1、Revision Note SL NOREVIEW NODATE OF REVIEWREVIEWED SECTION/PAGE NO 1 1 13.12.2019 2 2 28.12.2019As per below tableS.No.DMRCs Comments Description in brief on revision R-2 (Safety Comments)Comments incorporated in Section Number 1Organization chart with names of responsible key safety person to be su
2、bmittedIncorporated in Section 5.1 2Clause 6.5 : Excavation below ground level: Procedure and precaution required to avoid soil collapse in case excavation need to be carried out below 2 meter need to be submittedIncorporated in Section 6.8 3Work permit system to dig-where underground services may b
3、e located as mentioned under clause 39.2 iv Condition of contract on safety & Health and Environment, May 2019 needs to be incorporated in Method StatementIncorporated in Section 6.3 and format enclosed as Annexure-A 4As mentioned under clause 38.1 (viii), Condition of contract on safety & Health an
4、d Environment, May 2019, for safety of utility as well as personnel, a trial trench shall be excavated manually only after clearance from competent Electrical personnel in respect of Electrical cables subsequent to testing by a cable detector. Same need to be incorporated in Method Statement.Incorpo
5、rated in Section 6.3 and 6.5 5Emergency procedure for accidental damage to Gas pipeline, Petroleum pipeline or any other critical utility need to be mentioned.Incorporated in Section 6.9 6Responsibility and person accountable for implementation of all safe work procedures at site need to be detailed
6、Incorporated in Section 5Project Title: DMRC CONTRACT: DC-01-Part Design and Construction of elevated Viaduct, Elevated Ramp, siding line and Ten Elevated stations viz. Keshopur, Pashchim Vihar, Peeragarhi, Mangol Puri, West enclave, Pushpanjali, Deepali Chowk, Madhuban Chowk, Prashant Vihar & North
7、 Pitampura METHOD STATEMENT FOR UTILITY IDENTIFICATION WORKSDISCIPLINECivilMechanicalElectricalGeneralContactDocument controlNAME: M.S for Utility Identification WorksTel:Action RequiredFor informationFor ApprovalTABLE OF CONTETSSECTION.NODESCRIPTIONPAGE NO1.0PURPOSE52.0SCOPE53.0APPLICABILITY / AREA
8、 OF APPLICATION54.0REFERENCE DOCUMENT55.0RESPONSIBILITY56.0METHODLOGY87.0RECORDS 128.0SAFETY, HEALTH AND ENVIRONMENT 129.0EMERGENCY PROCEDURE FOR ACCIDENTAL DAMAGE TO GAS PIPELINE, PETROLEUM PIPELINE OR ANY OTHER CRITICAL UTILITY1210.SHE RISK ASSESSMENT14ANNEXURE A- CHECKLIST AND WORK PERMIT1.0PURPO
9、SEThe object of this Method Statement is to lay down a procedure for identification of utilities and diversion during construction of contract.2.0 SCOPEThe scope of the method statement includes Pier/Pile cap location marking. Check utility by metal/cable detector. Trench cutting to be done. Excavat
10、ion required as per location. Preparation of diversion plan based on joint record of utility identification and after discussion wih client. Record photograph of utility trench with pier no. marking. Backfilling.3.0APPLICABILITY / AREA OF APPLICATIONValid for DMRC DC01 contract4.0 REFERENCE DOCUMENT
11、S: Complete the work as per technical specification ,BOQ items, CPWD specifications, IS codes & other relevant specifications EHS Manual Specification of utility owing agency.5.0RESPONSIBILITYReporting structure of personnel involved utilities identification & diversion and shall be as belowProject
12、Manager- Shall be responsible for the overall execution of piling activity.Dy. Project Manager (Viaduct)- Shall report to the Project Manager- Shall be responsible for control, supervision & direction for implementation & execution of construction plans- Shall also be responsible for supervision of
13、construction Records.- Develop construction schedules, construction method statements &prepare progress & accomplishment reports- Shall communicate to client representative day to day activitiesEngineer- Shall report to Dy. Project Manager- Shall be responsible for day to day planning at site- Utili
