




已阅读5页,还剩1页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
OPT-C200Product SpecificationShanghai Optech Science and Technology Co.LTDCatalogue 1.Product configuration- 3 -2.Sample specification- 4 -3.Equipment support requirements- 5 -4.The warranty for the equipment- 6 -5.Service- 6 -6.Training- 7 -7.Documents attached- 7 -OPT-C200 is a product of Shanghai Optech Science and Technology Co.LTD by applying electroluminescent principle for the detection of internal defects in solar cells. This equipment gives the opportunity to analysis the EL image to control the choice of material better and to detect the problems coming from the process of production of solar cell, It is a necessary equipment for solar cell chips and components manufacturers.OPT-C200 test sample is solar cell chips, the chip must be faced up to be stacked in the test box during the process. 1.Product configurationSubsystemconfiguration The loading system- Using two robots during sample mounting process,every sample mounting box can load five hundreds solar cell chips.- There are six sample taking boxes in the finishing module,defect types and defect priority can be defined by user, every catching box can load two hundreds solar cell chips- A variety of cell types test match 125125 156156 (gate 2, 3 grid, other)The standard configuration Catching system- A group of six catching boxesOptionalImaging system- Using high resolution, high sensitivity, near infrared camera - Use SONY chips- Maintain Room temperature 30 by refrigeration - Exposure time 1-10s adjustable - Resolution:1.4MThe standard configuration Human machine interface - Testing mode:it can monitor and count chips during normal producing- Debugging mode:it can monitor every signal and debug robot by itselfThe standard configuration The electric power supply- Adopting dc regulated power supply - DC30V / 10A The standard configuration Image display and analysis- Set up parameter about catching box(defect name、loading warning、decreasing distance for every time)- Toolbox for automatic recognition of defects: Provide information data for different type of defects.- Setup for selective mode: Manual,semi-auto, automatic - Image processing: gain, gray scale, shear, rotate - Search: bar code query, query the date - Other: user-defined The standard configuration The Windows XP operating system The standard configuration size (mm)weight (KG)Test case3100*1200*170015002.Sample specificationEL picture Defects Crack Black cone Black border Broken linesOther performance Content Note productivity(p/h)16001800Sample size (mm)125 125 / 156 156Of monocrystalline/polycrystalline silicon solar cell Breakage rate 0.05%3.Equipment support requirementsRequirements Specifications Space total size (mm)3100*1200*1700power requirements AC220V 15AAir supply requirements 0.60.8MPaNetwork Optional Equipment working environment +15+40( temperature )1075(humidity )Equipment placed environment +5+40(temperature ) 585(humidity )4.The warranty for the equipment - Start time: after the equipment acceptance - Warranty time: one year Note: one year warranty period refer to problems occurred not due to artificial reason and not due to the non-controllable accident (such as earthquake, fire) firmware damage. 5.Service - On-site installation and debugging equipment - Standard installation time: 5 days x 8 hours work time - Phone support: 7 days 24 hours - On-site support (working days) : reach the site within 24 hours (depending on the specific situation) - On-site support (day off), arrived at the scene within 48 hours (depending on the specific situation) - Warranty: in accordance with company standards for service 6.Training - Equipment usage - Fault handling - Equipment maintenance 7.Documents attached u Users manual,including: - Operation process - Ma
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 四川省成都市崇庆中学2024-2025学年初三5月阶段性检测试题语文试题含解析
- 内蒙古化工职业学院《生物工程专业综合实验》2023-2024学年第二学期期末试卷
- 浙江宇翔职业技术学院《机器人技术实践创新》2023-2024学年第二学期期末试卷
- 湛江市年模拟数学试题(二)
- 轮胎仓库消防安全培训
- 2025电子商务运营技术外包服务合同(乙方提供)
- 2025大连市家具销售合同范本
- 2025租赁合同-汽车租赁合同
- 2025标准租赁合同范本全新版
- 2025年广州市房屋租赁合同书范本
- 骨科查体-骨科体格检查-四肢(精制医学)
- CT设备维保项目实施方案
- 约克冷水机组年度维护保养方案
- 医院年度文化建设工作方案范文
- 吊装式风机安装作业指导书
- 物资拆装搬运服务方案
- 高一数学分层训练AB卷(人教A版2019必修第二册)第九章统计(知识通关详解)【单元测试卷】(原卷版+解析)
- 培养自我认知能力-心理健康教案
- 第九届全国大学生测井技能大赛备赛试题库-上(单选题)
- 建筑制图与识图教学课件:第八章 结构施工图
- 《全面风险管理报告》模本-模范本
评论
0/150
提交评论