, rather than following certain
37、 prescribed procedures or disciplines. We need to ask ourselves “How many of these activities are absolutely necessary for our production activities ?” and “How many of these activities are adding value to the product - rather than cost?” Or we might ask ourselves, “how many of these activities are
38、related to things the customer sees and cares about?”,2. Waste,工业工程培训资料IEEmaterial,18,Waste Itself? Fusio Cho of Toyota defines waste as “ anything other than the minimum amount of equipment, materials, parts, space, and workers time, which are absolutely essential to add value to the products.” As
39、early as the 1920s Henry Ford was concerned with the problem of waste. He discussed it specifically in the book Today and Tomorrow, which Toyota people diligently studied later. To put it in simple terms, “If it doesnt add value, its waste.” When we review the time people spend in the factory, for e
40、xample, we often find that more than 95 percent of an operators time is not being utilized to add value to the product. Rather, it is adding cost to the product. When we measure the material being processed in the factory, we may also find that, during more than 95 percent of the time, that material
41、 is in storage, waiting to be transferred, processed, or inspected. Similarly, a machine may be producing unnecessary or defective products, or it may be broken down or require maintenance. In either case, it is obviously not being used to add value to the product. Exhibit 3-2 is a graphic represent
42、ation of the problem. People may say, “We know all of that.” But the questions we should ask ourselves are, “Then what are we actually doing to reduce this waste?” “How much of our time is spent on eliminating this waste?” “Do we really know how much of this waste can be eliminated?” “Do we really k
43、now how much saving can be achieved through such efforts?” Unfortunately, most of us cannot answer these questions. One thing we should remember is that a lot of our work requires immediate action. The urgency of such matters can keep us from analyzing and planning our work. We may feel we have acco
44、mplished more when we spend time on urgent work and exhaust ourselves. But is it really a productive way of using our time ? The following portion of this chapter is devoted to answering these questions.,2. Waste,工业工程培训资料IEEmaterial,19,Seven Wastes What we are talking about here is the need to intro
45、duce production improvement practices where the action is taking place, that is, on the shop floor. By diligently practicing problem solving with as many people as possible, many of our current problems will disappear. While each persons ideas will be used to facilitate the improvement of factory op
46、erations, the most powerful results can be obtained by implementing improvement activities in the most integrative fashion so that each island of improvement can be tied together with the others. Also. we want to develop certain approaches to facilitate these improvements so that the improvement pro
47、cess becomes effective. In order to achieve such goals, we need to understand more about waste in the factory. While products made in each factory may be different, the typical wastes found in factories are very similar. After years of improvement activities, Toyota identified the following seven ty
48、pes of waste as the most prominent ones. The Seven Wastes 1. Waste from overproduction 2. Waste of waiting time 3. Transportation waste 4. Processing waste 5. Inventory waste 6. Waste of motion 7. Waste from production defects,2. Waste,工业工程培训资料IEEmaterial,20,Waste from overproduction. Toyota conclud
49、ed that overproduction is one of the worst waste commonly found in factories. This waste is created by producing goods over and above the amount required by the market. When the market is in an upswing, the effects of this waste may not be prominent. However, when market demand slows, the effects of
50、 overproduction are compounded and companies often get into trouble carrying unsold goods as extra inventory. Overproduction waste is typically created by getting ahead of the work. When this happens, more raw materials are consumed and wages are paid for unneeded work, thereby creating unnecessary
51、inventory. This in turn requires additional handling of materials, additional space to hold inventories, additional paperwork, extra computer, more forklifts or warehouse space, and so on. Furthermore, excessive inventory leads to confusion about what needs to be done first. It also distracts people
52、 and prevents them from focusing on immediate objectives or tasks. As a result, additional production control people are required. Since operators seem busy and machines are occupied unnecessarily, additional equipment may be purchased on the mistaken assumption that it is needed. Since overproducti
53、on creates difficulties that often obscure more fundamental problems, it is considered one of the worst wastes and should be eliminated. In order to do so, we first need to understand that machines and operators do not have to be fully utilized, as long as market demands are met. (This may seem odd
54、to many people, but it makes sense.) Operators at each stage of production should think of the next process as their “customer” simply because the next process involves working on the product produced in the previous process. We should make sure that only the amount required by the customer is produ
55、ced, at high quality, low cost, and at the time needed.,2. Waste,工业工程培训资料IEEmaterial,21,Waste of waiting time. While waste from overproduction is not always easy to identify because the operators appear to be busy (even though their work does not add value to the product), waste of waiting time is u
56、sually easy to identify. In fact, waste in the form of waiting should be exposed, so that corrective action can be taken. For example instead of occupying machines to overproduce goods, operators should idle them when the required amount of work is finished. With this practice in place, supervisors
57、can thus better assess the capacity and control the situation readily. If we look around the factory, we also find operators simply watching machines run. Some may say that machines must be watched so that corrective action can be taken quickly whenever a problem arises. But is that not already too
58、late for an operator to take action ? Shouldnt there be a mechanism that automatically stops the machine and buzzes or lights up to alert an operator when an abnormal condition occurs ? Another way to look at this is that there will be no initiative to eliminate because of such problems because thes
59、e problems are not being exposed clearly to the supervisors eyes; instead they are often resolved by operators without a supervisors knowledge. Even though some supervisors may prefer to ignore such problems as long as production schedules are met, should such practices be allowed? Transportation wa
60、ste. Transportation waste and double or triple handling are also commonly observed wastes in most factories. For example, incoming materials may be stored in the warehouse before they are brought to the line. With such a practice, a tracking person has to be informed where to pick up the materials,
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024郑州租房合同协议书
- 团队管理与建设企业培训
- 2025年沪教版选修3物理上册月考试卷含答案
- 2025年北师大版五年级语文上册月考试卷
- 学会合作-班队活动设计与实施
- 2024版采购协议条款与操作手册
- 2025年度二零二五餐饮特色小吃开发合作协议3篇
- 2024遗产继承分配协议书(含非物质文化遗产传承基金)3篇
- QCC品管圈培训教材
- 咨询工程师《项目决策分析与评价》习题及答案
- 桥梁工程施工现场监测方案
- 帝国主义:资本主义发展的最高最后阶段
- 江苏省苏州市2023-2024学年高一上学期期末学业质量阳光指标调研生物试题
- 阅读理解:如何找文章线索 课件
- 2024年广西北部湾港集团招聘笔试参考题库含答案解析
- 科技馆改造室内装修工程 投标方案(技术方案)
- (外研版)高一英语必修1(全册)同步练习汇总
- 朱熹文公世系通谱
- 工程造价毕业设计总结3000字(5篇)
- 买卖合同原告代理词
- 商铺租赁撤场协议
评论
0/150
提交评论