14、ty identification activities and preparation of construction records as per approved Method Statement and sub-contractors QC activities compliance.- Shall assist to evaluate the sub-contractors performance- Shall communicate to client representative day to day activitiesQA/QC Manager- Shall report t
15、o the Project Manager- Shall ensure overall control of QC activities- Implementation of Project Quality Plan.- Shall be responsible for implementation of Inspection and Testing Plan - Custodian of approved construction methodologyP&M in Charge- Ensure continuous availability of P&M at the site.- Ens
16、ure periodic preventive maintenance & timely breakdown repairs of all machinery & electrical equipment as per their inspection manuals.- Ensure operation of P&M as per company normsSurvey Engineer/Surveyor- Shall report to the Project Manager- Shall establish pier points and layout of pile cap as pe
17、r survey plan - Responsible for day to day survey activities and maintain records, during respective shiftsChief SHE Manager- Shall report to Project Manager.- Shall be responsible for overall control of SHE Activity as per approved Safety Methodology.- Ensuring the approval of Method statement by t
18、he client.- Responsible to Ensure to provide Risk Assessment involved in utility identification activities.- Monitoring of safety requirement and its compliances from time to time.Sr. Safety Manager- Responsible for completing all the documents needed for utility identification activity. - Responsib
19、le for provision of risk assessment.- Responsible for ensuring crane/rig documents. Jr. Safety Manager- Shall report to Sr. Safety Manager.- Shall ensure accident prevention- Shall ensure daily HSE activities fully complied.Safety supervisor- Monitor Safety practices, persuade to minimize non compli
20、ance- Reports incidents beyond control and unsafe occurrences to HSEO s5.1 ORGANIZATION CHART:6.0 METHODLOGY6.1 MACHINERY & EQUIPMENT:SL.NODescriptionNOs01Pick axe, spade, shovels, lifting pansAs required02Excavator0103Jack hammers0104Air compressor ( Diesel operated)0105Chain pulley block0206Weldin
21、g machine0207Gas cutting set0208Dewatering pump0109Sewage pumps0110Balloons for pluggingAs required11Packing tools, Measuring tape etc.As required12Metal/Cable Detector01 Note: All the required resources will be deployed well before the start of the work6.2 General: Traffic will be diverted accordin
22、g to the approved traffic diversion plan as and when required. The work area will be barricaded with barricading board and construction signs will be displayed at the site. Lighting with adequate intensity will be provided in and around the work area during the night shift. Area will be cleared of a
23、ll large bushes, trees, hedges and tree roots within a distance of 5.0m from the edge of the line of utility.6.3 Preparation (to be done in consultation with a competent person) Study the soil characteristics with reference to angle of repose for soil required etc. See that excavated area is not blo
24、cking the access to the site for man and material both or otherwise necessary sign shall be displayed at appropriate locations. It should be ensured that there is no exposed live wire in working areas which are accessible to building workers other than those authorized to work on such live lines. Al
25、ternate route for traffic should be provided (in case of road blockage). Ensure Road block procedures are followed. Ensure that there are no vibrations from an external source which may impact the excavation. Ensure that consideration has been given to proximity of adjacent structures while finalizi
26、ng the method of excavation. All efforts will be made to locate underground utilities that may reasonably be expected to be encountered during excavation work. A cable detector may be used before start of excavation. In the situation where a cable or utility is found to be existent, the engineer wil
27、l judiciously after obtaining the excavation clearance, excavate a trial trench manually only. The depth of trial trench shall not exceed 1.5 meters in general, 2.0 meters in special cases so as to ascertain the presence of any cable/gas pipeline/other utility. In case, no cable or other utility ser
28、vice lines detected in the trial trench, mechanical excavation upto 1.2 meters depth shall be undertaken. The whole process is repeated for the next 1.2 meters. Supervision, workforce and Inspection It should be ensured that all excavations are supervised by qualified person. Give Tool Box Talks reg
29、arding safety measures to be observed to the workers involved before starting the job. Confirm methodology to be adopted, explains Risk Assessment and plan of action in case of emergency. Confirm PPEs provided, are as per the work permit. If the depth of excavation is more than 7 feet (2.2 meters),
30、then double lifeline full body harness must be used. The harness to should be secured to a suitable lifeline. Minimum person shall be kept inside pit. All idle workers should be removed from there. Each excavation shall be inspected daily by the qualified persons, after heavy rains & Storms, or more
31、 often if conditions change rapidly. 6.4 Marking of pier locations:Marking of pier location and pile cap prior to work shall be made. Once the alignment of the project is fixed, the pier locations will be marked precisely using a total station. Then at each location, excavation layout for trial pit
32、corresponding to the pier will be marked with paint/peg system on the ground.Extreme precaution will be taken while excavating the area where any cable or pipe is identified6.5. Utility identification by detector.At first metal and cable detector shall be used for identification of existing Utility
33、if any. A trial trench shall be excavated manually only after clearance from competent Electrical personnel in respect of Electrical cables subsequent to testing by a cable detector 6.6 Excavation at Ground level/ Road level:Excavation shall be done manually by making trenches diagonally to pile cap
34、 to a depth around 2.0m. Excavated earth shall be stored 1m away from the size of the pile cap/pier location. Utilities passing within the pile cap/ pier layout can be located by manual excavation. The crust of the existing road shall be excavated using jack hammer, driven by diesel operated air com
35、pressor. Extra care shall be taken while excavating near the utility location.6.7 Excavation below ground level:Once the existing road has been excavated the remaining depth of trial pit shall be excavated using shovels, pickaxe and spades. If the soil is of sliding nature suitable slope/benching wi
36、ll be provided. The trial at pit first shall be excavated up to a depth of 1.2m.Extra care like shoring (detailed procedure mentioned below), battering or other means to support the pit shall be taken while removing the soil near the utilities after excavating to a depth of 2.0 m, the trail pit will
37、 be again checked manually for pipes/cables. If utility is identified then the pit will be excavated to required depth manually. If not, the trail pit will be terminated at 2.0m depth. The utilities found in the trial pit shall be protected by steel boards or other suitable means as per the utility
38、authority. In case of accidental damage to the utility, it should be immediately informed to the concern authorities of utility and client.6.8 Shoring Bracing or shoring of trenches shall be carried along with the excavations. Trenches 6.56 feet (2 meters) or deeper must be shored or sloped back to
39、the angle of repose. Any excavation in unstable ground will require shoring or sloping. An adequate supply of materials such as timbers, trench sheets & props with which to shore the sites of excavation must be delivered to the site before starting excavation. Material used for sheeting, shoring or
40、bracing must be of good condition. Timbers must be sound, free of large knots and of appropriate dimensions. Shoring with GI sheets shall be firmly supported by steel/ scaffold pipes with spacing of 4 ft in horizontal & vertical direction with cross bracing & shall be suitable clamped. Supporting sy
41、stems; i.e., piling, cribbing, shoring, etc., shall be designed to meet accepted engineering requirements. When tie rods are used to restrain the top of sheeting or other retaining systems, the rods shall be securely anchored well back of the angle of repose. 6.9 Recording of utilities in trail pit:
42、Once the excavation is completed, all the utilities shall be recorded in respect of the direction of the passing and its depth from road level/ground level in coordination with client representatives. A layout drawing of utilities present in the location shall be prepared with coordinates for each l
43、ocation and signed by both Contractor and Client representative for future reference. The concern authorities of respective utilities shall also be informed for further action.6.10 Backfilling of Trail pit:Once all the utilities are identified the trial pit shall be backfilled with same excavated ma
44、terial and compacted. 7.0 RECORDSAfter identification of all utilities, detailed signed sketch with coordinates shall be submitted to DMRC with photographs.8.0 SAFETY, HEALTH AND ENVIRONMENT: Working area shall be barricaded and display boards shall be provided Sufficient Lighting shall be provided
45、in the working zone Safety stewards shall be engaged for monitoring to avoid unsafe conditions and unsafe acts All the staff and workmen shall be provided with personal protective equipment like safety helmets, safety hand gloves, safety shoes, safety goggles, retro reflective jackets etc. All the p
46、ersons involved shall be given the task briefing before start of the excavation activity. First aid box with medicines shall be made available at the site office No stranger shall be allowed in the vicinity of the working area.9.0 EMERGENCY PROCEDURE FOR ACCIDENTAL DAMAGE TO GAS PIPELINE, PETROLEUM
47、PIPELINE OR ANY OTHER CRITICAL UTILITY Dial Before Dig Always make sure that there are no gas / water /chemical pipelines etc. underground the area where planning to dig. Digging or running heavy equipment can damage underground lines. Even minor excavations can damage gas pipelines and can cause fi
48、re. Dial the concerned utility emergency number for confirmation and clearance. Emergency Procedure in case of accidental damage Cordon off and evacuate the area to a safe place. Call the utility emergency number (Gas, Electricity, water etc.) and then notify local emergency services (Fire etc.). Fo
49、r example, call IGL emergency no. for any damage to gas pipeline. Stay upwind of any suspected leak. DO NOT operate machines, mobile phones, or any electrical items that may generate spark in the area. Prohibit smoking in the area Keep people and traffic away from the accidental damage area PROHIBIT
50、 the operation of machinery 10.0 SHE RISK ASSESSMENTName of the ProjectReference NoActivities Covered:Utility IdentificationDate of Risk AssessmentDate of Next Risk Review13/12/201913/01/2020SHE Risk Assessment LeaderSHE Risk Assessment Team MembersRisk Assessment LeaderReviewed ByApproved ByNameDat
51、e13/12/201913/12/201913/12/2019SignatureIMPACTValueImpact descriptionProbability Descriptions12345Result of Hazard to PersonnelResult of Hazard to Assets / ProgressStatusDescriptionPROBABILITY1LM5Single or multiple fatalityCatastrophic Damages, Critical DelayVery Much likelyHappens several times per
52、 year in a construction site2OE4Serious injury requiring hospitalizationMajor Damages, Unemployable due to illnessMost likelyHappens several times per year in our IC3WDH3Lost Time InjurySerious Damage, intense health effectLikelyIncident occurred in our Company4II2Injury requiring Medical Treatment but no
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 北京高考语文三年模拟真题(21-23年)知识点汇编-文言文阅读
- 2024年公益劳动服务基地共建协议书
- 废品收购合同格式
- 住房维修工程合同样本
- 工业区土地租赁合同参考
- 八年级语文上册第二单元整体公开课一等奖创新教学设计
- 第24课《寓言四则》公开课一等奖创新教学设计 统编版语文七年级上册
- 部编版语文八年级上册 12 与朱元思书 公开课一等奖创新教案(表格式)
- 婚外情离婚协议书的法律解释
- 手机合作框架协议新模板
- DB52T 1041-2015 贵州省红粘土和高液限土路基设计与施工技术规范
- 先天性甲状腺功能减退症研究白皮书
- 绘本成语故事:四面楚歌
- 孩子磨蹭和拖拉怎么办
- 招投标兵法-控标文件撰写技巧指导课件
- 特种作业安全培训登高作业
- 配网工程监理管理要点-
- 儿童性发展与性教育-北京师范大学中国大学mooc课后章节答案期末考试题库2023年
- 卵巢癌(腹腔镜)临床路径
- 儿童体育锻炼安全须知课件PPT【内容完整】
- 施工企业成本控制讲课稿
评论
0/150
提交评论